1. boyser Operating instructions FMP Series Peristaltic Pump FMP Instruction Manual Table of contents L ANOOI UON PR ee ee EOE E se ee 3 2 Safety and Responsibility ccecccceccccececcsceccccecccceccccececcececcccsceccececes 5 OR Te de TE e E 9 4 Transport and Storage E 11 5 Assembly and Installation nn 12 6 COMMISSIONING saves ia 18 7 Maintenance repair malfunctions disposal and spare parts 19 ER E 25 9 Declaration Of CONFOMIRY cccccccccececccceccccsccccsceccececcececcccsceccececes 43 IO e dd et TEE 44 FMP Instruction Manual 1 Introduction This manual forms an integral part of the pump and must accompany it until its demolition The series FMP peristaltic pump is a machine destined to work in industrial areas and as such the instruction manual must form part of the legislative dispositions and the applicable technical standards and does not substitute any installation standard or eventual additional standard 1 1 Explanation of the safety information The instructions of this manual whose inobservance is determined as a failure to meet safety standards are identified by this symbol The instructions of this manual whose inobservance compromises electrical safety The Instructions of this manual whose inobservance compromises the correct working of the pump are identified with this symbol 1 2 Users qualifications Pumps are machines that due to their functioning
2. Attach the front cover to the pump housing 15 Mount the pipes from both discharge and suction sides 16 Open all of the valves 22 FMP Instruction Manual 7 3 Troubleshooting regen lra cause laas Pump hose has no lubricant Lubricate pump hose Increased pump temperature Increased product temperature Reduce product temperature Insufficient or poor suction conditions Check suction line for blockages Pump speed too high Reduce pump speed Valves on discharge and or suction side O completely or partially closed HEURE CE Pump hose insufficiently compressed Check number of shims Pump hose rupture the product leaks out into the housing Serange pump Mose Partial blockage of the suction line Clean pipe ressure ici ity i p Insufficient product quantity in storage Fill storage container or exchange pump container Insufficient diameter on the suction side Rss Ue Camer On UMS svetome side as far as possible Suction line too long Shorten the suction line as far as possible High viscosity of medium Reduce viscosity as far as possible Reduced flow or Air introduction in the suction Check connections and accessories for air pressure connections tightness Tighten connections and accessories High pulsation on suction Mount antipulsation equipment Reconsider application speed etc The pipes are not correctly fastened Fasten pipes correctly e g wall brackets Pump speed too high Reduce pump speed Vibrations on pu
3. it is not squeezed together under vacuum The diameter must correspond to the rated diameter of the pump hose A larger diameter is recommended in the event of viscose liquids The pump is self priming and does not require an admission valve The pump is reversible and the suction connection can therefore comprise of one of FMP Instruction Manual maana LISA two options Normally the option is selected which is best suited to the physical conditions of the installation lt is recommended to use a flexible transition between two fixed pipes and the hydraulic connection of the pump in order to avoid the transmission of vibrations 5 2 2 Discharge side The discharge line is to be kept as straight and short as possible in order to avoid performance reduction The diameter must correspond to the rated diameter of the pump hose A larger diameter is recommended in the event of viscose liquids It is recommended to use a flexible transition between two fixed pipes and the hydraulic connection of the pump in order to avoid the transmission of vibrations 5 3 Adjusting the roller pressure The peristaltic pump is equipped with shims in order to adjust the precise pressure distance to the roller dependent on speed and operating pressure Fig 2 1 Roller 2 Shims FMP Instruction Manual Fig 3 Squeezing the hose 1 Hose in normal shape 2 Insufficient squeezing back flowing media in the cavity will destroy the hose within a sh
