Home
        Operating Instructions
         Contents
1.     e With oil supply systems fitted with water oil coolers  close the stop valves on the water in  and outflow  pipes  To prevent freezing  drain the water from the water oil cooler     Interior protection with preservative agent    Oil supply systems with forced lubrication should be run idle with preservative prior to any long term  storage     Duration of protection Preservative agent    up to 6 months None  Castrol Alpha SP 220 S  up to 24 months Close connection pipes          For storage periods longer than 24 months the oil supply system must be re preserved   For storage periods longer than 36 months  FLENDER should be consulted before        Table 7 1  Preservation procedure when using mineral oil or PAO based synthetic oil    Duration of protection Preservative agent    up to 6months Special anti corrosion oil None    TRIBOL 1390 1           up to 36 months Close connection pipes    For storage periods longer than 36 months  FLENDER should be consulted before        Table 7 2  Preservation procedure when using PG based synthetic oil   1  Resistant to tropical conditions and sea water  Max  ambient temperature 50  C  Interior preservation procedure   e Remove the oil supply system from service and drain off the oil     e Fill the oil supply system  if necessary  via the connected gear unit  with a sufficient quantity of  preservative agent as indicated in Table 7 1 or 7 2     e Start the oil supply system and allow it to idle for a short time     e Drain off the pre
2.   C and   35   C  Another  max  temperature is possible  see details in the list of equipment         BA 9704 EN 02 06  5 32    FLENDER       3 2    3 3    3 4    Obligations of the user    e The operator must ensure that all persons involved in installation  operation  maintenance and repair  have read and understood these Operating Instructions  BA  and comply with them at all times in  order to         avoid injury or damage       ensure the safety and reliability of the oil supply system   and        avoid disruptions and environmental damage through incorrect use     During transport  assembly  installation  dismantling  operation and maintenance of the unit  the  relevant safety and environmental regulations must be complied with at all times     The oil supply system must be operated  maintained or repaired only by authorised  duly trained and  qualified personnel     The gear unit must not be cleaned using high pressure cleaning equipment     All work must be carried out with great care and with due regard to safety     All work on the oil supply system must be carried out only when it is at a standstill    The drive unit must be secured against being switched on accidentally  e g  by locking the key switch  or removing the fuses from the power supply   A notice should be attached to the ON switch stating  clearly that work on the oil supply system is in progress     If any changes are noticed during operation of the oil supply system  e g  increased operating  temper
3.  83     8 2 1 11 Volumetric flow meter   8 2 1 12 Control valve  85  86    8 2 1 13 Cooling water flow regulator  500   8 2 1 14Stop valve  510     oO oo JJ zl NOOO oad E E P       BA 9704 EN 02 06  2 32    FLENDER       8 2 1 15Stop valve  515   8 2 1 16Pipe filter  520   8 2 1 17 General    8 2 2  8 2 2 1  8 2 2 2  8 2 2 3  8 2 2 4  8 2 2 5  8 2 2 6  8 2 2 7  8 2 3  8 2 3 1  8 2 3 2  8 2 3 3  8 2 4  8 2 4 1  8 2 4 2  8 2 5  8 2 5 1  8 2 5 2  8 2 6  8 2 6 1  8 3  8 3 1  8 3 2  8 3 2 1  8 3 2 2  8 3 2 3  8 3 3  8 3 4  8 3 5  8 4   8 5    9   9 1  9 2   9 2 1  9 2 2    10    10 1  10 2  10 3  10 4    11   11 1  11 2    12     High pressure lubrication circuit  Radial piston pump  310   Pressure relief valve  316   Pressure release valve  338   Pressure gauge  345    Pressure gauge  348    Pressure measuring transducer  350   Pressure measuring transducer  358   Heating circuit   Three way cock  207  217   Heating circuit pump  210    Oil preheater  290    By flow filtration   Filter  620    Temperature control valve  632   Filling and emptying circuit  Three way cock  707  717   Pump  710    Other   Drain cock  3    Interlocking instructions   Main circuit   Heating circuit   By flow filtration   Filling and Emptying circuit  Variant 2   Variant 3   Variant 4   Enable gear unit   Warning gear unit   Stop gear unit   Response to malfunctions  Shut down    Faults  causes and remedy   General information on faults and malfunctions  Possible faults   Possible faults when installin
4.  Ltda  Ger sala 1017   Enseada do Vit  ria   ES Fax   55  0  27   32 24 37 36 flender vitoria uol com br  Flender Power z BE Markham Phone   1  0  9 05   3 05 10 21 info flenderpti com  CANADA Transmission Inc  BIS Sues Coui  Units    Ontario L3R 8V2 Fax   1  0  9 05   3 05 10 23 www flender ca       CHILE   ARGENTINA                            Geesse AROR Flender Cono Sur Ltda  Avda  Galvarino Gallardo 1534   Providencia  Santiago o SH e es a   Ee  URUGUAY  f Flender Liaison Office Colombia S  ang   L  if S   ren E  uexco ee nn u EE  a an Lago Nargis No  11520 Mexico  D F  GE E e 2    gt  E   A info flendermexico com  aoe Cina O 64660 Monterrey  N L  IT  52 E Bt bo es a info flendermexico com  PERU Flender Cono Sur Ltda  Avda  Galvarino Gallardo 1534 Providencia  Santiago Ea      CS       a  a  usa Forder omo 1 gluta Ros Re ZE Zeen  Flender Corporation ee Su Bakersfield  CA  93308 Ge a a a a x    Z 5 e flender1  lightspeed net  VENEZUELA F H  Transmisiones S A  Calle Johan Schafer o Segunda Petare  Caracas Phone   58  0  2 12   21 52 61 fhtransm telcel net ve    Calle  Municipio Sucre    Fax   58  0  2 12   21 18 38    www fhtransmisiones com          BA 9704 EN 02 06  29   32    FLENDER                                                                                                       BANGLADESH er No 2 St  George   s Gate Road z Phone   91  0  33   2 23 05 45 SC  SRI LANKA Flender Limited 5th Floor  Hastings Kolkata  700022 Fax   91  0  33   2 23 1857 flender flenderindi
5.  guss de  WINERGY AG Am Industriepark 2 Postfach 201160 Tel    02871 924 info winergy ag com  46562 Voerde 46553 Voerde Fax   0 28 71  92 2487 www winergy ag com  sales motox flender   BahnhofstraBe 40   44 Postfach 1709 Tel    0 70 71  707 0  EE 72007 T  bingen Fax  920 211 20 400 Motoxcom  www  flender com  LOHER GMBH Hans Loher StraBe 32 Postfach 1164 Tel    0 85 31  3 90 info loher de    94099 Ruhstorf    94095 Ruhstorf    Fax   0 85 31  3 94 37    www loher de       A  FRIEDR  FLENDER AG  FLENDER SERVICE  INTERNATIONAL    Am Industriepark 2  46562 Voerde    Postfach 201160  46553 Voerde    Tel    02871 92 2210  Fax   0 28 71  92   13 47    infos flender service com  www flender service com          Werk Herne  S  dstra  e 111  44625 Herne    Vertriebsburo Penig  Thierbacher StraBe 24  09322 Penig    Postfach 101720  44607 Herne    Postfach 44 45  09320 Penig    Tel    0 23 23  940 0  Fax   0 23 23  9 40   3 33    24h Service Hotline  49  0  17 22 81 01 00    Tel    03 73 81  61 520  Fax   03 73 81  61   4 88    infos flender service com  www flender service com       infos flender service com  www flender service com          BA 9704 EN 02 06    27   32    FLENDER       Addresses   International     2006 06     Industriezentrum N   S  d                                                                                            Phone   43  0  22 36   6 45 70 office flender at  AUSTRIA Flender Ges m b H  Strasse 4  Objekt 14 2355 Wiener Neudorf Fax   43  0  22 36   6 45 70 
6.  of a volumetric flow meter  The  volumetric flow meter sends an output signal in proportion to the square of the oil flow volume      11 Volumetric flow meter  83     The oil flow to the gear unit is monitored by means of a volumetric flow meter  The volumetric flow meter  sends an output signal in proportion to the square of the oil flow volume      12Control valve  85  86     Setting these valves influences the distribution of the oil flow     Caution    Setting  see item 7 6      13Cooling water flow regulator  500     The cooling water flow is regulated to suit the required cooling performance      14Stop valve  510     The cooling water inflow can be stopped by this stop valve  2 limiting switches are used for the electrical  control of the opening condition      15Stop valve  515     The cooling water inflow can be stopped by this stop valve      16Pipe filter  520     The cooling water is filtered by this pipe filter      17General    After switching off the main drive the oil supply system must continue to run until the drive has come  to a complete standstill     High pressure lubrication circuit  1 Radial piston pump  310     These pumps draw the oil for the high pressure lubrication circuit from the low pressure lubrication  circuit     8 2 2 2 Pressure relief valve  316     These valves limit the pressure in systems with a heating circuit     Caution    The factory adjustment of these valves must not be changed        BA 9704 EN 02 06  17 32    FLENDER       8 2 
