Home

Electric Lock (LM148) Installation Manual

image

Contents

1. Electric Lock LM148 Installation Manual Thank you for purchasing the electric lock for Sliding Gate Operator DSC 600 1000 DSR 600 1000 Once your sliding gate is separated to 2 parts you can use the electric lock to lock the moving part against the standing part with your pleasure Read the manual carefully and completely before you install the electric lock Electric Lock Part List Lock with 5m of power cables Lock Receiver x8 Countersunk head screw M6x10mm Socket cap screw Lock Keys for manual release x4 M6x12mm Important Information 1 Before you install the Electric Lock please be sure the gate is level moves freely and does not bind or block against barriers 2 The lock and receiver could be installed on either slide gate with your pleasure 3 For the Electric Lock to work correctly the gate must close firmly engage the lock catch against the lock receiver Installation Step 1 Disengage the clutch of the operator with the Triangular Key you can moves the gate by hand ensure both two parts of the gate can slide freely during installation of the Electric Lock Step 2 With the gate in the closed position determine the best location for the lock and receiver The lock and the socket of the receiver must be Horizontal Centers aligned with each other The lock and receiver should have a solid surface or tube fence to provide stability Step 3 For Metallic Tube gate if the thickness of the fence post is larger
2. than or equal to 3mm you can threading on the fence post fasten the lock and receiver only use bolts Figure B Without washers and nuts Otherwise drill holes through out the fence post fasten the lock and receiver with bolts lock washers and nuts For Chain Link gate you will need U Bolts saddles lock washers and nuts for the lock and receiver Step 4 Recheck the lock s position and alignment make sure the electric lock to work correctly Step 5 Connect the lock s power cables to the DSR DSC 600 1000 s control board Figure C Note Be sure that the clutch of the operator is engaged before you prepare to activate it Use the Triangular Key Figure A Moving Part Standing Part Countersunk head Countersunk head screw M6x10mm screw M6x10mm Socket cap screw M6x12mm Figure B Figure C CONTROL BOARD JED GILEND GALCiED aF NO

Download Pdf Manuals

image

Related Search

Related Contents

VIE - Etterbeek  DRAG-SPORTSMAN N2O    ACH Users Guide  www.truemfg.com  IPv4-IPv6 Transformer User Manual  Mattress Topper    Ingersoll-Rand PD05P-XXX-XXX-B User's Manual  Lirio by Philips Ceiling light 37593/31/LI  

Copyright © All rights reserved.
Failed to retrieve file