Home
Installation- and Operating Instructions
Contents
1. of the unit the discharge pipe is possibly not adequately dimensioned or clogged Operating instructions SILVER STEAM deluxe model page 10 The steam line Connection to the steam line V Functioning of the steam bath unit depends among others also on the correct steam a gt 5 distribution The steam has to reach the cabin homogeneously without drops and unnecessary condensate The place where the steam enters the cabin has to be chosen in such a way that the moist flow air never directly affects persons illumination bodies temperature sensors or other heat sensitive surfaces until it has been completely absorbed by the ambient air For the connection to the steam generator it is absolutely necessary to use the steam hose comprised in the delivery extent This hose is fixed to the left connecting piece of the steam tank by means of the enclosed spring band clamp see drawing This steam hose shall by no means be bent dented or damaged It is mounted vertically upwards and connects the steam tank with the permanently installed copper pipe Installation of the steam line Permanent installation is carried out by means of a 35mm copper pipe This copper pipe must have a gradient of at least 5 in direction of the steam bath cabin The condensate which is formed in the pipe system must according to the force of gravity flow smoothly i
2. The water pressure shall not be below 2 bar and above 5 bar If necessary a pressure reducer is to be integrated in the installation in place The water temperature should not be above 50 For the water connection the regulations of the local water supply company have to be observed by all means For the connection with the water pipe a fitting is integrated which prevents the water in the steam generator from being fed backward into the water pipe flexible hose 2 _ l E swivel WY Service note A strainer is installed in the solenoid valve inlet This strainer has to the task to filter possible dirt particles in the water pipe to prevent functional disturbances of the unit If the water supply of the steam tank is impeded by a soiled and clogged strainer this results in an activation of the safety circuit and an interruption of steam production This strainer has to be cleaned at regular intervals in particular after installation works at the water main Ventilation don t close the ventilation opening in any case The sealing cap of the left special steel pipe see drawing contains an opening which is absolutely necessary for the ventilation of the system This opening shall by no means be closed Closing of this opening would inevitably cause functional disturbances in the unit If P water leaks out of this opening during operation
3. 20 30 timer OFF is shown in the display By activating the keys Plus or 2 Minus the displayed switch off time may be changed The time shown in the display is automatically stored After completion of programming of the automatic switch the switch Automatic Switch may again be activated to reset the display into base mode Otherwise the intelligent microprocessor control resets the display 10 seconds after the last activation of the keys Plus Minus or Automatic Switch automatically into base mode If the steam generator is not required to be automatically switched on and off the same times have to be indicated for the switch on and switch off time e g ON response time 16 00 OFF response time also 16 00 Operating instructions SILVER STEAM deluxe model page 6 Odour intensity By means of this switch the intensity of the aromatics can be programmed When activating the switch Odour Intensity the character odour impulse is shown in the display By activation of the keys Plus or Minus the displayed impulse length can be prolonged An increase of the impulse length involves a longer running time of the aromatics dosage pump and therefore an increase of odour intensity The value which is shown in the display is stored automatically After that the key Odour Intensity is again activated and the character odour stop is shown in the display By
4. but does not convey water pump is blocked by calcareous deposits Water is continuously flowing out Solenoid valve for water feed is Clean or replace solenoid valve of the discharge pipe of the blocked Steam generator Steam line is clogged Remove clogging Hot water is jerkily flowing out of Small water pocket in the steam Remove water pocket the steam nozzle line Water is leaking out of the Discharge pipe not properly Install discharge pipe according ventilation openings of the left installed in place to the operating instructions special steel pipe top page 5 Cabin illumination is not working Fuse protection defective Replace fuse by a specialist electrician also see page 9 We wish you much joy and recreation in your steam bath Our SILVER STEAM supplies you with the proper steam Subject to change without notice March 03
5. generator always contains a small quantity of residual water even if it is switched off and emptied by the washing program The steam generator has to be stored frost protected by all means so that this water is unable to cause frost damage Operating instructions SILVER STEAM deluxe model page 14 Decalcification To achieve a long lifetime and troublefree steam generator function the steam tank must be decalcified regularly If decalcification is not carried out the lime deposits can lead to malfunctions after a time The time intervals between decalcification depend among other factors on the hardness of the water and the operating time of the steam generator The duration of decalcification depends among other factors on the preparation used the temperature and the intensity of the lime deposits The values given here are therefore guide values without any general validity Procedure Before beginning decalcification disconnect the steam generator from the mains by switching off the main switch e Remove the hexagonal brass screw plug visible from the top with a 23 mm socket spanner e Dissolve the contents of a MENi bag of anti liming agent in 7 litres warm water approx 50 C e Pour the anti liming solution into the steam tank using a funnel e After filling the steam tank screw the hexagonal brass screw plug back in again e gt G amp Warning Do not lose the internal gasket e Allow the anti liming agent t
