Home

User's Manual

image

Contents

1. 6 Fragile pieces of regular check discovered that the damage immediately replacing 7 After Machinery installation or replacement of parts must No load operate 10 minutes Machinery to start work after the normal operation PART 7 Troubleshooting Two rubber roller Not paddy plug Close Feed inlet damper rotating clutch handle loose two rollermake paddy flow down Adjust flow Appropriate Belt dripping 1 the belt wheel isn t 1 regulate to be parallel parallel with the 2 tighten machine belt loosing Machine works overload the motor power is too 1 replace with X high or motor is overhead with low power motor buzzing paddy isn t dry 2 dry paddy High pressure on the 3 decrease pressure rice exit 4 decrease paddy flow Power voltage low or unstable Too much feeding High percentage of paddy isn t dry 1 dry paddy broken rice or paddy in high or low pressure at 2 adjust pressure rice the rice exit 3 adjust machine base the main shaft is to make the gaps offcenter the gaps equal between the iron roller and sieve frame aren t equal Hice in chaff 1 sieve sheets break 1 Decrease feeding flow 2 strong wind by chaffi 2 adjust the blower with MEER absorbing blower hand wheel Sieve frame doesn t work 1 gears break 1 replace add 2 gears stacked with grease much chaff 2 clean out chaff 3 belt loosing 3 add grease The main shaft blocked 1 feeding too much 1 turn off then turn and 2 high pres
2. dasi augmen FIRU adjustaba spring rak hexagonal srewbolt JA Al ns lilek KAER aA hexagonal adjustable handgrip T N TOM I4 down RATE dirich handgrip lt anticlockwise oT ess 1 ML air spray plank 2 Wil air spray bearing seat 3 X 0 blower belt wheel 4 principal axis 5 447548 principal axis belt wheel 6 515 switch plank 7 il adjust an aerofoil plank 8 1248 slow roller 9 32 FR spring coil seat 10 5 spring coil 11 rubber roller distance regulation Hand wheel 12 amp amp zs FIA clutch hand handle 13 Z spring coil seat 14 1 Ef the discharge regulate hand handle 15 quick material Pegboard 16 5 hopperi7 lead to material plank 18 4 Feedstock roller 19 1242 fast roller 20 345 block plank 21 43 separate plank 22 spiral propeller 23 WEA husk rice room 24 aii rice Sieve 25 Xin rice Sieve stand 26 layering 27 3848 rice roller 28 51 6 spring coil nut 29 25 layering spring coil 30 WO rice expert 31 nut block up 32 57 amp 2 separate room 33 absorb bran wheel 34 Bi front stall 35 base36 rear seat PART4 Operation procedures Will be selected over the paddy inject into Hopper by regulating the flow regulator falling into two rubber rollers of Speed different relative rotation and mainta
3. 7 Twosided Main shaft bearing base om 3 207 307 Chaff cracker bearing base 302 Fixture wheel Blower bearing base PART3 Fundamental structure structure chart fas roller shart A direction rmm ecu 11 Z 745 marun AIA mei mem nibbar test roller n i iisdem a E om sommo rzeg age gear el a VL thee L sluice board adjustable screw revolving shaft compression Spring clutcn _ adjustable handwheel rae Jechmialicr z Irol number are angle me medaulg E c n224 n rm a raund plebe adjusbaak Se Pex nce And chaff saing green speed tegulale dedsralicr Suju nu auslde 228e amp c Son Ins da spesd ua paddy hopper Ld M ad screw a p x QU T board Qt a fuller m rubber sabar chat separator Be TM ku 4 ha lirai bira A toss board Cracker s dur ue pomme 1 Big fine chaff FI d rmm ccm U na cha separator 1 1 1 ME Qu EE e baMe baard BA 2 ee I af lt empty paddy eapon __ empty paddy unpalisned nce Ungolished rice sinkhole inta Hhee amp tas roller a maike Gover sedi a BARE
4. DALIANG LHP 6 150 Combined huller and Whitener United Rice Mill User s Manual AK 4A Xu Danyang Daliang Machinery Factory PART 1 Introduction LHP 6 150 Combined huller and Whitener United Rice Mill has high guality rubber roller rice huller combined with new structure rice mill with blowing wind It is fine structure It is both capable of operating continuously hulling and polishing to turn pre cleaned paddy into white rice in one pass With advantages of less broken rice high rate of polished rice low temperature and little power consumption PART2 Main Parameter 800 1000 K g hour 18 5 22 Kw 70 72 96 1230rpm haff haft cha main sha 1380rpm Whitener main shaft speed Processing accuracy Standard first class 920rpm weight 800kg Dimension 1250x650x2120 mm TYPE NUMBER Install position 2800 Main shaft belt pulley 3050 2 Chaff belt pulley 1219 02 Huller belt pulley 1422 Chaff pulverizer belt pulley 1270 Blower belt pulley Bearing type part of Huller part TYPE NUMBER Install position Main shaft the big end of mobile bearing cap Right wallboard the small end of mobile bearing cap Cross bridge gear center shaft Pinch roller shaft part of big Chaff shaft TYPE NUMBER 6307 111205 Install position Right end of big Chaff bearing base big Chaff wheel of blower part of Whitener Install position 11121
5. The sieve sheets are easlly damaged by wear and tear on the side of wxit for prolonging its life turn it over after having used for a time but if rice leakage happens replace the damaged ones at once 4 Check bearing regularly stop immediately for check if it is abnormat 5 When Mechanical failure or sudden blackouts on work fast roller Clutch pull handle should be left to the location 6 When the rubber of fast r roller wear about half fast roller and slow roller make exchange When completely worn out the replacement of new rubber roller 7 Before stop operation close feed flashboard When materials are empty then turn off 8 Hammer in easy to wear after hammer blunting Reduce efficiency Should carry out regular checks Turn around to use or replace one hummer can be turn around to use four times All hammer away at the same time transfer PART6 Use and maintenance 1 2 3 4 5 Rice cleared for operation before Prevent access to hard objects All gear must be installed secure belts tightened properly Replace rubber roller roller ends to be Flush the gap between the end wall and not more than 2 mm to prevent leakage paddy Various components periodic lubrication Fill the Lubricant oil and grease Bearing every three months Refuel lubricant Gear Box 1 kg of fuel to maintain monthly replaced rubber roller can not Exposed to the sun can not contact oily and corrosive substances
