        SC-1000 High Temperature Capacitance Sensor Installation and
         Contents
1.   Remove the Electrical Junction Boxes from the end of the sensor  This will  1 4 Figure Sheet 1 803 04 28 2000    expose the Spark Plug and the Shield Tube mounting flange       Shield Tube  Mounting Flange  Electrical A and Hex Head  Junction Box   Screws  R d A  emove n   i   d              Spark Plug    40 40    EIA a a    Pr  FEY IP       Figure 1 8    4  Loosen the Retaining Nut on the Plate Connection Spring and Threaded Rod  on all three Plates     Retaining Nut    Ceramic  Insulators    Transmitter or  Receiver Plate  Plate Connection  Spring Assembly       Figure 1 9    5  Remove the Threaded Rod from the Plate Connection Spring by twisting the  Spark Plug in the CCW direction   Figure Sheet 1 803 04 28 2000 1 5     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    Shield Tube and  Hex Bolts    Twist the Spark  Plug CCW to  remove the  Threaded Rod       Figure 1 10    6  Remove the Hex bolts from the Shielded Tube and remove the entire Shielded  Tube with the Spark Plug and Threaded Rod    7  Each of the Center Support Plates has two M10 bolts which hold the center  plates onto a slotted flange at the end of the each plate assembly  Remove the  Fixed Side Housing by removing the M10 bolts from the Center Support Plate     M10 bolt and  Nut       Figure 1 11    8  Lift the Center Support Plates off of the Fixed Side Housing and remove the  Expansion Side Housing Support Tubes     1 6 Figure Sheet 1 803 04 28 2000    ii   Slotted Flange       Mount  Lift this Center  
2.  the Spacer  Plate  Remove the 4 hex bolts holding the spacer plate and then remove the  spacer plate     Upper Expansion    Bearing Cups Spacer Plate    Lower Expansion  Bearing Cups  Expansion Housing       Figure 1 5    7  Locate the Upper and Lower ball bearing cups which support the sensor during  heat expansion  Remove the 3 bolts from each bearing cup and then remove  the bearing cups completely  Note the bearing cups are top and bottom  specific and should not be mixed    8  Remove the expansion housing mounting bolts and slide the entire expansion  housing off of the support tubes     Figure Sheet 1 803 04 28 2000 1 3     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR       Support Tube    Lower Expansion  Bearing Cup    Expansion Housing    Figure 1 6    9  After the expansion housing is removed from the sensor support tubes   temporarily replace the spacer plate  This will keep the two support tubes at  the proper spacing until the sensor is removed from the furnace    10  Remove the mounting bolts from the Fixed side of the sensor and slide the  entire Fixed side of the sensor out of the furnace     Removing the old SC 1000 Sensor Center Support Plates     1  Set the old SC 1000 sensor horizontally on a flat surface    2  Remove the all three BNC Receptacles from inside the Electrical Junction  Boxes  Note that the Receiver BNC Receptacle is different from the  Transmitter BNC Receptacles and should be kept separate     BNC Receptacle  Removed       Figure 1 7    3
3. ENSOR    Figure Sheet 1 803 04 28 2000    1 REPLACING THE SC 1000 CENTER SUPPORT PLATES        Removing the SC 1000 Sensor from the Furnace     WARNING   The SC 1000 Sensor contains several Ceramic parts that serve as electrical  insulators  Do not handle the Ceramic parts without using cotton protective  gloves  Any Oil or Dirt on the Ceramic parts can cause the electrical isolation to  breakdown in the extreme heat of the furnace  If the Ceramic parts have been  contaminated  use standard Rubbing Alcohol to clean the insulators before  installing the sensor     NOTE  All dimensions and fastening hardware are metric     The following steps will prepare the sensor for removal from the furnace     1  Turn off power to the SC 1000 Sensor   2  Locate the electrical junction boxes on the Fixed side of the sensor     Electrical    i Junction Box  Electrical    Junction Box    Shielded  Conduit       Figure 1 1    3  Open each Electrical Junction Box and disconnect the BNC connectors     Figure Sheet 1 803 04 28 2000 1 1     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    BNC Connector  for Receiver       Figure 1 2    BNC Connector  for Transmitter    BNC Connector  for Transmitter       Figure 1 3    4  Disconnect the Shielded Flexible Conduit from both Electrical Junction Boxes     5  Remove the Cover Plate on the Expansion side of the sensor     1 2 Figure Sheet 1 803 04 28 2000    Cover Plate       Figure 1 4    6  Located behind the Cover Plate are the Expansion Bearings and