6. operation of the unit the steam generator is switched off at the above mentioned switch Steam and thus the washing program is activated automatically Temperature setting When activating the switch 7emperature the displayed temperature 38 1 1726 switches to the set value display required temperature and the character 4 i temperature is shown in the display The displayed temperature temperature required temperature may now be individually changed by activating the keys Plus or Minus The setting range reaches from 30 C to 50 C The temperature which is shown in the display is stored automatically After completion of the temperature programming the switch Temperature may again be activated to reset the display to base mode Otherwise the microprocessor control resets the display 10 seconds after the last activation of the keys Plus Minus or Temperature automatically to base mode Automatic switch By using of this switch the steam generator can be automatically switched 10 00 limeron 46 4 C 17 26 steam bath mode 6 on and off When activating the switch Automatic Switch the character timer ON is shown in the display By activating the keys Plus or Minus the displayed switch on time may be changed The time shown in the display is automatically stored After that the key Automatic Switch is activated again and the character
7. the unit starts The system is emptied after that cleaned with fresh water twice and again emptied subsequently At the end of the washing program the steam generator is automatically switched off and then ready for further operation During the entire program flow water supply and current shall not be interrupted If the above mentioned switch Steam is switched on during the program sequence this does not interrupt the washing program Only after a complete sequence of the washing program the steam tank is again filled with water and steam production starts anew Permanent operation of the steam generator If the steam generator is not switched off at the corresponding switch the washing program will consequently not be started In this case the MAI microprocessor control autonomously starts the washing program The point in time the washing program is switched on is dependent on the heating capacity of the steam generator the size of the cabin the water consumption the cabin temperature and other factors Due to this unavoidable cleaning of the system a termporary interruption of steam production is inevitable Exhaust air ventilator With the steam generator being connected the air extraction air ventilator can be automatically switched on and off by the microprocessor control and cannot be influenced from outside Out of the operating time of the steam generator the exhaust air ventilator can be manually regulated by means o
8. 90 possible check of the temperature sensor please use the opposite chart 40 C 11200 Operating instructions SILVER STEAM deluxe model page 13 MN Cabin illumination The SILVER STEAM steam generator is equipped with a transformer optionally which supplies voltage to the steam bath cabin illumination This transformer is VDE approved and supplies a safety extra low voltage of 11 5V The illumination is switched on and off by means of the switch Light in the control panel of the steam generator see also page 2 Electric supply Installation is carried out by a light plastic sheathed cable and a conductor cross section of a minimum of 0 75mm The cable is directly connected to the connecting terminals of the transformer see opposite drawing The output of the light shall not exceed 60W at 11 5V Fuse Fuse protection is done by a 5A time lag fuse 5x20 This fuse is installed in the connecting terminals of the transformer fuse T5A connecting terminals 11 5V External transformer For steam generators without built in transformer standard equipment there is the possibility to install a suitable transformer in place The latter is fixed to the connecting terminals U9 and N attention 230V of the big plate bar The illumination is also switched off and on by means of the switch Light in the control panel of the steam generator also see page 2 Re Operation in winter A steam
9. Installation and Operating Instructions SIME STEAM Deluxe Model remote control on the wall optional remote control in the wall optional Technical data light 230V and 12V supply air ventilator 230V discharge pipe 32mm outside steam outlet 35mm outside Operating instructions SILVER STEAM deluxe model page 2 LIST OF SILVER STEAM MODELS Output Light Dosing pump Art No transform er P fow pee L 3 0 light 3198100030 Toa a a omom sow v 7 awona sf tow O s C san en ws C sam en ao isum ssw v 7 awos T w fowm pe L 6 0 light 3198100060 ss a eecvtowpine sow 7 7 awone 80 feon _ stonn a oon O e C isone oom 7 fono iom oom v 7 fawon Operating instructions SILVER STEAM deluxe model page 3 Functioning This high quality fully automatic steam generator produces water steam for steam cabins All necessary regulating and control functions may be set at the control panel of the steam generator or at the external remote control panel for remote installation optional By means of the computer interface which is provided for in the standard version it is possible to monitor and control the steam generator by a computer and by the Mi SILVER STEAM software The comfortable Mi microprocessor control effects all necessary regulating and control functions e Filling of the steam tank with water e Automatic refilling of the used
