Home

BARRIER GUARDRAIL INSTALLATION MANUAL

image

Contents

1. EOL 13 H Je IENA TENA HONY LID HL FERATE IL HHL AH 2 N JH THE HNG BOOTY LINDE TO JHL EU Lued READY SET INSTALL Make sure the installation site i5 cleaned of all debris to ensure an adequate access for the installer The client or owner shall advise the installation company of any embedded floor obstacles that may interfere with the floor anchors Carefully inspect all the installation site The guardrail contractor a technician shall inspect the job site prior to the preperation of approval drawings Review caretully all your installation drawings Installation and assembly of guardrails and accessories shall be in accordance with the specification and instructions contained in this manual and installation drawings Any Cogan product requiring modification during installation on site should be approved by a Cogan product engineer ASSEMBLING m REGULAR SECTION nominal rail lenght xD a 2 K M O AA post height g1 2 x7 carriage bolt LIFT OUT SECTION M O AN O EN t MV Q owed O Q 0 o 5 29 B ny gt 29 3 e 2 EK 2 T e 2 a D lt DN AN CORNER carriage bolt ADJUSTMENT CLIP 01 27 1 carriage bolt Z 0 ANCHORING Hammer drill a hole Same nominal diameter and at
2. DARRIER GUARDRAIL INSTALLATION MANUAL www cogan com Copyright October 2008 Cogan Wire and Metal Products Lid All rights reserved Cogan raster LEANER BETTER ANCHOR BOLTS Cogan shall not supply anchor bolts The client or owner shall be responsible tor adequate anchoring conditions and shall be responsible for the installation of adequate anchor bolts All base plates are fabricated with 03 4 holes typically 4 anchor holes per base plate As a minimum Cogan recommends 5 8 X 4 1 2 anchors with a gound level minimum of 2V2 embedment 2 1 2 m n BOLT TIGHTENING Bolts must be installed in properly aligned holes Initially they need only be tightened to the snug tight condition The snug tight condition 5 defined as the tightness that exists when all plies in a joint are in firm contact This may be obtained by the full effort of a man using an ordinary spud wrench To ensure that the correct length of bolt has been used verify that the entire thread of the nut is engaged with the bolt If bolt does not exceed past the face of the nut recheck installation details for type of hardware required Subsequently the bolts should be tightened but not exceed an additional 1 5 turn past the snug A li tight condition This ensures correct bolt tensioning QUALITY ASSURANCE System manufacturer e Established firm with a minimum of O ten years of experience in the design and fabricati
3. LIQONOO 1531 NY XO H3NT TOS1Q 3315 Q31v9nuuo2 E ZE HUM 20 HOIH Zi 3v SUYU OSvne SKS 40 207 BUY 1504 Tv dayna ED LD SALW ISIS TTY ANEITH Asn Medi Ns SE EHI SUN 1 uv TENIS Tum AV S IH SOLO il ANY LXI C r ABOO ANY Th TN 1 1 AN VC IO BHLO BAL 30 kis 3H1 OL HOH Kiel SONNO IIIA TNS Liars LEN HAMAR d r LHAT HL SONIA TeACHdaw 433H1 AG SLIG 1 11 HILA 2 LOM IN313 8N02NI 38 01 SINSINT3 AHY 20 SHILA G ld L N d LSNA MCK ALO OL OU Load S M YL ALY TIE LHL TELS DNILSIX 3 SHOISNSNIO TEAL TTF AdIH3A TWHS HSNO 0 3 1 SNOULIONOO TT313 HLA NOLLVNIIBOO ON aO NOLLYZRAIH JHL SINIOCTTONI SNOTISNSINIO ON S3 LNVO TT HOI T S IM 38 TMHS HSMM SCHONN INST JHL SLLOM LN W SAMFLE APPROVAL DRAWING HONG 2 Te Loe THF ANS 9 21 25 3 7 Nd ONY CONV C3034 38 LENA 51 5 3 1 5 2 115314 TT SIHA JHS AA T31 SEXISM ELF Ve SONSINMOZSH Hye 2 1185307 Rad D00F NO wg OSTOJ AH LESTMA NOLLVINEIDTXXC Wu OL TIO vare aa Gig HOA 30 ALSI S JHL HAA dT3H TIM EWL 1 Y ELSASS TH OTA SHYOIOO SINITTELSNI HdiH F 4 LY LYHL 231 5 EL UR 1551 NK HERAN 0 Hals uz HUA OFF H IH EL IHF SY OTIS xung 40 SOWA Sue 6160 Tri OHYTIO SD TT
4. least as deep as the lenght of anchors N Clean hole with blow out bulb Metal clip when cutting rails ior lenght adjustment 25 6 x4 1 2 min bolts anchors are used 00 for baseplates Drive the hilti bolt in the hole so that at least 6 threads are below the top surface of fixture Then thighten to the recommended torque value to achieve proper anchor setting b NS
5. on of guardra l systems 2 System design e Under the direct supervision of an engineer experienced in the design of guardrails n accordance with NBC AISC and CSA standards listed in 81 3145 2 3 Installation contractor shall have adequate experience in installing Cogan s Guardrail system MATERIALS Finish shall be security yellow applied with an oven cured powder coating process TOOLS REQUIRED FOR INSTALLATION Measuring tape e 15 16 and 3 4 Wrench or sockets Chalk line anchor bolts 2 FT Level preterably magnetic e Miscellaneous extensions Hammer drill with 5 8 drill bit SAMFLE APPROVAL DRAWING A 211 AS ANIVS 40 JC 3NO HIM IY SINSNOdHNOO 3 1 NOISN3NIO 39Ils Lino OO H31N32 OL H31N32 E AN3931 51 3 32 319 3ONVHYSTO NYA ONY 4000 HO ON 3 1 OL 9KNIOHODOY SONIN3dO TTY 40144 TIM NWOOO SOLUM ON HIM 3215 ONIN3dO NI OL ONY Olar 3 38 15 SINSNSH DSYSN 1313 TT 21 3 321 3 O 1313 dA 331030 X 2S SHOHONY SONSHINO23H 31382NO2 54 0007 NO 0354 HOISITIOO AB 03511 NOLLVINHO330 IN 4 HADA 390 4L1343v5 1 23 115113 4T3H TWA 3ONYLISIO H M ZL v Iv VALSAS Te uv SNYOODO N TTELSN Hal F 401003 1v HONOHHL NV348 NC HT000 01 v NYS Sv Ce NOLLVTTELSNI Hao ivHi SUVHLSNONSO SNOL

Download Pdf Manuals

image

Related Search

Related Contents

  ネジ切り機用オイル  Flex GF506D  NAC200  Trisa Electronics Swiss Cross Stone    Aerocool Strike-X Xtreme  concepteur-vendeur de cuisines & rangements  Banner Student / CAPP Handbook / 7.3  Tube compteur GM S  

Copyright © All rights reserved.
Failed to retrieve file