Home

Condair Dual 2 Installation and Operating Instructions

image

Contents

1. 0 12 3 4 5 6 7 8 9 101512 13 4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 50 Z ae 45 40 2 o P e N B rim 35 7 i 2 a ais 3 3 30 E SCH 2 ER E Ka by E vr q 25 E 25 2 amp sh 5 ge 5 7 2 4 20 2 je ei E 20 Af al 2 lt g ao 7 lt 2 2 Z rF2 T2 y s om 6 5 15 43 02 e 5 A ev s F e C 10 LoS EI K l 22 X 3 7 S Ka x 5 D o 0 o a 5 5 D ag S Condition of outside air rF0 T0 10 C 90 rh a Condition before humidifier rF1 T1 35 C 4 rh 1 34 1 36 1 38 o Condition after humidifier rF2 T2 17 5 C 65 rh 73 Incoming air Circulating air Outgoing air 74 Basic diagram of an enthalpy control Remark If the temperature is changed at the preheater the humidification of the air which can be reached by the humidifier must be adapted to the new temperature before the humidification unit When adapting make sure the efficiency factor of the humidifier system n is not exceeded according the following formula Preheater Hybrid humidifier Condair Dual Mixed air Exhaust air L 3 Q N S 2 g
2. Installation of the nozzle system The components of the nozzle system are supplied separately and must be assembled at the installation site The following sections explain the general installation of the nozzle system Detailed information dimensions fastening points etc can be found in the installation drawing supplied with your particular system Important The dimensions listed in the installation drawing are manda tory The nozzle system comprises the following main components A Two fixing straps for fixing the vertical mounting rails to the duct wall B Two or more horizontal mounting rails C Two vertical mounting rails which are fixed to the duct wall with the fixing straps Anumber of connection plates for fixing the horizontal mount ing rails to the vertical mounting rails E One or more nozzle grids with inserted nozzles F Four or six grid bearings per nozzle grid G Two or three housing entries First fix the two vertical mounting rails on both sides in the duct see installation drawing for positioning and fixing Important Use exclusively the fixing materials provided If this is not possible in your case make absolutely sure that the fixing holes are correctly sealed from the inside of the duct with suitable components 03 3 mm
3. 78 Capacity of unit l h 20 30 40 60 80 100 120 125 140 160 180 200 220 Type of silver ionization 30 30 60 60 125 1 125 125 1 125 250 250 250 250 250 cartridge Hygieneplus lonization current mA 1 0 10 1 2 1 8 24 30 36 38142 48 54 58 64 Capacity counter Ah 3 6 3 6 7 4 7 4 14 6 14 6 14 6 14 6 29 2 29 2 29 2 29 2 29 2 Capacity of unit l h 240 250 260 280 300 320 340 360 380 400 420 440 460 Type of silver ionization 250 250 500 500 500 500 500 500 500 500 500 500 500 cartridge Hygieneplus lonization current mA 7 0 74 76 82 88 94 10 0 10 6 11 2 11 8 12 4 12 8 13 4 Capacity counter Ah 29 2 29 2 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 Capacity of unit l h 480 500 550 600 650 700 750 800 850 900 950 1000 Type of silver ionization 500 500 500 500 500 500 500 500 500 500 500 500 cartridge Hygieneplus lonization current mA 14 0 14 6 16 2 17 6 19 0 20 4 22 0 23 4 24 8 26 4 27 8 29 2 Capacity counter Ah 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 58 4 Axair Ltd 2005 Printed in Switzerland Technical data subject to modification Consulting Sales and Servi
4. Mark the positions of the holes for the fixing straps on the duct wall and drill the 23 3 mm holes Important Make sure that the fixing holes in the left and right duct wall are exactly aligned opposite each other and that the axes of the upper and lower fixing holes are at right angles to the ceiling of the duct Then fix the vertical mounting rails to the wall of the duct with the fixing straps and screws provided Fix the connector plates to the vertical mounting rails using the screws and sliding nuts provided Fix the horizontal mounting rails to the connector plates using the screws and sliding nuts provided 4 In ducts being wider than 2m connect all the adiacently positioned horizontal mounting rails at the centre if possible using the profiled screwed connector s provided mount the vertical strut s between the horizontal mounting rails at the specified position mount the supplied ceiling attachment and bottom support to the duct ceiling and the duct bottom using the self tapping screws provided first drill the 03 3 mm holes 17 Y6 red Y7 blue Y8 yellow 18 Fix the grid bearings to the prescribed positions on the horizontal mounting rails using the screws and sliding nuts provided Mount bearing sleeve A and th
5. Cause Remedy If the internal controller is activated and the humidity signal of the connected humidity sensor is below 5 for more than 10 minutes the connection to the sensor is interrupted or the humidity sensor is defective The internal controller is activated although an external controller is connected Check connection cable humidity sensor and control signal setting or replace humidity sensor Disable the internal controller if an external controller is connected 67 7 2 Failures The following table presents failures that do not trigger an error message together with indications on their cause and notes on how to eliminate the sources of trouble Failure Cause Remedy Residual water in the section of the duct outside the water tub Sealing elements improperly installed or defective Post evaporation elements improperly installed or ceramic plates broken Air velocity in the duct is too high systems without booster gt 2 5 m s systems with booster gt 4 m s Mount sealing elements correctly or replace as required Mount ceramic plates correctly or replace as required Reduce air velocity in the duct if possible or install booster con sult your Condair supplier before hand Condair Dual humidifies perma nently Nominal value of humidity is too high Ambient humidity very low The internal sensor of the control unit is active although an ext
6. q n u Hybrid Humidifier Condair Dual 2 Installation and Operating Instructions lt e Ge N z Ww Spy o W 2 lt Eet tee Ae A SOSO NJ 9090611 Contents 1 1 1 2 1 3 2 1 2 2 3 1 3 2 3 3 3 4 4 1 4 2 4 2 1 4 2 2 4 3 4 4 4 5 4 6 4 7 5 1 5 2 5 3 5 4 5 5 6 1 6 2 6 3 6 3 1 6 3 2 6 4 6 5 7 1 7 2 7 3 9 1 9 1 1 9 1 2 9 2 9 3 9 4 Introduction To the very beginning Notes on the installation and operating instructions Spezialwerkzeug Important notes Correct use for intended purpose Safety instructions Overview of the Condair Dual Hybrid Humidifier Basic design of the Condair Dual Hybrid Humidifier Function Scope of versions Options Installation and first time commissioning Safety notes for installation and commissioning Installation of the humidification unit Installation of the nozzle system Installation of the post evaporation unit Installation of the central unit Installation of the components of the decentralized system Water installation Electrical installation First time commissioning Operation Introduction Commissioning for daily operation Taking the humidifier out of operation Inquiring operating parameters Setting up operating parameters Maintenance and replacement of parts Maintenance safety instructions Important notes on maintenance Removal and installation of
7. Current of silver ionization Actual current of silver ionization in mA Note This parameter is available only if the silver ionization is active Remaining capacity of silver electrode Remaining capacity of silver electrode in Ah Note This parameter is available only if the silver ionization is active Working hour meter Working hours elapsed since first time commissioning of the Condair Dual Remaining time until maintenance is due Hours remaining until next maintenance is to be carried out Note The time displayed refers to 100 humidification output If current operation requires less output the maintenance intervals may be extended accordingly Regardless of the remaining time display a complete maintenance has to be carried out once a year see chapter 6 Internal controller Internal controller activated on or deactivated off Note The internal controller may be activated from within the display level see chapter 5 5 Nominal value of relative humidity Preset nominal value of relative humidity in rh Note This parameter is available only if the internal controller is active Proportional range of the internal controller Preset proportional range P range of the internal controller in Note This parameter is available only if the internal controller is
8. Water drain connector drain valve hose stem outer 016 mm or G 1 2 outside thread 2409 Water connector of humidifier plug in system 210 mm Nozzle pressure 4 10bar Nozzle sizes 4 2 46 I h 3 10 up 4 0 I h 5 0 Monitoring of fully demineralized water min pressure max pressure conductance temperature of booster pump Admissible ambient temperature 2 1 40 C Admissible ambient humidity 2 max 75 rh non condensing Test and conformity certificates CE label System of protection control IP 31 central unit IP 30 central unit in protective cabinet Z409 IP 54 Options remote operating and fault indication Z401 or Z4015 wire breakage safe RS 232 485 interface Z404 Z405 casing central unit Z408 central unit in protective cabinet Z409 1 The nominal control accuracy may not always be available because various factors temperature control water recycling flap valve systems etc may affect the accuracy 2 Control and central unit 70 H 9 1 9 1 1 Appendix Notes on humidity control Notes on humidity control with the internal PI controller The internal PI controller of the Condair Dual Hybrid Humidifier The controller built into the Condair Dual Hybrid Humidifier is a so called PI controller proportional integral controller The PI controller interprets the analog signal as the actual
9. 28 16 From the back hang all booster elements to the upper cross arm Use the thread plates and the M6x12 mm hexagon socket screws to fix the remaining brackets 2 or 4 to the booster elements tighten the screws by hand only to allow later adjustment of the brackets Couple all booster elements at the top and bottom with a connector piece and two hexagon socket screws M6x12 mm as well as with the short snap lashes attach right below the long snap lashes Important When mounting the lower connector piece s the respec tive drain off sheet s must be removed again Align the Booster centrally at equal distance to the left and the right duct walls Finally push the booster elements up to a distance of 65 mm below the duct roof then tighten the screws of the brackets 17 Sealalljunctions between the vertical sections and the drain off sheets with sealing compound Install the ceramic plates Note The installation of the ceramic plates takes place from the bottom to the top and always starts with the two rear rows to the very left and right viewed in flow direction Then all other rear rows if present are installed and finally all front rows are mounted 18 Insert the upper and lower plate sealings into the corresponding slots of the vertical sections and push them to the top
10. 32 Install the upper flow sheets 25 Cut the supplied rubber gasket band into pieces of the appropriate length Use the supplied hexagon socket screws M6x12 mm and the washers to fix the upper flow sheets and the rubber gaskets to the brackets already installed Important Between the vertical sections with system specific inter stice the upper flow sheet marked with a V must be used Install the lateral flow sheets fil 26 Fixthe tvvo part lateralflovv sheets to the ductvvall using the self tapping screws provided drill holes 93 3 mm before First mount the lower part of the lateral flow sheets then the upper one the upper part must overlap the lower one 7 Important Make sure the lateralflovv sheets are flush with the duct roof and the duct floor Important Make sure the lateral flow sheets overlap the vertical sections by a sufficient amount Important Make sure the lateral flow sheets are tightly screwed at every oblong hole Finally seal the iunctions betvveen the lateral flovv sheets and the duct walls with sealing compound 33 34 Install the tub seal 27 Cutthe whole length ofthe tub sealing to the appropriate width width distance between lower edge of drain off sheet and bottom of duct plus 30 mm Then starting on one side of the duct push the tub seal underneath the lashes of the