7.  oil supply system 1 minute before the gear unit     Caution  Never operate the gear unit without the oil supply system     Before starting up the gear unit for the first time the oil supply system must be run for at least 15 minutes  to fill all the oil chambers  See operating instructions for  Gear Unit      Then shut down the oil supply  system and  if necessary  correct the oil level      All piping   particularly suction pipes  inadmissible air intake    as well as all screw connections and  flanges must be retightened  Leaks must be resealed     Pumps    The direction of discharge of the pumps used is dependent upon the direction    Caution  of rotation     The direction of rotation of the motors must correspond to the direction of the  arrow on the pumps     Observe our supplier   s specific operating instructions for the pumps   Water oil cooler    The necessary water connections must be manufactured by the customer operator for the water  oil cooler     If the oil supply system is shut down for a longer period or if there is a danger of freezing  the cooling  water must be drained off     As regards the water oil cooler  the specific Operating Instructions of the manufacturer must be  observed        BA 9704 EN 02 06  13 32    FLENDER       7 5    7 6    General notes on add on components    Note  For operation and maintenance of the components specified in the equipment list   observe the specified operating instructions   For technical data  refer to the list of eq
8.  type  For the oil viscosity and oil type  refer to the operating instructions  BA  or the gear unit rating plate     The oil supply systems are designed for oil viscosities  lt  2200 mm2 s  installations with heating circuit  up to 7500 mm  s  at minimum starting temperature  see rating plate  8          BA 9704 EN 02 06  4 32    FLENDER       2 1    2 2    3 1    General notes    Introduction    These Operating Instructions  BA  are an integral part of the delivery of the oil supply system and must  be kept in its vicinity for reference at all times     Note  The operating instructions  BA  for the gear unit must be observed   All persons involved in the installation  operation  maintenance and repair of  aution    the oil supply system must have read and understood these Operating  Instructions and must comply with them at all times  We accept no    responsibility for damage or disruption caused by disregard of these  Instructions     The    FLENDER oil supply system    dealt with in these Operating Instructions  BA  has been  developed for use as an oil supply system of gear units  Possible areas of use for oil supply system of  this type include the cement industry and others     The oil supply system is designed only for the application described in section 1   Technical data    and  the List of Equipment     The oil supply system described in these Instructions reflects the state of technical development at the  time these Instructions  BA  went to print     In the int
9.  you can ensure that the oil supply  system is ready for use at any time     To order spare parts  refer to the list of equipment   We guarantee only the original spare parts supplied by us   Please note that spare parts and accessories not supplied by us have not been  aution    tested or approved by us  The installation and or use of such products may  therefore impair essential characteristics of the oil supply system  thereby  posing an active or passive risk to safety  FLENDER will assume no liability or    guarantee for damage caused by spare parts and accessories not supplied by  FLENDER     Please note that certain components often have special production and supply specifications and that  we supply you with spare parts which comply fully with the current state of technical development as  well as current legislation     When ordering spare parts  always state the following   Material no  Type   Size Part no  Quantity  Spare part and customer service addresses    When ordering spare parts or the services of our specialist engineers  apply first to FLENDER AG        BA 9704 EN 02 06  26 32    FLENDER       Adressen   Deutschland     2006 06        A  FRIEDR  FLENDER AG    Alfred Flender StraBe 77 Postfach 1364    46395 Bocholt    46393 Bocholt    Tel    0 28 71  92 0  Fax   0 28 71  92   25 96    contact flender com  www flender com          A  FRIEDR  FLENDER AG  Kundenservice Center Nord    Alfred Flender Stra  e 77  46395 Bocholt    Postfach 1364  46393 Bocholt    
10. 10 flenderat  Postfach 132  BELGIUM  amp    r Phone   32  0  2   2 53 10 30  LUXEMBOURG N V  Flender Belge S A  Cyriel Buyssestraat 130 1800 Vilvoorde Fax   32  0  2   2 53 09 66 sales flender be  Business Center    Bellissimo       BULGARIA Auto Profi N GmbH 102  Boul     Bulgaria    1680 Sofia e Wa o A S e a Pi flender auto profi com  Office 48  Etage 4 S   8  0  2   CROATIA SLOVENIA z S  BOSNIA  HUM   Naklada doo  Mandroviceva 3a 10000 Zagreb GE E a E E 2 22 flender hi htnet hr  HERZEGOVINA    F Branch Office d Phone   420 315   62 12 20    CZECH REPUBLIC A  Friedr  Flender AG Fibichova 218 27601 Melnik Fax   420 315   62 12 22 info cz flender com  E Phone   45   44 77 4477 ad ekspedition dk siemens com  DENMARK Siemens A S Borupvang 3 2750 Ballerup Fax   45  4477 40 19  siemens dk gear  ESTHONIA   LATVIA   Addinol Mineral  l Suur Sdiamae 32 11415 Tallinn Phone   372  0  6   27 99 99 flender addinol ee  LITHUANIA Marketing OU    Esthonia  Fax   372  0  6   27 9990 www addinol ee  Flender Oy P O  Box 60 Phone   358  0  10   5 11 51 51 webmaster flender fi  ALAN c o Siemens Osakeyhti    Majurinkatu 6 02601 Espoo Fax   358  0  10 5 113939  wwwalender fi  Head Office 78996 Elancourt Phone   33  0  1   30 66 39 00  FRANCE Rendas 3  rue Jean Monnet   B P 5 Cedex Fax   33 0 1 30663513  Saes flender fr  Sales Office A   3     Flender Gar  Agence de Lyon PS an Garis ae   e 5        E   sales flender fr  Parc Inopolis  Route de Vourles     1  rue du Vieux Moulin 67400 Illkirch      
11. 2 3    8 2 2 4    8 2 2 5    8 2 2 6    8 2 2 7    8 2 3  8 2 3 1    8 2 3 2    8 2 3 3    8 2 4  8 2 4 1    8 2 4 2    Pressure release valve  338     This valve limits the pressure on the suction side of the high pressure lubrication circuit     Caution    The factory adjustment of this valve must not be changed     Pressure gauge  345   The oil pressure is indicated visually by means of a pressure gauge   Pressure gauge  348     This pressure gauge is connected to the high pressure lines by a connector and indicates the  corresponding pressure     Pressure measuring transducer  350     The pressure on the suction side of the high pressure circuit is monitored by means of this pressure  measuring transducer  It sends an output signal in proportion to the pressure     Pressure measuring transducer  358     The pressure on the pressure side of the high pressure circuit is monitored by means of these pressure  measuring transducers  They send an output signal in proportion to the pressure     Heating circuit  Three way cock  207  217     For filling and emptying  one three way cock is provided upstream and another downstream of the  heating circuit pump  Each cock setting must be adjusted to suit the respective function  See position  symbol on the three way cock and the oil flow path on the lubrication diagram      During the filling draining process the main pump must not be operating  After  aution    the process the cocks must be set in operating position again   Heating c
12. 22   61  0  2   97 56 1492    sales flender com au  www flender com au       Siemens Ltd   Industrial Automation  amp   Control    Sales Offices   BW3  Level 2   885 Mountain Highway  Bayswater    VIC 3153  Melbourne    Phone   Fax      61  0  3   97 21 27 65   61  0  3 97 21 7888    sales flender com au       Siemens Ltd   Industrial Automation  amp     Suite 5  1407 Logan Rd     QLD 4122  Brisbane    Phone      61  0  7   34 22 23 89    sales flender com au                Mt  Gravatt Fax   61  0  7   34 22 2403  Control  Siemens Ltd  E  Suite 2 WA 6104 Phone   61  0  8   94 77 41 66  ai Automaten g 403 Great Eastern Highway Redcliffe   Perth De SB esconder com au  NEW ZEALAND Flender  Australia  Pty  Lid  Zen ZC  P O Box 6047 NSW  2164  Sydney GEN a engen  sales flender com au          BA 9704 EN 02 06    31 32    FLENDER       12     Declaration by the manufacturer       Declaration by the manufacturer    in accordance with EC Engineering Guideline 98 37 EC  Appendix II B       We hereby declare that the    Oil supply systems of type OWGM    described in these Operating Instructions are intended for incorporation in a machine  and that  itis prohibited to put them into service before verifying that the machine into which they are  incorporated complies with the EC Guidelines  original edition 98 37 EC including any subse   quent amendments thereto      This Manufacturer   s Declaration takes into account all the unified standards  inasmuch as  they apply to our products  p
