User Manual DE-ICING BOX Accessory for SOLPLUS
Contents
1. Unit none Default setting 0 Password level Customer This parameter enables the de icing function to be started To enable set to 1 7 6 Explanation of the de icing function settings Duration of heating period The typical heating thawing period ranges from around 15 minutes at mild temperatures with wet sticky snow or when the pitch of the roof is steep and the snow slides off quickly to 2 hours when temperatures are very low the pitch of the roof relatively flat or the snow coverage thick When using the function for the first time please begin with a heating period of 60 minutes and watch whether and how quickly the heating thawing process progresses Heating current nominal output These two parameters define the actual performance level at which the de icing function is started Example SOLPLUS 50 inverter Nominal generator output 5500 W Target heating thawing is to be conducted at 75 of this nominal output nominal output of 4100 W Configuration required Parameter 286 Heating current factor Setting 75 Parameter 272 Nominal DC generator output Setting 5500 Maximum voltage Parameter 287 should be set to a value approx 10 higher than the open circuit voltage of your PV generator Note This means the DC voltage supplied by the inverter in de icing mode will not exceed the value set here If during de icing you find that the level of heating you want is not being achieved please check this parameter
2. ICING BOX Manual A1 EN 2014 04 29 doc or U energy 7 13 ONIC TL Mounting the DE ICING BOX 5 Mounting the DE ICING BOX All connecting cables between the DE ICING BOX and the SOLPLUS inverter are approx 2 m long Mounting location e Dry location e Close to the inverter e Make sure that circulation of air around the device is not impeded A minimum clearance of 20 cm in all directions from top bottom and sides must be kept from the inverter 6 Electrical Connection of the DE ICING BOX 6 1 Setup of the data connection Use the data cable supplied with the DE ICING BOX to make a connection between the SOLPLUS inverter plug connection X4 25 pin Sub D socket on left hand side and the DE ICING BOX plug connection X1 9 pin Sub D connector 6 2 Connecting the DC connections between the DE ICING BOX and inverter Preliminary remarks If there is no DC string available on the inverter for connecting the DE ICING BOX you will have to use standard commercially available Y joints available for every type of DC plug connector Note If you cut and terminate the cable yourself please take great care to ensure the polarity of the strands is correct The positive connection of the DE ICING BOX is at the top right of the box above the 9 pin Sub D socket see Fig 2 Connect the positive connection of the DE ICING BOX to the positive connection of the inverter Likewise connect the negative connection of the
3. and increase the setting 8 Option Connecting Another Source of Mains Current The inverter gets the energy required for the de icing function from the feed point from the PV modules For this reason you must make sure that you install a 2 way meter at the feed point if you intend installing a DE ICING BOX The inverter can however also be supplied with power from another source of mains current during de icing The functions of relay 1 selector switch and relay 2 circuit closer control connection of this other source via the contacts of the 8 pin terminal strip X5 Please observe the information and instructions in the User Manual on connecting this power source and contact loading SP25 55_ DE ICING BOX_Manual_A1_EN_ 2014 04 29 doc S B LUJ energy 10 13 IRONIC Starting the De icing Function 8 1 Configuring option relay 1 Parameter 46 Function of relay 1 Menu Options Unit Default setting 1 Password level Customer Set to 11 relay 1 is tripped during de icing mode 8 2 Configuring option relay 2 Parameter 47 Function of relay 2 Menu Options Unit Default setting 0 Password level Customer Set to 11 relay 2 is tripped during de icing mode 9 Starting the De icing Function Preliminary remarks The de icing function can be started activated at any time of the day day or night However when operating the DE ICING BOX during the day you must take into account the fact that the inverter n