10. activating the keys Plus or Minus the displayed stop length can be changed An increase of the stop length involves a longer stop between the aromatics injections and therefore a decrease of odour intensity The time which is shown in the display is automatically stored After completion of programming of the odour intensity the seconds TM 01 0 odour impulse seconds minutes switch Odour Intensity may again be activated to reset the display to oase mode Otherwise the microprocessor control resets the display 10 seconds after the last activation of the keys Plus Minus or Odour Intensity automatically to base mode Power reserve The digital clock has a power reserve of approximately 200 hours The programmed data of the set temperature the automatic switch and the aromatics interval control remain stored even after termination of the power reserve Ext Control panel Remote control panel optional The fi SILVER STEAM deluxe steam generator can be operated by an remote control panel for wall installation This control panel has the same functions as the integrated control panel At the remote control panel all necessary switching and programming functions can be carried out Also the display shows the time temperature operating conditions and service notes Therefore the steam room unit may be operated and controlled by means of a remote control
11. ctly into the steam line near the steam nozzle The enclosed brass hose stem is inserted into a hole in the copper pipe from above and soldered into position The pressure line is laid kink free from the steam generator hose pump right hose to the steam line and connected to the brass hose stem 2 7 n 7 oO g aa ES Brass hose stem Warning Under no circumstances may the scent essence be injected into the vertical part of the steam line above the steam generator or into the steam tank The scent essence may not flow through the steam hose into the steam tank The hoses are led into the steam generator from below Maintenance of the scent dosing pump The hose built into the scent dosing pump is subject to wear If damaged it should be replaced with an original spare hose Since the steam generator has to be opened for this this service work may only be carried out by an authorised electrician Procedure 1 Remove the cover of the hose pump 2 Dismount the old hose Hose guide Hose labyrinth 3 Insert a new hose into the hose labyrinth 4 Place the hose around the rotor 5 Press the hose into the hose guide and pull down lightly Put on cover 6 Putonthe cover in such a way that the pins of the pump catch in the and push down oblong holes of the cover e y 7 Push the cover down to the end and screw tight with both screws SCHLAUC a Original spare parts can be obtained from when require
12. d POURS TAL FT Pupkei Operating instructions SILVER STEAM deluxe model page 17 Check list for trouble shooting in case of functional disturbances w Attention Trouble shooting shall only be carried out by an authorized specialist electrician The BAI SILVER STEAM steam generator is equipped with an intelligent microprocessor control which recognizes various functional disturbances and indicates corresponding error messages in the display Error message Possible cause Elimination Power failure Previous interruption of the Activate Steam switch power supply Low water level Interruption of the water supply Clean strainer in the water inlet solenoid valve or turn on tap in the feed line see operating instructions Sensor defective Temperature sensor defective or Replace temperature sensor or incorrectly connected check connection Level error Level sensor system soiled Clean or decalcify level sensor calcified or incorrectly connected system Check connection Pump defective Discharge pump defective Remove calcification or clogging calcified or mechanically blocked replace pump if necessary or pump inflow clogged Error check list Problem Possible cause Elimination Insufficient ventilation Exhaust air ventilator is defective or turning direction incorrect Cabin temperature is obtained Exhaust air pipe clogged Remove water pocket however no steam production The air which entered the steam Lo
13. es therefore a decrease of odour intensity The time which is shown in the 05 20 display is automatically stored After completion of programming of the odour stop odour intensity the switch Odour Intensity may again be activated to reset the display to base mode Otherwise the intelligent microprocessor control resets the display 10 seconds after the last activation of the keys Plus Minus or Odour Intensity automatically to base mode Venting the scent tube After the steam generator has started up it takes some time before the scent tube is completely filled with scent There is no injection of scent before the scent tube is completely filled with scent The steam generator allows the scent pump to be manually controlled to vent the scent tube The three buttons shown below must be pressed simultaneously and pressed until the tube is completely filled with scent mr Oe b PEN ATAJ iem hooo ha Operating instructions SILVER STEAM deluxe model page 16 Installation of the aromatics unit Connection of the aromatics unit The tank for the scent essence must be mounted directly underneath the steam generator with the hose connection being kept as short as possible The suction hose of the scent pump left hose is inserted into the tank in such a way that the end of the hose lies horizontally on the bottom of the tank The tank must have a vent hole The scent essence is injected dire