13. 3 18 57 flender flenderindia com  D Industrial Growth Centre Nimpura Phone   91  0  3222   23 33 07 SES  Femer Gate Rakhajungle Kharagpur 721302 Fax   91  0  3222  233364  Works flenderindia com  Eastern Regional Sales Office      Sech   Hastings Phone   91  0  33   22 23 05 45 Rai  Flender Limited Ge George   s Gate Road Kolkata   700022 Fax   91  0  33   22 23 08 30 ero flenderindia com    Western Regional Sales Office Vashi Phone   91  0  22   27 65 72 27 wae  Filsmelar Gate Plot No  23  Sector 19 C Navi Mumbai 400705 Fax   91  0  22 27657228  Wf0 flenderindia com  or Southern Regional Sales Office Aminjikarai Phone   91  0  44   23 74 39 21 E  SSES 41 Nelson Manickam Road Chennai 600029 Fax   91  0  44 23743919 SfO flenderindia com  Northern Regional Sales Office d 5  Flender Limited 302 Bhikaji Cama Bhawan New Delhi   110066 Aes pa e Si i zi     z nro flenderindia com  11 Bhikaji Cama Palace     Flender Singapore Pte  Ltd  J    d a alan Jendral Ahmad Phone   62  0  21   471 50 65 E  INDONESIA Representative Office E Jakarta 13210   bobwall cbn net id  c o P T  Siemens Indonesia Yani 68 Pulomas Fax   62  0  21  471 50 63  P O  Box 15745 493   A  IRAN Cimaghand Co  Ltd  No  13  16   East Street Tehran 15156 Ee E e a   S E 5 e info cimaghand com  Beyhaghi Ave   Argentina Sq        Phone   972  0  52   4 76 14 26 ram greenshpon de  ISRAEL Greenshpon poaz 34487  Halfa Fax   972  0  4   8 14 60 37 www greenshpon co il  Takanawa Park Tower 17F  Flender Japan Co   Ltd  d x y Pho
14. 58 3   since 2 seconds       BA 9704 EN 02 06  19 32    FLENDER       8 3 2    8 3 2 1    8 3 2 2    Heating circuit   By flow filtration   Filling and Emptying circuit    The interlocking instructions depend on the type  refer to equipment list for type specification  of the oil  supply system     Variant 2   ENABLE for the heating circuit pump  210  if    Oil temperature  gt  temperature value  265 2    START for the heating circuit pump  210  if    Oil temperature  lt  temperature value  265 3    STOP for the heating circuit pump  210  if at least one of the following conditions is fulfilled   Oil preheater  290  has been out of operation for 3 minutes  Oil temperature  lt  temperature value  265 2    ENABLE for the oil preheater  290  if    Heating circuit pump  210  has been in operation for 2 minutes  START for the oil preheater  290  if    Oil temperature  lt  temperature value  265 3     STOP for the oil preheater  290  if at least one of the following conditions is fulfilled     Heating circuit pump  210  out of operation   Oil temperature  gt  temperature value  265 4   Oil temperature  gt  switching point  290   Variant 3    ENABLE for the by flow pump  210  if    Main pump  10  in operation   ENABLE for filter differential pressure monitor  620  if    Oil temperature  gt  temperature value  265 5    ENABLE for the by flow pump  210  if    Oil temperature  gt  temperature value  265 5    WARNING for thed by flow pump  210  if    Filter differential pressure  gt  sw
15. 6 92 34 38  Fax   27  0  13   6 92 34 52    sales flender co za       Flender Power  Transmission  Pty   Ltd     Unit 14 King Fisher Park  Alton  Cnr  Ceramic Curve  amp  Alumina  Allee  P O  Box 101995    Richards Bay  Meerensee 3901    Phone   27  0  35   751 1563  Fax   27  0  35 751 1564       sales flender co za    ARGENTINA    Chilicote S A     Avda  Julio A  Roca 546    C 1067 ABN    Phone   54  0  11   43 31 66 10    chilicote chilicote com ar                         Buenos Aires Fax   54  0  11   43 31 42 78  Head Office  F 32210 660 Phone   55  0  31   33 69 20 00    BRASIL Flender Brasil Ltda  Rua Quatorze  60 Contagem   MG Fax   55  0  31 3331 1898 vendas flenderbrasil com  Cidade Industrial  Sales Offices a  Flender Brasil Ltda  Rua James Watt  152 Geer Ge   O i       e flesao uol com br  conjunto 142   Brooklin Novo ax   i Rua Campos Sales  1095 14015 110 Phone   55  0  16   6 35 15 90 a  Bel sala 14   centro Ribeir  o Preto SP Fax  55 0 16 6351105  flenderribpretoQuol  com br  Rua da Mitra   quadra 30  lote 16 R  e dg 65075 770 Phone   55  0  98   32 25 84 92  Flender Brasil Ltda  GE Cristal   sala 207 S  o Luis   MA Fax   55  0  98   32 25 84 93 flendersiz uol com br  airro Renascenca  A Rua Padre Anchieta  1691 80730   000 Phone   55  0  41   3 36 28 49 n E  ear aeei teia  conjunto 1110   Bairro Bigorrilho Curitiba   PR Fax 465  oa sso2sag dualiyionalheorebolicom br  Rua Jos   Alexandre Buaiz      29050   545 Phone   55  0  27   32 24 37 35 Sa  Flender Brasil
16. Graffenstaden Phone   33  0  3   88 67 60 00 _  FRANCE Flender Graffenstaden SA B P 84 67 402 Illkirch   Fax   33  0  3   88 67 06 17 flencomm flender graff com  Graffenstaden  Phone   30 210 291 72 80  GREECE Flender Hellas Ltd  2  Delfon str  11146 Athens Fax   30 210 291 7102 flender otenet gr  soci as Phone   36  0  1   3 45 07 90 flender monornet hu  HUNGARY Wentechi Kit  Bees ZS 1023  Budapest Fax   36  0  1   3 45 07 92 jambor laszlo axelero hu  Parco Tecnologico Manzoni i 2  ITALY Flender Cigala S p A  Palazzina G 20040 Caponago  MI  GE E E go Info flendercigala it  Viale delle industrie  17 g  THE NETHERLANDS Flender Nederland B V  a En doa 2595 BN Den Haag  Phone  31  0  70 3336974  sales iflender ni  c o Siemens Nederland N V  Postbus 16068 2500 BB Den Haag Fax   31  0  70 333 12 12 www flender nl    Boterdiep 37 3077 AW Rotterdam Phone   31  0  10   4 97 08 08 info bruinhof nl  UE Bani a Postbus 9607 3007 AP Rotterdam Fax   31  0  10 4824350  www bruinhofnl  NORWAY Siemens AS   stre Aker vei 90 0596 Oslo Phone   47   22 63 30 00 adinfo siemens no  Divisjon Automation 8 Drive Postboks 1 0613 Oslo Fax   47   22633105 www siemens no ad  Branch Office E x  POLAND A  Friedr  Flender AG Przedstawicielstwo w Polsce 43 190 Mikol  w ni e z 2 e Se 1 eier  EE  ul  Wyzwolenia 27 ae  ms  E  P e   E g Phone   351  0  21   7 54 24 10    PORTUGAL Rodamientos FEYC  S A R  Jaime Lopes Dias  1668 CV 1750 124 Lissabon Fax   351  0  21   7 54 24 19 info rfportugal com  p B dul Garii O
17. Operating Instructions    BA 9704 EN 02 06  Oil supply systems of type OWGM                FLENDER    A  Friedr  Flender AG   46393 Bocholt   Tel  02871 92 0   Telefax 02871 92 2596   www flender com       FLENDER       7 7  7 7 1  7 7 2    8   8 1  8 2  8 2 1  8 2 1 1  8 2 1 2  8 2 1 3  8 2 1 4  8 2 1 5  8 2 1 6  8 2 1 7  8 2 1 8  8 2 1 9    Contents    Technical data  General technical data  Oil viscosity   oil type    General notes  Introduction  Copyright    Safety notes   Proper use   Obligations of the user   Environmental protection   Special dangers   Warnings and symbols used in these Instructions    Handling and storage  Scope of supply   Handling   Storage of the oil supply system  Standard corrosion protection    Technical description  General  Measures required as a function of the start condition    Assembly   General   Check before start up   General notes on add on components  Final installation work    Start up   Oil viscosity   oil type   Oil filling   Pumps   Water oil cooler   General notes on add on components  Start up   Removal from service   Interior protection with preservative agent  Interior preservation procedure    Operation   Lubrication diagram   Control information  Low pressure lubrication circuit  Pump  10    Filter  20    Temperature control valve  32   Pressure gauge  45    Pressure gauge  46   Thermometer  60    Resistance thermometer  65   Volumetric flow meter  8  Volumetric flow meter    0     81    8 2 1 10 Volumetric flow meter  82   
18. Operating instructions are being changed without authorisation   Possible faults in maintenance   e Maintenance intervals are not being adhered to     e Leakage in the vicinity of the oil supply system is not being identified and as a result chemically  aggressive media are damaging the oil supply system     Maintenance and repair    Observe the    Safety instructions    in section 3    Note  The operating instructions  BA  for the gear unit must be observed    Oils   For the oil viscosity and oil type  refer to the operating instructions  BA  or the gear unit rating plate     The oil supply systems are designed for oil viscosities  lt  2200 mm  s  installations with heating circuit  up to 7500 mm s  at minimum starting temperature  see rating plate  8       For the oil change intervals  please refer to the operating instructions  BA  for the gear unit   General notes on add on components    Note  For operation and maintenance of the components specified in the equipment list   observe the specified operating instructions   For technical data  refer to the list of equipment     Preservation  Refer to Section 7     Start up    and Section 8   Operation      Cleaning    To prevent the build up of dust on the oil supply unit  cleaning must be done  aution    in accordance with operating conditions        BA 9704 EN 02 06  25 32    FLENDER       11     Spare parts  customer service addresses    Stocking spare parts    By stocking the most important spare and wearing parts on site
