Home
        8 Inch Side Port FRP Pressure Vessel User Manual
         Contents
1.     8 Inch Side Port FRP Pressure Vessel User Manual        11        ROPI     4 3  Head Disassembling   Read this article carefully before disassembling the head assembly to prevent  damaging its components   4 3 6  Inspection  Make sure that the end cap is removed from the vessel according to        lt Opening the Vessel gt    4 3 7  Remove the adaptor and seals  Hold the bearing plate tightly with one hand  and pull the adaptor out of the permeate port with the other hand  remove the  adaptor seals and the sealing plate seals    4 3 8  Remove the permeate port locknut  Remove the locknut using a dedicated  wrench  The locknut is left hand threaded and must be turned clockwise to be  removed        Figure 2 7 Remove the locknut Figure 2 8 Remove sealing plate    4 3 9  Separate the bearing plate and sealing plate  Pull the sealing plate with one  hand to separate it from the bearing plate   4 3 10  For parted seal plates  pull the permeate port out of the sealing plate and    remove the permeate port seals and the seals inside the sealing plate        Figure 2 9    8 Inch Side Port FRP Pressure Vessel User Manual  WWW ropv com cn           12        ROPI     4 3 11  Remove the permeate port seals        2 10 Remove seals    Carefully remove the seals to prevent damage to the  sealing surfaces  It is recommended to replace all used  seals with brand new seals        Figure 2 11 Head breakdown figure 1  sealing plate      Components  sealing plate  adaptor  bearing plate  per
2.     o E mail  service ropv com cn    Website  WwWw ropv com cn    8 Inch Side Port FRP Pressure Vessel User Manual  WWW  FrOpV com cn         33         ROPI     Appendix I    Pre  Running Check List    ame ating  resurerating   Wawel    Membrane is loaded as per requirements YESo NOg  Membrane ope    Adaptor is installed as per requirements YESo NOo  elements  Thrust ring is installed as per requirements YESo NOo    All components are clean and in good conditions YESo NOo  Vessel is installed and fixed as per requirements YESo NOo  Vessel       Head is assembled as per requirements YESo NOo  Locking kit segment and securing ring  high     YESo NOo  pressure vessels  are installed as per requirements  The pressure gage of closed vessel reads the same as YESO NOG  that of the system  Pipes are connected as per requirements without YESO NOG   ee stress concentration  Piping    connections    All piping components are in good conditions YESo NOo       Installation staff  Installation date     Inspector  Inspection date     8 Inch Side Port FRP Pressure Vessel User Manual        34         Appendix II    Maintenance Check List    Name    Pressure rating    Times of    Running time l  maintenance       Item Status Treatment    Corrosion YESo NOog    Deterioration YESo NOo       Damage YESo NOo    Leakage YESo NOo    Inspector  Inspection date     Maintenance staff  Maintenance date     8 Inch Side Port FRP Pressure Vessel User Manual    WWW ropv com cn        35      ROPI     ROPV
3.   8 Inch Side Port FRP Pressure Vessel User Manual        14        ROPI     4 5  Cleaning and Inspection of the non metallic components  Non metallic  components include sealing plate  permeate port  adaptor  permeate port locknut   permeate port plug and all seals    4 5 1  Inspect components for scale  corrosion or salt deposit  Place the components  into a bucket filled with mild soap solution and clean them to remove the deposits    4 5 2  Flush all components with clean water    4 5 3  Dry the components with compressed air or a clean and dry towel    4 5 4  Inspect all components carefully for any structural defects or damage in the  seals  For example  cracks in the permeate port or the locknut  damage in the  threads  aged  deformed or damaged seals  Replace any damaged or defective  component with new ones   4 5 5  Replace all components that need to be changed upon inspection   4 5 6  Inspect carefully the Feed Concentrate ports and attachments to the shell to  ensure that connections and seals are structurally sound  Please contact ROPV for  any questions    Please do not conduct any repair work before consulting with the manufacturer for  guidance  except for replacing head components     lf chemical reaction problems occur like cracks or    discoloration on the vessel or its components  please  contact please contact ROPV at  service ropv com cn       4 6  Head Assembly  Read and follow this section  Incorrect assembly may result in catastrophic head failure    
4.  4 6 1  Lubricate and install the seals     We recommend using brand new seals for head  assembly     Lubricate seals using glycerin or silicone base  lubricant     NO  LNSLLV       4 6 1 1  Lubricate the permeate port seals and place them in the grooves     8 Inch Side Port FRP Pressure Vessel User Manual        15              Figure 2 13 Install the permeate port seals    4 6 1 2  Head with parted sealing plate  Lubricate the sealing plate seal and  place it in the groove located on the inside diameter of the sealing plate   Lubricate the permeate port seals and place them in the grooves located on  the inside diameter of the permeate port  Lubricate the permeate port seals  and place it onto the outer edge of the permeate port    4 6 1 3  Lubricate the adaptor seals and place them in the grooves of the adaptor        Figure 2 15 Adaptor seals installation    8 Inch Side Port FRP Pressure Vessel User Manual       Www ropv com cn        16        ROPI     4 6 2  Assemble the sealing plate and bearing plate  4 6 2 1    Assemble parted sealing plate  Apply a thin layer of lubricant onto the       surface of the permeate port and push the permeate port through the hole of  the parted sealing plate    4 6 2 2  Insert the threaded end of the permeate port through the hole of the  bearing plate until full contact of the sealing plate and bearing plate    4 6 2 3  Thread the permeate port locknut onto the threads of the permeate port       Figure 2 16 Assembling parted seal plate 