6. eration First two rollers transferred to contact state Low noise from the friction of two rollers Hand wheel rotated 120 degrees was able to meet the required size According to the trough of brown rice in the mill and then adjust General rate of husk is 80 85 Fast off the equipment installed will enable rapid separation can Rapid isolation or make up the two rubber rollers lift upward slow roller left fast roller Downward pressure Taken closer 3 Wind separation election regulation Wind election separation of Brown rice mixture To regulate by air flow regulator 7 the hand handle of flow regulator turn clockwise can reduce speed Counterclockwise rotation speed increases 6 the hand handle of regulator turn clockwise can Increases speed Counterclockwise rotation speed reduce When the mixture which contains large amounts of rice husk should adjust 7 Counterclockwise rotation speed increases If the integrity of paddy be found at the husk export should adjust 7 turn clockwise reduce speed When rice mill Feed contains a lot of rice husk should adjust 6 Counterclockwise rotation speed reduce When flow and the rate of rice husk rate increase wind force turn higher Conversely decrease when the rate of rice husk decrease Wind force corresponding to adjust lower when turn on and turn off Wind force corresponding to adjust lower to prevent infiltrate paddy in husk 4 Flow Control Flow control devices were insta
7. in a certain distance paddy mixture in the separation indoor wind elections after separating rice husk discharge machines brown rice by the Stock Guide to enter husking rice part in the spiral propeller of the role along the axis entered husking rice Room subject to export resistance to impact grain between the pressure in rice roller under remove epidermis Spindle Hole meters from the high style roller jet injected into the wind groove milling room the milled rice to enhance the effect taking away some of the heat generated milled project rice bran go out from rice mill by blower when rice flow out from separate rooms to export removing chaff once again and it has been bright and clean hypothermia finished rice PART5 The methods of operation and matters needing attention 1 Major equipment operation 1 Huller flow control Huller flow regulation by the flow regulator When adjust the handle counterclockwise rotation Increased flow Clockwise rotation Slow down the flow Flow sizes which can be found through The target pictorialized outside regulator when target point 1 Minimum flow when first start the target point between 1 2 Based on the facts to gradually adjust 2 Rubber roller adjust distance Rubber roller distance adjust by Hand wheel Hand wheel Clockwise rotation Reduce the distance Instead increases the distance of two rubber rollers keep between 0 5 0 8mm the initial adjustment should at No load op
8. lled in the machine When the need for regulating the flow of brown rice Regulators used to regulate flow After the completion of regulatory guidance material damper should be fully opened to the lower plate 5 finished Rice precision Control Finished rice precision is decided by the size of the pressure resistance Greater pressure higher precision but too high pressure can lead to yleld lower high percentage of broken rice separate Room external button use to adjust wind flow to control high percentage of chaff in rice wind too strong Rice be absorbed in chaff If wind too small too many chaff be left in rice 2 Operation sequence adjust discretes preliminary gt turn on device gt close slow roller gt adjust flow distance of rollers wind flow preliminary gt Check the exports of materials brown rice Shriveled paddy paddy gt adjust flow distance of rollers wind flow gt open sluice board gt adjust flow of brown rice gt adjust finished Rice precision gt adjust wind flow to contoll The volume containing rice bran 3 Cautions 1 before operation make sure No plug no load start 2 The ground should be smoothly covered with concrete or cement platform to meet the machine at the same level install the machine and calibrate the level to ensure the feeding plate gradually to the full adjust the paddy flow and the pressure of rice exit by repective hand wheels to make the machine work at its full precision 3
9. sure clean the main shaft 2 adjust pressure with hand wheel PART 8 Eguipment installation chart PARKING LIST PARKING LIST LHP 6 150 NO Quan 0 Notes Big Wooden case Wooden case Wooden case Wooden case 7 11 1SET 12 Accessory list presentation a 1 1 1 1 1 1 1 2 1 1 assembled NO 6 T 8 9 40 Ao 42 O O Dn cel a M el

Download Pdf Manuals

image

Related Search

Related Contents

SikaRapid®-1  HI LITE / HI TOUCH    SHT-9002  La rentrée, c`est dur pour toi    Bedienungsanleitung Operating instructions  System Monitor/Controller  Product Software Quality  ASUS M32BC 9993 User's Manual  

Copyright © All rights reserved.
Failed to retrieve file