19. Tel    Fax      0 28 71  92 0   0 28 71  92   14 35    ksc nord flender com  www  flender com       A  FRIEDR  FLENDER AG  Kundenservice Center Stid    BahnhofstraBe 40   44  72072 T  bingen    Postfach 1709  72007 T  bingen    Tel    0 70 71  707 0  Fax   0 70 71  7 07   3 40    ksc sued flender com  www flender com       A  FRIEDR  FLENDER AG  Kundenservice Center Sud   AuBenstelle Munchen     LiebigstraBe 14    85757 Karlsfeld    Tel    0 81 31  90 03   0  Fax   0 81 31  90 03   33    ksc sued flender com  www flender com       A  FRIEDR  FLENDER AG    Tel    0 30  91 42 50 58    ksc ost flender com          Kundenservice Center Schlossallee 8 13156 Berlin Fax   0 30  47 48 79 30 uns tlendercam  Ost   Osteuropa  A  FRIEDR  FLENDER AG Am Industriepark 2 46562 Voerde Tel    028 71  92 0 contact flender com    Werk Friedrichsfeld    Fax   0 28 71  92   25 96    www  flender com       A  FRIEDR  FLENDER AG  Getriebewerk Penig    Thierbacher StraBe 24  09322 Penig    Postfach 44 45  09320 Penig    Tel    03 73 81  60  Fax   03 73 81  8 02 86    ute tappert flender com  www flender com       A  FRIEDR  FLENDER AG  Kupplungswerk Mussum    Industriepark Bocholt  Schlavenhorst 100    46395 Bocholt    Tel    0 28 71  92   28 68  Fax   0 28 71  92   25 79    couplings flender com  www flender com                i fl    A  FRIEDR  FLENDER AG Obere Hauptstra  e 09228 Chemnitz  Tel    0 37 22  64 0 ee a enger  FLENDER GUSS 228   230 Wittgensdorf Fax   0 37 22  94   1 38 eee  www flender
20. a com  PEOPLE   S Head Office  REPUBLIC Flender Power Trans  Shuanghu Shuangchen Rd  Tianjin 300400 Phone   86  0  22   26 97 20 63 flender flendertj com  OF CHINA mission  Tianjin  Co   Ltd  West  Beichen Economic J Fax   86  0  22   26 97 20 61 www flendertj com  Development Area  BEDA   Sales Offices  Flender Power Trans  C 414  Lufthansa Center ii Phone   86  0  10   64 62 21 51 is  mission  Tianjin  Co   Ltd  50 Liangmagiao Rd  Beijing 100016 Fax  486  0  10 64622143 Dellina flenderpre com cn  Chaoyang District  Flender Power Trans  1101 1102 Harbour Ring Plaza Shanghai 200001 Phone   86  0  21   53 853148 shanghai   mission  Tianjin  Co   Ltd  18 Xizang Zhong Rd  9 Fax   86  0  21   53853146   flenderprc com cn  Flender Power Trans  Rm  1503  Jianyin Building Phone   86  0  27   85 48 67 15  mission  Tianjin  Co   Lid  709 Jianshedadao  Hankou Wuhan 430015 Fax   86  0  27  85486836      uhan flenderpre com cn  T  Rm  2802  Guangzhou k  Flender Power Trans  SS S Phone   86  0  20   87 32 60 42 guangzhou   Ge SEN International Electronics Tower Guangzhou 510095     mission  Tianjin  Co   Ltd  403 Huanshi Rd  East Fax   86  0  20 87326045 flenderprc com cn  Flender Power Trans  G 6 F Guoxin Mansion Phone   86  0  28   86 19 83 72  mission  Tianjin  Co   Ltd  77 Xiyu Street Chengdu 610015 Fax   86  0  28   86 19 88 10 chengdu flenderprc com cn  Rm 3 705  Tower D  Flender Power Trans  City Plaza Shenyang Phone   86  0  24   23 34 20 48  mission  Tianjin  Co   Ltd  206 Nanjin
21. actual flow rate in the pressure line for supplying the bearings  either to be read off  device with  display and switch  81  or to be calculated from the output signal  analog device with 4 20 mA output   83    is lower than specified in the equipment list  the regulator valve  85  must be closed until the  required volumetric flow is obtained  For this see also information in the equipment list of the oil  supply system    If the actual flow rate is higher  however  the required rate must be set by closing the regulator valve   86   The remaining procedure remains unchanged     innl Setting must always be done on one valve only  The other valve must be left  fully open  Closing both valves will cause the pressure relief valve of the pump  to act and so reduce the flow rate  Moreover  a higher noise level can then be   expected     6  The volumetric flow in the second pressure line then results from the actual pump output and must  not be adjusted or reduced  Specifications for the corresponding flow rate must be regarded as guide  values only     7  After the flow rate has been set  both valves  85  86  must be locked with the locking screw to prevent  them getting out of adjustment        BA 9704 EN 02 06  14 32    FLENDER       7 7    7 7 1    1 1 2    Removal from service  e To remove the oil supply system from service  it must be shut off     N Secure the oil supply system to prevent it from being started up unintentionally   Attach a warning notice to the start switch 
22. ature or unusual noises   the drive assembly must be switched off immediately     If the oil supply system is intended for mounting on plant or equipment  the manufacturer of such plant  or equipment must ensure that the contents of the present Operating Instructions are incorporated  in his own instructions     Notices attached to the oil supply system  e g  rating plate  direction arrows etc  must always be  observed  They must be kept free from dirt and paint at all times  Missing plates must be replaced     Screws which have been damaged during assembly or disassembly work must be replaced with new  ones of the same strength class and type     e All spare parts must be obtained from FLENDER   Environmental protection    e When changing oil  the used oil must be collected in suitable containers  Any spillage of oil must be  removed immediately     e Preservative agent should be stored separately from used oil     e Used oil  preservative agent  oil binding agents and oil soaked cloths must be disposed of in  accordance with environmental legislation     Special dangers    e Depending on operating conditions  the surface of the oil supply system may heat up considerably   Danger of burns     e When changing oil  take care to prevent scalding by hot oil        BA 9704 EN 02 06  6 32    FLENDER       3 5    4 1    4 2    Warnings and symbols used in these Instructions    N This symbol indicates safety measures which must be observed to avoid personal  injury   This symbol ref
23. bor nr  8D   Phone   40  0  21   2 52 98 61 E  ROMANIA CN Industrial Group srl Sector 2 021747 Bucuresti Fax   40  0  21   2 52 98 60 office flender ro    A   Phone   7  0  8 12   3 20 90 34      RUSSIA Flender 000 Tjuschina 4 6 191119 St  Petersburg Fax   7  0  8 12 3 20 90 82 flendergus mail spbnit ru  F Branch Office Phone   421  0  51   7 70 32 67 E  SLOVAKIA A  Friedr  Flender AG Vajansk  ho 49  P O  Box 286 08001 Presov Fax   421  0  51 7 70 3267 micenko flender nextra sk  Poligono Industrial San ihari  Ea     Phone   34  0  91   6 83 61 86 f iberica flender es  SPAIN Flender Ib  rica S A  Marcos Calle Morse  31 28906 Getafe   Madrid Fax   34  0  91   6 83 46 50 ww fender cs   Parcela D 15   SWEDEN Siemens AB Ostergardsgatan 2 4 43153 M  lndal Phone   46  0  31   7 76 86 00 kundcenter ad se siemens com  Mechanical Drives Box 14153 40020 G  teborg Fax   46  0  31   7 76 86 76 www siemens se flender  Phone   41  0  62   8 85 76 00 info flender ch  SWITZERLAND Flender AG Zeughausstr  48 5600 Lenzburg Fax   41  0  62 885 76 76 Aender ch  er nn IMES Sanayi  Sitesi 34776 Dudullu   Phone   90  0  216 4665141 cuzkan flendertr com  z 123  E Blok 502  Sokak No 22 Istanbul Fax   90  0  216 3645913 www flendertr com  Ticaret Ltd  Sti   DIV Deutsche   Phone   380  0  44   230 29 43 gt  UKRAINE Industrievertretung Prospect Pobedy 44 03057 Kiev Fax   380  0  44   2 30 29 30 flender div kiev ua  Bradford i  UNITED KINGDOM  amp  Flender Power o Phone   44  0  12 74   65 77 00 info flend
24. e system pressure is limited by a pressure relief valve integrated into  the pump     Caution    The factory adjustment of this valve must not be changed     Filter  20     The filter  20  is monitored visually by means of a differential pressure indicator and electrically by  means of a differential pressure monitor     Temperature control valve  32    A temperature control valve is located in the by pass of the cooler    Pressure gauge  45    The oil pressure in the pressure line to the gear unit is indicated visually by means of a pressure gauge   Pressure gauge  46    The oil pressure downstream of the pump is indicated visually by means of a pressure gauge   Thermometer  60    The oil temperature is indicated visually by means of a thermometer    Resistance thermometer  65     The temperature of the system is monitored by means of a resistance thermometer with a transmitter   The transmitter sends an output signal proportional to the oil temperature        BA 9704 EN 02 06  16 32    FLENDER       8 2 1     8 Volumetric flow meter  80     The oil flow to the tilting pad thrust bearing is monitored by means of a volumetric flow meter     8 2 1 9 Volumetric flow meter  81     8 2 1    8 2 1    8 2     ech    8 2     ech    8 2     ech    8 2 1    8 2     ech    8 2     a    8 2 2    8 2 2     The oil flow to the gear unit is monitored by means of a volumetric flow meter      10Volumetric flow meter  82     The oil flow to the tilting pad thrust bearing is monitored by means
25. emperatures outside the range 0 to   20   C     Provision for special environmental conditions during transport  e g  transport  by ship  and storage  climate  termites  etc   must be contractually agreed     The openings must be sealed with plugs or flanged covers     Standard corrosion protection    The properties of the outer paint coat are as follows  Resistant to acids  weak alkalis  solvents   atmospheric action  temperatures up to 120   C  temporarily up to 140   C  and to tropical conditions     Note     Ensure that the paint is not damaged    Mechanical damage  scratches   chemical damage  acids  alkalis  and thermal  damage  sparks  welding beads  heat  cause corrosion which may cause failure of  the external protective coating     Unless otherwise contractually agreed  the interior preservation is guaranteed for  6 months  provided that storage is in dry  frostfree sheds  The guarantee period starts  on the date of delivery     For longer periods of storage   gt  6 months  we advise regular checking and  if necessary  renewal of  the interior and exterior preservation  see section 7  Start up            BA 9704 EN 02 06  8   32    FLENDER       5 1    Technical description    Observe the    Safety instructions    in section 3   General  Note  The operating instructions  BA  for the gear unit must be observed     The oil supply system specified below serves to cool the oil and or lubricate gear units  see section 1      Technical Data         As an option to the sta