5.  5 2 2  Remove the adapter from the membranes on both sides of the vessel   5 3  Unload the membrane    5 3 1  Clean off any lubricant residue or salt build up from the inside diameter at both  ends of the vessel     5 3 2  Remove the membrane out of the vessel according to the membrane  manufacturer requirements     Be careful not to scratch the inner  surface of the vessel while removing or  installing the membrane elements      gt             m  pa     Q  pa       5 4  Check and make sure the head is assembled according to Head Disassembly and  Head Assembly     8 Inch Side Port FRP Pressure Vessel User Manual        19           ROPI     5 5  Vessel cleaning and inspection       Figure2 21 Side Port and vessel inspection    5 5 1  Clean the inner surface and groove of the vessel by removing the residue or  corrosions with a mild soap solution and then flush with clean water     5 5 2  Check if there is any damage to the inner surface of the vessel  If yes  Please  change the vessel     5 5 3  Carefully inspect the F C ports and the shell to ensure intact sealing   structure and material  Any questions  please contact ROPV    5 6  Install the head at the concentration side    5 6 1  Apply a thin layer of glycerin within 50mm from the groove on the inner surface  of the vessel at the concentrate  downstream  end of the vessel     5 6 2  Apply a thin layer of glycerin on the surface of the head O ring for the  concentrate  downstream  end of the vessel     5 6 3  Install the
6.  F C ports into the hole in the vessel from the inside the vessel and push them out    Do not to scratch the inner surface of the vessel   s    side holes when installing F C ports        until the retaining ring grooves are visible from the outside of the vessel   D  Install the retaining rings  E  Reconnect the pipes as per Piping Connections   8 5  Low Permeate Water Quality  Possible reasons     A  O ring seals are damaged due to displaced membrane elements caused by frequent  Starting and shutting down of the system without taking measures to ensure gradual  pressure increase when starting and gradual pressure release when shutting down     Solution   a  Remove the head as per Opening the Vessel and remove the adaptor   b  Replace the permeate port seals and adaptor seals     c  Close the vessel as per Loading Replacing Membrane Elements and Closing the  vessel     B  Membranes may be displaced out of the sealing area during starting and shutting  down the system     8 Inch Side Port FRP Pressure Vessel User Manual         31      ROPI     Solution  Shimming the membranes   a  Remove the head at feed end and adaptor as per Opening the vessel     b  Remove the adaptor seals and the head O ring  Insert the straight end of the adaptor  into the permeate hub far enough to be held by the adaptor sea  Align the adaptor with  the membrane and push the head carefully into the vessel until the groove is exposed far  enough to insert a locking segment into it  Slowly remove the he
7.  Limited Warranty    Harbin ROPV Industry Development Center  hereinafter called    ROPV     vessels  the    Product     are  warranted to the original purchaser  the    Customer     under normal use and if installed  operated and  maintained in accordance with applicable User Guides to be free of defects in material and or  workmanship for a period of one  1  year from date of manufacture subject to the following  Any  replacement Product or Part will be warranted only for the remainder of the original warranty period or  thirty  30  days  whichever is longer     Exclusions from this Limited Warranty  The warranty shall be void if     1  Defects are not reported during the warranty period    2  The Product is subject to accident  damage  incorrect installation  mishandling  abuse  misuse   negligence or accident by any other party    Problems caused by modification or alteration    Chemical exposure or acts of nature    Any item manufactured by other companies    6  Wear on replaceable components under normal conditions   seals are excluded from this warranty     DI a pa    Procedure for Obtaining Warranty Performance   ROPV reserves the right to determine if a reported defect is a breach of this warranty  This may require   at ROPV   s discretion  one or more of the following  1  an inspection or test of the Product and or the  system in which it was installed by an ROPV representative   the customer is responsible for arranging  access to the Product  2  an inspection or t
8.  required  Misalignment in any direction  should be avoided and keep to a minimum as much possible since it will generate  mechanical stress concentrations that will damage the membrane housing    3 2 10  Verify the alignment  There is a maximum of 0 76mm misalignment tolerance in any  direction for all ports as shown in figure 1 3  Severe misalignment could impair the life  expectancy of the vessel  Excessive force to tighten the couplings is an indication of  misalignment  When properly aligned couplings should be able to turn slightly by hand  after installation        Maximum Misalignment  76mm    8 Inch Side Port FRP Pressure Figure 1 3       WWW ropv com cn      8     ROPI     Chapter 4 Maintenance Guide    4 1  Preventive Maintenance    Periodical cleaning and maintenance of the vessel and replacement of damaged components is  essential to ensure a safe and normal operation of the vessel over a long service life   As a recommendation we suggest to follow the Prevention Checklist below     End closures   e Periodically clean and remove any salt and or corrosion deposits   e Inspect components for deterioration and replace as needed   e Maintain external components dry and leak free   Side Ports   e Inspect for leakage   e Inspect coupling connections for corrosion and replace deteriorated couplings as  needed   e Maintain all side ports dry and leak free to prevent corrosion     Read this section completely before servicing the vessel     DO NOT Service any component un