11. ditions meet the respective specifications see chapter 7 Technical data ambient conditions Caution Fully demineralized water is aggressive For this reason permeate lines and components located close to the humidification unit must be made of corrosion proof steel minimum requirements accord ing to DIN 1 4301 or plastic If it can be assumed that safe operation is no longer possible the Condair Dual must be taken out of service and secured against un intentional operation Safe operation may be affected in the following events components of the Condair Dual are damaged the Condair Dual does not work correctly connectors and lines are leaking components of the Condair Dual are worn or badly soiled the post evaporation elements are not correctly positioned locked or sealed after longtime storage under unfavorable conditions after transportation under unfavorable conditions Use only genuine accessories and spare parts available from your Condair supplier The Condair Dual Hybrid Humidifier and the optional accessories must not be modified in any way without the written consent of Axair Ltd 3 3 1 Q GQ N oN 11 12 Overview of the Condair Dual Hybrid Humidifier Basic design of the Condair Dual Hybrid Humidifier 22 Control unit Power supply Control or sensor signal input Connector for external safety circu
12. message appears or at least once a year the implementation of a total hygiene service is obligatory Resetting the Maintenance due message Upon completion of the total hygiene service the Maintenance due message may be reset as follows Make sure the control unit is switched off then press and hold any key while switching the control unit on Keep the key depressed approx 5 seconds until the red error LED lights up briefly approx 1 second Item Work to be carried out Nozzle system Switch on the individual spray circuits manually and check the spray pattern of the spray nozzles spray cone Optimum 90 60 permissible Remove spray nozzles with a poor spray pattern see Chapter 6 3 2 and clean them in an ultrasonic bath Check hoses and connections for sealing if necessary replace defective components Check spray nozzles for secure seating Slightly tighten loose jets with open end spanner width 16 mm 58 continued on next page Item Work to be carried out Post evaporation unit Check ceramic plates for breakage Damaged plates should be replaced see Chapter 6 3 1 Check ceramic plates for soiling Severely soiled plates should be replaced Note A grey discoloration of the ceramic plates is normal This is due to deposits from the silver ionization Ifthe ceramic plates show severe deposits of dust the ventilation system air filter should be checked
13. 518 2 o 01 5 DAS gt ES i E x 215 515 SE x Y Y 5 si JE Old L Position encoder enthalpy control 3 2 5 2 g s o o Room x2 x1 100 n xS x1 9 2 Declaration of conformity We herewith declare under our sole responsibility that the Condair Dual 2 Hybrid Humidifiers of the CD ZE and CD DZ series comply with the standards on electromagnetic compatibility according to EN50082 2 1995 and prEN 50082 2 1996 Axair Ltd Pfaffikon December 22 1997 9 3 Commissioning protocol Maintenance record On the following two page you will find the Commissioning protocol holding the current operating parameters the Maintenance record specimen to be copied 75 240 X901q010Ul ye den 015 urep 1ubl H S9 0N 040 GA ulelp Jo J001d ye y30 qo0uolN 410010 su0 193uu03 9 Zz0N y 6y 8A MPA Ae de Jo yndyng y 6y ZA guds Jo yndyng y 6y 9A MPA Ae de Jo indino J001d ye l duind 19 soog 210010 5101094102 SOH ui9 sri yw agouugd lu ST 9ue19npuo3 a1gauug4 peq dwind u u peoy lin 16 inss ld Heql dund o m mu ye 1nss id DupuOoM UO1S A zleur lx lpus lul duind 19 s00g 1ndui Go
14. maximum hygrostat flow control etc is interrupted the opposite message appears and the Error and Humidifi cation on indicators light up intermittently If a fault is detected during operation a corresponding error alertis trigger ed i e the error indicator either flashes alarm or stays on error anda corresponding message appears on the display also see chapter 7 1 If maintenance is due or the silver ionization electrodes require replace ment the corresponding message and the current status display appear intermittently Maintenance due Silver ionization electrodes worn Please consult chapter 6 for further information Notes on operation Make sure the minimum working pressure never drops below 2 bar during operation In case the working pressure drops below the limit check the reverse osmosis system and the fully demineralized water supply In standby mode the drain valve is opened for approximately 10 seconds every 24 hours thus flushing the permeate supply conduit for the sake of hygiene Humidification is not activated if the humidification request is below 20 96 2 valve connector box or 15 3 valve connector box respec tively 5 3 Taking the humidifier out of operation To take the Condair Dual Hybrid Humidifier out of operation e g for main tenance purposes proceed as follows Set the power switch to O Disconnect the control unit from the mains
15. proportional to the bandwidth of the P range For further information please refer to chapter 9 1 ntegral time of the internal PI controller Determines the integral time of the internal PI controller in minutes Note This parameter is available only if the internal PI controller is active Factory setting 15 minutes Optional settings off no integral time 2 100 minutes Note The integral time setting determines the period allovved to reach the nominal humidity Setting the integral time to the optimal value prevents the control characteristic from overshooting and at the same time balances the permanent deviation caused by the proportional range setting For further information please refer to chapter 9 1 6 6 1 6 2 Maintenance and replacement of parts Maintenance safety instructions A All maintenance work must be performed only by adequately qualified and trained personnel familiar with the dangers involved Ascertaining the qualifications is the customer s responsibility Instructions and details concerning the maintenance work must be observed and adhered to vvithout fail Only the type of maintenance work outlined in this documentation must be carried out Use original Condair spare parts exclusively to replace defective parts Before maintenance is initiated the hybrid humidifier must be tak en out of operation in accordance with instructions in chapter 5 3 and protected aga
16. Change values in small steps only Always modify the P range first Never alter the P Range and integral time settings simultaneously 71 p Dichte Density Densit kg m3 72 h x diagram 8 9 S S S 8 S s 8 P bar 105 Pa Z Z ci 1 N m Si 0 5 10 15 20 25 30 35 40 mbar Py fore k x Trockene Luft Dry Air Air sec g kg 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Y 50 a Q 1 10 Ge 45 SY 1 12 E 40 SY e __ Ls Wie LZ 3000 1 14 g 1 D l Ma LA 2999 2 35 ale L 2800 2 ge 3 Cl 116 6 RI T 2700 30 m A P 5 o Si 2600 4 e 3 de z 118 25 o d 2500 p 5 25 ee A 2 w ai ee 2 Lat oN 5 2 2 40 1 20 6 e 20 e ef kcal E 20 E al ca E Vi d 2 e 2 a Q W S s aoe 3 s fN x lt r 20 15 N ao 0 gt lt S 5 E E er lt Ae 5 sQ 124 lt 15 5 10 0 E ap 1 26 5 x 5 Ka a lt PN 5 lt x 5 KH 128 8 e 10 0 0 T 1 30 4 condair N 5 2 O 5 1 34 10 h x Diagramm f r feuchte Luft 142 h x Diagram for dir humidify h x Diagramme pour
17. and 2 blind nuts M6 to mount the silver ionization unit directly to the ventilation duct monoblock or to a frame Before mounting the silver ionization unit read the notes on correct loca tion and make sure the length of the water hoses to the connector box and the booster pump is as short as possible max 10 m Installation of the booster pump At the factory the booster pump is fastened to a mounting plate and is therefore ready to be connected as supplied Use the provided fastening set 4 round head wood screws o8x50 mm and 4 plugs 010 mm to fasten the mounting plate to a wall a pillar or another suitable surface Before mounting the booster pump read the notes on correct location and make sure the length of the water hoses between the pump and the connector box is as short as possible max 20 m Installation of the control unit Use the provided fastening material 2 pan head screws M5x35 mm 1 pan head screw M5x25mm 3 spring washers M5 and 3 blind nuts M5 to mount the control unit directly to the ventilation duct monoblock or to a frame Place the control unit close to the humidification unit Before mounting the control unit read the notes on correct location and make sure the length of the electrical wiring to the connector box the booster pump and the silver ionization unit is as short as possible 37 4 5 Water installation Water installation of the centralized system The following illustration shows t
18. as possible max 10 m Install the central unit in a freely accessible location providing enough space for operation and maintenance 0 5 m minimum clearance around the central unit distance to floor at least 1 m Installation of the central unit Use the provided fastening set to mount the central unit to the wall or to the monobloc If for some special reasons an installation with the supplied fastening material is not feasible choose a type of installation that is equally stable Important Use a level for accurate horizontal adjustment 010 mm 200 ram 35 4 4 36 Mounting profiles for direct fastening to the monobloc Installation of the components of the decentralized system Ss General notes on location and fastening Locate the system components so that the distance between particular components is as short as possible and the maximum admissible distance is not exceeded they arefreely accessible vvith enough space for operation and main tenance 0 5 m minimum clearance around the components distance to floor at least 1 m The booster pump the silver ionization unit and the connector box must be installed only in a location having a vvater drain on the floor If for any reason this is not possible it is mandatory to provide water sensors to safely interrupt vvater supply in case of leakage Further more install the components in a location that prevents damage to materi
19. components Removal and installation of ceramic plates Removal and installation of the spray nozzles Replacement of silver ionization Hygieneplus Replacement of the control unit fuses What if Error messages Failures Instructions for fault elimination Specifications ambient conditions Appendix Notes on humidity control Notes on humidity control with the internal PI controller Enthalpy control for Condair Dual Declaration of conformity Commissioning protocol Maintenance record Setup table silver ionization Hygieneplus oo O o Oo of HL G F go o zad E O Q oo A O BD N O O O o O O O O O O1 UO OQ N NN o O O O oon ul N A N 00 o 04 1 1 1 1 2 Introduction To the very beginning VVe thank you for having purchased the Condair Dual 2 Hybrid Humidifier abbreviated as Condair Dual The Condair Dual Hybrid Humidifier is designed for use in ventilation devices and ducts t combines the humidification technologies atomiza tion and evaporation Due to its modular design the Condair Dual covers a wide range of power requirements The Condair Dual Hybrid Humidifier incorporates the latest technical ad vances and meets all recognized safety standards Nevertheless improp er use may result in danger to the user or third parties and or impairment of the installation or other material assets All
20. for cracks Cleanliness and filter quality min F6 or EU6 Check the supporting structure the ceramic plates the plate sealings the flow sheets and the drain off sheets for correct assembly and tight seating of screw connections If necessary install faulty components correctly see Chapter 4 2 2 and tighten loose screw connections Central unit Silver ionization Connection box Booster pump Check the water filter in the feed line and clean if necessary Silver ionization see detailed information in chapter 6 4 Check the hoses and connections on the booster pump the silver ionization and the connection box for sealing Replace defective components where necessary Humidifier housing Water container Check the water container behind the post evaporation unit for collection of residual water In the event of a substantial amount of residual water check the water drain and post evaporation unit Please note drops of water and small pools of water in the water tray behind the post evaporation unit are as a rule caused by the system Clean the water container and humidifier housing also clean behind the post evaporation unit with a combined detergent and disinfectant e g Almu 18 available from your Condair dealer or clean with a similar medium Finally rinse all components with hygienically pure water humidifier water and rub dry Electrical installation Inspect connections and cables Arrang
21. humidity value captured by a sensor and controls the humidification capacity via the proportional range and inte gral time parameters Proportional range P range The proportional range is used to smoothen the control characteristic Thelargerthe selected P range the smootherthe control characteristic will be However this results in a permanent control deviation from the preset nominal value proportional to the bandvvidth of the P range Note Minor deviations may be compensated by optimal coordination vvith the integral time parameter Integral time The integral time setting determines the period allowed to balance the deviation of the control due to the P range and to reach the nominal value The greater the integral time setting the longer it takes to reach the nominal humidity providing better accuracy The smaller the integral time value the faster the nominal humidity will be reached reduced control accuracy Controller settings No general advice can be given on how to adjust the built in PI controller of the Condair Dual Hybrid Humidifier P range and integral time settings because every control distance distance between humidifier and measur ing spot presents a particular degree of difficulty in terms of adjustment However the following rules may be used as a guideline when adjusting the PI controller Always start from the factory settings Incase control requires fine tuning e
