Home
        Installation Instructions and User Guide
         Contents
1.                            1000       ERMOSTATIC POWER SHOWER              EVENT      ANY QUERY PLEASE CONTACT            CUSTOMER HELPLINE    el  01536 264 012         EASE KEEP THIS BOOKLET    FOR FUTURE REFERENCE  DEAR INSTALLER WHEN YOU          READ THESE INSTRUCTIONS      PLEASE ENSURE YOUSLEAVE THEM WITH THE USER         mg       i                                   rma  1                      ina                                  gt  lt    8   lt  3        5  gt                i        5             8 988  5                 955585         95 2 2                      Oe                ETE        Se 2  amp           4942532      5     05                        or       25 52 5 8            5        gA                           7                                                  Installation and Operating Instructions  for NewTeam Power Shower    e 1000         Please read this booklet carefully and ensure    competent person undertakes  the installation     Note  Following the headings in sequence will guide you through the installation  and operation of your NewTeam 1000 XT Power Shower     Pages  PLANNING YOUR INSTALLATION       Plumbing     Electrics    FITTING YOUR SHOWER       General      Plumbing Connections      The Unit      Water Electrical Connections     Riser Rail    COMMISSIONING  TEMPERATURE ADJUSTMENT  USER INSTRUCTIONS  TROUBLE SHOOTING   SPARE PARTS LISTING  INSTALLER NOTES    GUARANTEE    Refer to back cover for Guarantee  Customer Service and Replacemen
2.    if the stored hot water is at the  recommended 60  C                                                                                                                                                                                1000            1       operate the shower ensure the temperature control knob is       approximately  to the    12 o   clock    position and press the stop start button     2  For a hotter shower turn the control knob anti clockwise  for a cooler shower    turn it clockwise     3  The handset holder has a friction grip on the rail and simply slides up and down  to adjust the height  The angle of the handset can also be adjusted     4  The handshower has three shower modes  which are selected by rotating the  bezel around the spray head     Trouble shooting    Symptom    Pump not operating but  water is flowing    Pump not operating  and no water is flowing    Pump operates but no  water is flowing    Poor performance    Purge shower switch  switched to purge    No electricity supply    to unit    No water supply to unit    Restrictions in water  supply    Pump may have    overheated    Unit may be incorrectly  installed    Likely Cause Action Remedy    Isolate electrical supply   remove cover and  switch to shower    Check all fuses and  electrical supply    Check isolating  valves are turned on    Check cold water  storage tank has not  run dry    Check both hot and  cold isolating valves    are fully open    Allow unit to cool  and retry    Check
3.  that the top  of the shower unit  is at least 75 mm  below the base of  the cold water tank    If in doubt please call the NewTeam helpline  01536 264012       Spare Parts Listing    Newleam 1000                No         No  Description Finish  1 SP 087 0603 Base assembly   White      matt chrome  2 SP 087 0604 Front cover   White or matt chrome  3 SP 087 0110 Pump unit Not applicable  4 SP 087 0035 Motor cover Not applicable  5 SP 087 0127 Pipe connection Not applicable  6 SP 087 0230 Solenoid Not applicable  7 SP 087 0014 Front cover screws  Not applicable  8 SP 087 0129 Latching switch  Not applicable  9 SP 086 0061 Long inlet elbow x 2  Not applicable  10 SP 087 0154 Mixer valve assembly Not applicable  11 SP 087 0505 Temperature control knob   White or matt chrome  12 SP 087 0514 Stop start button   White or matt chrome  13 SP 087 0068 Pipe cover   White or matt chrome  14 SP 087 0211 Purge shower Not applicable   rocker switch   15 SP 280 0100 Spirit rail and White or   slider assembly   matt chrome chrome  16 SP 280 0033 Soap dish   White or chrome  17 SP 280 0024 Rail end cap   White or matt chrome  18 SP 285 0820 Hose   White or chrome  19 SP 168 0204 Zag Handshower   White or matt chrome     Not shown   Please define colour    Fig 8   Spare parts        Installer Notes       Installer Notes    sti               441                            1111    TEE                                             tilidi                                        Installer Notes       
