Home
Installation manual T4300S
Contents
1. Rw Installation Technical data type 43005 Heating Drum volume Weight net Drum Diameter Depth Revolutions per minute Capacity max manual Electric 2x300 litres 282 kg 760 mm 660 mm 45 rpm 2x13 6 kg Heat effect Electric 2x9 kW 2x13 5 kW 2x18 kW Gas Air consumption 2x600 m3 h Pipe connection Evacuation O 200 Drop in pressure Evacuation max 400 Pa Gas pipe connection Gas pressure See page regarding gas pressure Noise level 70 dB A Gas 2x300 litres 282 kg 760 mm 660 mm 45 rpm 2x13 6 kg 2x21 kW 2x600 M3 h O 200 400 Pa ISO 7 1 R1 2 70 dB A Installation manual Technical data motor specifications 230V 1 50Hz Drum motor No 487028125 Effect 430W Revolutions per minute 2760 rpm Blower motor No 487028124 Effect 520W Revolutions per minute 2830 rpm 200 240 400 415V 3 50 Hz Drum motor No 487028126 Effect 520W Revolutions per minute 2700 rpm Blower motor No 487028126 Effect 520W Revolutions per minute 2700 rpm 200 240 400 480V 3 60 Hz Drum motor No 487028126 Effect 520W Revolutions per minute 3300 rpm Blower motor No 487028126 Effect 520W Revolutions per minute 3300 rpm 10 Installation manual Setup Positioning Fig 1 Locate the dryer to ensure easy use and service Fig 1 The distance to the vvall or ot
2. 50 60Hz 2x18 2x1 2x35A 440V 3AC 60Hz 2x18 2x1 2x35A 480V 3AC 60Hz 2x18 2x1 2x25A 25 Installation manual be carried out by qualified personnel AN Function check Check that the drum is empty and the loading door is closed Start the dryer Check if the switches are working properly The dryer must stop if the loading door is opened The dryer must stop when the lint drawer is opened Checking the direction of rotation Fig 1 Correct direction of rotation clockwise Turn the terminal through 2 phases if the direction of rotation is incorrect Final test Let the dryer work for 5 minutes on a program that requires heat Then check whether the heating is working by opening the door and feeling the heat If the above test points are in order the dryer is ready for use Service organisation dealer If operational problems are encountered please contact your local service organisation dealer 26 Installation manual Dimension sketch Adapter for direct fresh air intake 1 Adapter kit no 988 802 050 Gas and electric heated dryer 2 Diameter O 315 1195 mm 790 140 mm ww Gp9 H Electrolux Professional Electrolux Laundry Systems Lundtoftegaardsvej 93A DK 2800 Lyngby Denmark Telephone 45 4526 4800 Telefax 45 4526 4801 Internet www electrolux com laundrysystems E mail els info electrolux com 2 Electrolux Professio
3. Phase L2 Phase L3 Phase Fig 3 Cables are installed with the aid of a screwdriver Fuse miniature circuit breaker and output The size of the fuse miniature circuit breaker and the max output of the tumble dryer can be seen overleaf 22 4 Installation manual Electric installation A To be carried out by qualified personnel A External connection 100 mA Standard on all electrically heated dryers A special screvv joint and a terminal can be found on the tumbler s terminal board The terminal for external control is supplied with 110V max 100 mA and is solely intended for operating contactors external control of a ventilator ee Ext ti Max connection 100 mA mmm Gnd must not be used for earthing an external terminal board External connection 1 25 A Option only on 400 V machines with neutral If the dryer is supplied from the factory with an external junction with max connection of 230 1 25 A this junction can be used to connect an external ventilator The cable to the external junction is installed in contactor K7 in K7 2 and K7 4 The earth cable is connected to the earth terminal in the terminal for the external junction Max connection 1 254 X1 X2 Gnd Ext connection 100 230V 7 2 7 4 K7 6 7 External connection 1 25 4871969 48 01 Installation manual Electric
4. any appliance Do not touch any electrical switch do not use any phone in your building Evacuate the room building or area Contact appropriate authorities Applies only to floor mops containing polypropylene The dryer must not be installed behind a lockable door or a sliding door In the rooms where the dryer is to be installed the door hinges must be on the outer side Tumble dryer Contents Dimension 7 Technical 8 SEP DOSIIOITT ue ots eg PG dein eec opere d hole UE AS coss 10 Bigot du PIPER PIED TIU PUT PU 12 Evacuation system 14 Evacuation lt 5 15 Gas Iristallallghma xoa mt a DES xb Ee c ca m e e ae 17 Electric installation 21 External 22 Electric installation Electrical 23 Function check 25 Options Adapter for direct fresh air intake 26 The manufacturer reserves the right to modify design material and specifications without notice Installation manual Dimension sketch Door opening 580 mm Operating panel Electric connection Gas connection Pipe connection evacuation