9.  thrust ring onto the head for the concentrate  downstream  end of       Figure2 22 Install the thrust ring  8 Inch Side Port FRP Pressure Vessel User Manual    WWW rOpV com cn           20         ROPI     the vessel     5 6 4  Grasp the permeate port and the locknut to keep the head and the vessel in the  Same axis and push the head into the vessel until some resistance can be felt  Then  continue pushing the head slowly into the vessel until it reaches over the groove   Please do not push the head too much over the groove since the seals may be  damaged if the head needs to be pulled back  If it is difficult to push the head with  hands  a rubber mallet can be used to hit the head until the head reaches its place     5 7  Install locking kit segment at concentration side     5 7 1  Inspect the groove and ensure it is clean and free of residues  Use compressed  air to dry the groove if available or use a clean rag to dry it     5 7 2  Apply lubricant like glycerin onto the locking kit segment screws to prevent salt  deposits to buildup  Position the locking kit segments into the groove        Figure 2 23 Install locking kit segment    5 8  Load membrane elements from the feed end of the vessel  5 8 1  Inspect and confirm there are no scratches on the inner surface of the vessel     5 8 2  Inspect and ensure there is nothing on the outer surface of the membrane that  may scratch the inner surface of the vessel     5 8 3  Using a clean rag or cotton and a mixture of glycerin 
10. Checking packaging  Temp  10   C  50   C    Check storage conditions Humidi40  70 RH    Light less than100Lux  Check height    Safe storage area    Finish the storage    Figure 2 27 Storage procedure    8 Inch Side Port FRP Pressure Vessel User Manual        271      ROPI     Chapter 8 Breakdowns and Solutions    Please refer to this article for common breakdowns and solutions  The contents of this  section need to be used with good practical industrial experience  We recommend that  only engineers with extensive work experience conduct any repair work     8 1  Locking Kit Segment and Related Issues     8 1 1  Locking kit segment screw is too tight to thread out   Solution  Apply penetrating fluid  such as WD 40 or LPS 1  onto the locking kit  segment and tap it with a hammer until the screw can be threaded off  Please take  care not to contaminate the membrane elements   8 1 2  Locking kit segment screw cannot be removed due to damage in screw cap or  threads  Solution  cut the locking kit segment screw off   Tools  angle grinder  cutting disc  power cables  electric drill  M8 screw tap  6mm  stainless steel drill bit   Steps     Cut the locking kit segment screw with angle grinder    Use an electric drill with stainless steel bit with diameter of 6mm to drill the rest  of the screw out of the bearing plate  Please take care not to damage the threads of  the screw hole in the bearing plate     Make new threads for the screw hole in the bearing plate with a M8 screw tap     F
11. Concentrate side ports in case of leakage   A  Shut down the system and drain the vessel    Disconnect the piping off the permeate port and Feed Concentrate ports    Open the vessel as per Opening the Vessel    Remove the retaining ring from the leaking port     mH o a w    Using a rubber mallet  tap the portin wards to remove the port     When removing Feed Concentrate ports  soft mats  should be placed inside the vessel to keep the inner    surface of the vessel from damaging by the falling F C  ports    NOI LNALV       Possible reasons    1  Seals are damaged   Solution  replace the seals   2  Ports are corroded or damaged or the sealing groove is scratched   Solution  replace the Feed Concentrate ports   3  Ports and the manifolds are not in the same axis  misaligned     8 Inch Side Port FRP Pressure Vessel User Manual         30      ROPI     Solution  adjust the manifolds and reconnect the pipes as per Piping Connections     8 2 7  Feed Concentrate Side Port Inspection and Installation   Please follow steps below to install Feed Concentrate side ports    A  Clean ports  Remove the fouling or residue on the F C ports with a mild soap solution  and flush them with clean water  Dry them with compressed air if available or a clean  towel     B  Lubricate and install F C ports seals  apply a thin layer of glycerin onto the seals and  seat them into the grooves in the F C ports    C  Apply a thin layer of glycerin onto the inner side surface of the vessel s ports  Insert  the
12. Connect the vessel to the manifolds and or to the next vessel while adjusting each  vessel and manifold to minimize misalignment at each end   For details  see    Chapter 4  Piping Connections        2 7  Install the strap assembly  Install the screws through the hole in the rack and thread  them into the strap locknut  use a torque wrench to tighten the screws within 3 5N m   NOTE  Pressure vessels expand during pressurization  over tightening the strap  assemblies will damage the vessel    2 8  Assemble end closure For details  see    Head Assembly    in    Maintenance Guide       2 9  Install membrane elements For details  see    Membrane Elements Installation    in     Maintenance Guide       2 10  Install thrust ring at the downstream end of the vessel    2 11  Close the vessel    2 12  Connect the permeate port manifolds  For details  see    Piping Connections        2 13  Inspect the installation  Inspection includes but is not limited to the position of the  vessel  the end caps and pipelines connections  Please inspect according to    Pre   Pressurizing Checking list    in Appendix 1    2 14  Pressurize and run the system     If in doubt or for installation issues  please contact ROPV     8 Inch Side Port FRP Pressure Vessel User Manual      60     ROPI     Chapter 3 Piping Connections    Enough room shall be reserved for both axial and radial expansion of the vessel in the design of the  manifolds and pipelines  otherwise the vessel and other components of the syste
13. Figure2 17 Assembling bearing plate    using a wrench until the sealing plate and bearing plate are thoroughly  contacted        Figure 2 18 Locknut installation Figure 2 19 Adaptor installation    4 6 3 Install the adaptor  Insert the end without seals into the hole of the permeate  port    4 6 4  Install the head O ring  Lubricate the O ring and seat it into the groove located  on the outside diameter of the sealing plate     8 Inch Side Port FRP Pressure Vessel User Manual        17              Figure 2 20 Head assembly    8 Inch Side Port FRP Pressure Vessel User Manual        18        ROPI    Chapter 5 Loading Replacing Membrane Elements    Read all parts of this section before replacing membrane elements  This article is for  reference only  load unload the membrane elements according to the membrane  manufacturer requirements     Membrane elements must be loaded at the feed  upstream  end of the vessel  and  unloaded through the concentrated  downstream  side of the vessel  Always remove  and install elements in the direction of feed flow     Make a matching list for the removed membrane and the vessel to avoid possible  disorder during membrane loading    Steps   5 1  Inspection    5 1 1  Verify all pressure has been relieved from the vessel  following system  manufacturer s recommendations     5 1 2  Ensure the vessel is opened according to Opening the Vessel   5 2  Disassemble membrane components   5 2 1  Remove the thrust ring located at the concentration side   