4.  to the terminal  that is marked with the letter L        The wire which is coloured Yellow Green must be connected to the terminal  which is marked with the earth symbol           The installation and wiring must comply with 1       regulations           Fig 2   Cylinder Flange          Fitting your Shower       General    In addition to the recommendation on    Planning your Installation    please take note  of the following     All plumbing should be completed before any electrical connections are  undertaken     The unit can be connected to a combination cylinder system providing it  has a cold water storage capacity of 115 litres  25 gallons actual      When connecting pipework avoid using elbows  sweep or formed bends will  ensure optimum performance     Do not solder within 300mm of the unit     Do not run pump dry this will damage the internal seal and invalidate the  warranty     All pipework to and from the unit should be a minimum of 15mm  Non restrictive  isolating valves must be fitted on hot and cold supply pipes     Do not position unit in areas subjected to freezing conditions     The temperature of your stored water must not exceed 65  C  A stored water  temperature of 60  C is considered sufficient to meet all normal requirements  in line with the British Standard 6700     WARNING   ALL CONNECTING PIPEWORK SHOULD BE EARTHED    Procedure   Plumbing Connections  Fig 1       Isolate mains water and electrical supplies     To empty the pipework open the hot and 
5. Guarantee Service Policy       Guarantee    Thank you for purchasing a NewTeam product  which has been designed  manufactured and  tested  in the U K   to the highest standards     Guarantee  2 Years  1 Year   Parts and Labour Second Year  Parts Only  This is provided that     1  The guarantee registration card is completed and returned within ten days complete with a           of proof of purchase     2  The product is installed and operated in accordance with our instructions and has not been  misused or damaged     This in no way affects your statutory rights as a consumer     The information on the Guarantee card helps NewTeam to process any claims and contact you  about your product and its maintenance if required  The registration of your personal details is  purely for Newteam use  and the other information helps us to make products for the future     NewTeam Shower products are designed  manufactured and tested to the highest standards     Should a complaint arise  products are guaranteed against faulty workmanship and materials for a  period of 12 months from the date of purchase  when in domestic use  second year guarantee is  parts only   For your guarantee to be valid  your shower pump must be installed by a competent  person  in accordance with the instruction manual     NewTeam will repair or replace  at our option   free of charge  any faulty components during the  guarantee period  provided it has been maintained and operated in accordance with our  instructio
6. Spirit level    Rail with slider attached    Soap Dish    Screw cap    Soap dish fixing screw    Rail fixing screws  amp   wall plugs    Fit the soap dish onto the bottom end of the rail and secure using the small screw  from the kit     Position the rail on the wall  bearing in mind the heights of people likely to use the  shower  and the length of the hose when connected to the shower and passed  through the retaining hole in the soap dish  Mark the wall to indicate the upper  fixing screw position  Screw centres are 605 mm  approx  23   inches   apart     Drill the wall at the marked fixing position using a 6 mm drill  and loosely fix the rail  end  checking that the rail is hanging vertically using the spirit level incorporated  into the top end of the rail  The bubble should be exactly between the two lines on  the spirit level body  Mark the position for the lower fixing screw  move the rail to  one side  drill the wall  and fix the lower end of the rail     Check that the rail is vertical and tighten both fixing screws     Slide the end cap into position on the top end of the rail  and fit the screw cover  into the recess in the soap dish     When fitting the hose  it should pass through the larger hole of the soap dish     Note  The hose nut  and not the handset handle  fits into the slider  and the slider  moves more freely on the rail if gripped next to the rail  rather than at the handset        Commissioning       Commissioning    1  With the front cover removed e