5. the pallet Fig 3 6 Remove the steel pipe by tilting the dryer forwards and removing the pipe Installation manual Installing the dryer Mechanical installation Fig 1 Adjust the dryer so that it is horizontal and stable on all four feet The height of the feet can be regulated by a maximum of 50 mm Once adjustment is complete lock the feet with the self locking nuts The dryer should not normally be bolted to the floor or base Connection branch Fig 2 Mount the enclosed branch at the top of the exhaust plenum Use the 4 screws 14 Installation manual Evacuation system Fresh air Fig 1 In order for the dryer to work optimally with the shortest possible drying time it is important for the air supply to the room to take place through a vent to the open air with the same amount of air being brought in as is evacuated In order to avoid draughts in the room it is best to position the air inlet behind the tumbler Fig 2 The free area at the intake air opening must be 5 times larger than the vent pipe s area The air resistance in the grate louvre must not exceed 10 Pa 0 1 mbar Max air consumption 2 x 600 m3 h The free area is the area through which the air can flow without resistance from fins louvres Note that fins louvres often block half the total area of the fresh air hole Remember to take this
6. Check that the gas flame is steady and blue in colour Function check The function check is described in the back of this manual 18 Installation manual Gas installation general Converting to bottled gas natural gas If the machine is to be converted to another type of gas the gas nozzle must be replaced 1 Remove the bracket A and nozzle 2 Mount the accompanying nozzle 1 3 Loosen the measuring branch screw 2 1 4 turn connect a manometer to the measuring branch 2 4 Connect the power and select a heat programme 5 Start the dryer 6 Set the nozzle pressure on setting screw 4 under nipple 3 7 Check that the gas flame burns evenly and has a bluish colour 8 Mount the cover screw 3 The numbers in brackets refer to the page regarding the gas valve Affixing the sign See fig 2 9 Electrolux 73286 GAS 567222259 0100 9915350 10200668 400 V GN no 1006 W Ca 104 8 450 W 402 Que 21KW CATECORY AND PRESSUHES m Pung sapang e This machine has been converted to XXXXXX and adjusted according to the installation manual 19 Installation manual Gas valve 1 Nozzle 2 Measuring tap nozzle pressure 3 Adjusting screw cap 4 Adjusting screw 5 Ignition control 6 Measuring tap supply pressure 20 Installation manual Gas installation
7. Installation manual T4300S 487 23 10 61 05 EN Installation manual The front of the dryer Affixed the enclosed sign on the front of the dryer CAUTION Remove clothes from dryer as soon as it stops This keeps wrinkles from setting in and reduces the possibility of spontaneous combustion Tumble dryer A Safety instructions A This machine is only intended for drying vvater vvashed garments Clothes that have been cleaned vvith chemicals flammable liquids must NOT be dried in the machine Remove clothes from the tumble dryer as soon as they are dry This prevents them from becoming creased and reduces the risk of spontaneous ignition The machine must not be used for drying foam rubber or foam like materials The machine must not be used for drying floor mops The machine must not be used by minors The machine must not be hosed down with water Mechanical electrical and gas installations must only be carried out by authorised personnel Report machine malfunctions to qualified service personnel as soon as possible This is important for your own safety and for the safety of others Gas dryers only The machine is not to be installed in rooms containing cleaning machines with perchloroethylene TRICHLOROETHYLENE or CHLOROFLUOROCONTAINING HYDROCARBONS as cleaning agents What to do if you smell gas Do not try to light
8. Note wa Because of the differences in gas installation Tables of pressure and adjustments regulations in European Union it is important to use the Italian language manual in Italy Heat effect 2 x 21kW and the French language manual in France ect EE Be Ga E Denmark LPG 30 30 2 20 Norway GNH 20 10 5 3 80 Sweden Finland Italy LPG 28 37 28 37 2 20 England GNH 20 10 5 3 80 Spain Portugal Ireland Greece France 28 37 28 37 2 20 Belgium 20 25 20 25 3 30 0 50 20 20 ioe 3 80 20 15 5 3 80 Holland 30 30 2 20 GNL 25 15 5 Austria Australia New Zealand The rest of the world except USA a Gas type c Nozzle pressure b Connection pressure d Nozzle 21 Installation manual Electric installation gas heated MN ro be carried out by qualified personnel IAN The tumble dryer must be connected to its own fuse miniature circuit breaker group and multipole switch in accordance with IEC 60947 Cable dimension When calculating the dimensions of the connecting cable refer to the local regulations Connecting power A wiring diagram is included with each dryer showing the wiring connection sequence Remove the back plate to connect through supply entrance to the power terminal strip Gas heating 1 phase 230 240V fig 1 ut Top dryer L1T Phase N1T Neutral Bottom dryer L1B Phase Pa N1B Neutral 3 phase fig 2 Top and bottom dryer L1