26. er power co uk  EIRE Transmission Ltd  Traum  Wars  eege Reet E Fax   44  0  12 74   66 98 36 www flender power co uk  SERBIA   MONTENEGRO Kat   Phone   381  0  11   60 44 73  ALBANIA G P Inzenjering doo  Ill Bulevar 54 19 11070 Novi Beograd Fax   381  0  11 3 11 6791 flender eunet yu  MACEDONIA          BA 9704 EN 02 06  28   32    FLENDER             NORTH AFRICAN 78996 Elancourt Phone   33  0  1   30 66 39 00  COUNTRIES EE EE Cedex Fax   33 0 1 30663513  Sales flender fr  E e Phone   20  0  2 5 75 1544   7  EGYPT Sons of Farid Hassanen 81 Matbaa Ahlia Street Boulac 11221  Cairo Fax   20  0  2 575 17 02 hussein sonfarid com  Head Office A _  SOUTH AFRICA lender rower Cnr  Furnace St  amp  Quality Rd  Isando Johannesburg Phone  27  0  11 5 712000   salesQiender co za    Transmission  Pty   Ltd     Fax   27  0  11 392 24 34    www flender co za       P O  Box 131 Isando 1600  Sales Offices   Flender Power Unit 3 Marconi Park  9 Marconi Phone   27  0  21   551 50 03   Transmission  Pty   Ltd  Crescent  Montague Gardens  Cape Town Fax   27  0  21 552 38 24 SeS Cieee aa  P O  Box 37291 Chempet 7442       Flender Power  Transmission  Pty   Ltd     Unit 3 Goshawk Park  Falcon Industrial Estate  P O  Box 1608    New Germany   Durban  New Germany 3620    Phone   27  0  31   7 05 38 92  ax   27  0  31   7 05 38 72    n    sales flender co za       Flender Power  Transmission  Pty   Ltd     9 Industrial Crescent  Ext  25  P O  Box 17609    Witbank  Witbank 1035    Phone   27  0  13   
27. erest of technical progress we reserve the right to make changes to the individual assemblies  and accessories which we regard as necessary to preserve their essential characteristics and improve  their efficiency and safety     Copyright  The copyright to these Operating Instructions is held by FLENDER AG     These Operating Instructions  BA  must not be wholly or partly reproduced for competitive purposes   used in any unauthorised way or made available to third parties without our agreement     Technical enquiries should be addressed to the following works    A  FRIEDR  FLENDER AG  D 46393 Bocholt    Tel   02871 92 0  Fax  02871 92 2728    Internet  www flender com    or to one of our customer service addresses  A list of our customer service addresses is given in  section 11   Spare parts  customer service addresses        Safety notes    Note  The operating instructions  BA  for the gear unit must be observed   Proper use    e The oil supply system has been manufactured in accordance with the state of the art and is delivered  in a condition for safe and reliable use  Any changes on the part of the user are not permitted  This  applies equally to safety features designed to prevent accidental contact     e The oil supply system must be used and operated strictly in accordance with the conditions laid down  in the contract governing performance and supply agreed by FLENDER and the customer     e The cooling water temperature at the entry of the cooler must be between   4 
28. ers to safety measures which must be observed to avoid damage to  aution    the oil supply system   Note  This symbol indicates general operating instructions which are of particular  importance     Handling and storage    Observe the    Safety instructions    in section 3   Scope of supply    The products supplied are listed in the despatch papers  Check immediately on receipt to ensure that  all the products listed have actually been delivered  Parts damaged during transport or missing parts  must be reported in writing immediately to FLENDER AG     Caution    If damage has occurred  the oil supply system must not be put into operation     Handling    A When handling FLENDER products  use only lifting and handling equipment of  sufficient load bearing capacity   Observe the notes regarding load distribution on the packaging     The oil supply system is delivered in the fully assembled condition  Additional items are delivered  separately packaged     Different forms of packaging may be used depending on the size of the oil supply system and method  of transport  Unless otherwise agreed  the packaging complies with the HPE Packaging Guidelines     The symbols marked on the packaging must be observed at all times  These have the following       meanings   bild transport  at 28  1               This way Fragile Keep Keep Centre of Use no Attach  up dry cool gravity hand hook here                BA 9704 EN 02 06  7 32    FLENDER       4 3    4 4    Note     The oil supply syste
29. es must be taken     Start conditions Measures    Oil equivalent length of Intermediate pipework    viscosity    when using   mineral oil  VG 320  approx     intermediate  pipework    Oil supply  system       Low pressure  lubrication    High pressure  lubrication    Gear unit    circuit circuit       without heating  circuit       with heating  circuit       with heating    Circuit insulate commonly       with heating  circuit          with heating  circuit    insulate commonly       with heating insulate commonly  circuit and and  heat shroud 1  heating strips 1     Heating  elements 1                       1  e The heating output must be sufficient to heat the oil up to min  0   C   e The plant must must not be operated before achieving O   C in all pipes   e The heat shroud is not included in the delivery of the oil supply system   e Heating strips are not included in the delivery of the pipework        BA 9704 EN 02 06  10 32    FLENDER       6 1    Assembly    Observe the    Safety instructions    in section 3     General    Note  The operating instructions  BA  for the gear unit must be observed     All preserved flange surfaces must be washed down with a solvent  e g  petroleum ether     UN Environmental protection requirements must be observed     The base frame must be set up horizontally     The system must be secured to prevent slippage  screws and plugs are included in FLENDER   s  delivery  fixing holes are provided in the base frame      On the version with a d
30. ether voltage and frequency of the motors correspond to the mains supply values and  whether the motors are duly protected to prescriptions     e Check that the electrical connections are properly tightened and the monitoring equipment is properly  connected and set     e Check that air inlet holes and cooling surfaces are clean   e Check that protective measures have been taken   e Check that the terminal box cover is closed and the line inlets are properly sealed   Connections must be carried out by a specialist in accordance with the current  aution  safety regulations  The relevant installation and operating requirements and  the usual national and international requirements must be observed   General notes on add on components    Note  For operation and maintenance of the components specified in the equipment list   observe the specified operating instructions   For technical data  refer to the list of equipment     Final installation work    After the gear unit has been installed with the oil supply system  check that all visible screw connections  are correctly tightened and  if necessary  retighten     Start up    The oil supply system must not be started up without the required operating  autlon    instructions being available   If damage has occurred  the oil supply system must not be put into operation     Observe the  Safety instructions    in section 3   Oil viscosity   oil type  For the oil viscosity and oil type  refer to the operating instructions  BA  or the 
31. for mill drive when at least one of the following conditions is fulfilled     Oil temperature  gt  temperature value  65 3   Oil flow quantity  lt  volumetric flow value  82 2  or  lt  switching point  80 2   Oil flow quantity  lt  volumetric flow value  83 2  or  lt  switching point  81 2     Oil pressure on pressure side   downstream of HP pumps e on 2 adjacent segment  lt  pressure value  358 1   e or incase of installations with   10 segments  on at least 3 segments  lt  pressure value  12 segments  on at least 4 segments  lt  pressure value  14 segments  on at least 5 segments  lt  pressure value  15 segments  on at least 4 segments  lt  pressure value  17 segments  on at least 5 segments  lt  pressure value  18 segments  on at least 6 segments  lt  pressure value    358 1   358 1   358 1   358 1           mn    358 1  358 1    Ve EE sit     Number of installation segments see quantity indication Item no  358 in the equipment list     If the oil temperature with STOP gear unit is higher than temperature value  65 3   the pump must  remain switched on until the oil temperature has decreased to a value  lt   65 2      Response to malfunctions    A Irrespective of the following information  the local safety requirements will  apply in all cases for operation of the oil supply system     Monitoring during operation is essential to identify any malfunctions occurring  see Section 9      Disturbances  reasons and remedy     and thus to implement preventive measures  The operat