4. Fife Corporation   P O  Box 26508  Oklahoma City  OK 73126  U S A   Phone  405 755 1600   Fax  405 755 8425  www fife com   E mail  fife fife com       SC 1000 High Temperature Capacitance Sensor  Installation and Maintenance Manual    A COMPANY OF      M  AXCESS    Figure Sheet 1 803 04 28 2000    CI INTERNATIONAL  Copyright    2000 Fife Corporation All rights reserved     Figure Sheet 1 803 04 28 2000    NOTICE    This Operating Manual describes the replacement of the center plate of the SC 1000 sensor  It has priority over the  general Operating Manual for the SC 1000   Copyright     All rights reserved  This custom Operating Manual may not be reproduced  by whatever means  in whole or in part   without the prior written consent of the FIFE Corporation     The information given in this custom Operating Manual may be subject to change without notice    We took the greatest care in compiling this Operating Manual  the possibility of error cannot be entirely excluded   however  The FIFE Corporation can accept no liability for incorrect information given  or the consequences arising  therefrom     Copyright    1996 FIFE Corporation  P O  Box 26508  Oklahoma City  OK 73126  U S A     FIFE GmbH  Postfach 1240  D 65779 Kelkheim Ts   Germany    Figure Sheet 1 803 04 28 2000     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    Figure Sheet 1 803 04 28 2000    REPLACING THE SC 1000 CENTER SUPPORT PLATES    Figure Sheet 1 803    04 28 2000     7 SC 1000 HIGH TEMPERATURE CAPACITANCE S
5. Plate off the side  housings Slotted Flange  Mount    Figure 1 12    9  Now the Expansion Housings are ready for the replacement Center Support  Plates        Installing the new SC 1000 Sensor Center Support Plates     1  Set the SC 1000 Fixed Side Housing on a level surface with the Center Support  Mounting tabs pointing up     Mounting Tab    Transmitter  Side    Receiver  Side       Figure 1 13    2  Install the new Transmitter and Receiver Center Support mounting slots onto  the tabs     Figure Sheet 1 803 04 28 2000 1 7     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR       Slotted Flange  Mounting  Figure 1 14  3  Install the M10 Bolt and Nut to secure the assembly   M10 Bolt and  Nut       Figure 1 15    4  Perform the same steps to attach the Expansion Side Support Tubes to the  Center Support Plates     1 8 Figure Sheet 1 803 04 28 2000    Center Support  Mounting Flange  Expansion Side    Transmitter Side Support Tube    Center Support  Assembly                                                                                                                  e    amp   i p SE 2    HE F       Receiver Side                                                                   Fixed Center Support Se  Side Assembly  Housin   e Figure 1 16    5  Install the three new Shield Tube assemblies into the Fixed Side Housing   Slide each assembly back into the sensor  Start threading the Hex head  mounting bolts back into the Fixed Housing but do not tighten them yet     6  Ateach o
6. ace opening  Use a  sealant around the mounting flange of the furnace opening and loosely bolt the  Fixed Side Housing of the sensor in place     Spacer    Furnace Wall    Plate          i                                                                                                                                         TOP VIEW    Figure 1 24    2  Remove the Spacer Plate from sensor     3  Install the Expansion Side Housing of the sensor in place  Use a sealant  around the mounting flange of the furnace opening and loosely bolt the  Expansion Side Housing of the sensor in place     Figure Sheet 1 803 04 28 2000 1 13     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    Expansion Side  Housing    EA ES    0                                                                                                                                                                                                        TOP VIEW    Figure 1 25    4  Install the Upper and Lower Bearing Cups and do not completely tighten the  bearing cup bolts  The ball bearings that are located in each slot should be  pushed towards the sensor  This allows the bearings to move outward when  the sensor begins to expand     Expansion Side  Housing   Upper and  Lower Bearing  Cups    Position Ball  Bearing towards  the furnace       SIDE VIEW  Figure 1 26    5  Install the Spacer Plate and tighten it completely     6  Finish tightening the Upper and Lower Bearing Cups so that they support the  Expansion Side Su
7. e Sheet 1 803 04 28 2000    The SC 1000 Sensor comes fully assembled out of the crate  The following steps will prepare the sensor  for installation in the furnace     WARNING      Be careful when lifting or handling the SC 1000  The SC 1000 Sensor contains  several Ceramic parts which are fragile as glass  To avoid damage  do not impact    the sensor     1  Remove the SC 1000 sensor from the packing crate   2  Remove the Cover Plate  Figure 1 20   on the Expansion side of the sensor     Cover Plate       Figure 1 20    3  Located behind the Cover Plate are the Expansion Bearings and the Spacer  Plate   Figure 1 21   Remove the 4 bolts holding the spacer plate and then  remove the spacer plate     Upper Expansion    Bearing Cups Spacer Plate    Lower Expansion ff    Bearing Cups  Expansion Housing       Figure 1 21    4  Locate the Upper and Lower ball bearing cups which support the sensor during  heat expansion   Figure 1 22   Remove the 3 bolts from each bearing cup and  then remove the bearing cups completely  After the bearing cups are removed   slide the entire expansion housing off of the support tubes     Figure Sheet 1 803 04 28 2000 1 11    SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    FIF E     Support Tube    Lower Expansion  Bearing Cup    Expansion Housing       Figure 1 22    5  After the expansion housing is removed from the sensor support tubes   temporarily replace the spacer plate   Figure 1 21   This will keep the two  support tubes at the proper spacing u
