Home

Appendix A: User's Manual for Rural Road Costing Model

image

Contents

1. 25 10 0 10 0 10 0 10 0 10 0 10 0 2 0 2 0 2 0 2 0 2 0 2 0 89 53 89 53 89 53 89 53 89 53 89 53 10 0 10 0 10 0 10 0 10 0 10 0 1 0 1 0 1 0 1 0 1 0 1 0 7 0 7 0 7 0 7 0 7 0 7 0 2 5 2 5 2 5 2 5 2 5 2 5 August 10 2009 VEMAX Management Inc Rural Road Costing User s Manual Appendix A Notice that certain model parameters are reported in bold GREEN font Some of the data obtained during the course of this project were reported on a division specific basis the remaining data on a province wide basis These include the i cut and fill unit cost ii strip depth and iii strip unit cost In practice these parameters account for the bulk of the costs incurred to construct rural roads So variability in these parameters across RM divisions account for the bulk of any differences in road construction costs among the six divisions included here The parameters of Table A 3 parts 1 and 2 require some explanation to avoid any misinterpretation this is particularly important where custom data is used The parameters are e Cross section volume m3 km This is the volume of cut and fill excavation required to construct the road grade over a one kilometre length based on engineering design standards In this case the cross section volume corresponds to a MFA road e Road width m This is the width of the road at grade for the road type in question based on engineering design standards Road width like cross secti
2. For each category of cost cut and fill stripping sub total etc three unique expressions of replacement cost are calculated The first column of results Current replacement cost km summarizes the CRC results by cost category for a single kilometre of MFA roadway The second column of results of Grand Total CRC indicates the percentage of costs accounted for by each cost category In this case we note that Cut and fill cost accounts for the greatest percentage of grand total CRC Table A 2 Summary results for selected parameter values Cut and fill cost 21 081 41 2 Stripping cost 5 827 11 4 Replacement cost 8 364 16 3 Gravel cost 9 035 17 6 Culvert cost 2 460 4 8 Engineering fees 3 274 6 4 Other costs 1 169 2 3 Notice that the summary results computes a Sub total of CRC based on a range of construction activities cut and fill stripping culverts etc The sub total then forms the basis for computing both engineering fees and other costs recall that these cost categories are derived by applying percentage values to the sub total Adding engineering fees and other costs to the sub total provides the Grand total of CRC sought ultimately by RM staff August 10 2009 VEMAX Management Inc Page 4 of 9 Rural Road Costing User s Manual Appendix A 3 3 Custom and Default Data Input Values The results obtained through mod
3. average km haul 50 0 50 0 Approach culvert Culvert supply amp install m 78 25 78 25 Length of culvert m 10 0 10 0 it of culverts per km it km 2 0 2 0 Roadway culvert Culvert supply amp install m 89 53 89 53 Length of culvert m 10 0 10 0 it of culverts per km it km 1 0 1 0 of sub Engineering percent total 7 0 7 0 of sub Other costs percent total 2 5 2 5 Appendix A It is important to note that any user employing the custom data input capability of the model must enter data for each and every data category e g cut and fill unit cost strip depth strip unit cost replace unit cost etc even if this data repeats the default data contained in other columns of the spreadsheet see Part 2 of Table A 3 Failure to do so can lead to erroneous results Part 2 of Table A 3 is presented below As can be seen this part of the table includes the default data reached by VEMAX and Municipal Affairs through the statistical study of data sets pertinent to the six RM divisions of interest Assuming custom input data is not applied by the user of the spreadsheet model the default data set employed for model calculations is contingent on the August 10 2009 VEMAX Management Inc Page 6 of 9 Rural Road Costing User s Manual Appendix A parameter value selected for RM Division number in Table A 1 In this case the value is 3 indicating that the data pertinent to RM division 3 is appli
4. Appendix A User s Manual for Rural Road Costing Model VEMAX Management Inc August 2009 VEMAX a MANAGEMEN Disclaimer Use of the Road Costing Model Significant care must be exercised in using this model in that this model like any other spreadsheet model is only an analytical tool designed for a very specific purpose In particular this model was designed to assist in developing estimates of the historical costs of constructing rural roads in Saskatchewan for the specific purposes of PS 3150 when records of actual historical costs are not available Within the context of PS 3150 it is assumed that actual records of the cost to construct rural roads will be available from 2002 to the present The application of this model is restricted to estimating construction cost for rural roads constructed in Saskatchewan prior to 2002 It should be noted that our research was not exhaustive and there may well be additional information not included in this review which would significantly alter the model results Further the costs of constructing roads are typically site specific and therefore may be highly variable across various locations The default data employed in this model is based on a number of listed sources and may or may not reasonably reflect the experience of individual Rural Municipalities RMs in Saskatchewan As such individual users of this model assume full responsibility to ensure that the data used in the model re