14. f the switch Ventilator in the control panel Supply air ventilator The supply air ventilator is automatically switched on when connecting the steam generator It is automatically disconnected a few minutes after the steam generator is switched off Operating instructions SILVER STEAM deluxe model page 8 Connection to the discharge pipe 0000009 hose connection drain water joint not airtight 4 UF The connection for the drain water is ensured by means of a flexible hose at the left pipe end see drawing The hose has to be permanently temperature resistant at 100 with an inside diameter of 32mm The joint is fixed by means of a screwless spring band clamp If required this discharge hose and the clamp may be obtained from This flexible hose ensures the connection to the discharge pipe which is permanenily installed in place The joint between the flexible hose and the permanently installed DN 50 pipe shall not be made gastight so that the necessary pressure compensation can take place at any time The discharge pipe provided for in place has to be installed in such a way that the water can flow off the steam generator trouble free and without back draught For the installation pipe material with a diameter DN 50 of a minimum of 50mm and an odour seal of adequate dimension
15. hanged The time shown in the display is OC SN stored automatically After programming of the time has been completed the switch Clock may again be activated to reset the display to base mode Otherwise the microprocessor control resets the display 10 seconds after the last activation of the keys Plus Minus or Clock automatically into base mode Steam production Steam production is switched on by the switch Steam Apart from the time and the cabin temperature the character steam bath mode is shown in the display After connection the small quantities of existing residual water are pumped off automatically the fresh water supply line opens and the steam tank is filled with water Water supply is automatically stopped as soon as the necessary water level is obtained and the water is heated Depending on the capacity of the steam generator some minutes pass during heating until the actual steam production starts The water which is used during operation is automatically refilled The MESA microprocessor control monitors continuously the steam production and ensures smooth functioning Depending on the heating capacity the steam production the water consumption and other factors a small quantity of water is replaced by fresh water from time to time If required the microprocessor control autonomously switches on and off the exhaust air ventilator if available to influence the room climate After
16. nto the cabin and from there into the discharge pipe The discharge pipe in the cabin has to be arranged beneath the steam nozzle in such a way that the hot condensate is unable to cause damage The entire steam line has to be as short as possible and installed carefully thus avoiding contractions and dents observe bending radius oe Also a condensate pocket water pocket in the steam line absolutely has to be avoided for this ee would inevitably lead to functional disturbances and present an unnecessary safety risk On its entire length the steam line is provided with an appropriate heat insulation This insulation M e shortens heating times of the steam bath cabin reduces condensate formation and contributes considerably in saving energy During the first commissioning of the steam generator the steam hose delivered with the unit may have an inherent smell To reduce this smell development as well as possible the steam hose is subjected to a pre ageing process at the works before Due to this pre ageing process traces of wear can be made visible at the steam hose concerned which are not always avoidable Safe functioning and reliability are not impaired by theses traces of wear Operating instructions SILVER STEAM deluxe model page 11 The steam nozzle An Mi special steam nozzle set with the article number 2260401100 should be used fo
17. o work A working time of one night is often appropriate Ending decalcification 1 Make sure the steam tank is closed with the hexagonal brass screw plug 2 Switch on the main switch again 3 Switch on the steam generator with the upper rotary switch on the control panel thereby starting the rinsing program gt The steam tank is then emptied cleaned twice with tap water and then filled 4 When the steam tank has been filled with water and the heater switched on automatically switch off the steam generator with the upper rotary switch on the control panel thereby starting the rinsing program again 5 The rinsing program must be started again at least two more times to rid the steam generator of all residues In the case of hard water decalcification must be carried out after about 100 hours of operation Safety information on GES anti liming agent General Remove soiled clothing A safety data sheet for the ost After inhalation Fresh air consult a doctor anti liming agent can be After skin contact Wash off with plenty of water obtained from the supplier of the After eye contact Rinse eye with open lid steam generator After swallowing Rinse mouth and drink plenty of water Operating instructions SILVER STEAM deluxe model page 15 Dosage of aromatics The comfortable ESL SILVER STEAM steam generator with integrated aromatics pump optionally regulates aromatization of the steam bath cabin fully automa