14. HARBIN ROPV INDUSTRY DEVELOPMENT CENTER    ROPI    8 Inch Side Port FRP Pressure Vessel  User Manual  Models     R8040B300S  R8040B450S    Headquarters Global Market    Tel    86 451 82267301 Phone    1 925 237 0184  Fax    86 451 82267303 Fax    1 925 264 1951  Email  ropv ropv com cn Email  hwang ropv com cn    Website  www ropv com cn Website  en ropv com cn en    ROPI     Table of Contents    CHAPTER 1 GENERAL PRODUCT DESCRIPTION                cccccceccsccccsccecccceccnccccsccnceccnccncecceccsceccecencecsecencucees  3   POC denne ai O Mae sre ate crs esate oretsacastsn voissttasnn E A  3   OPON SO GCI C AOS osc a secs cd ea cecteaac AS sac dexseceasnateananocagstencsed E N  4   Vessel Use and PFECAUL ONS iiscnsoe see inccdssccsceucinclasveldacecordsdewoucateajunbnckdeersasteeeienlessevdesasosesidannssadedealeedeerenstearevae     4   CHAPTER 2 INSTALLA TON sacsscecacseressse sia sosscunrtusasoutsecucsttansseduantaneuenevadeanas a  6   CHAPTER 3 PIPING CONNECTIONS scciscisncasiessicscanduunstacsasisnacsnces sacnuisstacenssaucesncesuewacsssnanenbsssuessnnasoanenbdoewass  7   Sole Permeate Port COnnectiON eessiaisre e a  7   3 2  Feed Concentrate Port CONNECTIONS           cccccccsesecccecesscccceesececeeecececesececeucececaueececeuausesesauesessueceeeeaees  7   CHAPTER 4 MAINTENANCE GUIDE sissacescvsanccsatiecscntatescenncrebbentadunansnetcossatteass tates banieuesiaterlss sraaseisbuasmaiisuees  9   4 1  Preventive Maintenance             ccceccsecsecsecsecsecsecseccuccecen
15. ad with care and then  check the size of the gap between permeate port and adaptor  The number of 2mm  shims needed to fill this gap will depend on the size of the gap  Reinstall the adaptor  seals and seal plate seal  slide shims on the flat end of the adaptor and insert the adaptor  into the permeate port hub  Shims must be placed between the permeate port and  adaptor     c  Close the vessel as per Closing the Vessel     8 Inch Side Port FRP Pressure Vessel User Manual        32      ROPI        Chapter 9 Service guide  Dear users     Thanks for choosing ROPV FRP pressure vessels  We provide you with the  following services according to our national laws and regulations  See ROPV Limited  Warranty for more details      I  Quality warranty    ROPV promises to provide    one year warranty and lifetime maintenance    on the condition  that the vessels are properly installed and operated     II  Technical suppport   1  ROPV commits to reply users within 8 hours for their complain or technical consultation   2  ROPV commits to arrive at project site within 48 hours if needed    III  Exclussions for the free service coverage   1  Damages caused by improper transportation  installation  operation and maintenance   2  Damages caused by operation without sticking to the requirements in this manual    3  Invoices are altered or Inspection Certificate is not available    Any problem  please contact via after sales    hotline 0451 82267309       es        Phone  0451 82267301 02 06 08
16. and clean water ata 1 1  ratio ball lubricate the inner surface of the vessel     5 8 4  Using a clean rag or cotton and a mixture of glycerin and clean water ata 1 1  ratio ball lubricate the membrane seal     5 8 5  Load the membrane from the feed end of the vessel  ensure that the membrane  is properly orientated  If there are more than one membrane to be loaded into the  vessel  do not push the first membrane into the vessel completely but reserve  around 200mm to facilitate the connection of the next membrane     8 Inch Side Port FRP Pressure Vessel User Manual        21           ROPI     5 8 6  Inspect and make sure the membrane interconnector is clean and intact  Apply  a thin layer of glycerin onto the interconnector seals without excessive amount   otherwise the membrane may get contaminated  Install the interconnector into  the loaded membrane     5 8 7  Install and connect the next membrane with the loaded one with the  interconnector     5 8 8  Load all membrane elements in the same way  Push all the membranes into the  vessel until the adaptor at the concentration end is inserted into the center hole of  the first membrane and the membrane face is pushed against the thrust ring     Please ensure all membranes are in the same axis   No load on the connection pipe  otherwise the  pipe or the membrane may be damaged      gt        m  a          lt           8 Inch Side Port FRP Pressure Vessel User Manual        2       ROPI    Chapter 6 Closing the Vessel  Please 
17. as    shown in figure 1 1     Manifold  ZE N IPS Grooved  a       a Manifold IPS Grooved       ses  O   0  ay ep  L  L O             Pressure Vessel Pressure Vessel      Sa  70 OVa r ae j  l AHI      JA x ae BM    Q O       Straight Connection           90   Bend Connection                Figure 1 1    8 Inch Side Port FRP Pressure Vessel User Manual    WWW rOpvV com cn        7     ROPI     3 2 6  The use of only one IPS standard coupling to connect directly to the manifolds is also  acceptable  However  the welding of the manifolds and the installation position of the  housing should be accurately controlled to ensure the proper alignment of the manifold  and the Feed Concentrate ports    3 2 7  Install the vessel correctly  Make sure to align the Feed Concentrate ports and the  manifold ports at a distance of 3 17mm    3 2 8  Connecting the vessel and the manifold  Since only one IPS coupling is used to connect  directly to the manifold precautions shall be taken to ensure additional flexible space is  provided for the connection of vessels and manifolds by adding an extra IPS coupling to the  manifold  as shown in figure 1 2     Pressure Vessel Distribution Manifold    Single IPS Grooved       A    ee em ee rr MMM     es eC es oes nT OES    O  R    Intermediate IPS Grooved Coupling IPS Grooved Coupling  Manifol    Figure 1 2    3 2 9  Slight angle between manifolds and F C ports using IPS standard clamp for connection is  acceptable  However  high accuracy in alignment is