22. in case the humidification capacity of the hybrid humidifier exceeds the current humidification requirements of the facility Controller function Activation on or deactivation off of the internal PI controller Factory setting off Optional settings on PI controller active off PI controller inactive Caution Do not activate the internal controller if an external controller is connected The internal controller interprets the analog signal of the A external controller as the actual humidity value captured by a sensor If the analog signal is 0 in this case the internal controller activates 100 humidification capacity which could lead to excessive humidification Nominal value of relative humidity Setting of the nominal humidity value in rh Note This parameter is available only if the internal PI controller is active Factory setting 45 rh Setting range 10 100 rh 55 56 Proportional range P range of the internal PI controller Sets the proportional range of the internal PI controller in 96 Note This parameter is available only if the internal PI controller is active Factory setting 10 Setting range 4 100 Note The proportional range is used to smoothen the control char acteristic The larger the selected P range the smoother the control characteristic vvill be Hovvever this results in a permanent control deviation
23. is located below the cabinet and covered in front and on both sides by a metal apron The small cabinet contains the connector box the spray valves the drain valve the spray circle drain valves and the water jet pump Both protective cabinets are constructed in accordance with industry standards and comply with pro tection class IP54 External dimensions of large cabinet w x h x d in cm 60 x 60 x 21 External dimensions of small cabinet w x h x d in cm 50 x 30 x 21 13 4 4 1 4 2 14 Installation and first time commissioning Safety notes for installation and commissioning A All installation and commissioning work must be performed only by adequately qualified personnel being familiar with the Condair Dual Hybrid Humidifier Itis the customer s responsibility to ensure suit able qualification Prior to installation work the ventilation system into which the Condair Dual is to be incorporated must be taken out of operation and secured against unintentional start up tis mandatory to observe and comply with the instructions regarding the location and installation of particular components ofthe Condair Dual Hybrid Humidifier see chapters 4 2 through 4 5 Use only the mounting accessories included in the delivery for installing the various system components If for some special reasons an installation with the supplied installation accessories is not feasible choose a type of installation that is equally stabl
24. l humidit de Fair 15 m f r for pour 101 325 kPa 1 38 x 18 Meeresh he Sec level Nivedu de la mer o 2 2 o A Ax 9 I o 2 co 0000 000017 0009 7 0007 vk 9 1 2 p Dichte Densily Densife kg m3 Enthalpy control for Condair Dual For accurate and energy saving air conditioning an enthalpy control is recommended In simple terms enthalpy is the amount of energy of the air in kJ kg With an enthalpy control the air temperature and the air humidity are used to control the preheater in a vvay that the Condair Dual can be exactly and continuously regulated along the adiabatic line to the respec tive outlet conditions rF2 and T2 VVith an enthalpy control a reheater is not needed Important A dew point control which uses the dew point as regulation para meter in conjunction with a preheater and an air humidifier and where the desired air temperature is achieved with a reheater is not suitable If another control system than the enthalpy control should be used please contact your Condair representative Example of an enthalpy control for Condair Dual x Trockene Luft Dry Air Air sec g kg 1 10 1 12 1 14 1 16 1 18 1 20 1 22 1 24 1 26 1 28 1 30 1 32
25. permeate conductance in uS Note If this value is exceeded in operation the drain valve Y5 of the connector box is opened until the conductance of the permeate drops below the given limit value again Spraying capacity of spray valve 1 Nominal spraying capacity of open spray valve 1 Y6 in kg hr at a spraying pressure of approximately 7 bar Spraying capacity of spray valve 2 Nominal spraying capacity of open spray valve 2 Y7 in kg hr at a spraying pressure of approximately 7 bar Spraying capacity of spray valve 3 option Nominal spraying capacity of open spray valve 3 Y8 in kg hr at a spraying pressure of approximately 7 bar Note A nominal spraying capacity value of 0 is displayed if the optional spray valve 3 is not available Starting point of booster pump Starting point of the booster pump in of the maximum humidification request Note This parameter is available only if the control unit is configured to work with an internal booster pump Booster pump on off status while flushing This parameter indicates whether or not the booster pump runs during the flushing cycle of the permeate conduit Note This parameter is available only if the control unit is configured to work with an internal booster pump Silver ionization on off This parameter indicates whether the silver ionization disinfection is activated on or deactivated off
26. tothe upper cross arm Make sure the lovver cross arm is located precisely vertically belovv the upper cross arm 10 Now slide the wall supports of the lower cross arm to the duct wall check the alignment of the supporting construction once again mark and drill the 3 3 mm fixing holes 6 holes per wall support Fix the wall supports to the duct wall using the self tapping screws provided minimum 6 screws per wall support Note If your system has three cross arms repeat steps 9 and 10 for mounting the middle cross arm 23 Mounting and alignment of the vertical sections Use the brackets for the upper flow sheets as D spacers the bracket with system specific width is marked with a V ZZ Drain off RS sheet left Teh Drain off sheet with system specific width marked with a V Drain off sheet right 11 Use the clamping brackets to fix all vertical sections to the cross arms and temporarily align them according to the installation drawing provid ed 5 Note Tighten the clamping brackets only to a point at which the vertical sections can still be moved Important The openings of the sections to the very left and right must face the duct wall Push the vertical section to the very left towards the duct roof until it comes to a stop then align it at a distance of 50 mm parallel to the duct wall Finally fasten the screws of
27. 5 5 68 Failure Cause Remedy Spray valve Y8 option Z407 does not open not even at 100 humidification request Spray valve Y8 defective or not activated in the control system Contact service provider The humidifier is automatically powered down after about one week of operation Ag ionization defective or exhaust ed Capacity counter run out Replace silver ionization cartridge and or reset the capacity counter 7 3 Instructions for fault elimination A When eliminating faults the Condair Dual Hybrid Humidifier must be taken out of operation see chapter 5 3 Danger Make sure the mains supply to the control unit is disconnected check with voltage tester and the shut off valve of the water supply is closed Have faults eliminated by adequately qualified and trained personnel only Malfunctions caused by the electrical installation must be repaired by authorized personnel only Caution Electronic components are very susceptible to electrostatic discharge When carrying out repairs to the control unit appropriate measures ESD protection must be taken to prevent damage to electronic components Malfunction of the booster pump must be remedied by your Condair supplier only 69 8 Specifications ambient conditions Type Capacity in l hr at 7 Type Capacity in Uhr at 7 bar vvater pressure bar vvater pressure Scope of versions in terms of capacity C
28. D ZE DZ 20 20 CD ZE DZ 300 300 CD ZE DZ 40 40 CD ZE DZ 400 400 CD ZE DZ 60 60 CD ZE DZ 500 500 CD ZE DZ 80 80 CD ZE DZ 750 750 CD ZE DZ 100 100 CD ZE DZ 1000 1000 CD ZE DZ 120 120 CD ZE DZ 160 160 CD ZE DZ 200 200 Power consumption 155VA 335 VA with booster pump Mains supply to control unit 200 240 VAC 50 60 Hz Voltage of solenoid valves Y5 Y8 24VDC extra low voltage Number of steps humidity control 3 step 7 step with option 2406 Resolution of humidity control 33 14 2 with option Z406 Control accuracy 1 3 step 10 7 step option Z406 4 Control signals active 0 20 VDC phase control 0 10 VDC 0 8 25VDC 1 5 VDC 0 5 VDC 0 1 VDC 0 20 mA 4 20 mA passive all potentiometric humidity sensors from 1 10kQ Central unit Weight 18 5 kg Z409 39 0 kg 22 7 kg Z409 43 2 kg Dimensions HxVVxD 951 x 693 x 220 mm Z409 600 x 600 x 210 mm and 300 x 500 x 210 mm Ceramic plate sizes 6 Maximum air velocity in duct 2 5 m s vvithout booster 4 m s vvith booster Max admissible supply air temperature 50 C before humidifier Water supply connector pressure water temperature water quality requirements 1 2 outside thread nominal width 15 mm working pressure 2 10bar max 45 C fully demin water 0 5 15 uS cm without any additives max 1000 cfu ml
29. Set the service switch of the mains supply line to Off Close the shut off valve of the water supply conduit Note If the water supply system requires maintenance depressurize the water system first For this purpose switch the control unit back on again and wait until flushing is concluded and the alarm message no 07 minimum permeate pressure appears on the display Then switch the control unit off again as described above Mind hygiene Let the fan of the ventilation system run until the humidification unit is dry In case the humidification unit requires maintenance switch the ventila tion system off and secure it against unintentional power up LS Important information on extended periods of non use Important For reasons of hygiene we basically recommend that the Hybrid Humidifier should be left switched on even in periods when there is no requirement for humidification With the system switched on the water circuit is flushed at regular intervals and hence the build up of germs is opposed However if it is necessary to leave the Hybrid Humidifier switched off for long periods the following points should be noted Mind hygiene Drain all water conduits For safety reasons the post evaporation elements should remain in their working position even if the humidifier is not used for an extend ed period This prevents the water from being sprayed directly into the duct in case the humidifier is powered up inadverte
30. active 51 5 5 52 Integral time of internal controller Preset integral time of the internal controller in minutes Note This parameter is available only if the internal controller is active Output limitation Preset limit value of output in of the maximum output capacity Analog signal Range of the selected analog signal in V or mA respectively Note The value in brackets is the current value in of the maximum signal or the current ambient humidity in rh respectively Error history Numeric codes of the 4 most recent errors example 07 last error 10 second to last error etc Note Information on the meaning of error codes is given in chapter 7 Software version Current version of the control unit software Setting up operating parameters In the setup level you may adjust various operating parameters to adapt the Condair Dual Hybrid Humidifier to your particular requirements Important The adjustments made in the setup level immediately exercise an influence on the operating characteristics of the hybrid humidifier There fore adjustments must be made only by persons having sufficient know ledge in the field of humidification and air conditioning technology and being familiar with the Condair Dual Hybrid Humidifier Accessing the setup level The Condair Dual is in s