4. surfaces clamps reducers motors with adequate anti oxidant products Spare hoses should be stored in a dry place away from direct light 4 3 Elevation Models FMP 30 FMP 40 FMP 50 Models FMP 60 FMP 70 FMP 70D To elevate the pump use the eye To elevate the pump its bolt necessary to use elevation belts an SE 11 FMP Instruction Manual 5 Assembly and Installation 5 1 Ambient conditions Assembly is to be carried out in the following order If the pump has to be installed outdoors then it is to be equipped with protection against sunlight and weather influences When positioning the pump ensure that sufficient room for access is provided for all types of maintenance work Limit values for hose temperature and pressure Max Pressure Min Temp Max Temp C Feed C Feed chemical chemical Min Temp 2C Environment 40 40 40 Only available for FMP 40 At max TS the life of hose is drastically reduced Please contact with Boyser or authorized distributor for high T application 5 2 Correct installation of the pump 5 2 1 Suction side The pump is to be positioned as near as possible to the liquid container so that the suction side is kept as short and straight as possible The suction line must be absolutely airtight and made of a suitable material so that
5. the front cover 8 Remove the press flange and connections from the pump housing 9 Remove the press rings 10 Remove the pump hose to be exchanged 19 FMP Instruction Manual maana Else 7 2 1 2 Model FMP 60 1 oa M 8 9 Close off all valves in order to prevent leakage of the feed chemical Dismantle the pipes from both discharge and suction sides Remove the front cover Remove a roller the roller that is not touching the pump hose Mount the front cover Turn the rotor with the help of the motor so that the remaining roller is not pressing against the pump hose Dismount the front cover Remove the connections Remove the press flange from the pump housing 10 Remove the pump hose to be exchanged 11 Dismantle the inserts from both pump hose ends 1 2 2 Exchanging the pump hoses installation 7 2 2 1 Models FMP 30 FMP 40 FMP 50 FMP 70 and FMP 70D 1 2 Clean the interior surfaces of the pump housing Lubricate the internal surfaces of the pump housing at the contact surfaces to the pump hose with original silicon grease 3 Check the rollers Ensure that the roller surfaces are not damaged 4 Lay the pump hose into the pump housing 5 Lay the press rings Between the end of the hose and the press ring it has to be a distance of 3 7 mm 20 FMP Instruction Manual Fig 4 Required distance between the end of the hose and the press ring 6 Fasten the press flange and the connecti
6. 0 00 34 110 00 35 110 00 36 107 00 41 110 00 53 36 FMP Instruction Manual SERED mmm 8 5 Spare parts exploded FMP 70 Model 25 23 2 22 26 3 16 STR oe 19 7 DAS 3 FMP Instruction Manual 112 00 10 Pos Description GQuantty Reference _ 5 mm 20004 e Rolershat SS o Roll 7472 00 10 _ 13 Press ring 14 Connection DIN flange S S 112 00 11 Connection ANSI flange S S 112 00 12 Connection DIN 11851 NW 65 112 00 13 Connection DIN flange PP Connection ANSI flange PP i 17 Base left 1 BE Base left S S 18 Base righi aas E T aas o De PS PS ES 38 FMP Instruction Manual Pos Description Quantity o Ringforshat 1 26 Lip seal box I a asea ES 2 1 Inspection window fixed model ao Inspection window movil model a O ring front cove SR mn aeaio R SR Css 29 26 27 28 30 31 32 33 34 Reference 111 00 30 111 00 31 112 00 28 112 00 29 112 00 30 112 00 31 112 00 32 112 00 33 112 00 34 112 00 35 39 FMP Instruction Manual SERED mmm 8 6 Spare parts exploded FMP 70D Model ES SI LS MIR Da ENJ si KS e Gs ee x ee x gt ESS ve d Ya D 20 20 0 Q 40 FMP Instruction Manual Pos Description Quantity Reference i s s e ae ronne e mega 4 120006 o Role 4 120007 14 Connection DIN flange S S ed Connect
7. 0 59 80 99 es e Jo do Factoring default setting if working pressure is not informed 16 FMP Instruction Manual ny R 5 3 6 FMP 70D Model Number of shims of 1 mm thickness Each of the two pump bodies is fitted with the following configuration a NR NBR EPDM HYPALON NR A and NBR A 1 min cn iu 20 39 40 59 60 79 80 99 i OO Factoring default setting if working pressure is not informed 1 FMP Instruction Manual 6 Commissioning 6 1 Testing prior to commissioning the pump The following tests are to be carried out Ensure that the pump has not been damaged during transportation or storage Immediately report any damage to the supplier Check that the mains voltage is suitable for the motor Ensure that the hose is suitable for the fluid to be conveyed and that it is not damaged Make sure that the temperature of the liquid does not exceed the recommended temperature range Only switch the pump on if it the front cover has been properly attached Check that the rollers are correctly fitted and fastened Check that the drive pump and the inner of the rollers are correctly greased The specially formulated grease can be obtained from BOMBAS BOYSER S L or from the authorized distributor Check that the thermal overload protection not included in the delivery scope corresponds to the value specified on the motor type plate Check whether the direction of rotation is correctly adjusted Check
