Home

F.I.T. PRO Vacuum system 使用說明書使用说明书USER MANUAL

image

Contents

1. ALTRES UNAM E RPS gt AA E FIRE EE CH gt IIe E ES RE O ESAS da DS WA ERA AA ARA NATA EE RE DIE o BEAR UE ATA gt AREA YAA AER SA RIS PK ECH PERSIA gt HEEE A gt A TERCERA EE DET TH Fe HEFT HSL gt F LT Vacuum System BUA HUN gt TURE TEAK HE O RRA EEE o Bn RIA RS gt TORBAY ZERO REER A lA STIA TES E E AE ODA 29 ME ATLA DE a T mr IER E PK 2 ARIEL RK FERRER gt WIR cen Te Bae SA A eM IE A Aine gt FLT IS E ERA mins gt PEGS ZAG
2. a EPR she PIPER PD ARA HA PRE mt MHK Te rm ng CEA a UE H teas SHAS AS UA ARMAS VAL e Jr TARMA AGD PA A E RA ERE RADA AEE DUE FEM Ai AK oe A AE RARA KES MK WH Re ae RCA 0 PI CEU KR HER TE EAT ii e VELE P R IAS BEAT He Vi PR ETI SUB AK CE An mr SORA EI RE A EA PEE LIZ Ai EAT MX F L T Vacuum System Ah Gsm TUNES EA 29 MM MUARA A T A E mi ZEAE Bk HUA WN THEA KE KIRIA T co E 2 RK PENA SR ru WR die LE ji SERE rh EA ir ERIE LR EA A FUT ABRAZA Pi Aa te AZ FLT KARTE A AAA ARA EIA dit AAA AT EXI cl A at Les AN SA HI Ee RAR RAE EA ELSA NI F DAE tad Oy SE HEI In a RERI ie A RAR ARK ER VADER oh RETA 3 ZE FLT Vacuum System ZUNE AK SEI RELAIS Gill SEA amp SEA H 5 Pin HI Nexus WI IGT Be ES
3. ER CR1632 USE E DURE 29 ME FE FAR ERR ER SEHR ERAS gt SE E RIA FIBA gt Gr n O AMEN SETARE EBU ARTERIAL REE DVD gt EMILIE DN EI E SEI gt afi HABER E ZEI PREDA gt TARR RTI E O RS EA DE DETER FIFA RENE Ar EEA CEA gt rola gt 4 O dal gt PIERE E AER ERRATA EPR gt FURIA gt EAS BATA FRA I A ZE F ERRE FT Vacuum System HA ARRAIGADA SA i kK al PN ESO FISE FI AT REVES EAS SC o HERTZ SR E RE Ey ES ae Pe i PETE AN LS ARIAS eae EA AGE Pe eS AGRA WAZ MALA FS nk RER HEKRA AK SCA BEE FALE MAA AMA AMAR Ie BIS RP a ti WEM CR1632 hn RT BEE RIE RIN 1 IEDR AL A GU Ref HERA D PE Se ET AY RE SAR HER ARIF LARA BT AY tut i DEE EA 29 An PKR tii ST AR EY CAS A R Jes LAA WEE CW A CERA EV DA A RR MA REET H or A a ARA MARTA Ae UE TS BOTA He RA AK ECA oer FP D ET ca Ek E E ASA FEZ AA Ea A AeA A Ra EA EAR RII FLT MAA MAMA AE wae E BEA TANTRA o
4. EH CR1632 M i rit AT DEAE 29 Am AEH ers FER H e SI ZZ NAR FE URETA BRERA O FAIRER ERA AURA E Vb A A Eh PEAT PIE A FTA EAER VAER R 0 BRR FRIIS I ei AREA mt FEARS Al KE O PRL Een REIN ARR BUA TI CIEE ABE pm o RG LER A EIA E KB O AKES HAWN AOA LMA SAAR SAL PAREKH HRA EPS AA BA FYE AWA RA Se ia E Thank you for choosing FlTpro Vacuum System pre dive vacuum leak detection system for underwater camera housings Please read this manual carefully before installing and using FlTpro Vacuum System 1 Safety precautions Never dive or immerse the housing in the water without the protective cap The yellowish rubber valve is not watertight it serves only to hold the under pressure during the evacuating process Diving or immersing the housing without the protective cap will result in flood and or damage of your housing camera and FlTpro Vacuum System Replace the protective cap immediately after achieving the testing under pressure Always use CR1632 battery or equivalent Watch the polarity positive side contact is on the metal casing
5. negative contact is on the printed circuit Wrong polarity can damage the circuit and void the warranty Follow the standard pre dive testing procedure immediately after installation see instructions in this manual to confirm there is no leak All units are tested thoroughly prior to shipping In case the test shows there is a leak recheck the seal between the FlTpro Vacuum System and the housing It is the sole responsibility of the user to ensure the tightness between the FiTpro Vacuum System and the housing FIT will not be held responsible for any damage that may result from the faulty installation and use of the product If the problem persists please do not use the product and contact the dealer sales representative When putting the protective cap and or pump cap always hold the valve body with other hand to ensure it doesn