Home
MERIT Target System Installation Manual - MERIT experiment
Contents
1. o po e Target transporter Hg system and cart place on transporter Common baseplate Solenoid place on common baseplate and attach with brackets HPU Miscellaneous computer equipment 2 Common baseplate setup a b Place liner on floor prior to baseplate installation User rollers to move baseplate solenoid into beamline Survey equipment should be used to ensure beamline and magnet axis are in the same vertical plane Use hydraulic jacks to lift baseplate off rollers Adjust leveling screws so that baseplate top surface is leveled 26 5 27 0 cm above floor A very slight tilt of the baseplate will ensure the Hg system does not accelerate while being rolled towards the magnet 3 Transporter setup oe pao se Use rollers to move transporter downstream of common baseplate Elevate with leveling screws to match common baseplate height Remove swivel hoist rings and attach bridging plates to transporter Remove ratchet straps securing Hg system to transporter Place C clamp on rail on upstream side of one cart wheel Remove upstream anchor bracket from transporter and downstream anchor bracket from common baseplate Ensure the bolt on the upstream anchor bracket on common baseplate is completely threaded in this will ensure the target system cannot be inserted too far into the magnet Ensure that bridging blocks are installed on the transporter top surface These blocks rest on both surfaces and bridge
2. 5 Hg extraction process a b i j k Periodically monitor personnel breathing zones and secondary containment interior with Hg vapor monitor Weigh empty flask and record weight flask number Turn on pump to initiate fluid transfer from secondary containment to intermediate flask Monitor tubing for any potential leak points Stop pump after fluid level reaches desired level in intermediate container Reposition the peristaltic pump onto the tubing between the drain valve and intermediate flask Place straw from intermediate flask to empty flask ensuring straw does not drip Turn on pump to initiate fluid transfer from intermediate flask to steel flask Monitor tubing for any potential leak points Stop pump after transfer is completed Loosen pump rollers from tubing Remove straw from flask using gauze to wipe as short straw is removed Ensure extracted straw does not drip Raise straw and tubing above intermediate flask so that tubing is emptied Replace Teflon tape on flask plug and reinstall plug Weigh filled flask and record weight flask number Place flask in flask holder Repeat sequence for each flask until mercury removed from secondary containment sump 6 Verify tubing is empty after last flask Remove tubing from pump and QD4 holding gauze under QD4 during extraction process Cap tygon tubing and piping assemblies 7 Inspect photo tray and all equipment surfaces looking for liquid Hg Clean as ne
3. pressure decay if no leaks are found Equipment Required Air pump Pressure hose Crescent wrench Soapy water in spray bottle 120V extension cord Latex gloves Pressure Decay Manifold Secondary Containment Hg Containment Schematic 8Feb2007 Figure VII 1 Hg Containment Schematic Procedure 1 Ensure sump vent valve VV is closed 2 Hold a cup under QDI to catch any Hg droplets that could be released from the quick disconnect 3 Attach pressure decay manifold to Hg inlet port seen in figure VIII 3 a b Put on latex gloves to protect hands from Hg Pressure decay manifold should be located in the largest U Line crate in a clear plastic bag inside of an orange bucket Handle the pressure decay manifold as if it contains liquid Hg small droplets could be inside Remove the quick disconnect plug while holding the cup underneath MERIT Installation ManualR2 VI 3 Target System Disassembly e Insert the pressure decay manifold until the quick disconnect locks into place 4 Use bicycle pump to pressurize the primary containment to 1 psi and isolate primary containment Note time 5 Observe pressure over a 2 hr period Acceptable leak rate is 5x10 torr 1 sec which corresponds to a pressure drop of 0 2 psi For reference MERIT Hg System Primary Volume Volume in 3 Volume liter Hg Cylinder 1178 1 19 3 Sump Tank 133 8 2 2 Hg Cylinder Inlet Piping 6 8 0 1 Hg Cylinder Disc
4. sufficiently Place curved plates on top of jacks and position jacks under brackets Jack stands are labeled for each location Attach manual hydraulic pumps to jacks Use jacks to raise baseplate off rollers Remove rollers Adjust upstream leveling feet such that approximately 15 8 cm protrudes above gusset plate Adjust downstream leveling screws such that approximately 8 8 cm protrudes above gusset plate Adjust middle leveling screws to approximately match the downstream screws Use jacks to raise entire baseplate high enough to insert magnet support beam under upstream leveling feet Baseplate does not have to be perfectly level during this process as the downstream end will be lowered Insert support beam under upstream feet centering pads under circular feet Ensure clearance between upstream leveling feet and support beam and relieve pressure from upstream jacks to allow baseplate to lower onto support beam Do not remove jacks yet Ensure clearance between downstream leveling feet and floor Relieve pressure from downstream jacks to allow baseplate to lower until jacks bottom out Insert bottle jack under downstream end of baseplate centered between the sides Raise downstream end of baseplate with bottle jack to allow side jacks to be removed Relieve pressure from bottle jack to allow downstream leveling screws to rest on floor MERIT Installation ManualR2 II 2 Target System Installation k Final elevation of downstream end o