8. e hose in the direction of flow No valves are needed for this This ensures gentle handling of the metered media The FMP Series has been designed for safe and uncomplicated operation as well as straightforward maintenance The FMP Series can be used for many different media However this pump type is often the optimal solution for abrasive shear sensitive and viscose media Typical areas of use include processes where only a low discharge pressure is required max 8 Bar 3 1 Construction Main modules Drive Unit Housing Base frame The pump housing is closed off with a screwed front cover in order to avoid the risk of injury The motor serves to drive the rotor Two rollers at the ends of the rotor serve to press the pump hose against the pump housing The rotary movement of the rotors alternately press and relax the rollers in relation to the pump hose This serves to suck the media and convey it into the metering line FMP Instruction Manual Fig 1 Diagram of functional principle 3 Rollers 1 Housing 4 Hose 2 Rotor FMP Instruction Manual 4 Transport and Storage 4 1 Transport The pump is protected by a cardboard packaging The packaging materials are recyclable 4 2 Storage The pump should be in a resting position The hose should not be compressed Avoid areas open to harsh weather or excessive humidity For storage periods of longer than 60 days protect the coupling
9. ed FMP 30 Model 21 25 2 2 DODAC 25 FMP Instruction Manual Pos Description Quantity Reference i i Shim o oor a Roller shat i 2 107000 14 Connection SS 1 1 4 BSP E Shaft cap 17 Base il La Base left S S 1 18 Base right 1 ass ans 19 Base middle ese miele 58 anze aper D RS 26 FMP Instruction Manual Pos Description Quantity Lip seal roller 107 00 33 Eye bolt 106 00 40 Drain plug FMP 107 00 41 2 FMP Instruction Manual 8 2 Spare parts exploded FMP 40 Model 28 FMP Instruction Manual Pos Description Quantty Reference _ 106 00 01 06 00 03 Roller support 106 00 06 Shim 1mm 106 00 07 Shim 4mm 106 00 49 Shaft screw 106 00 08 Roller shaft 106 00 09 Roller 106 00 11 Metallic cover 106 00 13 Metallic cover vacuum equipment 106 00 43 11 Polycarbonate cover 106 00 14 12 Press flange 106 00 15 13 Press ring 104 00 05 Press ring for NORPRENE hose 106 00 51 Connection SS 1 1 2 BSP 106 00 17 Connection SS 1 1 2 NPT 106 00 34 Connection DIN 11851 NW40 106 00 35 Connection TRI CLAMP 106 00 36 Connection flange DIN DN40 INOX 106 00 37 ee 1 1 Connection flange ANSI DN40 INOX 106 00 38 7 10 Connection Polypropylene 1 1 2 BSP 106 00 39 Connection PVDF 1 1 2 BSP 106 00 41 Connection Polypropylene 1 1 2 NPT 106 00 47 Connection SMS 38 106 00 42 Peristaltic hose NR 106 00 18 Peristaltic ho
10. ion ANSI flange S S E 17 Base ans 18 Base middle Tese made 58 oe SS Ca psa e 12002 29 Drain plug AMPIO e mom 41 FMP Instruction Manual Pos Description Quantity Reference _ Metallic cover ring 112 00 51 Gear reducer coupling 112 00 47 2 Collector DIN S S 112 00 50 __ Collector ANSI S S 112 00 53 42 FMP Instruction Manual 9 Declaration of Conformity We hereby declare Original EC Declaration of Conformity BOMBAS BOYSER S L C Narc s Monturiol 24 Pol Ind Can Magre 08187 Sta Eulalia de Ron ana Barcelona Spain That the following designated product complies with the pertinent fundamental safety and health requirements of the EC Directive in terms of its design and construction and in terms of the version marketed by us This declaration loses its validity in the event of a modification to the product not agreed with us Description of the product Peristaltic pump BOYSER FMP Product type Serial no Pertinent EC Directives Signature Details of the signatory FMP 30 FMP 40 FMP 50 FMP 60 FMP 70 FMP 70D Refer to nameplate on the device CE Declaration of Conformity Ann II A 2006 42 CE The pump is conform to the safety requirements according to the 2006 42 CE norms and amendments Manufacture Declaration Ann II B 2006 42 CE The pump cannot be operated before the machine in which is assembled the pump will be declared i