4. rise The inverter will now heat your PV generator for the length of heating period you have set and switch itself off again automatically at the end of this period 9 3 Stopping the de icing function To stop deactivate the de icing function manually press and hold the Start button for 3 seconds SP25 55_ DE ICING BOX_Manual_A1_EN_ 2014 04 29 doc S B LUJ energy 11 13 IRONIC Monitoring and Logging the Results 9 4 Switching off the DE ICING BOX an the 1 0 button The 1 0 button main switch is only required for switching on the DE ICING BOX to enable you to start the de icing function or to stop the function manually 10 Monitoring and Logging the Results The de icing function can only properly fulfil its purpose if its use is carefully thought through and planned When using the de icing function for the first time make sure that the level of heating you want is achieved You can use the display on the inverter to monitor this If you experience problems with this function check the Heating period time Heating current factor and Maximum heating voltage parameters parameters 285 287 in the inverter s Options menu see chapter 5 Our recommendation as regards usage We recommend that you use the de icing function only when a spell of good weather is expected that will enable your PV system to generate electricity and feed it into the grid There is no point in using the de icing function every day possi
5. DE ICING BOX to the negative connection of the inverter 6 3 Connecting the DE ICING BOX to the power supply Now connect the DE ICING BOX to a power socket with earthing contact using the IEC power cable supplied with the device Finish off by running all cables with care Do not leave any loose cables hanging down 7 Setting the De icing Functions at the Inverter Note All functions can be accessed and set with the aid of the final customer password password level 1 Button combination A gt V A gt V and complete by pressing OK Further information with regard to controlling the inverter display can be found in the User Manual for SOLPLUS inverters Requirements Inverter firmware Version 1 2 25 or higher If it is not installed carry out a firmware update You can show the firmware version by pressing any button on the display The firmware version will be displayed for a few seconds The firmware version can also be found under the main menu item Inverter All parameters required for operating the DE ICING BOX can be found under the main menu item Options password must be entered first The following parameters must be set to enable the de icing function to be activated started at all SP25 55 DE ICING BOX Manual A1 EN 2014 04 29 doc COLL energy 8 18 IRONIC Setting the De icing Functions at the Inverter 7 1 Duration of heating period Parameter 285 Heating period time Menu Options Unit Min
6. How it works Recommendation Roof pitch To facilitate effective functioning of the DE ICING BOX we recommend a roof pitch of 25 degrees or more Roof area Prerequisite for use of the DE ICING BOX is that the area below the solar modules is free of obstructions so that the snow can slide off unhindered Safety Owing to the fact that the DE ICING BOX when in use leads to snow sliding off the PV modules and the roof safety is a top priority in the area below the edge of the roof We recommend you fence off the danger area in Some manner Always switch the DE ICING BOX off when it is not required Owing to the way it operates a DE ICING BOX that is switched on consumes up to 50 W of power depending on your PV generator if the inverter has not yet been switched to de icing mode Its typical power consumption is less than 10 W and under 0 5 W when switched off The de icing function can only properly fulfil its purpose if its use is carefully thought through and planned For this reason keep a log especially during the first winter period of when and how you use it and the results achieved see chapter 7 3 1 Safety information relating to the DE ICING BOX Please read the following safety information and instructions before you put the system into operation for the first time in order to avoid personal injuries and or property damage These instructions must be complied with at all times Do to attempt to install or put this devi
7. SOLU ersv IRONIC Solutronic Energy GmbH Kuferstrasse18 D 73257 Kongen Fon 49 0 70 24 9 61 28 0 Fax 49 0 24 9 61 28 50 www solutronic de User Manual DE ICING BOX Accessory for SOLPLUS Inverters SOL PIiUS Accessory for SOLPLUS Inverters RS 2014 04 Version A1 Subject to change without prior notice Contents 1 TEE OUCTON YIN VANS so spirsiecaistlac tars st berth em a al ni Ab EE 4 2 SVIMDOIS VISCO sarrar ce eE AEE EAA E E rE E en sakanedensienbaneshawisenuseusann EAE 4 3 FONI WORS aee E T A E AT 4 3 1 Safety information relating to the DE ICING BOX nnnnannnesnnnensnnnesrnnrnsnrnnsrnrnnsnrrnsnrrrnsnreennnnnn 5 4 DESIG Or Ihe TE AIC ING BOX ereitean aan susie niea nab dias sears es a e n a a ai 7 5 M unung ie DIE AIC ING BOX sre scaca cine ssotr inreda a E E EEEE E E 8 6 Electrical Connection of the DE ICING BOX cc ceccccccsccccessseecceeseeseeeeeceeuseesseaseeessageeessegeeeeseass 8 oT SEP OF Me Gala COMME CUO asia aacseescicactcecnesecas se sccena ses essed axe nsene duet abinnn tines a eee 8 6 2 Connecting the DC connections between the DE ICING BOX and inverter cccceeceeeees 8 6 3 Connecting the DE ICING BOX to the power supply ccecccceececceeeeceeeeeeeeeeseeeeeseeeeeeeeseees 8 T Setting the De icing Functions at the Inverter cc ccccccecceeceeeeeeeeeeeeeeeeeeesaeeeeeesaeeeeeseeeeeaeeeeeeas 8 7 1 Duration of heating Period ccccccseccccsssseecceeceec