5. The second input RM Division number refers to the RM division to which the RM belongs If custom data is not employed within the model the selection of division number will dictate and select the default data applied in model calculations The default data it should be noted is based on statistical investigation of data obtained by VEMAX and Municipal Affairs for August 10 2009 VEMAX Management Inc Page 2 of 9 Rural Road Costing User s Manual Appendix A the purpose of this study Note that values of 1 2 3 4 5 and 6 are acceptable inputs for this parameter each number corresponding to each of the 6 identified RM divisions The CRC results in BLUE font reported in this table are the estimated cost of road construction in km for the selected input data i e custom input data or default data for the selected RM division for the years 2007 and 2002 respectively Given the rapid rise in road construction costs over this period the 2002 CRC estimate will be substantively lower than the 2007 CRC estimate generated through model data and calculations Of these two results the 2002 CRC dollar figure is the input required for the VEMAX Asset Register system supporting PS 3150 compliance In other words if the road costing model is used to estimate CRC for the Asset Register system the 2002 CRC dollar figure should be entered as the Reproduction Replacement Cost and assigned a Valuation Year of 2002 A
6. asonably represent the circumstances in the RM under study Individual users of this model may choose to substitute certain data elements based on their own knowledge experience or historical observations However it is important to note that any data used whether it is the default data or substituted data must prove acceptable to auditors involved in the PS 3150 process and the responsibility for the input data the model results and the involvement of auditors in the process of estimating historical costs using this model lie with the individual users It should also be noted that this model is intended for the sole purpose of estimating typical construction costs for the following designated roads constructed prior to 2002 i Main Farm Access MFA ii Grid iii Primary Grid and iv Special Roads There may be situations for which the use of this model is inappropriate For example the model is not designed to be used to estimate the construction costs of heavy haul roads structural haul roads structural roads roads with base and sub base or surfaced roads e g surfaced roads in urban areas Again this model should only be used to estimate the replacement cost of the listed designated roads only in the absence of better information e g actual historical cost data Rural Road Costing User s Manual Appendix A 1 Introduction The intent of this brief manual is to introduce and explain the Excel spreadsheet model desi
7. cable for the RM in question This is indicated in Table A 3 by the answer YES under the column heading Division 3 Note that all other divisions list the answer NO to the implied question Use These Values This reflects the internal logic of the spreadsheet model Among the column headings Division 1 Division 2 Division 6 and Custom Input Values shown in Table A 2 above only one may list the answer YES In other words only one set of input data can be used for model calculations So in this case the numbers under the column heading Values of Table A 2 precisely equal the values under the column heading Division 3 of Table A 3 the only data set listing the answer YES Note that all default data sets are listed in GREEN font This is simply a model convention indicating that these are the default data sets pertaining to each RM division Table A 3 Data input values Part 2 Default Values 6 146 6 146 6 146 6 146 6 146 6 146 7 0 7 0 7 0 7 0 7 0 7 0 27 8 27 8 27 8 27 8 27 8 27 8 3 16 3 43 3 43 3 54 3 21 3 43 0 10 0 08 0 08 0 12 0 12 0 10 3 06 3 04 2 62 4 00 3 16 4 18 3 76 3 76 3 76 3 76 3 76 3 76 5 00 5 00 5 00 5 00 5 00 5 00 8 05 8 05 8 05 8 05 8 05 8 05 0 222 0 222 0 222 0 222 0 222 0 222 1 6 1 6 1 6 1 6 1 6 1 6 50 0 50 0 50 0 50 0 50 0 50 0 78 25 78 25 78 25 78 25 18 25 78
8. el calculations rest on both basic parameter inputs as depicted in Table A 1 and a range of data input values As discussed above while default data is provided for each RM division to which any particular RM may belong custom input values can be entered by RM staff and applied to model calculations This provides the flexibility necessary to modify default data for a particular RM should superior data be available Table A 3 illustrates the first half denoted Part 1 of the data input area of the spreadsheet model Part 2 is shown and discussed further below As can be seen this part of the spreadsheet contains 4 columns The column Parameter name simply lists the names of all data input parameters used in model calculations and discussed in detail within the main report of this study The column Unit indicates the relevant unit quantities and or costs of the input parameters The column Value contains the values actually employed in model calculations values listed in bold BLUE font to indicate they are the product of internal model calculations The values placed in this column through model calculations are based on the key parameter values selected in Table A 1 Recall for instance that the parameter value for Use Custom Input Values was 0 indicating that custom input values were not to be used in model calculations This is reflected in the statement NO under the column heading Custo