5. 8 Stop pump after reservoir is full 7 Release tygon tubing from reservoir filter and hold end above height of peristaltic pump reverse direction on the pump to draining all remaining fluid in the tygon tubing back into the drum 8 Prime hydraulic pump if needed a Disconnect the hydraulic hose from hydraulic pump Prime hydraulic pump by filling impeller cavity with hydraulic fluid Expected transfer time is less than 1 min at speed setting 1 Have rags ready to recover overflow oil if any b Reconnect hydraulic hose to hydraulic pump 9 Disconnect peristaltic pump from electrical power supply 10 11 Close valves 1 and three 12 Recap and close purge valve Connect HPU to power supply 13 Remove orange plastic cover on hydraulic pump motor a section of the drive shaft should be visible Cycle the pump motor by using start and stop switch while observing the MERIT Installation ManualR2 direction of shaft rotation An arrow on the top of the pump motor on the side with the heat exchanger shows the correct direction a If the shaft spins in the opposite direction turn off the HPU disconnect from power and change the phase of the motor by switching the white and black wires b Reconnect power turn system on and cycle the pump motor to ensure correct rotational direction 14 Connect hydraulic hoses to the A amp B ports on the proportional control valve Insert mating QD on ends of hoses to corr
6. ERIT Installation ManualR2 VII 3 Hg Drain VIII Mercury Drain Description This procedure outlines the steps required to drain the MERIT primary containment of Hg into the shipping flasks The system has been designed to allow draining without opening the secondary containment Equipment Required Peristaltic pump Hg fill tubing amp 120V extension QD input valve cord Plastic sheeting Gauze amp Teflon Tape Flask holder and intermediate flask PPE Lab coats over Screw driver for lifting and company clothing shoe carrying flasks covers gloves safety glasses with side shields Hydraulic jack Weight scale Scavenger local ventilation QD1 VV 3 Secondary Containment pia i LETT SE n I QD4 Ta Hg Containment Schematic 8Feb2007 Figure VIII 1 Hg Containment Schematic Procedure 1 Home the mercury system removing all mercury from the Hg cylinder 2 Place photo tray on floor near mercury drain QD3 MERIT Installation ManualR2 VII 1 Hg Drain 3 Place a layer of plastic or gauze along the bottom of photo tray Place Hg flask holder intermediate Hg flask scale and pump in photo tray Provide power 120V to pump controller Figure VII 2 Hg drain setup 4 Perform visual check of secondary containment interior for an increase in the presence of liquid Hg 5 Verify secondary containment filter ports covered 6 Remove drain tube assembly from storage and atta
7. Note do not completely remove snout yet As more of the target snout is removed from the magnet bore manual support of the snout may be necessary As soon as adequate room exists between the magnet and the secondary box install the snout support bracket Continue extracting the target snout from the magnet rolling the cart until stopped by the downstream anchor bolt 3 Secure Hg system a b c d Reinstall the upstream anchor bracket on the transporter baseplate and lock cart in place Remove the two bridging plates and reinstall the swivel hoist rings Reinstall the downstream anchor bracket on the common baseplate Place ratchet straps around secondary box securing the ends to the swivel hoist rings 4 Transport Hg system away from common baseplate a b Ensure rollers are oriented in the desired direction and swivel rings are accessible Use leveling screws to lower transporter onto rollers This step can also be accomplished by placing the bottle jack under the ends of the transporter to take weight off the leveling screws Once the transporter is adequately supported on the rollers the roller handles can be used to manually move the transporter to the area where the Hg drain process will take place MERIT Installation ManualR2 V 2 Target System Disassembly VI Leak Testing Description This procedure outlines the process to pressurize the primary containment to check for leaks and provides a comparison
8. ae Paez yA x Zon CAN Report No 203 H T 9012 R2 MERIT Target System Installation Manual Adam J Carroll Van B Graves Philip T Spampinato June 2007 Introduction MERIT Target System Installation Manual Adam J Carroll Van B Graves Philip T Spampinato DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government Neither the United States government nor any agency thereof nor any of their employees makes any warranty express or implied or assumes any legal liability or responsibility for the accuracy completeness or usefulness of any information apparatus product or process disclosed or represents that its use would not infringe privately owned rights Reference herein to any specific commercial product process or service by trade name trademark manufacturer or otherwise does not necessarily constitute or imply its endorsement recommendation or favoring by the United States Government or any agency thereof The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof Oak Ridge National Laboratory is managed by UT Battelle LLC under contract DE AC05 000R22725 for the U S Department of Energy MERIT Installation ManualR2 i I III IV VI VII VII XI XII XII XIV XV Introduction Table of Contents A a r a E a a a a a Shipping Informati