18. e carefully  Incorrect handling and storage may result in catastrophic  failure   Check the packing conditions when accepting the goods  Contact the logistics company at  once in case of damaged vessel   Slight damage in the outer surface of the vessel within the painting layer is acceptable   Any query  please contact ROPV     7 1  Vessel Handling Precautions    e Keep the vessel from falling down to the ground or colliding with other objects when it  is being moved    e Special care should be taken if forklift or other machinery is used for handling the  vessel    e Use padding to protect the vessels during handling to prevent damage    e DO NOT Scratch or damage to the inner surface of the vessel    e DO NOT lift the vessel from the Feed Concentrate ports or permeate ports    e DO NOT impose excessive external force on the vessel    e DONOT climb on the vessel    e Damaged vessel must not be used     7 2  Storage Requirements    e Donot store with other products    e Make a list of product and spare parts before storage    e Store vessels in their original packaging    e Storage temperature range should be  102C  50 2C   e Storage humidity range should be 40  70 RH    e Store ina place with a light intensity of less than 100Lux    e Store ina safe area to keep the vessel from shaking or falling   e Height  not exceeding 3 packing units     8 Inch Side Port FRP Pressure Vessel User Manual        26              Product quantity              Checking    Parts quantity       
19. ecessueeceeseneces  21   CHAPTER 6 CLOSING THE VESSEL n eisciniicinsansceissi ninesini aa   23    CHAPTER 7 HANDLING AND SIORAGE         ssesessesessesecscscssescececesereececececeroscececeseroecececererorcecererercecececeeeee   26      8 Inch Side Port FRP Pressure Vessel User Manual      1         ROPI     7 1  Vessel Handling Precautions            ccscscssresscssrcscsssscsssescussesteustecessscsssencustenscsesvscssneusrencustsenesssscusrenens  26   7 2  Storage Requirements              cccscssecesccesccsecoecesecesecsecesecesecsecessssecesesseesseceesteecesstaeceesessesscesseascesseaeceess  26   CHAPTER 8 BREAKDOWNS AND SOLUTIONG                 ccscsccsccscsccsccsceccncssceccecenceccecencncsececcncsececcnssscesenes   28    8 1  Locking Kit Segment and Related ISSUCS             ccccssccccssseccesececeneceeeneeeeeesceseeecessneceeeaeeeeeeecessecetsneeeeens   28    8 2  Head and Related ISSUCS sscpctesccccncstvesnetataseubsseaewssiecoreddnevae  cueesoseeieaugekdetunseutdbiweseleseesysieresestegcansetecaewes   28    8 3  Vesseland Related  SSUES inssin a aa ne ee  29    8 4  Feed Concentrate Side Ports and Related ISSUCS            cccccecessecceccessececeusececceeecescesesececauesessuneceseneees   30   Bs HOW OUI Ce Water Qualy scot Src enneren a EA  31   CHAPTER 9 SERVICE GUND Ey iaicstccacencanchaciatcasseasanmaunastussadeetuucseiebcasnedcducctinusshinusinasstensia aeaa aa   33    APP NAN aria er ae ee ee EA ee   34   PU PRIN MN C NECKE ge ccc rr citar E AE EA SEES ca o
20. ecsessecsecsecuceuceuctsessesseeeseceuceeceusesessesseseseeseeees  9   rl  Mme   1021 0  EAE   E A A ce en er ee ee A eee eee ee  9   4 3  Head DISASSCMDIMNG axicccesainmscasivesacadeeresatdanntisietegedsdnasecataaunntecebesedsbecaeistdusadestesnnedsanstecasanevatarevapodagaances     12   4 4  Head Assembly Cleaning and INSPECTtION              ccccccssecccesseccesecccenececenececeeeceseeceseeceseuseeseuecesseceneness  14   4 5  Cleaning and Inspection of the non metallic COMPONENMS             ccccccessccceeessececeesececceeececeeeeseceeaeneees  15   4O  Head As SeMOl V einiino E E E a N E E   15   CHAPTER 5 LOADING REPLACING MEMBRANE ELEMENTS                sccsccececceccececcececceccececcecsececcscsecsccnes   19         SL ADEC UON nn ar ne ere Pree E eee eer ee eer  19    5 2  Disassemble membrane components         sssssessseessreressrrssrrssrrrssrrssrrressrrssreesrersreresrersseeeseereseeeseerseeeese   19    Co IO TINS EeNNN eaea E E  19    5 4  Check and make sure the head is assembled according to Head Disassembly and Head Assembly   19    Deo  Vecseldedanne and ISOC LON eai a aE E  20    5 6  Install the head at the concentration sid               ssssesssenseseesseerssrrssrrssrrreserrsseresrersrrrssrressrersrerssereseerse  20    5 7  Install locking kit segment at concentration SIGE           ssssusseesesenssrressrersrrrssressrrrssrrrssrresereserresrreserersee  21   5 8  Load membrane elements from the feed end of the vessel            ccccceeseccceeesececeeeeceeees
21. elt  Push the head  Slowly into the vessel until it reaches over the groove  Please do not push the  head too much over the groove since the seals may be damaged if the head needs  to be pulled back  If it is difficult to push the head with hands  a rubber mallet can  be used to hit the head until the head reaches its place        Figure2 25 Install head assembly    6 3  Install locking kit segment at feed end  6 3 1  Inspect the groove and ensure it is clean and free of residues  Use compressed  air to dry the groove if available or use a clean rag to dry it   6 3 2  Apply lubricant like glycerin onto the locking kit segment screws to prevent salt  deposits to buildup  Position the locking kit segments into the groove     6 4  Install the permeate port plug     8 Inch Side Port FRP Pressure Vessel User Manual    WWW FrOpvV com cn        24         ROPI    Apply Teflon sealing tape on the threads of the plug  not exceeding 2 layers  before  threading it into the perm port  Over tightening may damage the permeate port   Maximum torque is 15Nm  Tighten plug at 50  of the maximum torque  The end face  of the plug should be 3mm higher than the permeate port face    6 5  Reconnect the pipes       Figure 2 26 Install permeate port plug    Reconnect the pipes as per Piping Connections     6 6  Check as per Appendix I Pre Running Check List    8 Inch Side Port FRP Pressure Vessel User Manual    WWW ropv com cn        25      ROPI     Chapter 7 Handling and Storage    Read this articl