8. f the three Plate Connection Spring  reconnect the threaded rod and  tighten the retaining nut  Approximately Vs    of thread should be inside the Plate  Connection Spring Nut  If the Ceramic insulators are be compressed  readjust  the retaining nut until the compression is removed     Retaining Nut    Ceramic    Transmitter or Insulators    Receiver Plate    Plate Connection  Spring Assembly       Figure 1 17    7  Tighten the Shield Tube Hex Head mounting bolts for all three assemblies     Figure Sheet 1 803 04 28 2000 1 9    SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR    Tighten the Hex  Bolts       Figure 1 18    8  Reinstall the old Electrical Junction Boxes over the spark plug assemblies  And  then install the BNC Connectors onto each Spark Plug  Note that the receiver  BNC receptacle is different than the two transmitter BNC connectors  the     receiver BNC has a plastic ring that the transmitter does not have         Transmitter  Receiver BNC BNC  White Plastic  Ring    Figure 1 19    9  Atthis point it is important to test the isolation of the Transmitter and Receiver  Plates using a Ohm meter  Verify that there is infinite isolation between the  Transmitter Receiver plates and the support structures  Also verify that the  center pin of each BNC plug conducts at approximately zero ohms to it   s  respective plate  If there are any problems  fix them now before the sensor is  installed into the furnace        Preparing the SC 1000 Sensor for Installation    1 10 Figur
9. ntil the sensor is mounted in the furnace    6  Before beginning the installation of the sensor  verify that the sensor plates are  completely electrically isolated from the sensor housing using a Multimeter set  to read resistance  Ohms   To check the resistance  open both electrical  junction boxes which are mounted on the Fixed Housing   One shown in  Figure 1 23   Disconnect the BNC connectors  Probe the center pin and the  connector casing with the Multimeter on all three connector receptacles  The  resistance should be infinite  If it is not infinite  investigate the ceramics to  determine where the short circuit is located and repair the problem     Connector Casing  BNC Connector    Center Pin       Figure 1 23       Installing the SC 1000 Sensor in the Furnace    1 12 Figure Sheet 1 803 04 28 2000     WARNING     Be careful when lifting or handling the SC 1000  The SC 1000 Sensor contains  several Ceramic parts which are fragile as glass  To avoid damage  do not impact  the sensor     WARNING     The SC 1000 Sensor contains several Ceramic parts that serve as electrical  insulators  Do not handle the Ceramic parts without using cotton protective gloves   Any Oil or Dirt on the Ceramic parts can cause the electrical isolation to breakdown  in the extreme heat of the furnace  If the Ceramic parts have been contaminated   use standard Rubbing Alcohol to clean the insulators before installing the sensor     1  Lift the SC 1000 sensor into place and slide it into the furn
10. pport Tubes loosely     1 14 Figure Sheet 1 803 04 28 2000    Upper Expansion    Bearing Cups Spacer Plate    Lower Expansion  Bearing Cups  Expansion Housing       Figure 1 27    7  Press on the Teflon sealant around the Cover Plate mounting flange   8  Install the Cover Plate and tighten the Cover Plate bolts     Cover Plate       Figure 1 28    9  Finish tightening the Fixed Side Housing and Expansion Side Housing  mounting bolts     10  Install the Shielded Conduits into both of the Electrical Junction Boxes     Figure Sheet 1 803 04 28 2000 1 15     7 SC 1000 HIGH TEMPERATURE CAPACITANCE SENSOR       Electrical  Junction Box    Electrical  Junction Box    Shielded  Conduit    Figure 1 29    11  Reconnect the BNC Connectors to the BNC Receptacles     12  Restore Power to the Sensor   13  Calibrate the SDE 30 circuit board using Figure Sheet 2 217     1 16 Figure Sheet 1 803 04 28 2000    
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Program Interfaces - Fujitsu manual server  Manual do Utilizador da Câmara  Bedienungsanleitung Sony  TB5403PRO -‐ MANUALE DI ISTRUZIONI  Bus Differential Function Settings  Télécharger l`article de Claude La Charité  ExitCare User Manual Version 7.8  GUISSéNY  Samsung SGH-C520 Инструкция по использованию  conservez ces instructions    Copyright © All rights reserved. 