Home

User Manual TNFCD/TNFAD Flashing Beacons B 23-TNF

image

Contents

1. User Manual BARTEC TECHNOR TNFCD TNFAD Flashing Beacons Date Rev Checked by Approved by Page Document no 27 09 2011 B F S Gr 1 of 1 23 TNF 5 Marking An Ex certification label is attached to the enclosure Ref examples in Fig 1 Handling Due to the weight and nature of the enclosures precautions have to be taken to avoid damages to the equipment and the individual The flamepaths on the Exd enclosure must be securely protected to avoid damage Installation Dismantling When mounting the enclosure ensure that the mounting support is able to take the full weight of the enclosure If any twisting or bending of the enclosed bracket is likely use washers or packing plates as necessary between the mounting support and the bracket before the screws or nuts are tightened The beacons will be fixed to the bracket by using 2 ea M6 screws When connecting cables ensure the incoming cables wires are isolated from power sources Ensure that the glands used are securely tighten and that they are approved according to ATEX Termination of cable to be done according to termination label located inside the bottom lid ref fig 2 Therafter connect the internal alt external earth connections Tighten the compression nut on the gland s used All other openings to be blinded using an Ex ATEX approved blind plug Before the power source is connected ensure that the voltage of the source is the same as indicated on the label on the b
2. atent 23 TNF 5_B User Manual TNFCD TNFAD
3. eacon When removing the enclosure the same precautions apply as those observed when mounting the enclosure Inspection Maintenance TNFCD TNFAD Flashing beacons are made of corrosion resistant materials We recommend that maintenance is performed in accordance with the IEC 60079 17 60079 1 standards If the flashing beacon needs to be opened proceed as follow 1 Disconnect the power source 2 Unscrew the external fixing screw on the Exd part 3 Clean and inspect the theads flamepath on the bottom part and inside the tube 4 Inspect the O ring on the bottom part We recommend that this O ring is replaced upon every opening of the beacon NOTE new O ring to be supplied by BARTEC TECHNOR Before assembly the O ring and threads to be protected with copper grease or other approved greases 6 Connect the tube on to the bottom part and assure that the unbrako fixing screw is firmly tightened If any damages are found the enclosure should be put out of service and the manufacturer contacted Fig 1 Fig 2 BARTEC gash le TNFCD STAVANGER NORWAY C E MOG 126d CC T4 TERMINATION SPEAKER OUT 46 2 surety v BARTEC Hale TNFAD STAVANGER NORWAY CE C470 gt 2G Exd Ic T4 The passing on and copying of this document and the use or communication of it s contents are forbidden without express authority Offenders are liable to payment of damages All rights are reserved in the event of the registration of a p

Download Pdf Manuals

image

Related Search

Related Contents

Nordyne RC 92+ Furnace User Manual      N8180-41A マルチサーバ接続 BOX 取扱説明書  AIR Transfuser User Guide  日本語 - Kodak  LES CONGÉS PARENTAUX    SPEED VEE 800  Leica RX1200 User Manual - Pdfstream.manualsonline.com  

Copyright © All rights reserved.
Failed to retrieve file