31. al assets in case of leakage Danger of damage Do notinstallthe components in exposed locations or locations with excessive dust load The booster pump is designed for wall mounting while the control unit the silver ionization unit andthe connector box are designed for direct fastening to the ventilation duct monoblock Make sure the construction wall pillar housing etc to which the components are to be mounted offers a sufficiently high load bearing capacity and is suit able for the installation Caution Do not mount the components to vibrating parts Use only the provided fastening material to mount the various com ponenis If for some special reasons an installation with the supplied fastening material is not feasible choose a type of installation that is equally stable d m BOB XA 98x50 mm Installation the connector Upon delivery the box is ready to be connected Use the provided fastening material 4 pan head screws M5x55 mm 4 spring washers M5 and 4 blind nuts M5 to mount the connector box directly to the ventilation duct monoblock or to a frame Before mounting the connector box read the notes on correct location and make sure the length of the water hoses between the connector box and the nozzles is as short as possible max 10 m Installation of the silver ionization unit Use the provided fastening material 2 pan head screws M6x25mm 2 spring washers M6
32. alve Y8 100 100 4 4 4 7 s zi 7 S 8 4 0 gt 0 gt 0 20 50 80 100 0 15 27 39 51 63 75 87 100 Control signal Control signal Monitoring The system continuously monitors the minimum and maximum pressure the conductance of the fully demineralized water and the temperature of the booster pump If the conductance of the fully demineralized water exceeds the admissible range max 15 uS cm the drain valve 14 of the connector box opens and the water system is flushed until the conductance meets the preset value An error message is displayed if the conductance value does not reach the admissible range within a certain period 2 10 bar 10 Spray circle discharge only with option Z409 On systems having a central unit with spray circle discharge option Z409 the spray circle drain valve Y5 opens after no humidification demand has occurred for 12 hours Then the valves Y9 Y10and Y11 open one after the other for approximately 60 seconds to discharge each spray circle via the water jet pump 3 3 Scope of versions The Condair Dual Hybrid Humidifier is available in two versions either as centralized system type CD ZE or as decentralized system type CD DZ n the centralized system the control unit the booster pump the silver ionization unit and the connector box are assembled and vvired in the form of a so called central unit on a mount
33. ation B1 Active controller B2 Passive controller F1 Fuse 2A slow blow control F2 F3 H2 H3 Silver ionization sub PCB H4 Serial interface RS232 RS485 option 2404 2405 J1 42 X21 12 Jumper to be installed if no monitoring devices are connected to terminal X21 Ei Lei 24VSIK K1 LF M1 PS2 PS3 TS2 Y6 Y8 Y5 ZE X22 X23 123456 12345678 E LL E En rel 1 H3 ai x25 123 X24 o ASA 12 326 A 22 222 781 d Up 9VDC no Input c GND 0 N External safety circuit maximum hygrostat flow control release power off etc Conductance sensor Booster pump Permeate minimum pressure switch Permeate maximum pressure switch Excess temperature switch of pump External service switch or plug in connector Spray valves connector box Drain valve connector box Central unit Electrical installation of centralized systems The electrical installation of centralized systems includes also see wiring diagram Designation Description Cable specification Connection of the power supply to terminal X1 The service switch Q and the fuse F2 are mandatory Caution Make sure the voltage indicated on the rating plate meets the local line voltage Otherwise do not connect the control unit min cross section 1 5 mm Connection of the external safety circuit maximum hygrostat flow control release circuit etc to ter
34. cation liability working methods personnel qualifications etc Do not carry out any operations for which you are not sufficiently quali fied or unfamiliar with the consequences In case of doubt contact your supervisor or Condair supplier beforehand Before carrying out working steps on particular components of the Condair Dual Hybrid Humidifier set the ventilation system and the humidifier out of service disconnect them from the power supply by setting the service switch to Off and secure the units against unintentional operation Installation maintenance and repair of the electrical installation of the Condair Dual must be carried out only by qualified personnel being aware of possible danger and implications Poorly maintained humidification systems may endangerhealth There fore it is mandatory to observe the specified maintenance intervals and to carry out maintenance work in strict accordance with the instructions Observe all local safety regulations regarding the handling of mains powered electric and electronic equipment Caution To prevent damage caused by water the Condair Dual must be installed only in rooms provided with a floor drain If for some reason the Condair Dual must be installed in a location without floor drain itis mandatory to provide a water tub with drain or water sensors to Safely interrupt water supply in case of leakage For safe operation of the hybrid humidifier make sure the ambient con
35. ce an SGS Reg No 40002 2 Manufacturer Axair Ltd a WMH Company Seleko AB Box 143 137 22 V sterhaninge Telephone 46 8 504 105 60 Fax 46 8 504 105 61 Internet http www seleko se E Mail info seleko se TN c ndalr
36. cessed and modified one after the other once the setup level has been launched Language Selection of the control unit s dialogue language Factory setting English Optional settings German English French Dutch and Danish Note Following confirmation of the selected language the control unit switches to the appropriate language without delay Analog signal Selection of the analog signal range Factory setting 0 10Vdc Optional settings 0 20 Vpa phase control 0 10 Vdc 2 10 Vdc 0 5 Vdc step control board 1 5 0 1 Vdc 0 20 mA 4 20 mA and 0 8 2 Vdc Note The value in brackets is the current value in of the maximum signal or the current ambient humidity in rh respectively Caution The signal ranges 0 20 mA and 4 20 mA must be selected only ifa sensor operating at current signals is used otherwise the control may be damaged Display of current permeate conductance Note Display function only no setting options Maintenance interval This setting determines in what intervals the display will be prompting you for maintenance Factory setting 2000 hours Optional settings 2000 4000 6000 8000 or 10000 hours Output limitation Sets the output limit value in of the maximum output capacity Factory setting 100 Setting range 10 100 96 Note This parameter may be used to limit the maximum output
37. chapter 7 1 Error messages Resetting the capacity counter Following the replacement of the silver ionization cartridge the capacity counter needs to be reset as follows Press and hold both arrow keys key while switching the control unit on Keep both arrow keys depressed approx 5 seconds until the red error LED goes off and then comes on again briefly approx 1 second Replacing the silver ionization cartridge Setthe hybrid humidifier Condair Dual out of operation as per chapter 5 3 and depressurize the water system e Remove the two electrical connectors from the connections on the silver ionization cartridge e Loosen the hose connectors at the entry and the exit then remove both screw in nipples Caution The silver ionization cartridge is filled with fully demineralized water Place a bucket under the cartridge before loosening the connec tions Undo the four screws fastening the silver ionization cartridge to the holder then remove the cartridge Caution The empty silver ionization cartridge weighs approx 3 kg 6 5 Ib e Install the new silver ionization cartridge in the reverse order Caution Exhausted silver ionization cartridges must be sent to the local Condair representative for correct disposal 63 6 5 64 Replacement of the control unit fuses The fuses of the control unit must be replaced by authorized personnel only e g electrician Caution Electron
38. ctions one after the other and fix them with the angle brackets to the duct roof Proceed as follows align the corresponding section parallel to the preceding section on the left by means of a bracket for the upper flow sheets Then push the angle bracket to the duct roof and fix it using two self tapping screws provided drill holes 03 3 mm before Finally fasten the M6x12 hexagon socket screw in the vertical section gt Important At the interstice with system specific width the bracket for the upper flow sheet marked with a V must be used as a spacer Important The brackets for the upper flow sheets serve as spacers only and must not be mounted yet their final installation is explained in the following section 25 26 13 Mounting the brackets for the upper flow sheets Starting with the narrow vertical section left or right align the front edge of the first bracket with the front edge of the topmost opening in the vertical section see figure above then fix the bracket to the duct roof using 2 or 3 as required self tapping screws drill holes 03 3 mm before Mountthe remaining brackets in an offsetorder front rear see figure above Important Mount the bracket marked with a V between the vertical sections with system specific width 14 Fix self adhesive sealing plates to the two remaining angle brackets see illustration above Use the M6x12 hexa
39. drain off sheets Important The tub seal must be installed in one piece do not cut Important Make sure the tub seal tightly joins to the duct floor adjust with knife if necessary and verify appropriate tightness at both lateral flow sheets 4 3 Installation of the central unit Ss ZN Location of the central unit The central unit is designed for wall mounting Make sure the construc tion wall pillar etc to which the central unit is to be mounted offers a sufficiently high load bearing capacity and is suitable for the installa tion Caution Do not mount the central unit to vibrating parts The central unit must be installed only in a location having a water drain on the floor If this is not possible itis mandatory to provide water sensors to safely interrupt water supply in case of leakage Further more choose a suitable location that prevents damage to material assets in case of leakage Make sure the ambient conditions at the desired location meet the specifications outlined in chapter 8 2 Danger of damage Do not install the central unit in exposed locations or locations with heavy dust load Use the optional casing option Z408 to protect the central unit from damage and soiling or use the central unit with spray circle discharge integrated in two protective cab inets option Z409 Install the central unit so that the water hoses between the connector box and the nozzles are as short
40. e In cases of doubt contact your Condair supplier Installation of the humidification unit Important notes Usually the design and dimensioning of the ventilation duct monoblock as well as the location of the Condair Dual Hybrid Humidifier inside the duct are determined recorded and set compulsory when planning the entire system Priorto installation however make sure the following criteria have been taken into consideration Caution fully demineralized water is aggressive For this reason all components located close to the humidification unit duct monoblock fastening material drain pipe etc must be made of corrosion proof steel minimum requirements according to DIN 1 4301 or plastic For installation and maintenance of the humidification unit a viewing window and a sufficiently large maintenance door must be available in the duct monoblock In the area of the humidification unit the ventilation duct monoblock must be vvaterproof Important An air filter must be installed at the air inlet of the humidification unit The filter must meet the quality standards F6 EU6 or better n case of low ambient temperature the duct must be insulated to prevent the moist air from condensing inside the duct If the system is equipped with a heater make sure it is at least 0 5 m avvay from the humidification unit n order to avoid drops seeping over the ceramic elements an even air flow over the full cross section of the po
41. e for a qualified specialist to rectify defective installations Humidifier water Water treatment Determine the bacterial count at the water connection to the central unit In the event of bacterial count concentrations above the limit of 1000 cfu ml in accordance with the hygiene certificate the water supply water pipes must be subject to a microbiological inspection and appropriate action must be taken immediately please contact your Condair dealer Bacterial count concentrations in the upper area of the permitted range may be an indication of the onset of bacterial problems in the water supply The water supply and water pipes should also be subject to a microbiological inspection Inspect the water treatment plant salt available lines sealing conductance satisfactory System air Determine the bacterial count in the supply air before the humidifier inlet In the event of bacterial count concentrations above the limit of 1000 cfu m3 in accordance with the hygiene certificate the ventilation system must be subject to a microbiological inspection and appropriate action must be taken immediately to rectify the situation please contact your Condair dealer Bacterial count concentrations in the upper area of the permitted range may be an indication of the onset of bacterial problems in the ventilation system The ventilation system should also be subject to a microbiological inspection Determine the bacterial count in the ai