8. bly even for hours at a time during a spell of bad weather You could well find that you consume more energy keeping the generator clear than the snow free generator is actually able to generate on the next snow free day It goes without saying that it is extremely difficult to make any sort of definitive statement with respect to the amount of energy used and the potential additional amount gained The following parameters are provided to allow you to monitor the energy consumption and thawing performance of the DE ICING BOX Parameter 227 DE ICING energy today Menu Options Unit kWh Resolution 0 001 kWh This parameter indicates the amount of energy consumed by the de icing function during the current day or night today il Note Parameter 8 Energy today which measures the amount of energy fed into the grid today and the value provided by the annual energy logger are not affected by the de icing function Parameter 229 DE ICING energy total Menu Options Unit kWh Resolution 1 kWh This parameter indicates the total amount of energy consumed by the de icing function since start up Parameter 12 Energy total which measures the total amount of energy fed into the grid is not affected by the de icing function SP25 55_DE ICING BOX_Manual_A1_EN_ 2014 04 29 doc S B LUJ energy 12 13 IRONIC Warranty Our tip During the first winter at least with the DE ICING BOX you should keep a precise log of t
9. ce into service until you have read through all the documentation supplied thoroughly Read through these safety instructions and all other user instructions and tips before you begin work with this device If you sell on hire out or pass on this device to someone else in some other way make sure that you give the new user these safety instructions too Intended use This device must be used only for the purpose described in this User Manual All safety regulations must be complied with All installation work must be carried out precisely as described in this manual No modification of any kind to or in this device or to its external wiring is permitted Any such modification could lead to serious safety problems and danger to life and limb A N Caution The surface of the device housing may be hot Risk of injury Very hot Do not touch High voltage due to incorrect connection Risk of fatal or bodily injury from electric shock Improper use of these devices non observance of the warnings given in this manual and improper tampering with the safety functions can lead to property damage personal injury electric shock and in extreme cases death SP25 55_DE ICING BOX Manual A1 EN 2014 04 29 doc COLL energy 5 3 IRONIC How it works General information Solutronic Energy shall accept no liability for damages resulting from non observance of the warnings given in this User Manual Read the operating maintenance and saf
10. cee ccc cceececceeescecceeeeeeceeeecseuseeeseuseeecsaeeecseaseessageeessageeessaaass 11 9 4 Switching off the DE ICING BOX an the 1 0 button ccc cecceeceeeeeeeeeeeeeesaeeeeesaeeeesaaaeees 12 10 Monitoring and Logging the Results cc cccccceeceeceeeeeeeeeeeeeeeeseeeeseeeeeseeeeseeeesseeessneeeseeeeseneeeas 12 E APPAR Y cetera a a dare plate slay mane EE E EE E E E E E EEE EA 13 SP25 55_DE ICING BOX Manual A1 EN 2014 04 29 doc COLL energy 3 3 IRONIC Introductory remarks 1 Introductory remarks The DE ICING BOX is an accessory specifically designed for the SOLPLUS 25 55 inverters manufactured by Solutronic Energy It is only suitable for use with these inverters This document is a supplement to the User Manual for SOLPLUS inverters Please read and observe the safety information and danger notices contained in that manual A complete version of the User Manual for the inverters can be found on the CD supplied with each inverter A printed version hardcopy of the complete Installation Instructions is supplied with each SOLPLUS inverter Please comply with all instructions and information of relevance to and essential when handling pieces of technical equipment 2 Symbols used Please read and observe the following safety instructions in this manual The danger classes describe the risks of non observance of the safety instructions The safety instructions describe the following danger classes per ANSI Cautio