9. ble kit f Electrical Connections g Fuses h Straps 17 Assorted Boxes on pallet Figure II 3 a Optics Box b Hg Vacuum c Air Hoses Figure II 3 Assorted Boxes on Pallet MERIT Installation ManualR2 Shipping Information Shipping Information Description This instruction outlines continues the shipping information with the unloading operation Equipment Required Electric screw driver Impact Wrench Forklift with 6T capacity Rollers and jacks Procedure 1 Open the two black plastic boxes and remove tool boxes 2 Open the wood crates a Unscrew top panel and remove b Unscrew front panel and remove hold panel while unscrewing for safety Repeat step two for all creates Remove smaller boxes and materials around the larger equipment Remove large hex screws to release large equipment like HPU Using a 6T capacity forklift remove pallets containing drums and boxes A Dek ee Using a 6T capacity forklift remove large equipment MERIT Installation ManualR2 Il 5 Target System Installation III Target System Installation and Assembly Description This procedure describes the process to install equipment into the TT2 and TT2A tunnels prior to Hg filling Equipment Required 14 drive ratchet Hex drivers 1 1 8 1 1 4 1 5 8 sockets Jacks amp support stands Bottle jack Adjustable wrench Procedure 1 Orderof installation into MIT experimental area a
10. cessary If no Hg found remove all equipment and store MERIT Installation ManualR2 IX 2 X Hydraulic Fluid Fill Description This procedure outlines the process to transfer hydraulic fluid from the shipping drum to the hydraulic power unit HPU reservoir It also includes steps to fill the hydraulic fluid lines and expel any air that may be in them Equipment Required Hand tools to open drum Peristaltic pump with tygon tubing that has never been in contact with Hg Hydraulic hose QD mating ports with open ends Crescent wrench for piping adjustments or replacement Teflon tape for piping replacement Allen wrench pack 1 1 4 Crescent wrench for disconnecting hydraulic hose Piping clamps to secure pipe tygon tubing connections Tubing assembly for transferring fluid from drum Procedure 1 Place fluid drum near HPU Remove drum cap Remove fill cap on HPU reservoir 2 Place peristaltic pump on drum and connect controller to electrical power supply 120V Insert tubing assembly into drum and secure other end to reservoir oil filter with piping clamps 3 Open valves 1 and 3 close valve 2 figure IX 2 4 Remove cap and open purge valve on top of reservoir to release air 5 Start peristaltic pump and observe fluid transfer Pump should be operated at 80 100 full capacity 6 Fill reservoir to capacity Expected transfer time is approximately 35 minutes at speed setting
11. ch to QD3 Connect tygon tubing to intermediate flask Implement peristaltic pump between QD3 and intermediate flask Secure all piping connections with pipe clamps 7 Install pressure check assembly into QDI This will allow release of vapor lock conditions or pressurization of the primary containment MERIT Installation ManualR2 VII 2 Figure VIII 3 Primary containment pressurization assembly 8 Hg drain process a b no Re Ensure sump tank drain valve VT is open Periodically monitor personnel breathing zones and secondary containment interior with Hg vapor monitor Periodically inspect sump tank and primary containment piping for leaks Open drain valve VD and turn on peristaltic pump gradually bring up the speed to maximum If vapor lock occurs use pressurization assembly to allow intake air to reach the sump tank Close drain valve VD when mercury reaches appropriate level 2 and liters in intermediate flask Open Hg flask insert short straw into flask and cover opening with gauze Transfer pump to tygon tubing between intermediate flask and steel flask Turn on pump to initiate fluid transfer Monitor tubing for any potential leak points Stop pump after transfer is completed Release tygon tubing from pump and gravity drain remain Hg into steel flask Remove straw from flask using gauze to wipe as short straw is removed Ensure extracted straw does not drip Replace Teflon tape on flask plug and reinstal
12. cket wrench Procedure 1 Open both mercury filters to allow air flow 2 Attach snorkel to filter that does not need replacement Turn on snorkel so air is drawn into the secondary through the dirty filter Ceva Ca io MERIT Installation ManualR2 Reconnect mercury vapor filter cover with cap screws Place bagged filter in satellite accumulation area drum Remove the cap screws attached to the dirty filter s cover Open the vapor filter box Detach used filter and double bag Insert new mercury vapor filter Disconnect snorkel and close both mercury filters to air flow XII 1 Nozzle Replacement XIII Nozzle Replacement Description This procedure outlines the process to replace a nozzle after mercury has been present in the primary containment The process begins with the Mercury Delivery System outside of the magnet Equipment Required Crescent wrench for piping Flat head screw driver for Rags to cap ends of primary replacement pipe clamp and secondary containments Procedure 1 Follow steps outlined in section XIV to remove secondary cover from snout assembly 2 Move snorkel to break in secondary containment 3 If mercury was present in secondary containment wipe off primary containment where possible to reduce mercury build up in secondary containment 4 Place the replacement titanium mercury supply pipe near the primary mercury tube assembly 5 Remove rectangular patte