11. mps and Insufficient nominal width of the pipes Increase nominal width pipelines Pump base plate loose Fasten base plate Pulsation dampers insufficient or Install pulsation dampers on suction and missing or discharge side Reduced flow or pressure FMP Instruction Manual Check the compatibility of the hose with Chemical exposure the liquid being conveyed the cleaning fluid and the lubricant High pump speed Reduce pump speed ar High conveying temperature Reduce product temperature ort operational KEE High operating pressure Reduce operating pressure hoses e i n Pump cavitation Check the suction conditions Abnormal elevation of temperature Check rollers shaft mounting Unsuitable lubricant Use lubricant BOYSER Insufficient quantity of grease Top up lubricant High inlet pressure gt 3 bar Reduce inlet pressure Pump hose Pump hose filled with deposits Clean or replace the pump hose See Holder press flange insufficiently ump housin ti pump g tightened Re tighten holder press flange Insufficient grease Top lubricant Insufficient motor performance Check motor and replace if necessary Insufficient output from frequency The frequency converter must match the converter motor Blockage in the pump Se voltage Start occurs at minimum SE RE earn Check if the suction or discharge side is g PETUR blocked Rectify blockage The pump does not start up 24 FMP Instruction Manual 8 Spare parts 8 1 Spare parts explod
12. n conformity with the safety requirements according to the 2006 42 CE norms and amendments Technical Manager 43 FMP Instruction Manual 10 Guarantee We guarantee against all manufacturing defects and guarantee the materials that compose the electro pump BOYSER for one year from the date of delivery This guarantee does not include the hose or the lubricant as these are elements that have a normal function wear irrespective of their duration This guarantee is valid as long as the equipment functions within the parameters indicated in the technical information card supplied with every pump or on subsequent changes authorized by BOMBAS BOYSER S L This guarantee includes materials and work but not the transportation of materials to or from our warehouses in Santa Eulalia de Roncana Barcelona being necessary to do so arising from the necessities of the client the corresponding costs of displacement and expenses will be charged 44
13. ons to the pump casing tightening progressive the bolts in clock wise 1 2 3 4 1 2 3 4 etc until the flange becomes totally tighten Fig 5 Way to proceed with the screws tightening 21 FMP Instruction Manual maana Else 7 Mount the front cover B Turn the rotor with the help of the motor so that the remaining roller presses against the pump hose 9 Dismount the front cover 10 Re attach the second roller with shims back onto the rotor 11 Lubricate the pump hose and the rollers 12 Attach the front cover to the pump housing 13 Mount the pipes from both discharge and suction sides 14 Open all of the valves 7 2 2 2 Model FMP 60 1 Clean the interior surfaces of the pump housing D Lubricate the internal surfaces of the pump housing at the contact surfaces to the pump hose with original silicon grease Check the rollers Ensure that the roller surfaces are not damaged Lay the pump hose into the pump housing Attach the inserts at both hose ends with the help of the press flange Fasten the two parts of press flanges us the base Fasten the press flange to the pump casing Fasten the connections to the press flange NOD Dm P L Mount the front cover 10 Turn the rotor with the help of the motor so that the remaining roller presses against the pump hose 11 Dismount the front cover 12 Re attach the second roller with shims back onto the rotor 13 Lubricate the pump hose and the rollers 14
14. ort period of time 3 Perfect squeezing 4 Excessive squeezing increased wear and tear to pump and hose The shims are fitted in the factory You can adapt the number of shims to the actual operating conditions according to the following table 14 FMP Instruction Manual 5 3 1 FMP 30 Model Number of shims of 0 5 mm thickness a NR NBR EPDM HYPALON NR A and NBR A 1 min rr O RE ss 80 99 o jh hk n h Bar Factoring default setting if working pressure is not informed 5 3 2 FMP 40 Model Number of shims of 1 mm thickness a NR NBR EPDM HYPALON NR A and NBR A 1 min o i e orge TS Iso fes Ise ns 20 J5 4 l4 4 A O E R 0 Factoring default setting if working pressure is not informed b Norprene KE eee e a 80 99 Par Factoring default setting if working pressure is not informed 15 FMP Instruction Manual n pit 5 3 3 FMP 50 Model Number of shims of 1 mm thickness a NR NBR EPDM HYPALON NR A and NBR A 1 min i l n tea 80 99 da if To o Factoring default setting if working pressure is not informed 5 3 4 FMP 60 Model Number of shims of 1 mm thickness a NR NBR EPDM HYPALON NR A and NBR A 1 min le eee 80 99 6 5 J5 EE Factoring default setting if working pressure is not informed 5 3 5 FMP 70 Model Number of shims of 1 mm thickness a NR NBR EPDM HYPALON NR A and NBR A 1 min eS 0 19 20 39 4
