Home
INSTALLATION MANUAL
Contents
1. ceceeeeceeeeeeeeeeeeecaeceeeeeeeseceteaeeeeeeeeeteees p 9 3 5 6 alre C EE EAE E EET ee E E E A p 12 3 6 Temporary dismantling iz isria orraa aE A AEAEE OOA p 12 3 6 1 Disconnecting the EquipMent cceeceeeeceeceeeeeeeeeceecaeeeeeeeeeseneneaeeeeeeeteeeeas p 12 3 6 2 Removing the Unit sty so iars skies EEE O EE dies p 12 3 7 Scrapping the EQUIPMENT cee ceeeeeeeeceeeeeeeeeneae cece eeeeeeeeeaaaeeeeeeeeesecsaaaeceeeeeeesecsenaneeeees p 12 4 ANNEX ELECTRICAL DIAGRAMS standard version diagrams Automatic Systems STD 1TR6 04 001 and BT 1TR6 04 002 Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 2 12 Automatic Systems e 1 INTRODUCTION We thank you for having chosen the TR491 dropping arm tripod turnstile designed and manufactured by Automatic Systems We are confident that your purchase will fully meet your requirements However in order to obtain maximum satisfaction from this equipment for a maximum period of time we strongly advise you to read this manual carefully before installing the equipment Although this manual has been prepared with great care some information may seem erroneous or unclear to you In this case please do not hesitate to contact us with your remarks or questions WARNING YOUR TR491 DROPPING ARM TRIPOD TURNSTILE COMPRISES A MECHANISM AND VARIOUS ELECTRICAL COMPONENTS ANY NEGLIGENCE DURING AN INTERVENTION IN THE MAC
2. unit is to be scrapped Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 12 12
3. 145 60 o 4 v Cable ducting 5 800 Power supply and command cable inlet area 8401220 00 Pi Power supply 230V single phase earth 3G x 2 5 Control wiring according to specifications Cabling to be prepared EXPANSION BOLT B15 30 3413 000 recommended model 2 1106GB Rev C p 6 12 Installation TR491 Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Automatic Systems fS 3 INSTALLATION 3 1 First step at Legend 4 1 Front end section A 4 2 Rear end section B 4 3 Hood A Fig 4 e The tripod turnstile has been packaged suitable for transport Move the material to the installation site with the assistance of a fork lift or manual hand truck and remove the packing material e Unlock and open the front doors 4 1 and 4 2 Keys are supplied as accessories in a separate bag e Open and remove the hood 4 3 e Check the state of the material Though it has been carefully packed damage may have occurred during transport Any transportation damage should be repaired or components replaced Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 7 1 2 3 2 Automatic Systems e Preliminary work on site e This is basically the following Check the positioning and location of the equipment acco
4. 491 2 1106GB Rev C p 10 12 Automatic Systems JA Legend 6 1 Walkway arm Fig 6 gt Lift up the walkway arm 6 1 manually and make sure this holds in the horizontal position 3 5 Check list O Before commissioning the dropping arm tripod turnstile proceed with the various mechanical tests as described in the Field manual paragraph 2 1 First service at 50 000 cycles then electrical proper operation of the optional readers pictograms etc In case of a mechanical problem please refer to the corresponding paragraph Check if all wires are firmly connected to their respective terminal blocks Check if the tripod s walkway arm 6 1 falls down when the electrical power supply is interrupted Check if all screws and nuts have been tightened firmly Inspect the inside of the turnstile to ensure no tools remain to cause equipment failures Remove any foreign body from the inside of the tripod turnstile packing debris etc and clean Oodaaqada Position the hood back 4 3 and lock it Close and lock the front doors 4 1 and 4 2 The dropping arm tripod turnstile is now operational Although all adjustments have been carried out in our factory a final adjustment may be required following transportation and installation of the equipment In this case refer to the Field manual Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 11 12 Automatic Systems