7. cold water taps       Make your connection into the hot water supply pipe from the cylinder  ensuring    that it is the first draw off  below the expansion pipe tee  to minimise the effects  of water draw offs elsewhere in the house  and a minimum of 1 metre from the  base of the cold storage tank and the expansion tee       If this is not possible  a direct connection must be made from the hot water    cylinder with a cylinder flange  Fig 2       The cold water supply should be taken directly from the cold storage tank     and must be positioned 60mm below the cold feed connection to the hot  water cylinder  This should not be directly beneath the ball valve as aeration of  the water going to the shower could cause pump damage       Run hot and cold pipework to the unit position     The Unit    We recommend that the unit is fitted at chest height  and set to one side of the  intended riser rail position  ensuring that the top of the unit is at least 75mm below  the base of the cold water tank     IMPORTANT     The unit must be fitted on the finished tiled surface     Do not seal the edge of the unit to the tiled surface with any sealant  as the  gap below the back of the unit and the tiles is needed for ventilation     The outlet connection must be positioned at the bottom of the unit           Fitting your Shower       Water Electrical Connections    WARNING    Do not fit fuse or switch on mains electrical supply until all plumbing work is  completed  Connecting pipework ca
8. e rear  or via channels in the base  of the unit  and the bottom or the right hand side     10  Feed the supply cable in to the unit but do not connect   11  Refit unit to pipes and secure to wall using 32mm x No 8 screws provided     12 Connect the supply cables into the appropriate terminals  marked N  L and     symbol  on the terminal block  and secure into position with the cable clamp     13 Do not fit the front cover at this stage  Refer to the commissioning procedure  on page 7     Note  If the electrical supply cable is concealed in the wall ensure that it avoids  the unit   s fixing points so that fixing screws do not pierce the cable                                                                                               Fig 3   Fixing points                                   Fig 5   Fixing screws                       Inlet  Short elbows  Inlet Elbow  Top Bottom 63mm  Feed  Long  Inlet Elbow  Top Bottom 86mm  Feed  Both     Measurements  Inlet Elbow given in the table  Back Feed 63mm are to be taken   from these points                                  Fixing the Riser Rail                Fig 6   Riser Rail             Spirit Rail Kit    Before proceeding with fitting the rail  identify each of the items supplied using the  illustration     The slider need not be removed from the rail during fitting  The top of the slider has     smooth profile  whereas the underside has    recess revealing the grooves on the  handset holder     Part Description  Rail end cap  
9. he installation of this unit  check that your site  requirements allow the top of the unit to be a minimum of 75mm below the  bottom of the cold water storage tank     Electrics    WARNING  THIS APPLIANCE MUST BE EARTHED        All electrical wiring for the shower must comply with the current  1       Regulations which includes earth cross bonding to all metal pipework     IMPORTANT   All plumbing should be completed before final electrical connections are made     The shower must be connected to a 230 240 volt A C electrical supply from a  13 amp ring main  via a fused double pole switch with at least 3mm contact  separation  The switch is to be clearly identifiable  a minimum distance of 2 5m  from a fixed tap or shower  i e  mounted in an adjacent room or via a ceiling type  pull cord switch  The unit should be fused at no more than 3 amps     This appliance must be earthed  and all associated metal pipework earth  crossbonded in line with current 1       regulations     As the colours of the wires in the cable  not supplied  used to connect to this  appliance may not correspond with the coloured markings identifying the  terminals in your switch  please follow the procedure below     Please use the cable entry point provided  Failure to            will eliminate any  BEAB approval   Procedure      The wire  which is coloured Blue or Black  must be connected to the terminal  that is marked with the letter N        The wire  which is coloured Brown or Red  must be connected
10. lled appointments  unless advised to NewTeam at least 24 hours in advance of the agreed  date and time     We reserve the right not to undertake work where payment cannot be made to our engineer at the  time of the visit     NewTeam hold stocks of components for all their range of products and these will be  maintained for the duration of their life     Should a product be discontinued  spare parts stocks will be maintained  but in the event of a part  becoming unavailable NewTeam reserve the right to supply a substitute of equal quality     The following payment methods can be used to obtain spare parts   By post  pre payment of proforma invoice by cheque or postal order   By telephone quoting credit card  Mastercard  Visa or Visa Delta  details     REPLACEMENT PARTS      Tel  01536 409 222    Fax  01536 409 201    E Mail spares newteam co uk    CUSTOMER SERVICE HOTLINE   Tel  01536 264 012    Fax  01536 409 201    E Mail service newteam co uk    Part No  404 0125 Issue 02 03       Guarantee       Please post immediately enclosing a copy of proof of purchase       FOR NEWTEAM USE    1000 XT    This label identifies your product and  provides all the information needed    Proof of purchase enclosed  YES    NO I       NAME        ADDRESS           POSTCODE        DATE OF PURCHASE        PRODUCT PURCHASED FROM        ra TOWN        bb       NewTeam   s philosophy is to offer outstanding products with quality and integrity     please help us by taking the time to answer the foll