42. e three or five bearing bushes B on the nozzle grid Insertthe nozzle grid s in the frames atthe appropriate position s note numbering on the installation drawing Note The nozzles are provided with a protective cap Ex works so that no dirt can ingress Remove these caps immediately before commis sioning the system Erect the housing passages 2 or 3 depending on the system for the spray circuits Bore the 219mm holes and install the housing passages in accordance with the adjacent illustration Now connect the spray circuits with the passages in accordance with the installation drawing provided In so doing note the following points The nozzles for the individual spray circuits are identified with colored bushings red blue and yellow Use only the supplied hoses o10 8mm outside the duct and o8 6mm inside the duct Other hoses may lead to troublesome operation When cutting hoses always add at least 5 mm to the specified length This way the hoses can be fastened correctly down to the stop to the quick action couplings of the nipples Important When cutting hoses use an appropriate tool providing straight kink free cuts Hoses must be free of kinks and other damage longitudinal scratch es in particular Verify correct fastening of the hoses Correctly mounted hoses can not be removed without pressing the locking ring 4 2 2 Installation of the post evaporation unit The component
43. eet on the corresponding side between the vertical section and the overlapping ceramic plate until it comes to a stop Then bend the free end of the anti drip sheet downwards so that it forms a curve and touches the lower ceramic plate 22 23 On each side insert the two part lateral plate sealings Proceed as follows first insert the lower sealing piece between the vertical section and the ceramic plate then push it downwards until it comes to a stop Now insert the upper sealing piece and align its top end with the upper edge of the ceramic plate Caution risk of injury To prevent injury resulting from the rough ceramic plates or the lateral plate sealings use a spattle or a similar tool to insert the plate sealings Finally push the two upper plate sealings down until they come to a stop Install the ceramic angle L 300mm L 400 mm L 100mm L 300 mm L 500 mm L 300 mm L 300 mm L 700 mm 24 Place the ceramic angle one ortwo angles on top ofthe ceramic plate Important Thetopmostceramic plate does notrequire a ceramic angle Important Between the vertical sections with system specific interstice the specially marked ceramic angle must be used On systems with two ceramic angles per plate at least one angle is system specific Repeat steps 17 to 24 until all ceramic plates are installed Please observe the installation sequence of the plate rows 31
44. emote operating and fault indication PCB Z401 standard version Z401S wire breakage safe version allows the connection of remote indicators displaying the following stages of operation standby humidification in progress maintenance due and error Note The remote operating and fault indication PCB is supplied with separate instructions Serial interfaces RS232 Z404 or RS485 Z405 The serial interface RS232 or RS485 is used to transmit operational data from the Condair Dual Hybrid Humidifier to a PC or a building control system Note It is up to the customer to develop installation specific software In formation on the communication parameters and the data format support ed by the interface is available from your Condair supplier Connector box with 3 spray valves Z407 The connector box with 3 spray valves allows 7 step control of the Condair Dual Hybrid Humidifier Casing for central unit Z408 The casing protects the central unit and its components from soiling and damage The casing may be installed at any time following the installation of the humidifier Note The casing is supplied with separate mounting instructions Central unit with spray circle discharge Z409 All components of the central unit with spray circle discharge are integrated into two rugged protective cabinets The large cabinet contains the control unit and the silver ionization The booster pump
45. ernal sensor is connected Set nominal value correctly Wait Deactivate the internal sensor of the control unit see chapter 5 5 Spray valves open and close continually Unstable controller signal Check controller settings and adjust controller as required Maximum humidification capac ity is not reached Output limitation active System incorrectly dimensioned insufficient capacity Booster pump defective insuffi cient permeate pressure Deactivate output limitation see chapter 5 5 Contact your Condair supplier Replace booster pump Booster pump starts too late or not at all Output limitation active and or selected starting point of booster pump is too high Fuse F3 blown Deactivate output limitation set ting 100 see chapter 5 5 and or adjust starting point of booster pump call service technician Replace fuse Pressure at the manometer of the connector box drops to 0 bar during operation Water hose s between spray valves and spray nozzles or hoses inside the duct disconnected Working pressure is too low Attach water hose s Check reverse osmosis system and fully demineralized water supply conduit Spray valve Y6 stage 1 and or spray valve Y7 stage 2 do not open Spray valve Y6 and or spray valve Y7 defective Output limitation active Replace spray valves Deactivate output limitation setting 100 see chapter
46. gon socket screws provid ed to fix the angle brackets to the lower end of the two middle vertical sections Push angle brackets down to the ductfloor then fasten M6x12 hexagon socket screws Now fix the angle brackets to the duct floor using two self tapping screws provided drill holes 03 3 mm before Important Depending on the slope of the tub the angle brackets may need to be fixed to the vertical sections using the extensions provided see enlarged section in the figure above Install the booster elements only on systems with Booster If your system is equipped with a Booster the booster elements must now be mounted CZ Note If the post evaporation unit is accessible from the back via a service door the Booster may be installed atthe end of the installation procedure The connector pieces and the short snap lashes are then mounted from the back Mounting the booster at the end facilitates the installation of the ceramic plates and the ceramic angles Ea 22 4 7A 7A Z 2 22 22 f VV c Y I LI IIQ WQWC ZIZKMIUE N IU OVIlIY 0 Ia E E 7 22 2 22 15 Firstfix the two upper brackets to all booster elements using the thread plates and the M6x12 mm hexagon socket screws use topmost oblong holes es Important Tighten the screws by hand only to a point at which the brackets can still be moved 27
47. h a length of at least 230 mm not included in the delivery 2 Important notes Please read this chapter carefully lt contains important information which mustbe observed for safe correct and economic application ofthe Condair Dual Hybrid Humidifier 2 1 Correct use for intended purpose The Condair Dual Hybrid Humidifier is intended exclusively for humidifica tion in ventilation systems Any other type of application vvithout the intended purpose The manufacturer supplier cannot be made liable o written consent of Axair Ltd is considered as not conforming with the for any damages resulting from improper use The user bears full responsibility Correct use for intended purpose further includes 2 2 Safety instructions observation of all instructions regulations and notes contained in the present installation and operating instructions for the Condair Dual Hybrid Humidifier strict adherence to the specified inspection and maintenance intervals correct maintenance of the hybrid humidifier compliance with specified ambient and operating conditions The Condair Dual Hybrid Humidifier must only be installed operated and serviced by persons familiar with the product and sufficiently qualified for the respective task It is the customer s responsibility to ensure that the installation and operating instructions are supplement ed by internal instructions with respect to supervisory and notifi
48. he ceramic plates are correctly located and properly sealed Caution Put the system into operation only if the above require ments are met without fail Set the mains supply service switch power supply to control unit to On First set the power switch of the control unit to I then open the shut off valve of the water supply conduit The control system now carries out a basic system test while the Humidification on and Error indicators light up Once the test is completed the drain valve opens for approximately 20 seconds flushing of the permeate conduit 45 46 If a fault is detected during the system test a corresponding error alert is triggered i e the error indicator either flashes alarm or stays on error and a corresponding message appears on the display also see chapter 7 1 After successful conclusion of the system test the unit switches to standby mode and one of the following displays appears depending on the current state of operation The Condair Dual is in standby mode no humidification The Condair Dual humidifies in addition the Humidification on indicator lights Drain valve open the permeate is led directly to the drain conduit cause preset flushing cycle is in progress every 24 hrs or the conductance of the permeate is too high If the external safety circuit
49. he water installation of the centralized system Installations to be carried out are highlighted in grey Important Read and observe the notes on vvater installation atthe end of the current chapter min inner 15 mm Pmin 2 bar working pressure Pmax 10 bar Tmax 45 C Conductance 0 5 15 0 uS cm G 1 2 6 G 1 2 3 G 1 2 VVSeosogsonggsst Lmax 10 m UR V FEST O G 38 Shut off valve by customers 7 Nozzle system connectors Filter by customers mesh width 0 125 mm 8 Spray lines 210 mm Connector G 1 2 outside thread for fully demineralized water 9 Central unit Drain with siphon trap by customers Flushing conduit 018 16 mm or 2409 012 10 mm Flushing connector 016 mm or 2409 G 1 2 outside thread Water installation of the decentralized system The following illustration shows the water installation of the decentralized system Installations to be carried out are highlighted in grey gt Important Read and observe the notes on water installation at the end of the current chapter Lmax 10 m min inner 15 mm Pmin 2 bar working pressure Pmax 10 bar Tmax 45 C Conductance 0 5 15 0 uS cm 0 12 mm 0 0 0 0 O Om N Shut off valve by customers Filter by customers mesh width 0 125 mm Connector G 1 2 outs
50. hird spray valve output indication 0 2 appears only if internal permeate pump is active p pump int ext intern 3 appears only if silver ionization is active Ag degermin on 4 appears only if internal controller is active controller funct on e next menu option 4 previous menu option 49 50 Description of display level parameters The following description explains the parameters that may be accessed via the lt W gt and lt A gt keys once the display level has been launched with the lt M gt or lt E gt key Maximum humidification output Maximum spraying capacity in kg hr Current humidification output Current spraying capacity in kg hr Note The actual spraying capacity may differ from the displayed value depending on the current spraying pressure Analog input humidification request Current signal value at the analog input in of the maximum value Note If the internal controller is active the displayed value corresponds to the current ambient humidity in rh Booster pump internal external This display indicates whether the control unit is configured to work with an internal or external booster pump Conductance Current conductance of the permeate in uS Permeate limit Selected limit value of
51. ially or fully vvorn Errors An error message indicates a fault detected during operation that may cause damage to the system If such a fault occurs the Condair Dual is switched off automatically Indication red LED lights constantly error message appears on the display A If the fault indicator red LED and the Hu midification on indicator green LED light up intermittently the external safety circuit ma ximum hygrostat flow control etc is in terrupted Example 2 Fi bi An error message always overwrites a preceding alarm message Example Notes Thefirsterror message remains in the display even if subsequent faults occur Following elimination of the source of trouble the error message may be reset by switching the control unit off and back on again Fault message Cause Remedy Cause Electronic component RAM watchdog EPROM EEPROM on CPU PCB defective Remedy Replace CPU PCB Cause Internal safety circuit interrupted power supply PCB defective flat ribbon cable between power supply PCB and CPU PCB disconnected or defective Remedy Replace power supply PCB plug in flat ribbon cable or replace cable as required Cause Signal at analog input out of preset range Remedy Select correct range of analog signal input Check connected sensor or controller a