5. C Automatic Systems IA TR491 dropping arm tripod turnstile INSTALLATION MANUAL Automatic Systems s a Head office amp factory Avenue Mercator 5 1300 Wavre Belgium Tel 32 10 23 02 11 Fax 32 10 23 02 02 Automatic Systems reserves the right to change the characteristics of its products without notice Automatic Systems TR491 TR6 GB a YD JMW MQ 1302 20 01 00 Installation TR491 2 1106GB Rev C Automatic Systems JSN Table of contents 1 INTRODUCTION a E T Coecteencauvederueey p 3 2 GENERAL EE E E p 4 2 1 E e A E EEEE EAEE EE EEEE AT p 4 2 2 Switching off the equipment cece eeeecececeeeeeeeeee cece ee eeeedeaeaeceeeeesesecacaeeeeeeeeetenneenneeeees p 5 2 3 General Conditions Of USC ccccccccceeeeeceeeeee cece ceeeeesecsanaeeeeeeeeeseedeceacaeeeeeeeseesnninaeeeeeess p 5 2 4 In case of power failUre c ceccccceceeeceeceecece cece eee eeeeeeaeaeceeeeeseccaaeeeceeeeeeeeseedecieeeeeeeeteees p 5 2 5 Overall dimensions and installation plan cccccceeeeeeeceeceeeeeeeseeeeeceeeeeeeeeseesenneeeees p 6 3 INSTALLATION 23 555 2255 senic a a SA e e aeaa ae a n e aaae aaea Eer aeaaaee Rea EE a p 7 3 1 EEE ET A E EE A E E I EEN p 7 3 2 Preliminary WOK ON SNE aerer a OEA E IAEE EAEAN EE EAE p 8 3 3 Installing the tripod turnstile cece cece cece cece secencaeceeeeeeeesecaaaeeeeeeeeeseesecieeeeeseeeeeeeas p 8 3 4 Electrical connections and initial power up
6. HINE MAY SERIOUSLY ENDANGER YOUR SAFETY AS SOON AS YOU OPEN THE HOUSING PUT OFF THE MAIN SWITCH 2 1 ON THE ELECTRICAL CONTROL LOGIC 2 2 LOCATED UNDER THE HOOD BE CAREFUL IN HANDLING ANY INTERNAL ELEMENT WHICH MIGHT BE UNDER POWER OR COULD BE SET IN MOTION WHEN WORKING ON THE CIRCUITS IT IS RECOMMENDED NOT TO DISCONNECT WIRES WITHOUT MARKING THEIR TERMINALS NOT TO REMOVE THE CONNECTOR WITHOUT MARKING ITS PRECISE POSITION IMPORTANT BECAUSE OF THE SHOCKS THE TURNSTILE COULD CAUSE WE ADVISE YOU TO PROHIBIT THE ACCESS TO UNACCOMPANIED YOUNG CHILDREN AS WELL AS TO ANIMALS Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 3 12 Automatic Systems fS 2 GENERAL 2 1 General view 1 12 1 3 1 8 O Green arrow OOOO00 PASSAGE IN SERVICE O Red cross O PASSAGE OUT OF SERVICE JQ O 1 5 N bi 1 4 1 4 Approach pictogram option AT 4 5 1 2 1 4 1 10 1 1 Legend E 1 1 Front end section A hinged 1 11 1 2 Rear end section B hinged yo east 1 3 Hood 1 9 1 4 Approach pictogram option 1 5 Card reader option 1 6 Tripod obstacle with stainless steel arms 1 7 Tripod turnstile mechanism See Field manual A 1 8 Electrical control logic 1 9 Floor fixing 1 10 Steel housing 1 11 Commercial identification plate 1 12 Lock Fig 1 Conventionally and as a general rule the user will be considered in direction A when th
7. JSN 3 6 Temporary dismantling e Ifthe equipment has to be temporarily dismantled e g if you need to change its location follow the procedure below 3 6 1 Disconnecting the equipment Unlock and open the front doors 4 1 and 4 2 Unlock and remove the hood 4 3 Make sure that the power supply cables are not live Put off the main switch 2 1 near the electrical control logic Disconnect the power supply wires 2 4 from the main switch 2 1 as well as the earth cable 2 5 Disconnect any other cabling control wires etc 3 6 2 Removing the unit Loosen the four expansion bolts inside the front and rear end sections at the bottom of the housing Remove the two fixing brackets from the turnstile Either remove or cut off floor fixing expansion bolts and make good the floor surface protruding fixings are a dangerous risk to the health and safety of persons using the area Using manual handling or fork lift truck remove the tripod turnstile to safe or its new location for installation 3 7 Scrapping the equipment e When the equipment is withdrawn from use proceed with the dismantling procedure as described in paragraph 3 6 Temporary dismantling Ensure that the various components of the equipment metals electrical components plastics etc are handled recycled or disposed of in the appropriate method to comply with regulations and codes of practice in the country where the
8. e turnstile is at his right hand side in direction B when the turnstile is at his left hand side Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 4 1 2 Automatic Systems fS 2 2 Switching off the equipment C Automatic Systems TA Prod Type n Volts EC 2 1 Phase GOLA 50 60 TA kg Amp Legend 2 1 Main switch 2 2 Control logic 2 3 Earth connector 2 4 Customer power supply cables 2 5 Customer earth cable 2 3 2 1 Fig 2 e As soon as you open the housing put off the main switch 2 1 near the electrical control logic 2 2 located under the hood 2 3 General conditions of use e Your TR491 dropping arm tripod turnstile has been designed to operate in any climatic environments of 20 C to 60 C with up to 90 of relative humidity 2 4 Incase of power failure e Whatever the control mode set up the dropping arm tripod turnstile has been developed to leave the walkway clear when the electrical power supply is interrupted Access by the user will consequently be free in both directions in an emergency situation Refer to paragraph 3 2 Principle of operation in the Field manual for more information Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 5 1 2 Automatic Systems lan ion p d installat imensions an Overall d 2 5 5 620 45 620