13. ed systems testing of the Hg system and the solenoid will occur at the Massachusetts Institute of Technology MIT Upon successful completion of MIT testing MERIT will be drained of mercury and hydraulic fluid then disassembled The MERIT pieces will be placed in a land sea container for transportation to CERN for the experiment At CERN in the TT2A tunnel the MERIT will be reassembled and properly commissioned as described by this document before beginning the one month of testing Upon completion of experimentation the MERIT will be held in the TT2A tunnel for a significant radioactive cool down period The MERIT then will be decommissioned disassembled and sent by the land sea container to Oak Ridge National Laboratory for final storage This document contains instructions and procedures required for all non operational aspects of the MERIT equipment such as setup and disassembly leak checking Hg fill and drain etc These instructions should cover all expected preparatory operations required to conduct tests at both MIT and CERN It does not cover detailed operation of the equipment those procedures are provided in a separate Operations Manual MERIT Installation ManualR2 1 1 Shipping Information II Shipping Information Description This section lists the location of equipment inside the shipping containers and boxes and provides a procedure for unloading the equipment from the crates Packaging Arrangement 1 Wood Crate Dim
14. ensions 176 L x 66 W 90 H Figure II 1 a Mercury Syringe Unit b Three drums c Acrylic sought cover Figure II 1 Wood Crate 2 Wood Crate Dimensions 136 L x 66 W 74 H Figure II 2 a HPU b Extra pallets O hydraulic fluid drum pi Hg waste drum e Aluminum brace MERIT Installation ManualR2 H 1 Shipping Information Za Figure II 2 Wood Crate 3 Arizona Instruments Box a Jerome monitor and equipment 4 Both Black Plastic Box a Socket set b Tool box screw drivers c Tool box wrench d Electrical umbilical Tool kits Peristaltic pump co Power extension cords h Scavenger air vent 5 B Box Black B a Lab Coats b Gloves c Large cheese cloth MERIT Installation ManualR2 1 2 d Clean up protection 6 B Box Red B STARTER BOX a 12 J Box a 13 L Box a b RJ 45 cables Air hose Cables Networking box Cheese Cloth Empty bottles Buckets gallon size VM 3000 Cables Fasteners Washers Hg clean up Ziploc bags HgX Hand held Hg vacuum pump Sponges Work gloves Duct tape Blue air hose Hg Monitor kit Replacement cables Jerome Tape Lockout boxes MERIT Installation ManualR2 Shipping Information 113 c Shims 14 M Box a Manuals 15 S Box a Gaskets b Hose clamps c Bungee cords d Scale 16 W Box a Wire ties b Yellow tape c Helium monitor d Sealant e Hg monitor ca
15. ents can be made using the leveling screws or the jacks d Axial adjustments of the Hg system can be made by adjusting the positioning bolts on the upstream and downstream ends of the target cart e Once final alignment has been achieved all tie down nuts on the sliding mechanisms should be tightened and the jamb nuts on the leveling screws should be tightened against the gusset plates Remove and store all jacking equipment g Anchor plates are provided to attach the baseplate to the floor using concrete anchor bolts MERIT Installation ManualR2 II 3 Experiment Removal IV Removing Experiment from Beamline Description This procedure outlines the steps needed at the end of the experiment to remove the system from the beamline and allow the beamline equipment to be reinstalled It is assumed the experiment has been allowed to cool for a sufficient number of days such that personnel can work near the system but efforts have been made to minimize personnel exposure during this process Equipment Required 17 drive ratchet Hex drivers 1 1 8 1 1 4 1 5 8 sockets Jacks amp support stands Bottle jack Adjustable wrench Procedure 1 Disconnect cabling a b c g h Prior to dismantlement ensure syringe cylinder is in HOME position Ensure power is removed from HPU Disconnect hydraulic hoses catching any drips that occur during breaking of the quick disconnects Disconnect electrical cable
16. esponding ends on the secondary containment a Forinstallation at CERN additional hose length is required Remove QD from both hoses and add the additional length Reconnect QD and complete mating QD to secondary containment 15 Cycle the hydraulics full 15 stroke in the primary containment to remove air in the hydraulic fluid system Continue to cycle until excess air stops exiting through the purge valve 16 Disconnect the A amp B hydraulic tubes from the secondary containment A small amount of oil will leak during disconnect Catch all released oil with rag or catch pan Figure IX 1 HPU Hydraulic Fluid Fill MERIT Installation ManualR2 X 2 a OIL FILTER QI _ KOO SINN o VALVE 3 N LUI gt a gt VALVE 1 ZH LOO INI NI Figure IX 2 Hydraulic Fluid Fill Point Assembly X 3 MERIT Installation ManualR2 XI Hydraulic Fluid Drain Hydraulic Fluid Drain Description This procedure outlines the process to transfer hydraulic fluid from the hydraulic power unit HPU reservoir to the shipping drum Equipment Required Hand tools to open and close drum Peristaltic pump with tygon tubing that has never been in contact with Hg Pliers for purge cap removal Tygon hose assembly for insertion into oil drum Flashlight to view fluid level Crescent wrench for piping adjustments or replacement 120V extension cord Procedu