22. est of the product and or the system in which it was installed  by the Customer  3  an inspection or test of the product and or the system in which it was installed by  third party inspector appointed by ROPV  4  return of the Product to ROPV   s factory for inspection or  testing  This is not a statement of limitations for warranty performance and ROPV reserves the right to  conduct warranty performance outside of the items shown    If the Product is found by ROPV to be defective under the terms of this warranty  ROPV will perform one  of the following at its option  1  supply a substantially similar replacement part based on FOB factory  terms  2  conduct a field repair of the Product  3  issue a credit for the original cost of the Products  This is  not a statement of limitations for warranty performance and ROPV reserves the right to conduct warranty  performance outside of the items shown    Products returned to ROPV for inspection or testing must be shipped freight prepaid at the Customer   s  expense  If a breach of warranty is confirmed  ROPV will bear all costs related to the inspection and  testing  If the Product failure is found to be caused by cause other than breach of warranty  all costs  related to the inspection and testing of the Product will be borne by the Customer  This includes a  USD 500 per day fee and all related travel expenses    All reported defects must be submitted to ROPV in writing     Disclaimer   ROPV makes no expressed or implied warranty ot
23. her than that specifically set forth in this warranty  statement  ROPV disclaims any warranty of merchantability or of fitness for a particular purpose    ROPV   s liability under the terms of this warranty shall not exceed the purchase price of the Product which  are claimed to be defective  ROPV shall not be liable for any consequential or incidental damages  whatsoever  including but not limited to injuries or damages to person or property  loss of business  profits  business interruption  loss of use  cost of removing installing Products  or the claims of third  parties     Warranties or Representations by Others  No agent  employee  dealer  or other person has any authority to make any warranties or representations  concerning ROPV or the Product  ROPV is not responsible for such claims of warranty or representation     8 Inch Side Port FRP Pressure Vessel User Manual  OOOO OWA TO CO        36      
24. il a  smooth finish is achieved  For dip damage or scratches not affecting the structural wall    2mm   epoxy or vinyl ester resin can be used to fill the damaged surface     8 2 5  Vessel is corroded or cracked  Possible reasons     A  Ph out of range  medium is to acid or alkaline   B  Non acid membrane shells mixed with acid proof membrane shell     Solution   a  Inspect the cracks     If it is a high pressure vessel or the cracks reach structural layer   2mm deep   the vessel  must be replaced     b  Check the medium    Check the PH range and adjust accordingly   8 2 6  Body damage    A  During transportation   B  During installation    8 Inch Side Port FRP Pressure Vessel User Manual        29      ROPI     Solution  replace the vessel if the body is seriously damaged  measures below can be  taken if there is only slight damage    Tools  painting gun  air compressor  electric dryer  angel sander and sanding disc  louver  blade     Materials  Epoxy resin and hardener  body filler and hardener  ROPV paint  fiberglass  mat     Steps  First  use epoxy resin  mats  fiberglass mat to fill the damage  once the resin is  cured sand the excess until the surface is level and smooth  apply body filler if necessary   last  paint with a painting gun     For any leakage of Feed Concentrate port  please  contact Harbin ROPV Industry Development  Center     gt        EE  Z  pmr      Z       8 4  Feed Concentrate Side Ports and Related Issues     Please follow steps below to remove Feed 
25. lush the residue with clean water     Take care not to damage bearing plate  vessel and permeate port  during cutting  Helmet and mask must be used for protection     D gt        m                         8 2  Head and Related Issues   8 2 1  Leakage in seals    Possibilities    A  Deteriorated head seals after running for over 2 years   B  Seals are damaged due to improper installation   C  Seals are deformed due to the PH of the medium   D  Seals are deformed due to the temperature of the medium  Solution     8 Inch Side Port FRP Pressure Vessel User Manual        28      ROPI    a  Check the composition  temperature  and PH of the medium   b  Replace the seals as per Maintenance Guide     8 2 2  Sealing plate or permeate portis damaged   Solution  Replace sealing plate or permeate port    There should be no more than 4 layers of seal tape  on the permeate port threads  It is better to use PVC  tubing to connect to the permeate port rather than  stainless steel  Threads of the tube that connects the  permeate port must be in match with those of  permeate port     D gt        m           a           8 2 3  Bearing plate is corroded due to leakage in vessel  Solution  Repair the leakage and replace bearing plate as per Vessel and Related Issues   8 3  Vessel and Related Issues   8 2 4  Leakage in sealing surfaces   Possible reasons     Scratches or damaged bore at the seal area location     Solution  For lite scratches  hand sand sealing areas using wet 600grit sand paper unt
26. m could be damaged   There are some location deviation about feed concentrate ports and permeate ports connecting   consider these deviation when design the piping connection  otherwise the stress concentration may  damage the pipe  Careful reading of this chapter will facilitate safe and normal working conditions of  the vessel and pipelines     3 1  Permeate Port Connections   3 1 1  Use flexible connections to reduce vibration impact    3 1 2  A U swan neck tubing with flexible connectors at both ends  or one piece of flexible soft pipe   should be used for permeate port connections    3 1 3  Extra and independent support shall be provided for permeate port pipelines rather than   using permeate port as support   Note  To prevent damage to the permeate port do not tighten the permeate port conections  over 50N m of torque   3 2  Feed Concentrate Port Connections   3 2 1  Use flexible grooved couplings  IPS     3 2 2  Do not connect any manifolds rigidly to the vessel    3 2 3  Manifolds must be supported independently    3 2 4  Manifold span should be greater than vessel span to allow for vessel growth under  pressure    3 2 5  To reduce the risk of stress concentration we recommend that    two IPS standard flexible  couplings and one piping section    are used to connect the Feed Concentrate ports and  manifold ports  this method lowers requirements for housing alignment and the position  accuracy of the manifold welds  However  this method will increase the initial cost 