18. on of the keys Plus or Minus Switch Clock The time is shown in the display after activation of this switch The time may now be changed by activation of the keys Plus or Minus Switch Automatic Switch The timer ON is shown in the display after activation of this switch By activating the keys Plus or Minus it is possible to change the switch on time After new activation of this switch the character timer OFF is shown in the display which again may be changed Switch Odour Intensity The odour impulse is shown in the display after activation of this switch The impulse time may now by changed by activating the keys Plus or Minus After new activation of this switch the odour stop is shown in the display which may be changed again Switch Plus Activation of this switch increases the value during programming e g time Switch Minus Activation of this switch decreases the value during programming e g time Display 43 8 C temperature steam bath mode operating mode Operating instructions SILVER STEAM deluxe model page 5 Operation of the steam generator If the steam generator is switched off the display shows the time and the 20 6 C 17 26 cabin temperature Time setting By activating the switch Clock the character time is shown in the 354C 17 26 display By activating the keys Plus or Minus the displayed time may Ame be c
19. r steam inlet into the cubicle If this is not possible and another type of steam inlet is used the diameter of the Copper pipe Herb tray Seals 35 mm Fastening nut m Ailt r Steam exitt Wall bushing Socket 2 sided 350mm Installation height Condensate outlet Floor 4 opening may not be smaller than 35 mm A steam nozzle with numerous small openings may not be used The steam nozzle is to be firmly installed at a height of about 35 cm above the floor Care must be taken during installation to ensure that the exiting steam or condensation water cannot cause any damage Herb tray The top of the Mi special steam nozzle is equipped with a tray for solid aromas herbs The herbs in the tray are heated during steam operation and their aroma spreads around the cubicle Liquid aromas may not be used in the tray as they will cause damage to the steam nozzle Only herbs certified to be safe from a health point of view may be used Cover for steam nozzle A transparent cover article number 1260401120 must be mounted to protect against direct contact with the steam nozzle r This cover is made of transparent plastic It is pushed over the 11 4 thread of the steam nozzle and clamped tight between the steam nozzle and cubicle wall Operating instructions SILVER STEAM deluxe model page 12 Installation of the temperature sensor a gt temperature sensor Installation The temperat
20. s are to be used If necessary the odour seal can be made from DN 50 preformed parts The DN 50 pipe connection between the steam generator and the odour seal has to be vertically running with a minimum length of 80 cm Installation For wall installation please use the drill template which is drill template contained in the delivery extent The steam generator shall o only be fixed on an underground with sufficient carrying capacity For installation the SILVER STEAM steam generator has to be protected against humidity according to its 2 type of protection Operating instructions SILVER STEAM deluxe model page 9 Electric supply Safety instructions Current supply of the unit has to be effected by an all pole main switch with a contact gap width of a minimum of 3mm and a fault current safety switch of IrN lt 30mA Before opening the housing the unit has to be switched free of electrical tension The electric supply alignment and service works shall only be carried out by a qualified electrician The enclosed cable arrangement and the corresponding safety instructions in force shall be observed Connection to the water main For the water connection a pressure resistant Ve washing machine connection hose with a 90 angle connection and a R thread is to be used This hose is fixed watertight to the thread connection of the solenoid valve by means of the swivel nut attached to it Odo0000
21. tically and thus ensures an agreeable and pleasant climate gt the special flair for your steam bath Addition of the aromatics is switched on by the switch Aromatics at the front panel of the steam generator The intelligent lost microprocessor control activates the dosage of aromatics in relation to the temperature inside the steam bath cabin Dosage of aromatics in only started if the steam production is switched on and the steam bath cabin is heated up to at least 5 C below the prescribed temperature Please only choose those odorous essences which are not detrimental to health Odour intensity By means of this function the intensity of the aromatics can be second programmed When activating the switch Odour Intensity the character SK odour impulse is shown in the display By activation of the keys Plus 01 0 or Minus the displayed impulse length can be prolonged An increase of the impulse length involves a longer running time of the aromatics dosage pump and therefore an increase of odour intensity The value which is shown in the display is stored automatically After that the key Odour Intensity is again activated and the character odour impulse odour stop is shown in the display By activating the keys Plus or Minus the displayed stop length can be changed An increase of the seconds stop length involves a longer stop between the aromatics injections and minut
