Home

User Manual - Badger Meter, Inc.

image

Contents

1. 3 N C 4 N C 5 N C Active Sensor 0 5V DC Pickup Option 8 Socket End 1 Red 10 30V DC 2 Black 0 5V DC Output 3 White Ground 3 Pins 1 10 30V DC 2 0 5V DC Output 3 Ground 4 N C 5 N C Figure 5 Wiring for active magnetic pickups Page 8 TRB UM 00288 EN 02 June 2015 Operational Startup OPERATIONAL STARTUP Follow this procedure to start the meter MAKE SURE THAT FLUID FLOW HAS BEEN SHUT OFF AND PRESSURE IN THE LINE RELEASED BEFORE ATTEMPTING TO INSTALL THE METER IN AN EXISTING SYSTEM After installing the meter close the isolation valves and open the bypass valve Flow liquid through the bypass valve for sufficient time to eliminate any air or gas in the flow line Open the upstream isolating valve slowly to eliminate hydraulic shock while charging the meter with the liquid Open the valve to full open HIGH VELOCITY AIR OR GAS MAY DAMAGE THE INTERNAL COMPONENTS OF THE METER 5 Open the downstream isolating valve so the meter can operate properly 6 Close the bypass valve to the fully closed position NR 7 Adjust the downstream valve to provide the required flow rate through the meter NOTE The downstream valve may be used as a control valve METER REPAIR AND CLEANING Repair Kits Each FloClean repair kit is factory calibrated for accuracy throughout the entire flow range Each kit is complete and includes a new K factor which is the calibrated number of pulses generat
2. the process If the rotor support is jammed in the body use a pair of pliers or vice grips to break it free Hold the rotor support over a suitable container and rotate it through 180 The thrust ball will drop out Do not lose the ball Remove the rotor assembly Remove the second retaining ring from the opposite side of the meter Repeat steps 3 and 4 for the remaining rotor support Identify parts and flow direction to match with original meter body Clean and or sanitize parts to meet appropriate sanitary standards gt 0poIaDg Y Meter Body Jam Nut Sleeve Bearing Magnetic Pickup Rotor Support Mlle UU Ii Thrust Ball Rotor Assembly Release Jam Nut and Remove Magnetic Pickup Remove Rotor Supports Do Not Rotate During Extraction Y Remove Retaining Rings Remove Rotor m Stnd 28 04 Auth 956 FLOW Thrust Ball Extraction Hole 4 aif a Rotate Rotor Support Clean and Inspect Component Parts E Through 180 To Per 3 A Sanitary Standards Reverse hl Extract Thrust Ball Dismantling Procedure to Reassemble Figure 6 Positions of repair kit components Page 10 TRB UM 00288 EN 02 June 2015 B16c Series Cop Sop 3 A Turbine Installation B16C SERIES COP SOP 3 A TURBINE INSTALLATION NOTE This procedure applies to installation of replacement turbine repair kits and re installation of cleaned or sanitized turbine IMPORTANT Before reassembly no
3. 02 TUR UM 00107
4. Bypass Line z Figure 1 Installation with bypass line Install a minimum length of 10 pipe diameters of straight pipe on the upstream side and 5 diameters on the downstream side of the flow meter The piping should be the same size as the meter bore or threaded port size June 2015 TRB UM 00288 EN 02 Page 5 Installation FloClean Turbine Flow Meter NE Paper E EN 10 Pipe Diameters 5 Pipe Diameters Minimum Minimum Y Display Isolation Valve me A pa lan Figure 2 Installation without a bypass line Do not install the flow meter or connection cable close to electric motors transformers sparking devices or high voltage lines Do not place connecting cable in the same conduit with wires that furnish power for such devices These devices can induce false signals in the flow meter coil or cable causing the meter to read inaccurately DAMAGE CAN BE CAUSED BY STRIKING AN EMPTY METER WITH A HIGH VELOCITY FLOW STREAM If problems arise with the flow meter and monitor consult the Troubleshooting Guide on page 12 If further problems arise consult the factory If the internal components of the turbine flow meter are damaged order a turbine meter repair kit See Repair Kits on page 9 Page 6 TRB UM 00288 EN 02 June 2015 Installation Wiring Typical wiring configurations for the pickup options are
5. iar aa ds e o daa awa Seal EA E e dea E 14 FloClean Flow Rate Chart iii a sa SKREKK A RRMA SE WHE sa dR RE RES 14 Dimensions dnd Drawing 04 4 6 200 eres caaen Os ew ras aa ee Sad ke sk K EN EEE ed Gea gd 15 Model Numbers 25444 as seede aars Sea re s aker see aha Ged Saad Aa 16 Page 2 June 2015 Scope of This Manual SCOPE OF THIS MANUAL This manual is intended to help you get the FloClean Sanitary Meter up and running quickly IMPORTANT Read this manual carefully before attempting any installation or operation Keep the manual accessible for future reference UNPACKING AND INSPECTION Upon opening the shipping container visually inspect the product and applicable accessories for any physical damage such as scratches loose or broken parts or any other sign of damage that may have occurred during shipment NOTE If damage is found request an inspection by the carrier s agent within 48 hours of delivery and file a claim with the carrier A claim for equipment damage in transit is the sole responsibility of the purchaser SAFETY Terminology and Symbols A DANGER Indicates a hazardous situation which if not avoided is estimated to be capable of causing death or serious personal injury AWARNING Indicates a hazardous situation which if not avoided could result in severe personal injury or death ACAUTION Indicates a hazardous situation which if not avoided is estimated to be capable of causing minor or moderate