27. meate port plug  permeate port    locknut  seals     8 Inch Side Port FRP Pressure Vessel User Manual  WWW  FOpV com cn        13        Figure 2 12 Head breakdown figure 2  parted sealing plate      Components  sealing plate  permeate port  adaptor  bearing plate  plug  permeate port    locknut  seals     4 4  Head Assembly Cleaning and Inspection     Please read this section carefully before making decisions and taking measures on  component structure or corrosion problems  Please combine the operational  experience with this manual to deal with corrosion and component damage  You  can refer to  lt Breakdowns and solutions gt  for the content that is not included in this  section or contact ROPV for conditions not covered in this manual   4 4 1  Cleaning and Inspection of the metallic components   Metallic components include the aluminum bearing plate  stainless steel locking  kit segments and screws   4 4 2  Inspect the components for scale  salt deposit or corrosion  use a steel brush or  a scrubbing pad to loosen any deposit  Be careful not to scratch the bearing plate  anodize coating   4 4 3  Place the components into a vessel filled with mild soap solution and remove  the corrosion   4 4 4  Flush all components with clean water   4 4 5  Dry the components with compressed air or a clean and dry towel   4 4 6  Inspect all components carefully  check for any structural defects or damage in  the bearing plate anodized coating  Replace any damaged or defective component   
28. moval tool set is available from ROPV    While not necessary for head removal  they have proven an effective and easy  way to remove the vessel head without causing any damage to the vessel   There are four components  bearing block  position nut  bearing rod  center  piece        Figure 2 2 ROPV Head Removal Tool    8 Inch Side Port FRP Pressure Vessel User Manual        10           ROPI     4 2 6 1 1  Thread the center piece into the permeate port of the head assembly     to hand tight  Do not over tighten the center piece  Fig  2 3    4 2 6 1 2  Place the bearing block at the end face       Figure 2 3 Figure 2 4    4 2 6 1 3  Thread the position nut into the center piece  4 2 6 1 4  Turn bearing rod clockwise  The head will move with the bearing rod  as it moves toward the end of the vessel  You will be able to remove  the head once it has cleared the retaining groove area of the vessel   4 2 6 2  Alternative Head Removal   It is possible to remove the head assembly  without the ROPV head removal tools  A 1    NPT Male threaded piece of PVC  or       Figure 2 5 Figure 2 6    similar material  pipe should be threaded into the head permeate port to hand  tightness  Pull the pipe outward to remove the head  If the vessel has been in  operation for an extended time  a slight rocking motion or forceful tug may be  required to break the head seal bond  Also  a handle at the end of the pipe will  ease head removal   forming a T with the pipe that threads into the permeate  port 
29. read this article carefully  Incorrect assembly may result in catastrophic failure     6 1  Pre Closing Inspection    Please read this article before closing the vessel     DO NOT use corroded or damaged parts to avoid  catastrophic failure  Do not pressurize the  vessel before all closing steps are finished        6 1 1  Inspect the head is assembled as per Head Disassembly and Head Assembly  6 1 2  Verify that the membranes are loaded as per Loading Replacing Membrane    Elements  6 1 3  Ensure the inner surface of the vessel is free of corrosion build up or residue of    foreign materials        Figure 2 24 Vessel cleaning    6 1 4  Inspect and make sure there are no scratches or damage on the inner surface of  the vessel    6 1 5  Inspect the vessel groove and make sure there are no residues or salt buildup in  it    6 1 6  Inspect the Feed Concentrate port connections and vessel  make sure the seals  are intact  structurally sound and free of corrosion  If you have any questions or  find any adverse situation please contact ROPV    8 Inch Side Port FRP Pressure Vessel User Manual        23      ROPI     6 2  Install head at the feed end  upstream   6 2 1  Apply a thin layer of glycerin within 50mm from the groove on the inner surface       of the vessel    6 2 2  Apply a thin layer of glycerin onto the head O ring at feed end    6 2 3  Grasp the permeate port and locknut  keep head and vessel in the same axis   Push the head into the vessel until some resistance can be f
30. required vessel element interface hardware is supplied with the vessel  Ensure that an  element adapter is installed at each end of the vessel before use    e Vessel expands under pressure and careful consideration must be taken when installing  straps saddles and system connection piping    e Installation with the straps saddles provided is strongly recommended   e Vessel should not support any other system components  Connections must be non load  bearing    e Mount vessel using strap saddle hardware provided and span recommended in the  engineering drawing    e Do not over tighten the straps   vessel must be allowed to expand under operation    e Maximize the connection flexibility to allow for vessel growth under pressure    e Align the side ports with the system manifold  correcting any misalignment before final  installation    e Provide overpressure protection in the system safety devices    e Inspect end closures regularly for signs of corrosion  Immediate corrective action and or  replacement are suggested in case of corrosion    e Thrust Ring must be installed at the downstream end of the vessel    e Relieve system pressure before working on the vessel     8 Inch Side Port FRP Pressure Vessel User Manual        4     ROPI     e Do not attempt to over tighten the Permeate Port connections as this may damage the end  closure  One turn past hand tight should be sufficient    e Never operate the vessel in excess of its ratings  This may void the warranty and cause bodil