17. f baseplate is approximately 20 1 cm above floor upstream corner of baseplate is approximately 37 1 cm above floor Height adjustments are made using the leveling screws While it is preferred that the baseplate weight be taken off the screws prior to adjustment minor height adjustments lt 2mm can be made by turning a screw under load l The middle leveling screws should be adjusted so they are snug against the floor 6 Final alignment a Final alignment adjustments are made based on the use of beam surveying equipment or optical diagnostics b Lateral positioning adjustments can be made by loosening the tie down nuts on the sliding mechanisms loosening the lateral positioning bolts on one side and pushing the sliding plates with the positioning bolts on the other side Note this process can be performed with the baseplate in the tilted orientation The magnet plate rests on a low coefficient of friction surface and can move relative to it once the tie down nuts are loosened However relative movement of the plate is limited by the slots that encompass the studs protruding from the baseplate Should axial motion occur the maximum movement is limited by the clearance between the studs and the slot walls which is 0 125 inch 3 mm As a precaution a beam can be clamped to the baseplate against the downhill edge of the magnet plate during these lateral position changes to prevent the possibility of downhill motion c Vertical adjustm
18. gh levels of mercury vapor are present attach snorkel to rectangular mercury air filter assembly on top of secondary containment to reduce mercury vapor presents A connector plate on the secondary containment may need to be removed to allow for air flow 11 Place local Hg drop cloths under secondary containment tube 111 Have Hg spill equipment available Release stabilization rod at end of secondary containment sleeve assembly from primary mercury containment tube Do not remove stabilization rod from secondary containment tube Disconnect pipe clamps holding secondary containment flexible joint and remove flexible joint Slide forward and take local Hg vapor level reading Remove two flathead screws connecting secondary containment sleeve to Hg jet chamber Carefully slide the secondary containment sleeve off the jet chamber assembly and cap open end if mercury vapor was present in secondary container 2 Opening Enclosure Box a C Designate set down location for lid after removal preferably standing against a vertical surface Check levels of mercury vapor present in the secondary containment If high levels of mercury vapor are present attach snorkel to rectangular mercury air filter assembly on top of secondary containment to reduce mercury vapor presents A cap on the alternate filter assembly may need to be removed to allow for air flow Unscrew all cap screws from lid and retain all fasteners MERIT Installation Man
19. harge Piping 3 4 0 1 Sump Tank Return 59 4 1 0 Hg Supply Piping 46 3 0 8 Jet Chamber 511 3 8 4 1939 1 31 8 Test duration 2 00 hrs Allowable dP 0 20 psig 10 34 torr Equivalent leak rate torr liter sec 0 046 Allowable leak rate 0 010 torr liter sec At end of test duration Leak Rate torr liter sec dP torr dP psig 1 00E 04 0 02 0 000 5 00E 04 0 11 0 002 1 00E 03 0 23 0 004 5 00E 03 1 13 0 022 1 00E 02 2 27 0 043 5 00E 02 11 33 0 215 1 00E 01 22 65 0 430 6 If primary containment fails the leak test additional means of determining the cause must be taken Access inside the secondary containment will be required see section XIV MERIT Installation ManualR2 VI 4 VII Mercury Fill Hg Fill Description This procedure outlines the steps required to fill the sump tank with Hg from the shipping flasks The system has been designed to allow filling without opening the secondary containment however should the secondary containment be opened for other reasons filling can also be performed through a port mounted in the sump tank lid Equipment Required Peristaltic pump amp Hg fill Step ladder tubing QD input valve Photo tray Weight scale Flask holder PPE Lab coats over 120V extension cord Gauze company Clothune stos covers gloves safety glasses with side shields Scavenger local ventilation Teflon tape Hg Disposal Barrel Procedure Secondary Containment Hg Containment Sche
20. l plug Weigh filled flask and record weight flask number Place flask in flask holder Reposition peristaltic pump to tygon tubing between QD3 and intermediate flask Repeat sequence for each flask until mercury no longer pumps into the intermediate flask MERIT Installation ManualR2 VII 3 Hg Drain 9 Remove remaining mercury a b g h i Look for remaining mercury in sump tank If none present reduce the angle of the mercury system to further lower QD3 with respect to the system Turn on pump until intermediate flask reaches appropriate level or pump no longer is transferring mercury Release tygon tubing from peristaltic pump and transfer pump to tygon tubing between intermediate flask and steel flask Turn on pump to initiate fluid transfer from intermediate flask to steel flask Monitor tubing for any potential leak points Stop pump after transfer is completed Loosen pump rollers from tubing Remove straw from flask using gauze to wipe as short straw is removed Ensure extracted straw does not drip Raise straw and tubing above intermediate flask so that tubing is emptied Replace Teflon tape on flask plug and reinstall plug Weigh filled flask and record weight flask number Place flask in flask holder Repeat if needed 10 Verify tubing is empty after last flask Remove tubing from pump and QD3 holding gauze under QD3 during extraction process Cap tygon tubing and piping assemblies 11 Inspect ph