52. ic components are sensitive to electrostatic discharge Protective measures ESD protection mustbe taken before replacing the fuse s of the control unit Replace fuses F1 and F3 ofthe control unit only with fuses matching the specifications belovv Fuse F1 fuse type 2 A slovv blovv Fuse F3 fuse type 6 3 A slow blow Caution Never use refurbished fuses Do not bridge the fuse holder wiring diagram 7 What if 7 1 Error messages Faults detected during operation trigger the fault indicator red LED and a corresponding event message appears on the display The Condair Dual makes a distinction between alarms and errors Alarms An alarm indicates a temporary fault that vvas detected during operation short time interruption of the water supply or faults that do not cause damage to the system If the source of trouble disappears vvithin 30 minutes the alarm is reset automatically Othervvise the system issues a corresponding error message Indication red LED flashes once a second Example alarm message appears on the display A Alarm message Cause Remedy Cause Permeate conductance limit required for stopping permeate flushing is not reached even after extended flushing Remedy Check reverse osmosis system Cause Pressure atfully demineralized vvater connector of booster pump is too low cause water conduit too narrow reverse osmosi
53. ide thread for fully demineralized water Drain with siphon trap by customers Flushing conduit 18 16 mm Flushing connector 016 mm N 10 12 Nozzle system connectors Spray lines 010 mm Booster pump Control unit Connector box Silver ionization 39 40 Ss gt P Notes on water installation The installation of the shut off valve and the filter maximum mesh width 0 125 mm in the fully demineralized water supply conduit is mandatory If possible both assemblies are to be installed close to the booster pump Before joining the fully demineralized water supply conduitto the water connector flush the conduit thoroughly for at least 10 minutes If the water pressure is gt 10 bar install a pressure reducing valve set to 10 bar in the supply conduit Ifthe conduitlength between the water conditioning unit andthe Condair Dual exceeds 20 m the supply conduit must be equipped with a suitable pressure damper overflow valve surge tank etc Furthermore the supply conduit must be properly fastened according to the regulations The drain hose is fed from the connector box or from the corresponding connection of the protective cabinet Z409 down into a drain conduit with siphon trap Use a hose clamp to attach the drain hose to the nipple of the connector box Prevent the drain hose from slipping out of the funnel by fastening it with appropriate means right above the funnel without reducing
54. inal X22 n cross section 0 5 mm m Connection of minimum pressure switch PS2 on booster pump maximum pressure svvitch PS3 on connector box and excess temperature svvitch of booster pump TS2 on connector box to terminal X23 n cross section 0 5 mm m Connection ofthe conductance sensor LF on connector box to terminal X23 Important For accurate measurements of the conductance the shielding must be connected to the terminal X23 7 shielded cable min cross section 0 25 mm Connection of the silver ionization to terminal X24 min cross section 0 5 mm Connection of an external controller or humidity sensor to terminal X25 admissible signal values see chapter 8 1 Specifications The shielding of the control signal must be connected to terminal X25 3 Caution If the shielding of the control signal is already connected to a poten tial or a grounded conductor do not connect it to terminal X25 3 shielded cable min cross section 0 25 mm 43 4 7 44 First time commissioning The following steps are carried out upon first time commissioning Inspecting the installation Flushing the water circuits Checking the spray nozzles Configuring the control unit or the system respectively Carrying out test runs Setting up the ionization current and the capacity counter of the silver ionization according to the table in the appendix Since first time commissioning
55. ing base or in a 2409 protective cabinet In the decentralized system the above components can be fitted individually decentralized Centralized system CD ZE Humidification unit 2g Connector box Central unit including 2h Permeate maximum pressure svvitch 2a Control unit 3 Electrical connectors power supply control or 2b Permeate minimum pressure switch sensor signal input connector for external 2c Excess temperature switch of pump safety circuit 2d Booster pump 4 Shut off valve by customers 2e Silver ionization unit 5 Filter by customers max mesh width 0 125 mm 2f Permeate conductance sensor 6 Connector G 1 2 for fully demineralized water 11 Decentralized system CD DZ 2a 2b 2c 2d 2e 2f 2g 2h 12 Humidification unit Control unit Permeate minimum pressure switch Excess temperature switch of pump Booster pump Silver ionization unit Permeate conductance sensor Connector box Permeate maximum pressure switch o Electrical connectors power supply control or sensor signal input connector for external safety circuit Shut off valve by customers Filter by customers max mesh width 0 125 mm Connector G 1 2 for fully demineralized vvater 3 4 Options Remote operating and fault indication Z401 and Z401S By means of 4 potential free relay contacts the r
56. inst unintentional switching on Before servicing the humidification unit the ventilation system must be set out of operation consult the documentation of the ventilation system Important notes on maintenance The Condair Dual Hybrid Humidifier incorporates the very latest technolo gy and has been designed to guarantee hygienically trouble free oper ation when operating conditions are observed The hygiene during operation was tested proven and confirmed by the award of the Fresenius Hygiene Certificate following long term tests at the Fresenius Institute To ensure operational safety and to guarantee hygiene in long term operation the maintenance concept for the Condair Dual has been structured in two stages This differentiates between periodical checking and the implementation of a total hygiene service of the Hybrid Humidi fier Note Axair Ltd offers maintenance contracts Please contact your Axair representative for an offer 57 Periodical checking Periodical checking should be carried out monthly and include the follow ing steps Item Work to be carried out Nozzle system Check the spray pattern of the spray nozzles spray cone optimum 90 60 acceptable If necessary clean the spray nozzles see full servicing guide Check hoses and connections for sealing if necessary replace defective components Post evaporation unit Check ceramic plates for breakage Damaged plates should be replaced
57. is always done by a service technician of your Condair supplier the current manual does not provide detailed infor mation on this procedure The commissioning protocol with the system configuration data can be found in chapter 9 4 5 Operation A 5 1 Introduction The Condair Dual Hybrid Humidifier must be commissioned and op erated only by personnel familiar with the unit and adequately qual ified for the task Ascertaining the qualification is the customer s respon sibility The Condair Dual Hybrid Humidifier is operated via the control unit The control unit provides the following display and control elements 1 Display 5x7 dot matrix 2x16 characters lt M gt key menu key lt A gt key arrow key up key arrow key down lt E gt key entry key Error indicator red LED Humidification on indicator green LED 8 lt l O gt key power switch N O oO W N 5 2 Commissioning for daily operation The following description outlines the commissioning procedure for daily operation It is assumed that first time commissioning has been carried out properly by the service technician of your Condair supplier Proceed as follows to prepare the Condair Dual Hybrid Humidifier for operation Check the installation and all system components for damage Caution Do not put the system into operation in case of damaged installations or system components Make sure t
58. it Options to be installed inside the control unit Remote operating and fault indication Z401 Z401S RS232 serial interface option Z404 RS485 serial interface option Z405 Shut off valve by customers Filter by customers max mesh width 0 125 mm Connector G 1 2 for fully demineralized water Booster pump Minimum pressure switch Excess temperature switch of pump Silver ionization unit 13 14 15 16 17 18 19 20 21 22 Drain with siphon trap by customers Drain valve Conductance sensor Connector box with 2 spray valves 3 step Connector box with 3 spray valves 7 step option Z407 Maximum pressure switch Spray valves Duct drains with siphon trap by customers Post evaporation elements porous ceramics Spray nozzles Air filter min F6 EU6 by customers 23a Drain valves only with option Z409 23b Water jet pump only with option Z409 24 Water tub or floor drain by customers 3 2 Function From the reversing osmosis system RO system the fully demineralized water also called permeate is fed to the booster pump 9 via a shut off valve 7 and a filter 8 Depending on the current output requirements the booster pump increases the vvater pressure to the required operating pressure of approximately 7 bars yield load From the booster pump the fully demineralized water is fed to the connector box 16 either directly on systems for exhaust air cooling or via the silver ioniza
59. jeue ie jeubis y 6 nd no uonesy pruny Ien1ov Age 10113 jeubis Hojeuy y 6 nd no uone3lijipituunu jeulwoy N Bellon sulew p inse ls uoneliui1ndino uu A18 51 131101 U09 Ji uun A02B s s llonuo9 Ji Aug 5ue1 d 124615 1 02 d 1 15 10 15 5015 104u09 Jo yun IE nu Jo u0e301 41 SI 2 Ji eUIWON 2110 uo J quinu IEUge IEnO a0A1 pun u sucu qulpul Gan u sinou DupuoN y olqououl jo d qulnu uone901 uy s nqis Jo Auge Jayioddns 9e u09 yul anjea jeurwou jenjoe uan uonezluol qual GUO HO UOREZ UOL NM S au H0 uo Bulusnil 16 dund 15004 d dud 19 sooq 1ulod Bunie s z eng 1IPDU02 JIVXV A U BU 1S Jo 1040 Huluoissiwwoy uv lu sril l aan s nou 99 9 5 9upe 9npuo3 pb un d Age 10113 1X N uom db ulpul H 3 e3uu q 02 au D40391 JULUIJUILIN z eng JIPDU09 9 4 Setup table silver ionization Hygieneplus Setup of ionization current and capacity counter
60. llation ventilation facility into which the Condair Dual Hybrid Humidifier is to be incorporated all instructions and warnings provided on the Condair Dual Hybrid Humidifier all local sanitary regulations 1 3 d Special tools Conventions The following conventions apply to the present installation and operating instructions Steps to be carried out operational sequence are preceded by a bullet This symbol identifies safety and danger instructions which if disre garded could result in personal injury and or damage to material assets This symbol identifies additional information and instructions de signed to assist you in handling your hybrid humidifier and ensure a proper and economical operation Safekeeping Please keep these installation and operating instructions in a safe place where they are always available If ownership changes they must be passed on to the new operator Ifthis documentation gets misplaced please contact your Condair supplier to obtain immediate replacement Language versions The installation and operating instructions for the Condair Dual Hybrid Humidifier are available in several languages Please contact your Condair supplier if you require another language version of the present documen tation Important Fastening the outer left and right vertical sections to the cross arms ofthe post evaporation unitrequires a 5 mm hexagon socket extension wit
61. llowing requirements Working pressure at maximum humidification capacity min 2 bar Maximum admissible inlet temperature 45 C No additives such as chlorine disinfecting agents ozone etc Max germ count at the vvater inlet on the Condair Dual 1000 cfu ml Conductance of the supply water 0 5 15 0 uS cm 41 4 6 Electrical installation ZN All work concerning the electrical installation must be performed only by adequately qualified personnel electrician or specialist with equi valent training Please observe all local regulations concerning the electrical instal lation Wiring diagram also found on the cover of the control unit The following wiring diagram provides an overview of the electrical installa tion The diagram applies to both versions of the humidification system The terminals X1 to X26 are located below the cover of the control unit fastened with 3 screws The terminals accept the following maximum cable cross sections stranded wire 1 5mm solid copper wire 2 5 mm H2 Z401S Error Maintenance Operation On Fuse 104 slow blow power supply Fuse 6 3A slow blow booster pump Remote operating and fault indication option 2401 or Z401S wire breakage safe X1 12345678 LINT NL 222222220 F2 o L N MD Ag Silver ioniz