9. ing parts After the power supply from the remote isolator has been energised test for correct polarity supply voltage and earthing power up the equipment by putting the main switch 2 1 to the ON position Note When the turnstile is connected to an IT power system a 2A two pole circuit breaker must protect the 230V power supply Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 9 12 Automatic Systems fS TR6 CONTROL LOGIC AS1025 board 1 230V main power supply connector 2 Fuse 1 T500mAL 250V 230V power supply 3 60VA multivoltage transformer 4 AS1025 board 5 Fuse 2 T2AL 250V 24VDC voltage 6 12C expansion connector 7 Parameter programming DIP switches 8 DIP switches for selecting operation mode and programming parameters 9 AS LINK connector for programming console AS1026 board 6 12C expansion connector 20 Dropping arm test button 21 Dropping arm connector Fig 5 AS1026R2 board 5 18 10 Programming push button and LED 11 RS232 line TTL 5V level 12 Customer input output connector 13 Signal relay 14 Direction A and B limit switches connector 15 Direction A and B electromagnets connector 16 Application microcontroller 17 Microcontroller reset button 18 Direction A and B simulation buttons 19 230V power supply filter Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR
10. rding to the site s general lay out Preparation of fixing holes in the floor as in Fig 3 Make sure to drill holes with the diameter adapted to the expansion bolts that will be used type recommended model B15 30 ref 3413 000 Ensure that the drilling positions do not conflict with any cables pipes ducts or steelwork in the floor structure If this does occur a slight repositioning of the turnstile may be needed Preparation of electrical supply and control cabling all power and control cables enter the turnstiles through the floor at either end section rear or front Mark and drill entry holes in floor as described for the fixing holes A single phase 230V 2Amp max power supply is required installed to the country Regulations relevant for this installation complete with earth bonding for the metalwork Control cables for remote desk consoles if supplied and other access control devices when applicable will also be required installed to conform with relevant regulations and control device specifications Note All cables to have a 2 meter tail Note If you add any flammable elements see EN60950 paragraph 4 4 5 standard into the end sections of the turnstile make sure that the floor is fireproof 3 3 Installing the tripod turnstile e Position the turnstile on site precisely e Fix the 4 expansion bolts to the floor Put the two fixing brackets inside the front and rear end sections at the bo
11. ttom of the housing as illustrated in Fig 3 The fixing brackets are supplied as accessories e Carefully pull the power or control cables into the end sections of the turnstile ensure cables are not trapped between the floor and the end sections or the fixing brackets e Check turnstile for alignment and level and tighten fixing brackets firmly e When the turnstiles are fitted in banks rows of more than 1 unit attention should be given to the linear vertical and horizontal alignment Packing shims can be used Automatic Systems TR491 TR6 GB a YD JMW20 01 00 Installation TR491 2 1106GB Rev C p 8 12 3 4 Automatic Systems e Electrical connections and initial power up e The electrical connections must be made according to the diagrams affixed inside the housing gt Make sure that the power supply cables are not live All internal connections are factory made If necessary cut off the excess cable length Connect the 230V single phase power supply wires 2 4 to the terminals on the main switch 2 1 and the earth wire 2 5 to the adjoining terminal 2 3 Make sure the equipment is correctly earth bonded housing amp associated metalwork Proceed with all other electrical connections depending on the equipment specifications control wiring etc Route all cables via the cable entry holes and secure in the cable fastenings provided ensuring that they are held clear of the turnstile mechanism s mov
Download Pdf Manuals
Related Search
Related Contents
Omron Healthcare GOSMART HJ-112 User's Manual Patton electronic 2292 Network Card User Manual Copyright © All rights reserved.
Failed to retrieve file