9. gned to facilitate the calculation of Current Replacement Cost CRC estimates for rural roads of varying type in alternative Rural Municipality RM divisions across the Province of Saskatchewan In actuality there are 3 such models one for each of the road types considered in this study i Main Farm Access RoadCostModel_Aug10_09_MFA_USER xls ii Grid RoadCostModel_Aug10_09_Grid_USER xls and iii Primary Grid RoadCostModel_Aug10_09_PrGrid_USER xls Although differing by certain data elements the three models nonetheless operate identically For this reason the manual will use as its example the spreadsheet model employed to calculate CRC estimates for MFA roadways 2 Model Construction The spreadsheet model itself consists of three individual worksheets e Disclaimer This worksheet contains the disclaimer pertaining to the use of the road costing model It repeats the disclaimer listed above e Assumptions This worksheet lists and describes the assumptions and calculations embedded in the spreadsheet design itself In essence it summarizes much of the information embedded in the main report of this study So it will not be reviewed here e MFA_Data amp Results This worksheet accepts user defined parameter values and data and posts a summary of key model results It is this worksheet that is of principal concern in this manual since it is the user interface applied to estimate CRC e MFA MainCalcs This worksheet is linked t
10. he length of culver required Again this data is required twice since the culvert underlying the main road may be longer than the culvert required for approaches to the main road e of culverts per kilometre km The number of culverts required for each kilometre of road constructed Again this data is required twice since for example a greater number of approach culverts may be required than culverts underlying the main road e Engineering percent The percentage of road construction costs typically attributable to engineering fees e Other costs percent The percentage of road construction costs typically attributable to other costs e g signage low level crossings etc 4 Concluding Remarks This brief manual has illustrated the steps necessary for users to estimate current replacement costs for rural roads through the road costing spreadsheet Recall that there are 3 such spreadsheets one for each road type And although this manual illustrates the function of the MFA version alone the remaining spreadsheet models i e Grid and Primary Grid versions operate identically Only the data employed varies e g cross sectional data August 10 2009 VEMAX Management Inc Page 9 of 9
11. m Input Values of Table A 3 NO in response to the question Use These Values In other words since 0 was selected in Table A 1 the custom input values of Table A 3 will not be used as the values supporting model calculations although coincidentally most of the values match excepting Strip depth and Strip unit cost Whether applied in model calculations or not however it is important to note that all data elements under the column heading Custom Input Values are in RED font As discussed previously this indicates that users are free to enter data within this area this column of the spreadsheet should they choose to do so However it is important to note that any custom data employed must meet the approval of auditors involved in the PS 3150 process August 10 2009 VEMAX Management Inc Page 5 of 9 Rural Road Costing User s Manual Table A 3 Data input values Part 1 Parameters Values and Custom Input Custom Input Values Cross section volume m3 km 6 146 6 146 Road width m 7 0 7 0 Strip width m 27 8 27 8 Cut and fill unit cost m3 3 43 3 43 Strip depth m 0 08 0 10 Strip unit cost m3 2 62 3 26 Replace unit cost m3 3 76 3 76 Gravel lift cm 5 00 5 00 Gravel crush amp stockpile cost m3 8 05 8 05 Gravel haul cost t km haul 0 222 0 222 Mass Volume conversion t m3 1 6 1 6 Gravel haul distance