21. late c The transporter baseplate should be maneuvered behind the common baseplate so that the rails align d Lower leveling screws to the floor and bring transporter to a height that matches the common baseplate Once the transporter and common baseplate top surfaces are flush ensure that bridging blocks are installed on the transporter top surface These blocks rest on both surfaces and bridge the gap between the transporter and common baseplate and are required to prevent the transporter from tipping as the rear wheels of the cart roll onto the transporter e Remove upstream swivel hoist rings from transporter and replace with plates that bridge the two baseplates Note that if bridging plates are not installed then as the cart wheels transfer from one rail to the other transporter tipping can occur f Remove upstream anchor bracket from transporter g Ensure the downstream transporter anchor bracket and bolt are in place and firmly attached 2 Extract Hg system from magnet a Have snout support bracket ready and available b Place a C clamp on rail of the downstream side of one cart wheel c Remove downstream anchor bracket from common baseplate d While manually controlling Hg cart remove C clamp MERIT Installation ManualR2 V 1 e g Target System Disassembly Slowly roll Hg cart away from magnet using multiple personnel to ensure it cannot accelerate If necessary stop motion and reinstall C clamp on rail
22. m the lower air filter port b Attach the air duct from the snorkel to the air filter port use the screw driver to tighten down the clamp to ensure a seal Turn on mercury snorkel and set to a low speed Open top air filter port by removing metal cap allowing air flow into the secondary containment Use the Jerome to sample the air exiting the mercury snorkel for mercury vapor Monitor air inside secondary containment for decreasing mercury vapor levels using the VM 3000 connected to secondary through air port by QD 4 Turn off mercury snorkel when VM 3000 reads zero Monitor mercury vapor level for several more minutes to check for a mercury vapor leak in the primary containment a If mercury vapor level begins to rise turn back on mercury snorkel and repeat b If mercury vapor level stays at zero secondary containment can be accessed MERIT Installation ManualR2 XIV 1 Opening Secondary Containment XV Opening Secondary Containment Description This procedure outlines the steps to open the secondary containment either by removing the containment sleeve that is inserted into the magnet bore or by removing the rectangular lid over the syringe pump Equipment Required Mercury snorkel to remove Flat head screw driver for air VM 3000 mercury vapor duct clamp Jerome Procedure 1 Opening Sleeve Assembly a Preparations 1 Check levels of mercury vapor present in the secondary containment If hi
23. matic 8Feb2007 Figure VII 1 Hg Containment Schematic 1 Place Hg disposal barrel near QDI fill port Set support braces on top of the drum Set the photo tray on the support structure Place a layer of gauze along the bottom of the tray to help contain any spilt Hg Place peristaltic pump and flask holder in tray and provide power 120V to pump controller MERIT Installation ManualR2 VII I Hg Fill Figure VII 1 Hg fill setup 2 Use Hg vapor monitor to test for presence of vapors within secondary containment Record reading Perform visual check of secondary containment interior for presence of liquid Hg 3 Verify secondary containment filter ports covered 4 Verify sump tank drain valve VT open Verify system drain valve VD closed and QD3 closure plug is in place 5 Prepare local ventilation system and place inlet near where flasks will be emptied 6 Place a cup under QDI to catch any released Hg remove quick disconnect cap from QD1 Monitor for and clean up any released Hg 7 Remove tygon tubing from storage bag Install tygon tubing into QD1 fill port holding gauze under QD1 during insertion process Remove cap from Hg straw and ensure straw does not drip Minimize lengths of unsupported tubing Open valve VV 8 Hg transfer process a Periodically monitor personnel breathing zones and secondary containment interior with Hg vapor monitor and exhaust of local ventilation system b Periodically inspect