15. ould enable the entire plant to be shut down in the event of an emergency in such a way that the overall plant can be brought into a safe condition Unauthorized access Possible consequence Fatal or very serious injuries Measure Ensure that there can be no unauthorized access to the unit Hazardous media contamination of persons and equipment Possible consequence Fatal or very serious injuries material damage Ensure that the pump hoses are resistant against the media being conveyed Always observe the safety data sheets for the media to be conveyed The system operator must ensure that these safety data sheets are available and that they are kept up to date The safety data sheets for the media being conveyed are always decisive for initiating countermeasures in the event of leakage to the media being conveyed FMP Instruction Manual maana 22s Observe the general restrictions in relation to viscosity limits chemical resistance and density Always switch the pump off before exchanging the pump hose Correct and proper use Possible consequence Fatal or very serious injuries The unit is not intended to convey or regulate gases or solid media Do not exceed the rated pressure speed or temperature for the pump The unit may only be used in accordance with the technical data and specifications provided in these operating instructions and in the operating instructions for the individual components The sys
16. poration of particles form the hose into the product being pumped This can be achieved e g by means of filtration a hose rupture alarm or other means Suitable for the respective process CIP cleaning In the event of CIP cleaning it is necessary to obtain information from the manufacturer about correct installation of the pump a special installation is required as well as regarding the compatibility of the cleaning agents with the pump hoses and the hydraulic connections Cleaning should be undertaken at the recommended maximum temperature Direction of rotation flow direction Possible consequence Material damage right through to destruction of the unit The pump s direction of rotation in relation to the desired flow direction must be checked prior to every start Disconnect the pump from the mains Possible consequence Personal injury You may only carry out work on the pump after it has previously been switched off and disconnected from the mains FMP Instruction Manual Environmental influences Possible consequence Material damage right through to destruction of the unit The device is not suitable for outdoor operation Take suitable measures to protect the device from environmental influences such as UV rays Moisture Frost etc FMP Instruction Manual 3 Functional description The FMP Series is a displacement pump The feed chemical is conveyed by the rotor squeezing th
17. r 4 Drain plug FMP 50 ECH O Ring front cover Lateral rotor 3 108 00 32 x 108 00 35 108 00 44 33 FMP Instruction Manual 8 4 Spare parts exploded FMP 60 Model 25 CD 29 27 D 23 G 12 G3 QD QA 34 FMP Instruction Manual Connection flange DIN Halar Connection flange ANSI Halar Peristaltic hose NR Peristaltic hose NR A Peristaltic hose NBR Peristaltic hose NBR A Peristaltic hose EPDM Peristaltic hose HYPALON 8 19 Bearing box cap 20 Base left Base left S S 21 Base right Base right S S 22 Base middle 100mm Base middle S S 100mm Pos Description 6 Roller support 7 Shim 1mm na Shim 7mm shim smm 8 Shaft som Oooo 9 Baler ana OO 16 Insert S S Insert Polypropylene Insert PVDF 17 19 Quantity Reference 110 00 01 110 00 03 110 00 04 110 00 05 110 00 06 110 00 07 110 00 55 110 00 56 110 00 08 110 00 09 110 00 10 110 00 11 110 00 12 110 00 13 110 00 14 110 00 15 110 00 16 110 00 46 110 00 47 110 00 17 110 00 41 110 00 42 110 00 43 110 00 44 110 00 45 110 00 18 110 00 19 110 00 20 110 00 21 110 00 22 110 00 54 110 00 23 110 00 37 110 00 48 110 00 38 110 00 49 110 00 39 110 00 50 39 FMP Instruction Manual Quantity 23 Base middle 60mm fell Base middle S S 60mm Reference 110 00 40 110 00 51 106 00 27 110 00 26 110 00 27 110 00 28 110 00 29 110 00 30 110 00 31 110 00 32 110 00 33 11
18. se NR A 106 00 19 Peristaltic hose NBR 106 00 20 Peristaltic hose NBR A 106 00 21 Peristaltic hose EPDM 106 00 22 Peristaltic hose HYPALON 106 00 48 Peristaltic hose NORPRENE 106 00 50 Shaft cap 106 00 23 Base left 106 00 24 Base left S S 106 00 44 Base left trolley steel 106 00 52 Base left trolley S S 106 00 54 5 zech zech 29 FMP Instruction Manual Pos Description 18 Base right Base right S S Base right trolley steel Base right trolley S S 19 Base middle Base middle S S Ball bearing anterior Ball bearing posterior Ball bearing roller Ring for shaft Lip seal box Lip seal roller Eye bolt Drain plug FMP be Quantity Reference 106 00 25 106 00 45 106 00 53 106 00 55 2 un 106 00 28 106 00 29 106 00 30 106 00 31 106 00 32 106 00 33 106 00 40 107 00 41 30 FMP Instruction Manual 8 3 Spare parts exploded FMP 50 Model 2 DAO DOAS FMP Instruction Manual Pos Description Quantity Reference _ Sim 1080006 e Roller sha 2 1080008 13 14 Connection ANSI flange DN 50 PVDF 108 00 19 Connection DIN 11851 NW 50 108 00 15 ER E i Peristaltic hose HYPALON Shaft cap aq 17 Base left 1 Teen See righi R Base right S S 1 19 Base middle 2 lese miele 58 Taa 2 o De TI ER FMP Instruction Manual Quantity Ball bearing roller A Ring Tor shaft i i Pos Lip seal box Lip seal roller Eye bolt bovse