t unwind from the housing It is not advisable to dive without under pressure with FiTpro Vacuum System installed While this shouldn t result in any damage it is only reasonable to always test the tightness of the housing and FiTpro Vacuum System prior to diving After all this is the reason for installing the device in the first place so be advised to plan the dive so that you have time for the test procedure Always do the test procedure in a dry place Rubber valve is not watertight and water splash could damage the circuit Do the procedure before boarding small boats the power consumption of the ci
6. testing procedure to check the sealing
7. ATA Bp MALIA KT BLA Bilt Nexus D810 AARMA ERR H Pr DIA BURA LW Dik WEIT LED WS NEM IA EI PNI ZA RT RH ARAA CU FS EB EPRI foe dk AA DA Sp ae a MAA o H e E a7 4 SIE 1 RR RP 3 2 AWA FIR EIEII 3 20 f LED IFE RARA AA II RR BI KA CA BM eZ A KA Be pes Bi ER fe DR ABBE 5 Franti 6 JP ZI BAK ROA OMS HERRA ao 7 HHS LK SABES HS GHAR AK SCA Ra Ae ZS TAA ES PB SAR DIR e mz eg 8 IEI E A AE 9 item ME LED II Sim 15 20 ih WRENN Ce rel Pir DB RODAR TEA IT LED FENER RIRS BRA KRAK ASAE ie PIE CERA REV AO HIT IPA AY RE SERII d ETE POLA TA AA RAM 10 KIEF ME LED 15 Aug IIIe WI ERES Tat TRI EI EA SRI oak E SIFI ME ET TEE A PAIE DR HEK AI As o 11 Haka FIRII IPEE EMT 12 PERA io 13 0 F HURT RER HE e 14 SLI BOE BR PPR A BRR BOE E DEP STAR CM SPRIE o BI AREA Ko tu E HAD 5 Ra
8. ES BZ LED JE EIERE 15 20 13 gt ASA NTE gt PAD am ORG LED FEIE RATER ETIE FAO TERM BRATE IZEREN H RA ET E MRE gt PLO FER CE EU PU gt 0 CBE gt WIZE LED ont O PI SREE gt RIADA gt MERA Je E Our DE D E D E Ip ADUCE 11 SES 12 BEIS gt mem 14 SEO URREA gt ARTO KS 13 PT TR e 15 SERBS BALADA PEE gt EA MAI EH A P DORA DUE gt DUE PEDIA RAIN EEN gt REA E i A GR
9. FLT PRO Vacuum system PAGE DIETEI bk A Asti BKE PERIE az UD ai Pre dive leak detection system for underwater DSLR imaging housings F 1 T PRO Vacuum system L fea EFA DBA USER MANUAL Sea POC RS OL English i ete F L T Vacuum System aA S FA E Ze bessi RIGE rk org Here ERC AE FIRII gt ZE SR SIR AR MIER 1 Dean AREA Pate a tee FII gt AIR FS ler SH TE TFE gt et EY SZ FB HAE BE AER AE hi E Rn EJE gt BA Copa i NIG gt PIRE SAE MARIA RAN gt Em ZE lee gt SATE i ZE A BERE E d AA CR1632 Drang Zen E COD DE TE ELA A PAE e Sr Pe Esi Ol e AER E WSL A gt See ol AREA 29 iki gt PK GER ere E gt YE EAS pi VT BETH ZEEE ARAA EER DEA DR e PE APE I AAA o RAE Wee RET AAA gt AEIR AZ ARK ZA AR e EI EVA ATA Se Ze A REA AER e A A EA EASA Pee AAA FLT AAA e WR gt SIS IE PLAN ERAS
10. gt FLT eR EET A RKE ER He Ce AR gt GEMA TARMA RAEE PIE ELE FEA MIDA EIN PREIS gt El s YNE KA LECH EEE AEK E D TE ZIN KRE En a 3 BER F 1 T Vacuum System ZARATE KE BR ERATI PE AO EES gt GM SEA amp SEA EY 5 Pin fire Nexus AAA ATA ABE e TARA RA gt ile Nexus D810 AA PHL ADCERE gt SEARS L hr e Fb gt EX RURALE LED RANA gt RRA RRA a Cie FSA fee AI EE RREI ES BS AE Pe 1 RE 2 AA NA EEEREN gt 3 at LED mt Jorge AE gt ATTE A RI AMES 5 oe 6 REALICE RECREERE gt IDE gt 7 HT ER gt RESINA CREA ERE ADT gt ARI gt DRS CEET 9 HER
11. ive cap 2 Press the power button under the yellowish rubber valve downwards until the switch clicks 3 Red LED starts blinking indicating the circuit is active At this time ambient pressure is measured and memorized 4 Detach the tubing from the pump cap Screw the pump cap into the valve body Attach the tubing back to the pump cap 5 Start pumping 6 Alternate red green blinking should start indicating that the pressure change is detected and that the circuit is active 7 After a number of strokes needed to achieve the proper under pressure depends on the housing volume the green LED starts blinking Apply further to 1 stroke 8 Detach the tubing from the pump cap Remove the pump cap 9 Replace and tighten the protective cap Observe the LED If the green LED still blinks after 15 20 minutes this indicates that no leakage is