9. her equipment behind the dryer should be min 20 500 mm Apart from the minimum distances shown on fig 1 there are no further requirements to the distance around the dryer There should be free access to the back of the dryer for the purpose of servicing 11 Installation manual Setup Connection to network 1 Fig 1 If several tumble dryers are to be connected to a network the plugs A in the side panels must be removed before the dryers are installed 2 Fig 2 A bushing for network cables must be installed from the inside in the right hand side panel The bushing must be pushed right through the hole in the left hand side panel on the side of the dryer 12 Installation manual Unpacking Handle the machine carefully when unpacking There are no transport fittings Remove the dryer from the pallet At least 2 people are required to remove the dryer from the pallet The dryer is secured to the pallet with 3 transport screws 1 Open the filter door Remove the 2 transport screws at the front 2 Remove the lower rear panel Remove the transport screw by the rear panel Install the rear panel 3 Position a 1 1 2 steel pipe behind the tumbler as shown in fig 1 4 Stand behind the dryer and tilt it forwards When the tumbler releases the pallet push the pipe under the tumbler Fig 2 5 Push the tumbler from in front so that it hangs over the rear edge of
10. installation The dryer must be connected to its own fuse group and multi pole main switch according to 60947 Connecting the cable Mount the enclosed cable gland The cable is led through the cable gland to the terminal block and connected as illustrated If there is a neutral conductor in the power supply line this must be connected to terminal N Cable dimension For calculation of the connection cable dimension please refer to local guidelines Fuse group and effect The sizes of the fuse group and the effect are shown on the following page Function check Mount the enclosed cover plate The function check is described in the back of this manual NB Correct direction of rotation is important The tumble dryer must be equipped with supplementary protection in accordance with heavy current regulations L1 L2 L3 N L1 L2 L3 N Top Bottom 24 Installation manual Electrical installation Heat output Type 4300S 9 13 5 18 kW Voltage Heat effect Motor effect Fuse kW Gas heating 200 240V 3AC 50 60 Hz 0 2 10A 400 480V 3AC 50 60 Hz 0 2 10A 230 240V 1AC 50Hz 0 2 10A Electric heating 230V 50 Hz 2x9 2x1 2x35A 400V 50 Hz 2x9 2x1 2x16A 415 50 60 Hz 2x9 2x1 2x16A 440 480V 3AC 60h 2x9 2x1 2x16A 400V 50 Hz 2x13 5 2x1 2x25A 415V 50 Hz 2 13 5 2 1 2 25 440V 60Hz 2x13 5 2x1 2x25A 480V 3AC 60Hz 2 13 5 2 1 2 20 400V 50 60Hz 2x18 2 1 2x35A 415
11. into account a Air principle The blower creates low pressure in the dryer drawing air into the drum via the heating unit The heated air passes through the garments 5x A and the cylinder vents The air then flows out through a lint filter filter drawer positioned immediately below the drum After this the air is evacuated through the fan and exhaust system It is very important for the tumbler to receive plenty of fresh air see next section Installation manual Evacuation system Exhaust duct The exhaust duct must be smooth on the inside low air resistance The exhaust duct must lead to the outdoors The exhaust duct must lead clear of the building as condensation may cause frost damage to the building The exhaust duct must be protected against rain and foreign objects The exhaust duct must have gentle bends fig 1 The exhaust duct must not be a shared duct between dryers and appliances using gas or other fuels as their energy source When several dryers share an exhaust duct The exhaust duct diameter must increase after each dryer fig 2 The table below shows the exhaust duct diameter and the necessary fresh air inlet area Note It is recommended that each dryer is connected to a separate exhaust duct Service organization dealer If you have questions relating to the design of the exhaust system please contact your local dealer or service organization The evacua
12. nal a Company in the Electrolux Group the world s No 1 choice about case studies contact 0845 077 65 65 0000
13. tion pipe diameter must not be reduced No of dryers Exhaust duct diameter in mm 0 15 0 30 045 0 60 0 75 0 90 1 05 fresh air intake in m2 Each machine requires a fresh air aperture of 400 x 400 mm Installation manual Evacuation system Gentle bends Several dryers on a shared exhaust duct Installation manual Gas installation general To be carried out by qualified personnel Fig Mount a shut off valve upstream from the dryer The gas line to the dryer must be designed for a power supply of 2x21 kW dependent on the size of the dryer The factory nozzle pressure setting corresponds to the fuel value given on the data label Check that the nozzle pressure and fuel value correspond with the values in the gas tables on the following pages If not contact the supplier Bleed the pipe system before connecting the dryer After connection test all joints for leaks Test run 1 Screw until the measuring connection 2 is loosened 1 4 turn 2 Connect a manometer to the measuring connection 2 see side with gas valve 3 Select a program with heating 4 Start the tumbler 5 Check the nozzle pressure see table Any adjustment is carried out using the regulator s adjusting screw 4 under the cover screw 3
Download Pdf Manuals
Related Search
Related Contents
Sears 45221 User's Manual Manuel d`utilisation et d`entretien des groupes 3172533-000 english-1st IT.qxd:- OmniMount 1N1-L P accura-expRACE KIT OWL-602DⅣシリーズ取扱説明書 Ajol et Vosges saônoises Full Text Copyright © All rights reserved.
Failed to retrieve file