32. g Street  N  Seng MOTH Fax   86 0 24 23342046  Shenyang flenderpre com cn  Heping District  7  Rm  302  Shanzi Zhong Da S  Flender Power Trans  u h d Phone   86  0  29   87 20 32 68 A  Saaft International Mansion Xi an 710002   xian flenderprc com cn  mission  Tianjin  Co   Ltd  30 Southern Rd  Fax   86  0  29   87 20 32 04  Flender Power Trans  Rm  23E  Xinhua Plaza  No 6    Phone   86  0  871   3 12 43 68     mission  Tianjin  Co  Ltd  Renmin East Rd  rnmtrg G00 we Oeae Ceecee  _ Rm 1007  Building A  Golden 4 7  mission  Tianjin  Go  Ltd  Center  Jincheng Intemational Zhengzhou 450008 e   a Man s8089 lenderpre com on  er   Plaza  No  68 Jingsan Rd    ji    Flender Power Trans  Rm  908  east   No  188 z Phone   86  0  25   83 24 25 50 m  mission  Tianjin  Co   Ltd  Guangzhou Rd  Kenjie 20191 Fax   86  0  25 83244820   anjing flenderpre com cn  Rm  1408  Pearl River  Flender Power Trans  o Her   Phone   86  0  411   83 77 93 55 e  eet Saaft International Building No  99 Dalian 116011 e _ dalian flenderprc com cn  mission  Tianjin  Co   Ltd  Xinkai Rd  Xigang District Fax   86  0  411   83 77 92 19  Rm  1401  Tianlin Building  Flender Power Trans  Hunan Gold Source Hotel Changsha 410007 Phone   86  0  731 5167309 changsha   mission  Tianjin  Co   Ltd  No 279  Second Block 9 Fax   86 0 731 5164746   flenderprc com cn  Furong Rd   Head Office    Ko e Hastings Phone   91  0  33   22 23 05 45 ET  INDIA Flender Limited Se George   s Gate Road Kolkata   700022 Fax   91  0  33   22 2
33. g the oil supply system  Possible faults in maintenance    Maintenance and repair   Oils   General notes on add on components  Preservation   Cleaning    Spare parts  customer service addresses  Stocking spare parts  Spare part and customer service addresses    Declaration by the manufacturer    17  17  17  17  17  17    18  18  18    18  18  18    18  18  18    19  19  19    19  19  20    20  21  21  22  22  22  23    23  23  23  25  25    25  25  25  25  25    26  26  26    32       BA 9704 EN 02 06  3 32    FLENDER       1 1    1 2    Technical data    General technical data    The most important technical data on the oil supply system are shown on the rating plate  These data  and the contractual agreements between FLENDER and the customer for the oil supply system  determine the limits of its correct use                                D Oil max   Max  permissible oil operating overpressure   t min   Minimum starting temperature   perm  operating pressure of the water  Pwater max      bar     PSI  Operating Instructions number   dD Special data  eg  total weight       Company logo and production location  2  Material No     3  Production order no     4  Type      Size      Variant   D   O     Note  These operating instructions generally include a list of equipment including the  drawings to the oil supply system and the operating instructions for the accessory  components     For further technical data  refer to the list of equipment and the drawings   Oil viscosity   oil
34. gear unit rating plate     The oil supply systems are designed for oil viscosities  lt  2200 mm2 s  installations with heating circuit  up tp 7500 mm  s  at minimum starting temperature  see rating plate            BA 9704 EN 02 06  12 32    FLENDER       7 2    7 3    7 4    Oil filling  Note  The operating instructions  BA  for the gear unit must be observed     To remove preservative residues  which could cause the oil to foam  the oil supply system must be  flushed out together with the gear unit before starting up     Before starting up the gear unit oil supply system must be filled with oil  After filling the filling holes must  be correctly closed and sealed     The oil must then be carefully drained out of the oil supply system  the monitoring equipment and the  oil chambers in the gear unit  while it is warm  It may be re used only as flushing oil  The flushing oil must  be cleaned before re use     There is a danger of scalding from the hot oil emerging from the housing   Wear protective gloves to avoid scalding     Caution    Remove any oil spillage immediately with an oil binding agent     Dh    Oil must be put into the oil supply system via the gear unit  see operating instructions for  Gear Unit      Care must be taken that no dirt can get into the oil circuit     Oil must be poured in until it is level with the mark on the oil level indicator  while the pump is not  operating  see operating instructions for  Gear Unit      The pump can then be started     Start
35. ing  pressures and oil temperatures should be recorded regularly     If irregularities at variance with the normal condition are noticed during operation  or if the operating data  change  it is essential that the cause be identified immediately  If necessary  shut the system off  If the  causes cannot be identified  even with the aid of the Troubleshooting List  inform FLENDER at once   see Section 11     Stocking spare parts  service facility addresses          N We URGENTLY recommend that a lockable emergency switch be provided to  ensure that the system is secured to prevent accidental switch on during  maintenance  repairs  or malfunctions  In addition  we would draw attention to   the relevant accident prevention regulations on site     For restart after malfunction  the information in Section 7     Start up    should be noted        BA 9704 EN 02 06  22 32    FLENDER       8 5    9 1    9 2       Shut down    If the gear unit and oil supply system are shut down for longer periods  the following measures are  necessary     a  Gear unit and oil supply system should remain filled with oil  Every 4 weeks gear unit and oil supply  system must be run for 1 hour  The necessary prelubrication and lubrication times should be  observed     b  If the measures listed under a  are not possible  the gear unit and the oil supply system  see  section 7     Start up     must be preserved     The operating instructions  BA  for the gear unit must be observed     Note  If the oil supply 
36. ircuit pump  210     When the pump is operating  the system pressure is limited by a pressure relief valve integrated into  the pump     The factory adjustment of this valve must not be changed  It must be ensured  aution    that the pump is pumping oil and will not run dry   Oil preheater  290     This oil preheater is provided for heating the oil  A temperature monitor with reclosing interlock is  integrated     By flow filtration  Filter  620     The filter is monitored visually by means of a differential pressure indicator and electrically by means  of a differential pressure monitor  When changing the filter during operation of the main pump the setting  of the 3 way cocks  207  217  must prevent any drawing in air     During the process the pump  210  must not be operating  After the process the  aution    cocks must be set in Operating position again     Temperature control valve  632     A temperature control valve is provided in the bypass        BA 9704 EN 02 06  18 32    FLENDER       8 2 5  8 2 5 1    8 2 5 2    8 2 6  8 2 6 1    8 3    8 3 1    Filling and emptying circuit  Three way cock  707  717     For filling and emptying  a three way cock is provided each upstream and downstream of the filling    emptying pump  Each cock setting must be adjusted to suit the respective function  see position symbol  on the three way cock and the oil flow path on the lubrication diagram      During the filling draining process the main pump must not be operating  After  autio
37. itching point  620    STOP for the by flow pump  210  if at least one of the following conditions is fulfilled   Main pump  10  out of operation    Oil temperature  lt  temperature value  265 5  longer than 2 minutes       BA 9704 EN 02 06  20 32    FLENDER       8 3 2 3 Variant 4    8 3 3    ENABLE for the heating circuit   by flow pump  210  if    Oil temperature  gt  temperature value  265 2   ENABLE for filter differential pressure monitor  620  if    Oil temperature  gt  temperature value  265 5   START for the heating circuit   by flow pump  210  if at least one of the following conditions is fulfilled   Oil temperature  lt  temperature value  265 3    Oil temperature  gt  temperature value  265 5   WARNING for the heating circuit   by flow pump  210  if    Filter differential pressure  gt  switching point  620    STOP for the heating circuit   by flow punmp  210  if    Oil temperature  lt  temperature value  265 2   ENABLE for the oil preheater  290  if    Heating circuit    by flow pump  210  has been in operation for 2 minutes  START for the oil preheater  290  if    Oil temperature  lt  temperature value  265 3     STOP for the oil preheater  290  if at least one of the following conditions is fulfilled     Heating circuit pump  210  out of operation  Oil temperature  gt  temperature value  265 4   Oil temperature  gt  switching point  290   since 1 second    Enable gear unit    ENABLE mill drive when all the following conditions are fulfilled     Filter differentia