31. til you verify that  system pressure is fully relieved from the vessel and the  system is completely shut down        4 2  Opening the Vessel    4 2 1  Shut Down System and Relieve System Pressure   The system must be shut  down and all pressure relieved before conducting any maintenance or repair on  the vessel  Read and follow all related guides provided by system provider    4 2 2  Disconnect permeate port piping  Unscrew and remove the permeate port  piping using a wrench  Pay attention to the thread turning direction to prevent  any damage to the permeate port due to reversed turning or over turning    4 2 3  Inspect End Closure   The end closure should be inspected for any signs of  corrosion or damage  Surface corrosion and salt deposits can be removed with a    8 Inch Side Port FRP Pressure Vessel User Manual     9        ROPI     brush or scrubbing pad  while flushing with water  Damaged components should  be replaced with approved components from ROPV   4 2 4  Remove the locking kit segment screws using a hex wrench        Figure 2 1    4 2 5  Lift the locking kit segment out of the retaining groove using a screw driver   Should the assemblies be difficult to remove  it may be necessary to rock the head  slightly or tap the head inward with a rubber mallet  Remove the end closure  It is  recommended to use dedicated end closure removal tools from ROPV    4 2 6  Remove the Head Assembly with One of the Following Techniques   4 2 6 1  ROPV Head Removal Tool  A head re
32. ut EE   34   APP RAD   ere nee een ers oe tr ee E ee eee ee ae  35   PVA TN OCC IS orea r ice vincent E carers E EEA E  35   PROP URCA WY Girl A Y eE anew aaece sean eelouvaeaous sonata sesaie dia eaioceouavsoersoteenadeavenoious E E   36     8 Inch Side Port FRP Pressure Vessel User Manual        2        ROPI     Chapter 1 General Product Description    ROPV pressure vessel is designed to withstand 6 times the designed pressure before a  catastrophic failure occurs  As a safety precaution the housings are designed for a full body  leak at 4 times the design pressure to keep catastrophic failure from happening  Each  standard vessel is carefully inspected and a hydro test is performed to ensure its reliability  before delivering from the plant    ROPV Pressure Vessels are designed to provide safe operation over a long service life if  properly installed  operated  and maintained  The vessel may cause loss of life  severe bodily  harm  or property damage if improperly installed  operated  or maintained  Read and  understand all guidelines provided in the vessel User Manual  Observe every precaution  contained therein  Failure to do so may result in malfunction and potential catastrophic  failure  It is recommended that only qualified technicians experienced in servicing hydraulic  systems work with this vessel  Misuse  incorrect assembly  or use of damaged corroded  components may result in catastrophic failure  ROPV Pressure Vessels are design and  manufacture in accordance 
33. with the American Society of Mechanical Engineers  ASME  Section  X Boiler and Pressure vessels Code requirements  for use as a membrane element housing     Product Identification    R 8040 B 300 S   6  W     ROPV   L Paint Color White    8 Inch Diameter Membranes per Vessel  Membrane Feed Concentrate  Membrane Length Side Port Connection  40 Inch    Maximum Operating  B Series Pressure  PSI     R 8040 B 300 E   6  B     L Paint Color Blue    Feed Concentrate  End Port Connection    8 Inch Side Port FRP Pressure Vessel User Manual    WWW rOpvV com cn        3     ROPI     Operation Specifications    R80 300E Design Pressure  300PSI   2 1Mpa   21Bar   R80 450E Design Pressure  A50PSI   2 1Mpa   21Bar   Max  Permeate Pressure  125PSI   0 86Mpa   8 6 Bar   Min  Operating Temp   14  F    10  C   Max  Operating Temp   150  F   66  C   Factory Test Pressure  ASME  1 1x Design Pressure  Standard  1 5x Design Pressure   Operating pH Range  3 11   Cleaning pH Range  2   12  less than 30 minutes     Vessel Use and Precautions    e Do not allow the vessel to fall or impact on the ground or other object    e Use padding to protect the vessels during handling to prevent damage    e Pressure up to the design pressure  PSI  of the specific model being used    e Vacuum conditions should be avoided with vacuum breakers    e Accommodates standard 8    nominal diameter spiral wound elements    e Read and follow the membrane manufacturer installation instructions along with this manual    e The 
34. y  or property damage    e Do not operate the vessel permeate port over 125PSI    e Flush the vessel with permeate before system shutdown to reduce the chance of corrosion    e Do not install the vessel under direct sunlight    e Operate the vessel within the recommended pH range   Operating pH Range  3   10  Cleaning  pH Range  2   12  less than 30 minutes     e Minimize membrane movement by careful shimming the membrane column    e Failure to understand and follow all precautions may void warranty and result in catastrophic  failure of the vessel    e These guidelines are subject to change  Please check with ROPV to ensure that the User  Manual is the latest version for the vessel model being used     8 Inch Side Port FRP Pressure Vessel User Manual     5     ROPI     Chapter 2 Installation    2 1  Carefully study the vessel engineering drawings for key dimensions and technical  requirements    2 2  Design and manufacture rack according to engineering drawings and system capacity   Independent support of both pressure vessel and manifolds shall be considered in the  design of the rack    2 3  Check the integrity of the vessel  especially the inner surface of the vessel and the  sealing surface of the Feed Concentrate ports    2 4  Ensure enough space is reserved around the two ends of the vessel for installation and  removal of the membrane elements    2 5  Mount the vessel on the provided saddles at the recommended span positions shown  on the engineering drawings    2 6  
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Slide corso antincendio.extraslim - Corpo Nazionale dei Vigili del  ダウンロード  20140228, Kurzanleitung-Master-114  Optoma EX525ST  324 Datasheet  Haier HWDC1000TXVE User's Manual  Samsung LW20M11C Manual de Usuario  UM10689 - NXP Semiconductors        Copyright © All rights reserved. 
   Failed to retrieve file