19. tem is not designed for use in areas of risk from explosion Only switch the pump on if it has been properly fastened to the floor Only switch the pump on if it the front cover has been attached Do not carry out any maintenance operations or dismantle the pump without first making sure that the pipes are not under pressure and are empty or isolated Inthe case of the hose becoming stuck during extraction or fitting it is necessary to reverse the direction of the pump relubricate and then repeat the operation As the peristaltic pump is volumetric and its functioning is positive displacement it is necessary to prevent a possible overload of pressure due to for example the accidental closure of a valve For this reason it is advisable to fit a safety device such as a safety valve pressure limiter etc Operational lifetime of the pump hoses Possible consequence Fatal or very serious injuries The operational lifetime of the pump hoses cannot be precisely specified For this reason the possibility of fracture and consequential leakage of liquids must be accounted for If the hose rupture alarm optional is fitted then the pump can be stopped and or an electrical valve can be actuated FMP Instruction Manual maana 22s In addition as the hose has an indeterminate life and due to the possibility of its breakage or deterioration the user is responsible for the prevention of a possible although most unlikely incor
20. that the optional electrical components are connected and are working properly Install a manometer in the pressure line if the back pressure value is unknown Check the operating instructions in order to ensure that the flow values pressures and power consumption of the motor do not exceed the rated values Install a pressure relief valve in the pressure line in order to protect the pump in the event that a valve is unintentionally closed off or the line is blocked in another way 18 FMP Instruction Manual 7 Maintenance repair malfunctions disposal and spare parts 7 1 Lubrication Check that the rollers and the hose are sufficiently lubricated o Check every 300 operating hours Gear reducers o FMP 30 FMP 40 and FMP 50 The lubrication is permanent Is not necessary any servicing o FMP 60 FMP 70 and FMP 70D Exchange the oil at regular intervals in accordance with the gear reducer maintenance manual 7 2 Exchanging the pump hoses 7 2 1 Exchanging the pump hoses dismantling 7 2 1 1 Models FMP 30 FMP 40 FMP 50 FMP 70 and FMP 70D Close off all valves in order to prevent leakage of the feed chemical Dismantle the pipes from both discharge and suction sides Remove the front cover Remove a roller the roller that is not touching the pump hose Mount the front cover oa W N gt Turn the rotor with the help of the motor so that the remaining roller is not pressing against the pump hose 7 Dismount
21. under pressure and moving parts can present dangers Improper use Removing the protections and or disconnecting the protection device FMP Instruction Manual The lack of inspections and maintenance They can cause serious damage or injury The person in charge of safety should therefore guarantee that the pump is transported installed put in service used maintained and repaired by qualified personnel who should therefore possess Specific training and sufficient experience Knowledge of the technical standards and applicable laws Knowledge of the general national and local safety standards and also of installation Any work carried out on the electrical part of the pump should be authorized by the person responsible for safety Given that the pump is destined to form part of an installation it is the responsibility of whoever supervises the installation to guarantee absolute safety adopting the necessary measures of additional protection FMP Instruction Manual 2 Safety and Responsibility 2 1 General safety information Live parts Possible consequence Fatal or very serious injuries Measure The device must be disconnected from the power supply before it is opened lsolate damaged faulty or manipulated devices from the mains in order to de energise Emergency stop switch Possible consequence Fatal or very serious injuries An emergency stop switch is to be connected for the entire plant This sh