11. n feed from above or below the unit  or straight  through the wall at nominal centres of 40mm     Top Feed   Hot on      right  cold on the left  Bottom Feed   Hot on the left cold on the right  Back Feed   Hot      the bottom cold on      top  Procedure     e The integral fittings on the valve are of the self seal push fit type  All burrs and  rough edges must be removed from the end of the tube  Where chrome plated  tube is used  roughen or remove the first 25mm of plating    e The inlet elbows supplied are of a standard length  in some cases these will  need to be shortened for correct installation  please refer to the tables for  correct measurements     1000 XT    1  Flush out pipework before installing the unit   2  Cut the inlet elbows to the required length  please refer to table below     3  Locate the inlet elbows into the mixer valve inlets by pushing firmly through  rubber grommets until pipe stop is felt     4  Hold the unit on the wall and mark the pipe work to the appropriate length     5  Cut the pipes and remove all burrs  Push the unit and elbows firmly onto the pipes  until the stop is felt     6  Mark the fixing points for the unit  Fig 3     7  Release unit from pipes by pressing the collets on the elbow fittings  and pulling  the unit off the pipework  Fig 4     8  Drill the wall and insert the appropriate wall fixings     9  Bring a supply cable  to conform to I E E regulations  from the switch to the unit  position  The cable can enter the unit from th
12. ns  and has not been misused or damaged     Modification or repair of this product by person s  not authorised by NewTeam will invalidate this  guarantee     This guarantee applies to products purchased within the United Kingdom or Republic of  Ireland  but does not apply to products used commercially     This guarantee does not affect your statutory rights     Se rvi ce Pol        Replacement Parts Policy    IMPORTANT     In the event of product or component malfunction  DO NOT tamper with or remove the product  from site  Telephone NewTeam Customer Service Department on 01536 264 012 and be  prepared with the date of purchase  model number and a description of the complaint     Our service staff are fully qualified to advise on correct installation procedures and will be able to  diagnose whether the fault will require a replacement part or a visit from a NewTeam  engineer     If required  a service call will be booked  and either yourself or an appointed representative  who  should be a person of 18 years or over  must be present during the visit     All site visits to product within the guarantee period will be carried out free of any parts or  labour charges provided the conditions of the guarantee have been adhered to   Second year  guarantee is parts only     All site visits to product out of guarantee will be subject to charges for parts and labour which is  payable by you or your appointed representative at the time of the visit  Charges will also be levied  on cance
13. nsure the black    purge shower    switch inside the  base is switched to purge  see A  fig 7   This enables water to flow without the  pump running which is necessary in the following commissioning process     2  Fit the front cover and fix with fixing screws  see fig 5      3  Push the temperature control knob onto the spindle with the marker pointing to  the    12 o   clock    position     4  Connect the shower hose to the unit but do not fit the handshower     5  Turn on the hot and cold water isolating valves  and the electricity isolating switch   Place the open end of the hose in the bath or shower tray     6  Set the temperature control knob to fully cold  marker at    6 o   clock    position  and  press the    stop start    button  The pump will not operate but water should run     7  Cold water will flow from the hose  and you should allow this to continue for two  minutes after which the control knob should be returned to the    12 o   clock     position   Allow the water to run for a few minutes to stabilise the hot water flow     8  Turn off the electricity at the isolating switch and remove the knob and cover   Switch the black    purge shower    switch to shower and refit the cover and knob  ensuring the marker on the knob points to the    12 o   clock    position     9  Turn on the electricity at the isolating switch   10  Pass the hose through the hole in the front of the soap dish and fit the handshower    11  Your shower is now ready to run  Press the stop 