62. minal X21 Important If no monitoring devices are connected to terminal X21 a jumper J1 must be installed to the terminal min cross section 0 5 mm Connection of an external controller or humidity sensor to terminal X25 admissible signal values see chapter 8 1 Specifications The shielding of the control signal must be connected to terminal X25 3 Caution If the shielding of the control signal is already connected to a poten tial or a grounded conductor do not connect it to terminal X25 3 shielded cable min cross section 0 25 mm Electrical installation of decentralized systems The electrical installation of decentralized systems includes also see wiring diagram Designation Description Cable specification Connection of the power supply to terminal X1 The service switch Q and the fuse F2 are mandatory Caution Make sure the voltage indicated on the rating plate meets the local line voltage Otherwise do not connect the control unit min cross section 1 5 mm Connection of the booster pump to terminal X1 n cross section 1 5 mm m Connection of the external safety circuit maximum hygrostat flow control release circuit etc to terminal X21 Important If no monitoring devices are connected to terminal X21 a jumper J1 must be installed to the terminal n cross section 0 5 mm m Connection of the solenoid valves Y6 Y8 on connector box to term
63. nd replace as required 66 Fault message Cause Remedy Cause Remedy Conductance limit exceeded gt 100 uS cm Check reverse osmosis system max conductance 15 uS cm check conductance sensor and clean if required Cause Remedy Permeate conductance out of admissible range of tolerance conduc tance sensor disconnected or short circuited Check reverse osmosis system Connect conductance sensor on con nector box check wiring Cause Remedy Nominal or maximum value of silver ionization current is not reached error message 10 present for more than a week Check plug in connection cables of silver ionization unit Replace silver ionization cartridge Measure ionic current at 100 humidifying capac ity and compare to setup value Cause Remedy At the daily Ag ion test the maximum ionization current could not be reached because the silver electrodes are partially or fully worn error message 11 present for more than a week Replace silver ionization cartridge see chapter 6 4 Cause Remedy The silver ionization cartridge was not replaced although the message Ag electrode change due has been present for more than a week or the capacity counter was not reset following the replacement of the cartridge Replace silver ionization cartridge and or reset the capacity counter see chapter 6 4
64. ntly 47 5 4 48 Inquiring operating parameters The Condair Dual provides a so called display level used for inquiring various operating parameters However the display level does not let you change the parameters Accessing the display level The Condair Dualisin standard operation mode the display ofthe control unit shows the current state of operation Press the lt E gt or lt M gt key to access the display level The opposite confirmation appears briefly on the display Then the first parameter of the display level shows up Selection of parameters in the display level Use the lt W gt and lt A gt keys to select the desired parameter next parameter lt A gt previous parameter Note The display level is an endless loop i e stepping forward from the last parameter automatically brings up the first parameter again Quitting the display level Proceed as follows to escape from the display level Press the lt M gt or lt E gt key The control unit returns to the status display Note If no key is pressed in the display level for 10 minutes the control unit automatically returns to the status display Overview of the display level Standard operation Display level Notes 1 without option Z407 t
65. or possible damage Damaged compo nents must not be reinstalled Replace all sealings of the nozzle with new ones Important Flush all conduits with fully demineralized water before assem bling the unit For installation proceed in the reverse order of removal Make sure to install the nozzles in their correct positions in the nozzle lattice see installation drawing Following installation verify correct fastening of all hose connectors Correctly mounted hoses can not be removed without pressing the locking ring 62 6 4 Replacement of silver ionization Hygieneplus On commissioning the current of the silver ionization must be adjusted by the technician in accordance with the table in chapter 9 4 Following the results of a germ test the settings may be changed at any time later on If the silver ionization cartridge needs to be replaced capacity counter reads 0 the display alternately shows the standard operation mode display and the opposite message In case the control unit is equipped with the optional remote operation and fault indication PCB the latter additionally issues an error In this case it is mandatory to replace the silver ionization cartridge with a new one If you do not reset the message Ag electrode change due see below the unit is automatically powered off after about one week of operation and the display alternately shows the two opposite messages also refer to
66. or to the bottom respectively until they come to a stop this fixes the plate sealings in position Important The contact surfaces of the sealing plates must face the protruding end of the ceramic plate mounted later Important No lower plate sealing mustbe installed atthe rear ceramic plates that require the installation of an anti drip sheet see step 21 Carefully push the ceramic plate chamfered part facing the bottom into the corresponding slot of one of the vertical sections then tilt the plate to the back and insert it into the slot of the other vertical section Align the ceramic element so that it protrudes for the same amount on each side 29 30 Ss 20 Insert in the lower flow sheet between the ceramic plate and the two vertical sections this step must be carried out only for the lowest ceramic element of a vertical row Important Between the vertical sections with system specific dis tance the specially marked lower flow sheet must be mounted Duct top view anti drip sheet 21 Only the rear rows of ceramic plates require the installation of anti drip sheets However the anti drip sheets must be installed only on the sides of the ceramic plates which overlap with the plates of a front row see figure above The ceramic plates at the very bottom require the installation of plate sealings instead of anti drip sheets Insert the anti drip sh
67. ot visible Lower angle bracket not visible 19 20 H First attach the upper cross arm 1 Stick the provided self adhesive sealing plates to all wall supports 2 Stickthe drillingtemplate provided for the left and right wall supports on the wall of the duct at the correct location see installation drawing and drill the 03 3 mm holes 6 holes per wall support Important Align the drilling templates at right angles to the roof of the duct and at the same distance from the nozzle screen 3 Attach both wall supports to the wall of the duct using the self tapping screws provided minimum 6 screws per wall support Important Before tightening the screws check that the wall supports are at right angles to the roof of the duct and that the dimension 158 mm between the surface of the support and the duct roof is correct 4 Fit the U section member on the wall supports and secure it to the supports with the M6x55 cylinder head screws washers and locking rings provided Mount the base plate only systems equipped with a Booster 5 If your system is equipped with a Booster now mount the base plate in the tub The base plate is attached to the tub ledge by pop rivets behind the post evaporation unit d Important If your system has no service door behind the post evaporation unit n
68. ow place the booster elements in the duct just behind the base plate Connect two part vertical sections 6 For systems with two part vertical sections first connect all sections with the connector pieces A 2 pcs per connection and the M6x12 hexagon socket screws 9 pcs per connection 21 22 7 Fix eachvertical section left and right to the upper cross arm using the clamping brackets the M6x20 hexagon socket screws and the wash ers supplied The two vertical sections serve as spacers when mount ing the lower cross arm Important Before tightening the screws push the vertical sections to the very stop towards the duct roof and align the supports parallel to the duct wall and at a right angle to the duct roof Note On systems with two part vertical profiles the shorter section piece is always on top 8 If applicable assemble the lower and middle cross arms Important Tighten the screws only to a point at which the wall supports can still be moved in the U section Note If your system has only one cross arm proceed with step 11 9 Fix the lower cross arm lowest arm on systems with three cross arms to the two vertical sections using the clamping brackets the M6x20 hexagon socket screws and the washers supplied Important Before tightening the screws align the two vertical sec tions parallel to the ductvvall andthelower cross arm parallel
69. persons working with the Condair Dual Hybrid Humidifier must observe and compiy vvith all information and safety instructions contained in the present installation and operating instructions The vvorldvvide vvell organized distributor netvvork of Axair Ltd provides service at all times by qualified technicians Please contact your Condair supplier in case of trouble or if you have any questions concerning humi dification technology in general Notes on the installation and operating instructions Limitation The present installation and operating instructions contain all information required for correct installation operation and maintenance of the Condair Dual Hybrid Humidifier The information is to be observed by the personnel in charge of the respective vvork The installation and operating instructions are supplemented by docu ments specific to the particular installation installation dravvings technical specifications and so on VVherever necessary these publica tions are appropriately cross referenced in the present installation and operating instructions As a complement to the present installation and operating instructions please observe all local safety regulations regarding the handling of mains povvered electrical devices all instructions and vvamings contained in the publications for the products used in coniunction vvith the Condair Dual Hybrid Humidifier all safety instructions regarding the insta
70. r at the humidifier outlet to confirm the hygienic function of the hybrid humidifier Maintenance record After the full servicing read off the operating parameters including Fault history on the display level and enter the values on the maintenance record sheet Finally reset the servicing indicator A Notes on cleaning agents Caution Strictiy observe the information and instructions supplied with the cleaning agents Caution Do not use solvents or toxic cleaning agents 59 6 3 6 3 1 60 Removal and installation of components Removal and installation of ceramic plates Es Removal of ceramic plates Note If the ceramic plates of a rear row viewed in flow direction must be removed the ceramic plates of the adjacent front rows must be dismantled first The removal sequence of the ceramic plates is always from top to bottom Proceed as follows to remove the ceramic plates of a row 1 Loosen the screws then remove the upper flow sheet 2 On both sides remove the two partlateral plate sealings of the topmost ceramic plate or the respective ceramic plate respectively 3 Push upper plate sealings upvvards until they come to a stop 4 Remove the anti drip sheet s only on rear plate rovvs and if present 5 Carefully pull the ceramic plate out of one vertical section