12. n example of the necessary data entry procedure is provided in Figure A 1 below Asset Listing Municipality Current Year Asset Actual Historical i Year Asset ID Description i AssetClass i Cost i i Road TWP 1 TWP551 MFA RR 55 56 Linear Assets i i 2007 If the road costing model is used to generate an estimated replacement cost for a road the valuation year must be set to 2002 Figure A 1 Entering 2002 CRC estimate within VEMAX Asset Register system Based on these inputs we can now interpret the parameter values within Table A 1 Ata value of 0 the parameter Use Custom Input Values suggests that the user defined custom data will not be used in the CRC calculations Instead default data of some sort will be applied By selecting 3 for RM Division Number the user has decided to apply the default input data associated with RM division 3 Cost calculations will therefore rest on the default data of RM August 10 2009 VEMAX Management Inc Page 3 of 9 Rural Road Costing User s Manual Appendix A division 3 In this case the estimated CRC for 2007 is 51 210 per kilometre of MFA roadway and the estimated CRC for 2002 is therefore 23 797 per kilometre of MFA roadway Recall that the 2002 figure is the one required for the VEMAX Asset Register system 3 2 Summary Results Table A 2 lists the summary results corresponding to the selected parameter values of Table A 1 above
13. o the data of MFA Data amp Results in order to conduct model calculations and derive the desired results This worksheet should not be modified in any way by users The nature of the calculations themselves are reviewed in detail within the main report of this study and will not be repeated here It is worth noting that excepting cells which require input from model users all worksheets are protected from inadvertent data entry In other words the contents of every cell in all worksheets Note that replacement costs for Special Roads can be estimated using either the Grid or Primary Grid spreadsheets Special Roads intended to accommodate less than 150 vehicles per day were designed to Grid standards Special roads intended to accommodate more than 150 vehicles per day were designed to Primary Grid standards For more detail see the cross section drawings within the worksheet Assumptions contained in each of the road costing spreadsheets August 10 2009 VEMAX Management Inc Page 1 of 9 Rural Road Costing User s Manual Appendix A may not be overwritten by model users unless the protection is explicitly disabled by the users The only exceptions involve the data input areas This has been designed into the model to avoid accidental changes in the model which could lead to errors or omissions in the results 3 Model Use As mentioned above the principal concern of this manual involves the data and summary res
14. on volume varies by road type e Strip width m Before cut and fill excavation can begin the topsoil must be stripped The total strip width includes the width of the road plus width of the ditch cuts on either side of the road Again this varies by road type e Cut and fill unit cost m3 The unit cost of cut and fill excavation e Strip depth m The depth of topsoil stripped e Strip unit cost m3 The unit cost of topsoil stripping e Replace unit cost m3 The unit cost of replacing the topsoil stripped following the construction of the road grade e Gravel lift cm The lift of gravel applied to the road surface e Gravel crush and stockpile cost m3 The unit cost of gravel material e Gravel haul cost t km haul The unit cost of gravel hauling per tonne kilometre haul distance e Mass volume conversion t m3 Density of gravel hauled required to convert t km to m3 e Gravel haul distance km Distance that gravel is hauled from pit to project site for road construction August 10 2009 VEMAX Management Inc Page 8 of 9 Rural Road Costing User s Manual Appendix A e Culvert supply and install m The supply and install cost for culverts Note that this data is required twice Once for approach culverts and second for culverts underlying the main road These costs need not be the same since for instance culverts underlying the main road may be of greater diameter e Length of culvert m T
15. ults worksheet of the overall spreadsheet model The data and results worksheet itself MFA_Data amp Results consists of three key areas of concern i key model parameters ii summary results and iii input and default model data Each is discussed in turn below 3 1 Model Parameters and Current Replacement Cost Results Table A 1 pictures the key parameters requiring selection by model users Note that the parameter values requiring entry are listed in RED font This is a standard feature of the spreadsheet model areas and cells accepting input are in RED font All other spreadsheet areas and cells should be left undisturbed by users Table A 1 Key input parameters and current replacement cost CRC results Use Custom Input Values 0 RM Division number 3 2007 Current Replacement Cost km 2002 Current Replacement Cost km The first input Use Custom Input Values refers to custom data that RM staff may prefer to employ since they better represent unit costs and other data of relevance to their particular RM and experience If users select a value of 1 then the custom defined values will be used Note that the topic of custom values will be discussed later in this manual If instead a value of 0 is selected then default data of some sort contingent on the selection of RM division number will be employed within model calculations

Download Pdf Manuals

image

Related Search

Related Contents

User Manual - Ecommerce software  取扱説明書 - 株式会社G.REST  Bienvenido al Manual de NetTutor  Altec Lansing LEF-3L User's Manual  GE Measurement & Control  Blog_ mode d`emploi  KOHLER K-1162-G-0 Installation Guide      Wind Crest VEN060I User's Manual  

Copyright © All rights reserved.