22. ure sensor is installed in the steam bath cabin next to the door in a height of 1 5m Please note the installation 44 steam bath arrangement from the opposite illustrations cabin element Procedure e Drilla hole with a diameter of 8mm for the sensor line e Insert the sensor line from the cabin interior into the hole e Fix the temperature sensor in front of the boring in such a way that the drill hole is covered steam bath i j cabin e Use corrosion proof screws e g V4A for the installation top view e Seal the boring e g by silicone e Guide the sensor line to the steam generator to fix it there at the connecting terminals 9 amp 10 Polarity of the two wires is not bat essential e In the standard version the temperature sensor is delivered with a line length of 3m If required this can be prolonged up to a maximum of 10m cross section minimum of 0 5mm7 The sensor line shall not be installed near supply mains to exclude possible disturbing influences temperature sensor For the functioning of the steam generator it is essential that the two Temperature sensor wires of the temperature sensor are connected with the corresponding connecting terminals of the steam generator A defective non connected temperature resistance or short out temperature sensor leads to an immediate activation of the e ni safety circuit and thereby an interruption of steam production For a 30 C 103
23. water e Regeneration of the water to improve water quality e Monitoring and control of the temperature in the steam cabin e Emptying of the steam tank e Cleaning of the steam tank and the level sensors e Automatic control of the air extraction fan e Automatic control of the supply air fan e Aromatics dosage optional e Availability of the safety extra low voltage for illumination optional Operating elements Switch Steam The steam generator is switched on and off by activation of this switch Switch Light The cabin illumination is switched on and off by activation of this switch Switch air extraction The exhaust air ventilator is switched on and off out of the operating period by activation of this switch Switch Aromatics The aromatics dosage is switched on and off by activation of this switch Switch Aux 1 Auxiliary instruments such as e g anteroom illumination anteroom ventilation musical equipment etc can be switched on and off by activation of this switch Operating instructions SILVER STEAM deluxe model page 4 Switch Aux 2 Auxiliary instruments such as e g anteroom illumination anteroom ventilation musical equipment etc can be switched on and off by activation of this switch Switch Temperature The operating temperature and the set temperature are shown in the display after activation of this switch which can be changed by activati
24. wer temperature in the cabin is too hot anteroom Temperature sensor incorrectly Position the temperature sensor Cabin temperature does not positioned according to the installation correspond to instructions To the indicated temperature Reference thermometer Position the reference incorrectly positioned thermometer directly next to the temperature sensor Insufficient output of the steam Use a more efficient steam generator generator Excessive ventilation Exhaust air ventilator may not run during the heating period Heating takes unusually long Fuse protection in place Replace or switch on fuse defective or switched off protection Heating element defective Replace heating element Voltage loss Switch on fuse protections and Operating instructions SILVER STEAM deluxe model page 18 Low water level Also see chart Clean strainer in the water inlet above solenoid valve or turn on water tap in the feed line see operating instructions Low water level Also see chart Clean or decalcify level Not heating and steam above electrodes Does not enter the cabin Fuse on the plate bar defective Replace fuse by a specialist electrician Temperature sensor defective See operating instructions page 8 Steam line clogged See operating instructions page 7 Calcareous deposits in the Decalcify steam tank steam tank Evacuation pump is humming Clean or decalcify pump Steam tank is not emptied
25. without problems A four wire shielded cable which can be purchased from DFi is needed for the electrical connection This connection line shall have a length of a max of 50 metres Installation of this line near supply mains has to be avoided to exclude possible disturbing influences Connection plan n ent external control panel control external control panel Operating instructions SILVER STEAM deluxe model page 7 Washing program As standard equipment the ES steam generator SILVER STEAM comprises an autonomously working washing program This washing program removes deposits from important components of the steam generator it cleans the complete heating system and the safety devices By means of this system the service life of the entire unit is considerably increased and maintenance reduced to a minimum This washing program is essential for a trouble free and reliable operation of the steam generator and must never not be stopped Programme sequence After having switched off the steam generator by means of the on off 481C 19 20 switch the character washing program is shown in the display At the hi Z same time a waiting period of one minute is activated If the WwWasmingiprogram steam generator is switched on again during this minute this means a continuation of steam production gt The washing program is not started and display is reset to base mode After this one minute waiting period cleaning of
Download Pdf Manuals
Related Search
Related Contents
Télécharger ce fichier Product Installation Guide Manuel d`utilisation communes Copyright © All rights reserved.
Failed to retrieve file