present so the housing is ready for dive If the green LED stops blinking and alternate red green or red starts blinking this indicates a leak so it is not safe for diving and the procedure of locating and eliminating the cause of the leak should be followed and the test procedure repeated afterwards 10 During the dive observe the LED If the green LED stops blinking and alternate or red blinking starts this indicates the rise of pressure and possible leak in which case it is advisable to immediately prepare and ascend following safety procedures to minimize the risk of flooding 11 Afte
12. r the dive rinse and dry the valve body 12 Remove the protective cap 13 Switch the circuit off pressing the red rubber button 14 Gently move the rubber button sideways to equalize the pressure You will hear the air hiss and the red LED will start blinking Be careful not to pull the bottom disc from the other side of the lid If this happens remove the upper lid and pull the lower disc through the hole then reinstall the upper cover 15 Replace the protective cap 5 Replacing the battery Always use CR1632 or equivalent battery The battery life with circuit switched on is about 29 hours Always switch the circuit off when not in use To replace the battery unwind the three bolts with hex wrench and lift the upper lid and the transparent window Remove bottom o ring and the electronic circuit Replace the battery with the new one The positive pole of the battery must face the outer metal enclosure the negative pole must face the printed circuit board Apply thin film of silicone grease to both o rings If necessary clean all the parts except the printed circuit with soft cloth Put the printed circuit in its seat in the bottom aluminum part Put the o ring around the printed circuit and press it gently into the recess Put the transparent window and upper aluminum part back matching the bolt holes Replace the bolts and tighten them sequentially to ensure even distance at all times Tighten the bolts Apply the standard
13. rcuit is small and the battery capacity is sufficient for 29 hours so there is no need to risk when there is a possibility of water splash 2 Warranty FIT will repair or replace at its option any product that proves to be defective in construction or materials within one year from the date of purchase FIT is not liable for damage to the equipment caused by leakage of water into the housing nor for loss of data or income that may result from such leakage or any accident during which FiTpro Vacuum System was in use This warranty is void in case of negligent handling of the FlTpro Vacuum System including but not limited to physical damage immersion of the unprotected electronic circuit in water modifications by other than the manufacturer and improper care There is no express or implied warranty except as stated above The buyer understands and agrees that because of the nature of this product he she uses FiTpro Vacuum System at his her own risk and agrees to hold FIT harmless except as stated above 3 Installation The installation procedure depends on the type of the adapter housing Compatible DSLR imaging housings include Nexus INON SEA amp SEA Subal Gates and Nauticam FiTpro Vacuum System is installed by either replacing the bulkhead bulkhead cap or screwed in the corresponding accessory port For more details please refer to the instructions from the local dealer 4 Operation 1 Remove the protect

Download Pdf Manuals

image

Related Search

Related Contents

  Hitachi YUTAKI S Inbetriebnahme Protokoll  Orthographe fichier pour l`autocorrection    HP Pavilion 17-f035nr  Equip 4-Socket Power Strip  Câmera Digital Kodak EasyShare CX4230 Zoom Guia do usuário  User manual  Avaya MultiVantage Little Instruction Book for basic  MANUEL D`UTILISATION DE LA BARRE DE CONTRÔLE  

Copyright © All rights reserved.
Failed to retrieve file