24. on aaa ot Target System Installation and Assembly Removing Experiment from Beamline i Target System Disassembly aree Leak Testine gorilla liado Meena aioe Neli ona Merci Dra a lA Hg Removal From Inside Secondary nono ncnoncnnnnnona nono ncnoncnnns Hydranle Blwid PIT e Sn Hydraulic Pluid Dri ari rara at Hg Vapor Filter Replacement ii A A a Nozzle Replacement alla na De Evacuating Secondary Containment ii Opening Secondary Containment ii la farro MERIT Installation ManualR2 il Introduction I Introduction The Mercury Intense Target MERIT experiment is a proof of principle experiment for a Neutrino Factory or Muon Collider MERIT creates a free jet mercury stream that interacts with a high energy proton beam inside a 15 Tesla magnetic field The experiment will be conducted at CERN during the summer of 2007 and will utilize the TT2 and TT2A tunnels The MERIT Hg target system creates the desired jet with a syringe pump two six inch diameter hydraulic cylinders actuate a ten inch diameter Hg cylinder The syringe pump and the magnet will be located in the TT2A tunnel The syringe cylinders are driven with a Hydraulic Power Unit HPU that will be located in TT2 Operational testing of the complete target system in a no field condition will be conducted at Oak Ridge National Laboratory ORNL water tests of the system will be followed by a mercury test Integrat
25. oto tray and all equipment surfaces looking for liquid Hg Clean as necessary If no Hg found remove all equipment and store Table VIII 1 Hg Measured Weights Hg Flask Number Empty Weight Ibs Filled Weight lbs 1G N Jom Jor A w r MERIT Installation ManualR2 VII 4 Hydraulic Fluid Fill IX Hg Removal From Inside Secondary Description This procedure outlines the steps required to extract Hg from the secondary containment should a large leak of the primary containment occur Equipment Required i Peristaltic pump amp Hg fill A Plastic sheeting tubing QD input valve Table or short platform Weight scale ae Boles daino PPE Anti C suits over 120V extension cord Gauze company IO shor covers gloves safety glasses with side shields Secondary Containment Hg Containment Schematic 8Feb2007 Figure IX 1 Hg Containment Schematic Procedure 1 Place photo tray on floor near mercury drain QD4 2 Place Hg flask holder intermediate Hg flask and pump in photo tray Provide power 120V to pump controller 3 Verify secondary containment filter ports covered MERIT Installation ManualR2 IX 1 Hydraulic Fluid Fill 4 Remove drain tube assembly from storage and attach to QD4 Connect tygon tubing to intermediate flask Implement peristaltic pump between QD4 and intermediate container Secure all piping connections with pipe clamps
26. re 1 Place fluid drum near HPU Remove drum cap Remove fill cap on HPU reservoir 2 Place peristaltic pump on floor by the drum and connect controller to electrical power supply 120V Insert tubing into drum and secure other end to reservoir drain with piping clamps 3 Remove cap and open purge valve or open valves 1 and 2 shown in figure IX 2 4 Open drain valve 5 Start peristaltic pump and observe fluid transfer Pump should be operated at 80 100 full capacity Slow pump speed as fluid flow begins to include a mixture of air and hydraulic fluid 6 Pump until mostly air is being transferred Expected transfer time is approximately 25 minutes at speed setting 10 for the majority of the transfer time 7 Close purge and drain valve Close valve 1 and 2 Disconnect tygon tubing assembly from drain valve Reverse peristaltic pump to return most of hydraulic fluid to drum Disconnect tygon tubing from pump and drain any remaining hydraulic fluid into the drum by gravity 10 Disconnect peristaltic pump from electrical power 11 Cap drum MERIT Installation ManualR2 XI 1 Hydraulic Fluid Drain Figure X 1 Hydraulic Fluid Drain MERIT Installation ManualR2 XI 2 Hg Vapor Filter Replacement XII Hg Vapor Filter Replacement Description This procedure outlines the process to replace a mercury vapor filter Equipment Required Mercury snorkel to remove mercury vapor New Hg vapor filter So
27. rn of cap screws connecting nozzle flange and primary mercury containment tube assembly 6 Disconnect mercury discharge flexible piping using the crescent wrench and XX wrench 7 Slide the mercury supply pipe out of the primary containment and plug off both ends with rags to contain the mercury 8 Immediately place the titanium mercury supply pipe to close the primary containment 9 Reconnect the mercury discharge flexible piping using the crescent wrench and XX wrench 10 Reattach rectangular pattern of cap screws connecting new nozzle flange and primary mercury containment tube assembly 11 Connect secondary containment tube to primary mercury tube assembly with two cap screws 12 Reconnect pipe clamp where secondary containment bladder connects with secondary containment tube assembly 13 Attach stabilization rod at end of secondary containment tube assembly to primary mercury containment tube MERIT Installation ManualR2 XII 1 Opening Secondary Containment XIV Evacuating Secondary Containment Description This procedure outlines the process of removing mercury vapor from the secondary containment and must be successfully completed to access the secondary containment safely Equipment Required Mercury snorkel to remove Flat head screw driver for air VM 3000 mercury vapor duct clamp Jerome Procedure 1 Attach mercury snorkel to lower air filter port a Remove the air filter metal cap fro
