Home

Solar Panel Measuring Meter Operating Instructions

image

Contents

1. E IN AUSTRALIA 65 Assembly Drive Tullamarine Victoria 3043 Toll Free 1800 VERTILUX 1800 837 845 V1 0615
2. Solar Panel Measuring Meter Operating Instructions How to use the solar panel measuring meter A special tool has been developed for measuring light under different conditions The amount of power required to operate a solar motorised product is about 100mAh This represents two cycles two open and close each day The measurement trom the solar panel is 100mAh This means that if the panel generates an output 100mA electric current It will need one hour to charge Under normal situations the charging time will be much longer Therefore the required charging electric current can be much less For example if the charging time is 5 hours the required charging current is 20mMA The measurement will also vary depending on the time of day If the solar panel is positioned where it can access direct sunlight the 4 cell panel MSP53 will always be more than enough For a location that has no direct sunlight the table below gives an Indication as to how many cells a panel needs on a particular site based on the light measured Grey condition Raining heavy cloudy or late afternoon 0 5 0 8 4 MSP 53 3 5 5 0 4 MSP 53 0 4 0 5 6 MSP 77 2 5 3 5 6 MSP 77 Shining condition Sunning and between 10am 3pm 0 3 0 4 8 MSP 101 18 25 8 MSP 101 0 2 0 3 10 MSP 125 10 MSP 125 Wnertilux wherever there s a window The measuring meter page 1 of 1 vertilux com au BLINDS PROUDLY MAD

Download Pdf Manuals

image

Related Search

Related Contents

ShipCAM - ShipConstructor Software Inc.  Axis M3113-R Network Camera  

Copyright © All rights reserved.
Failed to retrieve file