Home

10640 Discharge point / Operating Instructions

image

Contents

1. H L di Co AG Tel 41 44843 30 50 Postfach Fax 41 44 843 30 90 Moos ckerstrasse 86 home www hlag ch CH 8105 Regensdorf e mail sales hlag ch GAS UND ENERGIESYSTEME 10640 Discharge point Operating Instructions S o Construction Discharge point pressure regulating unit with inlet shut off valve10 pressure regulator 20 and manometer 30 for outlet pressure Max supply pressure Pimax 40bar l Start up of discharge point 1 Close shut off valve 10 at 9 o clock position Connect user with suitable connections for corresponding gas and pressure range 2 Relieve regulator by turning regulator setting knob 20 in counter clockwise direction 3 Slowly open shut off valve to 12 o clock position Pressure sets in on regulator 4 Adjust initial pressure P2 to required value by turning pressure regulating knob 20 in clockwise direction Pressure is indicated on the manometer 30 5 Check that the system is leak tight all the way to the user ll Short term shut off of discharge point Close shut off valve 10 by turning in counter clockwise direction to 9 o clock position lll Shut down of discharge point 1 Close shut off valve 10 by turning in counter clockwise direction to 9 o clock position 2 Let off initial pressure through user until indicator of manometer 30 stands at 0 3 Relieve pressure regulator by turning setting knob 20 in counter clockwise direction as
2. far as it will go IV Safety Observe general guidelines for handling gases Protect discharge point from mechanical or chemical damage Never use oils or greases Repairs must be made only with original parts by the manufacturer 04 07 Hj e10640 Discharge point Operating Instructions Seite 1 1

Download Pdf Manuals

image

Related Search

Related Contents

Ultrasone HFI-15G  NOTAS TÉCNICAS: INSTALACIÓN  Symantec Client Security  Manuel de recherche  

Copyright © All rights reserved.
Failed to retrieve file