28. s Roll up fiber bundles Relieve pressure from secondary beam windows and disconnect window pressure monitoring lines Disconnect secondary Hg vapor monitor and Scavenger tubing Note magnet disconnections are assumed to occur simultaneously 2 Install rollers a b Remove anchor bolts if installed Insert jacks under upstream brackets Use bottle jack under downstream end to raise baseplate high enough to insert jacks under downstream brackets Remove bottle jack Raise downstream end high enough to insert roller under pad ensuring roller is facing direction desired Raise upstream end high enough to remove magnet support bracket Insert rollers under upstream pads ensuring correct direction Relieve pressure on jacks and slowly lower baseplate onto rollers ensuring rollers are centered in recesses under baseplate Raise all leveling screws prior to movement MERIT Installation ManualR2 IV 1 Experiment Removal 3 Transfer baseplate out of beamline a b c g h i Place liner material in area where equipment is to be moved Remove berms from under liner material in beamline Use turtle to tow system or attach ratchet straps to wall and pull system out of beamline as far as necessary to provide room for reinstalling beamline equipment Walking access all around MERIT equipment will be required Use jacks to raise baseplate off of rollers and remove rollers Manually adjust corner leveling
29. screws so that feet will touch floor before the jacks bottom out Slowly release pressure from jacks to lower baseplate to floor Ensure baseplate is level and remove jacks Place all six leveling screws are in contact with floor Place berms under liner material 4 Reconnect monitoring equipment a Reattach Hg vapor monitor to secondary containment MERIT Installation ManualR2 IV 2 Target System Disassembly V Target System Disassembly Description This procedure outlines the steps required to remove the Hg target system from the magnet This process is expected to occur several months after the equipment has been removed from the beamline Note Hg removal should be undertaken after the Hg system has been transferred to the transporter baseplate This will allow the target snout to be manually lifted so the maximum amount of fluid can be drained from the corrugated return hose Equipment Required 14 drive ratchet Hex drivers 1 1 8 1 1 4 1 5 8 sockets Jacks amp support stands Bottle jack Adjustable wrench Procedure 1 Position baseplates a Personnel and equipment access around the baseplate is required for this process If the baseplate needs to be moved follow other procedures to move it into the desired location b Common baseplate should be leveled at a height of between 26 5 27 0 cm above the floor This will allow the Hilman rollers to be easily inserted under the transporter basep
30. sump tank and primary containment piping for leaks c Use scale to weigh filled flask Record weight amp flask number Place flask on table in flask holder d Carefully open Hg flask insert straw near bottom edge of flask and cover opening with gauze MERIT Installation ManualR2 VII 2 Hg Fill e Insert tubing into pump rollers Turn on pump to level 4 to initiate fluid transfer then reduce speed to 3 Observe fluid entering sump tank Monitor tubing for any potential leak points Listen for pump to start pulling air through tubing as flask is emptied Stop pump g Remove straw from flask using gauze to wipe as straw is removed Ensure extracted straw does not drip h Replace Teflon tape on flask plug and reinstall plug i Weigh empty flask and record weight flask number j Repeat sequence for each flask 9 Elevate straw above QDI then verify tubing is empty after last flask Remove tubing from pump and QDI holding gauze under QD1 during extraction process Cap straw and place entire tubing assembly into storage 10 Perform visual inspection of secondary containment amp primary piping for leaks 11 Inspect photo tray and Hg fill equipment surfaces looking for liquid Hg Clean as necessary If no Hg found remove all equipment and store Table VII 2 Hg Measured Weights Hg Flask Number Filled Weight lbs Empty Weight Ibs 219 00 N om JA jo v J M
31. the gap between the transporter and common MERIT Installation ManualR2 II 1 Target System Installation baseplate and are required to prevent the transporter from tipping as the front wheels of the cart approach the edge of the transporter 4 Target snout insertion a g h Use the turnbuckles on the secondary box to approximately align the target snout with the magnet bore Remove C clamp from rail Slowly roll Hg system towards magnet and adjust turnbuckles as needed Note that if magnet is not on the common baseplate as the cart wheels transfer from one rail to the other baseplate tipping can occur Once the snout support brace reaches the magnet stop Hg system and install C clamp on rail Remove snout support and place pipe stand under snout Reinstall support brace bolts in their threaded holes Remove C clamp and continue rolling Hg system and pipe stand towards magnet As the snout is more fully inserted into the magnet bore the pipe stand can be removed Continue rolling until cart contact upstream anchor bolt Place C clamp behind cart wheel Perform final precision insertion by adjusting upstream anchor bolt Install downstream anchor bolt and lock cart in place Remove C clamp 5 Tilt amp elevate common baseplate In these steps directional references are made while facing from the downstream end to the upstream end a b Attach baseplate jacking brackets using hex driver and ratchet Torque bolts
32. ualR2 XV 2 Opening Secondary Containment d Gently lift right hand side of the lid as viewed looking towards the beam and stand lid vertically on flange Prying may be required to unseat lid from gaskets e Disconnect flexible tubing from underside of lid and plug or clamp tubing to prevent escape of Hg vapors f Remove lid from enclosure box MERIT Installation ManualR2 XV 3
Download Pdf Manuals