38. k No  22  Bandaria Area  Dohan Bldg  i Phone   966  0  3   8 87 53 32  SAUDI ARABIA South Gulf Sands Est  Flat 3 1  P O  Box 32150 Al Khobar 31952 Fax   966  0  3 887 53 31 adelameen nesma net sa    i Phone   65  0    68 97 94 66 flender singnet com sg  SINGAPORE Flender Singapore Pte  Ltd  13A  Tech Park Crescent Singapore 637843 Fax   65  0    68 97 94 11 flender com sg  Mezzeh Autostrade  S e e Transportation Phone   963  0  11   6 11 67 94   o f  SYRIA Misrabi Co  amp  Trading Building 4 A  5th Floor Damascus Fax   963  0  11 6 11 09 08 ismael misrabi gmx net  P O  Box 12450  E ae 1F  No 5  Lane 240 E a E Phone   886  0  2   26 93 24 41  TAIWAN Flender Taiwan Limited Nan Yang Street  Hsichih Taipei Hsien 221 Fax   886  0  2   26 94 36 11 flender_tw flender com tw  Representative Office    Talay Thong Tower  53 Moo 9 A  Sriracha Phone   66  0  38   49 51 66   8  THAILAND Flender Singapore Pte  Ltd  10th Floor Room 1001 Chonburi 20230 Fax   66  0  38   49 51 69 contact flender th com  Sukhumvit Rd   T  Tungsukla  Flender Singapore Pte  Ltd  SCH    i The Landmark Building    Representative Office Dai   Phone   84  0  8   8 25 19 00  VIETNAM c o Siemens AG   Branch 2nd Floor Ho Chi Minh City Fax   84  0  8 8 25 15 80 flender_vn flender com vn    Office    5B Ton Duc Thang St   District 1    AUSTRALIA    Siemens Ltd   Industrial Automation  amp   Control    Head Office    9 Nello Place  P O  Box 6047    Wetherill Park    NSW 2164  Sydney    Phone   Fax      61  0  2  97 56 23 
39. l pressure  lt  switching point  20    Oil temperature  lt  temperature value  65 2    Oil flow quantity  gt  volumetric flow value  82 1  or  gt  switching point  80 1   Oil flow quantity  gt  volumetric flow value  83 1  or  gt  switching point  81 1     Oil pressure on pressure side downstream   of HP pumps e ofall segments  lt  pressure value  358 2   e no 2 adjacent segments  lt  pressure value  358 1   e and in case of installations with   10 segments  on at least 8 segments  gt  pressure value  358 1   12 segments  on at least 9 segments  gt  pressure value  358 1   14 segments  on at least 10 segments  gt  pressure value  358 1   15 segments  on at least 12 segments  gt  pressure value  358 1   17 segments  on at least 13 segments  gt  pressure value  358 1   18 segments  on at least 13 segments  gt  pressure value  358 1     Number of installation segments see quantity indication Item no  358 in the equipment list        BA 9704 EN 02 06  21 32    FLENDER       8 3 4    8 3 5    8 4    Warning gear unit    WARNING for the mill drive when at least one of the following conditions is fulfilled     Filter differential pressure  gt  switching point  20    Oil temperature  gt  temperature value  65 2    Oil flow quantity  lt  volumetric flow value  82 1  or  lt  switching point  80 1   Oil flow quantity  lt  volumetric flow value  83 1  or  lt  switching point  81 1     Oil pressure on suction side  upstream of HP pump  gt  pressure value  350 2     Stop gear unit    STOP 
40. lief valve     See separate Operating  Instructions  BA         Filter contaminated    unusual or increased  filter residues     Filter contaminated     Pipes dirty    Scale  welding residues     Oil contaminated   Abraded material from    defective pump     Abraded material from gear unit     Clean or replace filter     Clean the pipes     Change oil     Repair or replace pump   See separate Operating  Instructions  BA      Check gear unit  bearings  teeth   alignment  and repair defects        Oil consumption too high        Leak in pipes  connections   valves or gear unit     Shaft outlets on gear unit leaky     Water oil cooler leaky     Filter leaky     Table 9 1  Faults  causes and remedies       Tighten screws   Reseal     Replace sealing rings   Seal or replace water oil cooler     See separate Operating  Instructions  BA         Seal filter        BA 9704 EN 02 06  24 32    FLENDER       9 2 1    9 2 2    10     10 1    10 2    10 3    10 4    Possible faults when installing the oil supply system    e Important information for describing the drive and the environment will not be communicated to  others     e Performance data too high    e Cooling water not available of contaminated    e Chemically aggressive environment not taken into consideration   e The ambient temperature is not permissible    e Components with transport or other damage are being fitted    e Loosely supplied parts are interchanged    e Prescribed tightening torques are not being adhered to       
41. m must always be transported with due care to avoid injury  to persons and damage to the oil supply system     The oil supply system must be transported with suitable equipment only   During transport the oil supply system should be left without oil filling and on the  transport packaging     When handling the oil supply system  exercise special care to avoid damage  due to the use of force or careless loading and unloading    To transport and handle the oil supply system  use ropes or chains  Only the  designated lifting eyes on the base frame must be used for fastening    Care must be taken that the carrier ropes do not damage fittings and piping   A cross beam is therefore required for protection  The lengths of the ropes  must be set to ensure that the base frame is suspended horizontally     Storage of the oil supply system    The oil supply system must be stored in its position of use in a sheltered place  it must be placed on  a vibration free  dry wooden base and covered over     A    Note     Do not stack oil supply systems one on top of another     If the oil supply system is being stored out of doors  it must be particularly  carefully covered  and care must be taken that neither moisture nor foreign  material can collect on the oil supply system  consult FLENDER in any case      Unless otherwise agreed by contract  the oil supply system must not be exposed to  harmful environmental factors such as chemical products  high air pollution  air  humidity  and ambient t
42. n    the process the cocks must be set in operating position again   Pump  710     When the pump is operating  the system pressure is limited by a pressure relief valve integrated into  the pump     The factory adjustment of this valve must not be changed  It must be ensured  that the pump is pumping oil and will not run dry    Other   Drain cock  3    This drain cock may be used to conduct liquids out of the catching area of the base frame    Interlocking instructions    If not specified specially a dealy time of 30 seconds applies     Note  When enabling and determining starting condition for pumps  it must be ensured that  temperature values are based on VG 320 mineral oil   If other oils are used  the viscosity of the oil for that temperature value must not be  higher     Main circuit   ENABLE for the low pressure pump  10  if    Oil temperature  gt  temperature value  265 1   ENABLE for filter differential pressure monitor  20  if    Oil temperature  gt  temperature value  65 1    ENABLE for the HP pumps  310  when all the following conditions are fulfilled   Main pump  10  in operation    Oil pressure on suction side  upstream of HP pumps  gt  pressure value  350 1  and  lt  pressure value  850 2     STOP for HP pump  310  if at least one of the following conditions is fulfilled     Oil pressure on suction  side upstream of HP pumps  lt  pressure value  350 1     Oil pressure of a segment line  supplied by the pump   refer to lubrication schedule   gt  pressure value  3
43. ndard variant 1 the variants 2 to 5 are availabe     e E Variant  Main functions  123415    Pump group  Double change over filter             Water oil cooler       Tilting pad thrust bearing       Pressure line    Gear unit supply       Low pressure lubrication circuit       High pressure lubrication circuit       Heating circuit       By flow filtration             Filling   Emptying circuit  1  The filling   emptying circuit is functioning by the pump  210    Note  For control instructions  refer to section 8     Operation        Observe for this the drawings and the list of equipment  The components specified in the list of  equipment can also be found on the drawings with the part number     Caution    Before starting up all monitoring devices must in all cases be connected     Note  The direction of discharge of the pump used is dependent upon the direction of  rotation     innl To ensure optimum cooling performance  the specified direction of flow in the  water oil cooler must be observed  The cooling water inlet and outlet must not  be reversed   The pressure of the cooling water must not exceed 8 bars   If the gear unit is being withdrawn from service for a longer period or if there  is a danger of freezing  the cooling water must be drained off  Remove any  remaining water with compressed air        BA 9704 EN 02 06  9 32    FLENDER    5 2 Measures required as a function of the start condition       Depending on the required starting temperature the following measur