71. rent setting The current setting starts flashing Press the lt W gt or lt A gt key to change the setting e Confirm the new setting by pressing the lt E gt key Following confirmation of your entry the opposite message briefly confirms the new value Important Wait until this message confirms the new setting before accessing the next parameter Otherwise the modified setting will not be stored Note If you press the lt E gt key to confirm the current setting without modi fication the opposite message is displayed briefly Quitting the setup level Proceed as follows to escape from the setup level Press the lt M gt key The control unit returns to the status display Important All settings that have been modified and confirmed with the lt E gt key before quitting the setup level are stored automatically Note If no key is pressed in the setup level for 10 minutes the control unit automatically returns to the status display 53 Overview of the setup level Standard operation Setup level Notes 1 display of current permeate conductance 2 appears only if internal controller is active controller funct on next menu option 4 previous menu option 54 Description of setup level parameters The following description explains all parameters that may be ac
72. s of the post evaporation unit are supplied separately and must be assembled at the installation site The following sections explain the general installation ofthe post evapora tion unit Detailed information dimensions fastening points etc can be found in the installation drawing supplied with your particular system Important The dimensions listed in the installation drawing are manda tory The post evaporation unit comprises the following main components lt N A One two or three cross arms depending on the size of the system each consisting of 2 wall supports and a U section screwed together gt B One vertical section on each side of the duct the openings of the sections facing the duct wall Note The left vertical section is marked with an engraved L while the right vertical section car ries an engraved R Ge VW SS a ee J C Two or more vertical sections large Note These vertical sections are marked with an engraved M Upper flow sheets Upper angle bracket a Upper plate sealings Lateral flow sheets left d me nm m CO Lateral plate sealings Ceramic plates post evaporation elements Lower plate sealings Flow direction Lower flow sheets Drain off sheets Tub sealing Ser x Lateral flow sheets right Anti drip sheets n
73. s system too small or too many consuming devices connected to reverse osmosis system Remedy Check reverse osmosis system and fully demineralized water supply conduit Pressure at fully demineralized water connector must be at least 2 bar working pressure Install larger supply conduits min inner g 15 mm This message appears only if the system is equipped with built in booster pump Cause Admissible maximum pressure of permeate exceeded Remedy Check reverse osmosis system and or setting of booster pump Inte grate a pressure regulator into the supply line Cause Operating temperature of booster pump is too high or flat ribbon cable between power supply PCB and CPU PCB inside the control unit is disconnected or defective Remedy Check booster pump Plug in flat ribbon cable or replace cable as required Reduce temperature of fully demineralized water supply max 45 C Cause Nominal value of ionization current not reached cable defective or disconnected silver electrodes worn Remedy Check Re establish electrical connection of silver ionization Replace silver ionization cartridge see chapter 6 4 65 Alarm message Cause Remedy Cause Remedy Replace silver ionization cartridge see chapter 6 4 At the daily Ag ion test the maximum ionization current could not be reached because the silver electrodes are part
74. see full servicing guide Note A grey discoloration of the ceramic plates is normal This is due to deposits from the silver ionization Central unit Silver ionization Connection box Booster pump Silver ionization see detailed information in chapter 6 4 Check the hoses and connections on the booster pump the silver ionization and the connection box for sealing Replace defective components where necessary Humidifier housing Water container Check the water container and humidifier housing for soiling Rust slime dust clean if necessary see full servicing guide Check the water container behind the post evaporation unit for collection of residual water If residual water is present check the water drain and the post evaporation unit Maintenance record Read off the operating parameters including Fault history on the display level and enter the values on the maintenance record sheet Total hygiene service of the hybrid humidifier The frequency of the implementation of a total hygiene service depends on the operating conditions The state of the humidifier s hygiene and its components mostly depends on the quality of the humidifier water the performance and the frequency of replacement of the filter installed before the unit the air velocity the air temperature and the microbiological and chemical composition of the inlet air The basic rule is when the Maintenance due
75. slightly tilt the plate forward then withdraw it from the other vertical section 6 Remove the ceramic angle s located on top of the next ceramic element Repeat steps 2 to 6 until all ceramic plates of a row are removed Installation of the ceramic plates Before installation check all ceramic plates and ceramic angles for possible damage Damaged ceramic plates and ceramic angles must not be reinstalled For installation of the ceramic plates proceed in the reverse order of removal also see section Installation of the post evaporation elements of chapter 4 2 Important Make sure to reinstall the ceramic plates in the appropriate locations according to the overview section of the installation drawing and to install all plate sealings correctly 6 3 2 Removal and installation of the spray nozzles Removal of the spray nozzles e Remove the hose s from the spray nozzle press the locking ring towards screw then pull hose off e Squeeze the catch locks of the nozzle support and remove the support Note The nozzles may have different spraying capacities max 2 differ ent capacities per system Nozzles with identical capacity are marked with bushings of the same color A We recommend you note the positions and capacities of all nozzles before removal Use an open end wrench 16 mm to loosen and remove the nipple and the nozzle Installation of the spray nozzles Before installation check all parts f
76. st evaporation unit must be guaranteed f necessary rectifiers or perforated plates must be installed on the building side before the humidifier If the air velocity in the duct before the post evaporation unit in relation to the humidification efficiency exceeds 2 5 m s booster elements must be installed see chapter 4 2 2 The section of the duct holding the humidification unit must be equipped with a sloping tub having drains before and after the post evaporation unit pass through tub or with a drain before the separation as well as drains before and after the post evapo ration unit separated tubs Each drain must be connected sepa rately to the waste water system via asiphon For hygienic reasons connect the drain pipes with an open outlet to the waste water system of the building Note The effective height of the siphon drain depends on the duct pressure Correct dimensioning of the siphon drain is the custom er s responsibility Version 1 optimal Version 2 installation length optimized Side view Side view Heater Heater 2 slope min 12 to center drain 100 eee 1200 2001 1200 500 70 slope min 1 to center drain door min 130 min 400 1210 15 4 2 1 16 Flow direction
77. tandard operation mode the display of the control unit shows the current operating status Simultaneously press the lt W gt and lt A gt keys to access the setup level The opposite message is displayed briefly You are now prompted to enter the 4 digit access code The leftmost digit flashes Enter the access code 8808 as follows Change the first digit using the lt W gt and lt A gt keys Confirm your entry with the lt E gt key The next digit starts flashing Repeat this step to change the remaining digits Following entry of the last digit the opposite message is displayed briefly to confirm access to the setup level Note If you entered an erroneous code the message incorrect code briefly appears on the display and subsequently you are asked to re enter the access code Once you have accessed the setup level the first parameter is displayed without delay Selection of parameters in the setup level Use the lt W gt and lt A gt keys to select the desired parameter next parameter lt A gt previous parameter Note The setup level is an endless loop i e stepping forward from the last parameter automatically brings up the first parameter again Changing parameters The control unit is in the setup level Press the lt E gt key if you wish to change the cur
78. the diameter of the hose Observe the following notes on correct installation of the hoses Use the supplied black plastic hoses 8 6mm 10 8mm and 12 10mm only For hygienic reasons do not use other hoses except products supplied by Axair Caution Fully demineralized water is aggressive For this reason the entire water system must contain fully demineralized water resistant material only When cutting hoses use an appropriate cutting tool providing straight kink free cuts Caution After cutting the tubes the sharp cutting edge must be trimmed otherwise the couplings may be damaged Hoses must be free of kinks and other damage longitudinal scratch es in particular Whencutting hoses always add at least 5 mm to the required length This way the hoses can be fastened correctly down to the stop to the quick action couplings of the nipples Make sure the hoses are not kinked and pay attention to the mini mum bend radius of 100 mm Do not lead hoses past hot system components max ambient temperature is 40 C To prevent damage we strongly recommend leading the hoses inside a duct or a similar means of protection between the connec tor box and the openings of the casing Afterinstallation verify correct fastening of all hoses Correctly mount ed hoses can not be removed without pressing the locking ring Water quality requirements The fully demineralized water must meet the fo
79. the respective clamping brackets Hang all drain off sheets into the vertical sections and push them down to the very stop gt Important The drain off sheet with system specific width marked with a V must be mounted in the corresponding interstice see installation drawing provided Starting from the already fixed vertical section to the very left align and fix the remaining vertical sections one after the other Proceed as follows push the corresponding vertical section towards the duct roof until it comes to a stop Then align the section parallelto the preceding section on the left by means of a bracket for the upper flow sheets Finally fix the screws of the respective clamping brackets gt Important At the interstice with system specific width the bracket for the upper flow sheet marked with a V must be used as spacer Important The brackets for the upper flow sheets serve as spacers only and must not be mounted yet 12 Mount the angle brackets to the upper end of all vertical sections and fix them with the M6x12 hexagon socket screws provided slightly tighten by hand only Align the vertical section to the very left at right angle to the cross arm Then push the angle bracket towards the duct roof and fix it to the duct roof using two self tapping screws provided drill holes 63 3 mm before Starting from the vertical section to the very left align all other vertical se
80. tion unit 12 which degerminates the water If humidification is required one or both spray valves 18 of the connector box are opened depending on the current humidification requirements if the optional third spray valve is available the system opens one two or all three valves at a time The fully demineralized water is now fed to the respective spray nozzles 21 producing fine aerosol fog The air passing by the nozzles absorbs the aerosol fog thus getting humidified Aerosol fog not absorbed by the air is retained in the post evaporation elements 20 thus humidifying the air passing through the post evaporation elements Excess water is flowing down to the bottom of the post evaporation elements and is led to the siphon trap 19 via the drain in the water tub Control The system is controlled by an external controller or by the PI controller built into the control unit The standard system with a 2 valve connector box provides a 3 step control corresponding to 1 3 2 3 and 3 3 of maximum output The first valve opens at approximately 20 and the second one at approximately 50 If the humidification requirements reach approximately 80 both valves are open Note systems equipped with the optional third valve provide 7 step control with respective humidification power Step 1 to 3 12 2181 aaa 0 11218141518171 Spray valve Y6 1 O rli Spray valve Y6 Spray valve Y7 0 1 1 Spray valve Y7 Spray v

Download Pdf Manuals

image

Related Search

Related Contents

Soluciones garantizadas para grúas de  • •• ••• • •• •••    MANUAL DE INSTRUÇÕES  Pour remplaçer la pédale  Utilisation du produit GPS Multisport KeyMaze 300  Installation Manual Kawasaki Vulcan/Nomad Version 2.1    

Copyright © All rights reserved.
Failed to retrieve file