11. ety instructions before you put the device into operation for the first time If you are not able to understand the language used in this documentation sufficiently please contact and inform the supplier of the situation Trouble free and safe operation of this device presumes proper professional and workmanlike transportation storage mounting and installation as well as careful operation and thorough maintenance Always deploy trained and qualified personnel to work with and on electrical equipment Only appropriately trained and qualified personnel is allowed to work on this device or in its vicinity Such personnel can be deemed appropriately qualified if they are adequately familiar with the mounting installation and operation of the product as well as with all warnings and precautionary measures as Stated in this User Manual The ambient conditions specified in the product documentation must be complied with Please read and observe the following danger notices contained in this manual SP25 55 DE ICING BOX Manual A1 EN 2014 04 29 doc COLL energy 518 IRONIC Design of the DE ICING BOX 4 Design of the DE ICING BOX DE ICING BOX front view Main switch 1 0 LED indicator for LED indicator for Start button for Power On de icing mode de icing mode DE ICING BOX rear view k KNN av N Power supply connection Data connection from DC connections with IEC plug DE ICING BOX 9 pin to inverter 25 pin SP25 55_DE
12. he circumstances conditions under which you use the de icing function and of the amounts of generator and grid sourced energy consumed If you have 2 or more PV generators and 2 or more inverters connected to your PV installation we recommend that you use the de icing function in conjunction with just one of the inverters at least during the learning phase This will enable you to use the inverter not used for de icing as a control To help you keep such a log we have prepared a table you can use More information can be found on our website If you would like even more detailed information and assistance please talk to our service team We and our dealers would be extremely interested in receiving meaningful firsthand reports from you our users 11 Warranty There are absolutely no technical reasons why PV modules should not be used in feedback mode because the load to which they are subjected is no different from that that arises during normal daytime operation when they feed into the grid Some manufacturers already permit heating thawing of their modules in this way without any restrictions Other manufacturers have not yet issued such consent because they have not yet got round to investigating this matter If you receive a negative response from the manufacturer of your modules please ask for the exact technical reasons If many cases manufacturers cite safety reasons for why they are not prepared to give their consent the real
13. n Caution denotes a warning that if not observed can result in personal injury Nutzliche Informationen und Hinweise fur den optimalen Betrieb des SOLPLUS Wechselrichters Warning denotes a warning that if not observed can result in death or serious injury 3 How it works The DE ICING box is suitable for all SOLPLUS 25 55 inverters which have been produced after the calendar week 20 in 2007 Inverters which have been produced before this date have to be updated by Solutronic The de icing function is only suitable for crystalline PV modules whose open circuit voltage is less than 750 V at 10 C because otherwise the full heating performance will not be obtained The reason for this is that the maximum possible DC heating voltage is 835 V and the PV modules require a higher voltage in feedback mode SOLPLUS 25 35 50 and 55 inverters from Solutronic facilitate a de icing function in feedback mode that makes it possible to heat the modules This enables snow that falls or ice that forms on the modules to be thawed and to slide off Whether this results in complete de icing of the modules depends not least on the design e g pitch of the roof how the modules are installed the ambient temperature etc It is expected that the modules can be heated to about 10 C DE ICING operation may only be started manually and not automated SP25 55 DE ICING BOX_Manual_A1_EN 2014 04 29 doc S B LUJ energy 4 13 IRONIC