44. ne   81  0  3   54 23 87 05 A  JAPAN cla Simone RA 3 20 14 Higashi Gotanda 141 8641 Tokyo Fax  481  0  3 54 23 87 32 contact flender japan com  Shinagawa ku  7th FI  Dorim Bldg   Phone   82  0  2   34 78 63 37 sales flender korea com  KOREA Flender Ltd  1823 Bangbae Dong Seoul 137 060 Fax   82  0  2   34 786345    fiander korea com  Seocho Ku www   Al Showaikh Ind  Area Phone   965  0    48297 15  KUWAIT South Gulf Company PO  Box 26229 Safat 13123 Fax   965  0    4 82 97 20 adelameen awalnet net sa  Dahr el Jamal   y  LEBANON Gabriel Acar  amp  Fils s a r  Zone Industrielle  Sin el Fil Beyrouth enone  961  0  1249 82 72 gacar beirut com  Fax   961  0  1   49 4971  B P  80484  Flender Singapore Pte  Ltd  S  z 3 Level 1 Reception  CP Tower 5 s     e  Bhd y   Pusat Dagang Seksyen 16 9    PAKISTAN A  Friedr  Flender AG Postfach 1364 46393 Bocholt Phone   49  0  28 71  922259   ar wittag flender com    Fax   49  0  28 71   92 15 16          BA 9704 EN 02 06  30   32    FLENDER          PHILIPPINES    Flender Singapore Pte  Ltd     Representative Office    28 F  Unit 2814  The Enter   prise Centre  6766 Ayala Ave   nue corner  Paeso de Roxas    Makati City    Phone   Fax      63  0  2 8 49 39 93   63  0  2 8 49 39 17    junt flender com ph       BAHRAIN   IRAQ    Flender G  c Aktarma    Middle East Sales Office                      OMAN  GATAR Sistemleri Sanayi ve IMES Sanayi Sitesi S4716 SSC Ge   ji 2 e   s z E meso flendertr com  U A E    YEMEN Ticaret Ltd  Sti  E Blok 502  Soka
45. oler contaminated  Clean clogged cooler in accordance  with manufacturer   s maintenance  instructions  or replace    See separate Operating  Instructions  BA         Oil temperature too low  Gear unit has not heated up  Wait     Too much cooling water  Reduce cooling water supply   Cooling water too cold              BA 9704 EN 02 06  23 32    FLENDER       Malfunctions    Oil pressure too low     Oil pressure too high     Causes    Filter clogged     Suction line clogged     Pump is drawing in air     Oil temperature too high     Oil viscosity too low     Pump defective  pump drive  defective     Pressure relief valve incorrectly set     Pressure relief valve defective     Gear unit has not yet heated up     Oil pipes to and on gear unit  blocked     Oil viscosity too high     Pressure relief valve incorrectly set     Pressure relief valve defective     Clean or replace filter element  or  switch to clean filter and clean or  replace filter element    See separate Operating  Instructions  BA      Clean suction pipe     Check suction pipe and   if necessary  repair leaks     See there     Check oil viscosity and   if necessary  put in correct oil     Repair or replace pump   See separate Operating  Instructions  BA      Contact FLENDER     Repair or replace pressure  relief valve    See separate Operating  Instructions  BA      Wait    Find and clean blocked line   Check oil viscosity and    if necessary  put in correct oil   Contact FLENDER    Repair or replace pressure  re
46. rain cock on the base frame the drain cock must  depending on conditions at  the site  be fitted before setting the system down  For reasons of space fitting may not be possible  later without raising the system     If connection pipes are not supplied with the system  seamlessly drawn and bright normalised  NBK   pipes of ST 35 4 in accordance with DIN 2391 c  hydraulic tubing  quality grade C  must be used     The interfaces must be provided with the appropriate flanges or screw connections     For connection pipes we recommend using compensators to insulate against vibration and  compensate for stretching     Pipe fastenings  plastic clips  must be used to install piping  The distance between clips must be  less than 2 m   78 7        Make sure the piping is not twisted   After installation the pipes must be flushed out  Welded pipes must be pickled     The motors and monitoring equipment must be connected up electrically in accordance with terminal  diagrams  equipment lists and regulations  Check voltage and circuits     Before connecting the water oil cooler remove the plugs from the water connection and flush the  water oil cooler well to remove any dirt     Install the cooling water in  and outflow pipes  For the flow direction of the cooling water and the  location of the connections please refer to the dimensioned drawing        BA 9704 EN 02 06  11 32    FLENDER       6 2    6 3    6 4    ge    Check before start up  e Observe rating plate indication     e Check wh
47. servative agent into a suitable receptacle and dispose of the oil in accordance with  the regulations     A There is a risk of scalding from the hot preservative agent draining from the  gear unit  Wear protective gloves to avoid scalding        BA 9704 EN 02 06  15 32    FLENDER       8 1    8 2    8 2 1  8 2 1 1    8 2 1 2    8 2 1 3    8 2 1 4    8 2 1 5    8 2 1 6    8 2 1 7    Operation    Observe the    Safety instructions    in section 3   Note  The operating instructions  BA  for the gear unit must be observed     The part numbers       given in the following text have been taken from the list of equipment  assembly  drawing and the lubrication diagram     The following control information and or locking instructions must be noted for the individual  components     Note  In addition to this control information and or locking instructions  the specifications in  the list of equipment must always be observed     Only the control information and or locking instructions of the part numbers shown in  the list of equipment applies to the delivered oil supply system   For the specific switching points and or values  refer to the list of equipment     Further control information and or locking instructions are given in the operating instructions  BA      Gear Unit        Lubrication diagram   For the relevant lubrication diagram drawing number  refer to the list of equipment   Control information   Low pressure lubrication circuit   Pump  10     When the pump is operating  th
48. system is shut down for a longer period or if there is a danger of  freezing  the cooling water must be drained off     Faults  causes and remedy    Observe the    Safety instructions    in section 3     General information on faults and malfunctions    Note  The operating instructions  BA  for the gear unit must be observed    Note  Faults and malfunctions occurring during the guarantee period and requiring repair  work on the oil supply system must be carried out only by the FLENDER Customer  Service     In the case of faults and malfunctions occurring after the guarantee period and whose  cause cannot be precisely identified  we advise our customers to contact our  customer service     FLENDER will not be bound by the terms of the guarantee or warranty or  aution  otherwise be responsible in cases of improper use of the oil supply system   modifications on the oil supply system carried out without FLENDER   s   agreement  or use of spare parts not supplied by FLENDER     IN When remedying faults and malfunctions  the oil supply system must always  be taken out of service   Secure the drive unit to prevent it from being started up unintentionally   Attach a warning notice to the start switch     Possible faults    Malfunctions Causes    Oil temperature too high  No cooling water  Rectify cooling water supply   Insufficient cooling water  Increase coolung water supply   Cooling water too warm     Water oil cooler has air in it  Ventilate the water oil cooler     Water oil co
49. ublished by the European Commission in the Official Journal of  the European Community        Bocholt  2006 02 28       Signature  Manager Engineering TFE                 BA 9704 EN 02 06  32   32    
50. uipment     Start up    Before starting up the oil supply system check whether these operating instructions and the operating  instructions for the gear unit have been correctly adhered to     In all cases oil must be put in before starting up   aution    The cooling water circuit must be checked before starting up   Shut off valves must be secured against unintentional closing   All impurities must be removed from the oil supply system before starting up and after repair and    maintenance work  This applies particularly to water  e g  rainwater and leakage from the  water oil cooler  to prevent an oil water mixture     The three way cocks must be checked for plausibility before start up   All pumps  filters and coolers must be ventilated     A Pressure relief valve safety valve pressure settings made by FLENDER at its  works must not be altered  as they are not used to control the pressure and the  flow rate  They serve only as a protection against overload     The regulator valves  85  86  are supplied in a preset condition  The final setting must be done while   they are warm from operating  mill under operating load     Sequence    1  Nominal widths of the suction and pressure lines must be adhered to    2  It must be ensured before start up that both valves  85  86  are fully open    3  Then start up pump  10     4  The tuning valve on the pump  10   if provided  must be set in accordance with the manufacturer   s  instructions for setting and start up     KI    If the 
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
    Copyright © All rights reserved. 
   Failed to retrieve file