14. owing questions  Thank you        MARKETING INFORMATION       1  Please state your profession  Plumber    Builder    Electrician    Customer     Other     please specify        pa 2  Please state the reason for purchasing a shower  New Build O Replacement               Renovation    Other     please specify        3  If the product is a replacement shower  please state the type and make of the shower it is        replacing   1       4  What influenced you to purchase the 1000      Power Shower  Advertisement     Trade Press    Recommendation from Stockist    Recommendation from Installer TJ  Other     please specify        5  Please state your main reason for purchasing the 1000 XT Power Shower   NewTeam Product Knowledge    Product Features Product Styling    Price I  Other     please specify        Please tick here if you do not require any further information or product updates from NewTeam O    POST BACK    FOLD AND TAPE AS INSTRUCTED OVERLEAF    see             Please tape down           Fold  2nd Fold    Earlstrees Industrial Estate    Customer Service Dept   Corby    NewTeam Ltd   Brunel Road  Northants  NN17 AUW                adel          4    151 Fold                                                                                        ske aC       ne el                                                        2                                                                                     plumbworld    Big brands  small prices     Pdf Supplied By http   www pl
15. start button on the front cover to  operate the shower  which will work as a power shower     12  It is intended that with the temperature knob aligned to the    12 o   clock    position  you should get a comfortable shower temperature  If however the shower is too  hot or too cold remove the control knob and adjust the brass spindle anti   clockwise to increase temperature   clockwise to decrease  When the desired  shower temperature is achieved replace the knob with the marker pointing to the     12 o   clock    position     Temperature Adjustment    The valve allows the maximum showering temperature to be set at a safe level   preventing accidental scalding  This setting should be made during commissioning  and will require that the hot water cylinder is at its normal operating temperature     IMPORTANT        The handset must be in the spray mode     e We recommend the reading of User Instructions before proceeding further   This will familiarise you with the operation of the shower     Procedure     Turn the brass mixer valve spindle fully clockwise  and then anti clockwise until the  black line on the spindle is aligned with the groove on the mixer body  and fit the  control knob in the fully cold position  Check that it is correctly fitted by turning fully  clockwise to the stop  pull the knob off and check that the black line and groove are  aligned  Adjust if necessary  This sets the shower temperature to 38 40  C  with  the control knob pointing to    12 o   clock  
16. t Parts Policy   In the event of any query regarding installation please contact the NewTeam  Customer Service Department    Tel  01536 264 012    Fax  01536 409 201  E mail  service newteam co uk    E mail  spares newteam co uk    In line with our policy of continual product development the specifications may be  varied and product design altered  We reserve the right to depart from the details  given in this manual without prior notice        Planning your Installation       Plumbing    Under no circumstances should the unit be connected directly to the mains  cold water supply  or to a combination boiler  or pressurised hot water system        For correct operation of the NewTeam 1000 XT power shower  both hot   j  and cold water supplies must be gravity fed  at nominally equal pressures        from a cold water storage tank  and a hot water storage cylinder     We recommend a minimum of 115 litres  25 gallon actual  of cold water  supplied by a storage tank  Please ensure compliance with all Water  Regulations  Under no circumstances must the Power Shower be  connected to the mains cold water supply           Please ensure maximum supply head of 10 metres  minimum 75mm     It is recommended that the hot water supply is at a temperature of 60  C   in line with British Standard 6700  British Water Regulations  and Plumbing  Code of Practice              Do not use jointing compounds when connecting  and do not solder  within 300mm of the unit        Before proceeding with t
17. umbworld co uk       
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
シュナイダーブランド サーマルリレーTeSys Dシリーズ 原産地変更について  Phase Technology PC-SUB WL-10 User's Manual  View or  - Chevrolet Owner Center  Samsung NP-R430I Manual de Usuario (Vista/Windows7)    Audio and visual system and method for providing audio and visual  Manual    FR - Birth alarm    Copyright © All rights reserved. 
   Failed to retrieve file