14. o longer feeds electricity into the grid while the de icing function is activated This means that the DE ICING BOX has to be started differently depending on whether it is to operate during the day or night Activation starting and deactivation of the de icing function are both indicated by a short beep DE ICING operation may only be started manually and not automated 9 1 Switching on the DE ICING BOX an the 1 0 button main switch The DE ICING BOX is only required to start or stop manual operation of the DE ICING operation It is therefore useful to take the I O button main switch only to start or stop manually the DE ICING BOX operation Press and hold the 1 0 button main switch for 1 second and then wait 10 seconds until the Power LED lights up The Power LED must now be on In the case of night time use the inverter s display switches on a few seconds after you switch on the DE ICING BOX The display first shows the Start menu then the basic start screen During grid feed operation or if UDC is gt 330 V there is no change in what is shown on the display 9 2 Starting the de icing function At daytime 10 15 seconds At night time 3 6 seconds Starting DE ICING appears on the inverter s display The DE ICING LED on the DE ICING BOX comes on and you can hear a short beep from the inverter Shortly afterwards the display switches to DE ICING the grid relays close and the DC voltage and power slowly
15. reason however being that they have so far never had cause to think about de icing modules In such cases draw the manufacturer s attention to the existing standard already in force that stipulates the testing of modules in feedback mode as a binding criterion for certification H The de icing function can not be used with thin film modules due to the inadequate amount of heat that would be generated and the large surface area of the modules lower efficiency Furthermore the de icing function can not be used in conjunction with series diodes SOLPLUS 25 SOLPLUS 35 SOLPLUS 50 and SOLPLUS 55 inverters from Solutronic facilitate a de icing function in feedback mode that makes it possible to heat the modules Solutronic shall accept no liability for consequential damage to cables wiring buildings PV modules or their mounting frames that arises from proper operation or non operation of the de icing function If you need help do not hesitate to contact us Solutronic Energy GmbH Kuferstrasse 18 D 73257 K ngen Tel 07024 96128 0 Fax 07024 96128 50 info solutronic de www solutronic de SP25 55_DE ICING BOX_Manual_A1_EN_ 2014 04 29 doc S B LUJ energy 13 13 IRONIC
16. seneecceeeeecseaseecseaseeessageeecsauseecsuseesssageeessensenes 9 7 2 Setting the heating current cccccceccccseseeecceseceecsaeeeceeeeecsaueeeseuseeessadeeecsaeeesseeeessaseeessagsenes 9 7 3 Nominal output of your PV generator ccccccceeeceeceeceeeaeeeeeeseeeeeeeeeeeeseeeeeeseeeeeesseueeessesensaaeeees 9 7 4 Maximum DC heating Voltage ccccccccccseeceeceeeeeeeeeeeeeeseeeeesseeeeeeseeseeeseeeeesaeeeeeesseeeeesaeeesnaeeees 9 7 5 Heating CONFIQUIATION ccccccecseeeeeceeeeeeeeeeeeeeeaeeeeeeseeeeeeseaeeesaaeeeesaeeeeeesaeeeeesaaueeessaeeeeaeeeeesaess 10 7 6 Explanation of the de icing function settings cecccccseeeeeeeeeeeeeceeeeeesaeeeeeseeeeeesaaeeesseeeeeesaees 10 8 Option Connecting Another Source of Mains Current ccccccccceseeeeeeeeeeeeseeeeeeaeeeesaeeeeeesaees 10 8 1 Configuring option relay 1 cece ecceeceeceeeeeeeeeeeeeeeaeeeeeeaaeeeeeseeeeeeseeeeeeseeeeeeseaseeessaeeesaaeeeeesaaees 11 5 2 Configuring opton relay Zseni nnnnn nanan E aA Ei RANEE ERARA 11 9 Starting the De icing Function sisccencensnssswenresnoneracnenduacaanrusannaniauiaasataweniasuunedd ia euuadesananndsjeniadneniesatends 11 9 1 Switching on the DE ICING BOX an the 1 0 button main SWitCh ccceeccecseeeeeeneeeeeeeaees 11 9 2 Starting the de icing PUNCO sccsseecnccenuecseneiesendernnaasepinnadcnimdudsantionsanaesiaudinnsiandedebinmeeioumadadastadesens 11 9 3 Stopping the de icing function
17. utes Default setting 60 minutes Password level Customer Leave the factory setting unchanged for the first time you use the heating thawing function 7 2 Setting the heating current Parameter 286 Heating current factor Menu Options Unit Yo Default setting 80 Password level Customer Leave the factory setting unchanged for the first time you use the heating thawing function 7 3 Nominal output of your PV generator Parameter 272 Nominal DC generator output Menu Monitoring Unit W Default setting OW Password level Customer You have to enter the nominal output of the PV generator Even if incorrectly programmed the maximum output of the inverter used is never exceeded the output of SOLPLUS 25 inverters in de icing mode is limited to 2500 W that of SOLPLUS 35 inverters to 3500 W SOLPLUS 50 to 5000 W and SOLPLUS 55 inverters to 5500 W Despite this it is important that the value is correct because it is used to calculate the wattage set under parameter 286 7 4 Maximum DC heating voltage Parameter 287 Maximum heating voltage Menu Options Unit V Default setting 600 V Password level Customer Setting Open circuit voltage at 10 C of connected modules 10 of this value SP25 55 DE ICING BOX Manual A1 EN 2014 04 29 doc COLL energy 918 IRONIC Option Connecting Another Source of Mains Current 7 5 Heating configuration Parameter 288 Heating configuration Menu Options