6. xxx B16C 220A xxx CIP Models BP16C 003A xxx BFC16C 003A xxx BAW16C 003A xxx BP16C 005A xxx BFC16C 005A xxx BAW16C 005A xxx BP16C 007A xxx BFC16C 007A xxx BAW16C 007A xxx BP16C 105A xxx BFC16C 105A xxx BAW16C 105A xxx BP16C 107A xxx BFC16C 107A xxx BAW16C 107A xxx BP16C 108A xxx BFC16C 108A xxx BAW16C 108A xxx BP16C 110A xxx BFC16C 110A xxx BAW16C 110A xxx BP16C 115A xxx BFC16C 115A xxx BAW16C 115A xxx BP16C 220A xxx BFC16C 220A xxx BAW16C 220A xxx VALID THROUGH December 31 2015 Timothy R Rugh Executive Director 3 A Sanitary Standards Inc The issuance of this authorization for the use of the 3 A Symbol is based upon the voluntary certification by the applicant for it that the equipment listed above complies fully with the 3 A Sanitary Standards designated Legal responsibility for compliance is solely that of the holder of this Certificate of Authorization and 3 A Sanitary Standards Inc does not warrant that the holder of an authorization at all times complies with the provisions of the said 3 A Sanitary Standard This in no way affects the responsibility of 3 A Sanitary Standards Inc to take appropriate action in such cases in which evidence of nonconformance had been established NEXT TPV INSPECTION REPORT DUE March 2016 June 2015 TRB UM 00288 EN 02 3 A Certificate Page 13 Specifications SPECIFICATIONS Body Internal Wetted Parts 316L stainless steel Bearings Nickel binde
7. AGE THE ROTOR AND BEARINGS BY OVER SPIN 11 Check the meter by blowing air through the assembly If the rotor does not turn freely the meter should be disassembled and checked for anything that would obstruct movement of the rotor 12 Install the magnetic pickup NOTE After installing the new repair kit the electronics will need re calibration Refer to the electronics installation and operation manual If there are any questions on re calibration contact Blancett at 1 800 235 1638 or contact the manufacturer of the electronics June 2015 TRB UM 00288 EN 02 Page 11 Troubleshooting Guide TROUBLESHOOTING GUIDE Issue Possible Cause Remedy Meter indicates higher than actual flow rate e Cavitation e Debris on rotor support e Build up of foreign material on meter bore e Gas in liquid e Increase back pressure Clean meter Clean meter Install gas eliminator ahead of meter Meter indicates lower than actual flow rate e Debris on rotor Worn bearing e Viscosity higher than calibrated Clean meter and add filter e Install new repair kit e Recalibrate monitor Erratic system indication meter alone works well remote monitor application only Ground loop in shielding Ground shield one place only Look for internal electronic instrument ground Reroute cables away from electrical noise Indicator shows flow when shut off Mechanical vibration causes rotor to oscillate wi
8. LS Blancett Blancett turbine Flow Meter Turbine Flow Meters gt Flow Meters FloClean Sanitary gt Badger Meter ener eT User Manual Turbine Flow Meter FloClean Sanitary CONTENTS Scope of This Manual spess asia da A A kake dead AAA A A na ae E a 3 Unpacking nd Inspection iers eac aas deii A deh bad AA AAA AR AA 3 SM an aaa dd ea dd ee Ng a aa ad i ng 3 Terminology and Symbolsass isis arta a Cea ake A A AR add eh A 3 CONSIdETatiONS se vass ar e a A A NA A AA eee need A ead oe dr 3 Introduetion ais ra a A ARA A aah ARA A AAA 4 Operating Principled ita cin a ae eG ee Awad Di a a ee be 4 4 Installations 0 tias id a win EOI BRR GE ER AAA LG Bede due AR SEE EG See 4 SE 5 PUDO ate ese eed Se ae A AR AAA bo a ee ee We a 5 Wiringus cas 88 ds eed E Ras oP a aw eee AAA eae ep ah ad Pa wad awe Racha eG ahah aag a bach ad paced Z Operational Startup cents cin a ad eG ee awed a a a a a a aa aa a ee ba 9 Meter Repair And Cleaning scac ca sans da RR a A RRR ROR aw AE GAR ETE VE a ew ae GERE EG 9 REPAINKIS gudri a SSE AE es e e a i a Sa ble n BAe a E 9 Turbine Repair Kits Part Numbers oomi sida er aa e dd adr ge Ga ek GERE FE GE aia G Ad 9 Service Proc dures san as es ede r dene ee a ed STAR Hede base EDA Eee dad dd 10 B16c Series Cop Sop 3 A Turbine Installation o 11 Troubleshooting Guide mes awers aema A A Eb 12 3 A Certificate 2 ra don o wee ak wes e AR A A AAA ES AA de ga le SES GEA ad GRE EG 13 SPECIICALIONS u
9. and improves the fluid s velocity profile Fluid then passes through the turbine causing it to rotate at a speed proportional to the fluid velocity As each turbine blade passes through the magnetic field the blade generates an AC voltage pulse in the pickup coil at the base of the magnetic pickup These pulses produce an output frequency proportional to the volumetric flow through the meter The output frequency represents flow rate and or totalization of fluid passing through the turbine flow meter Output Signal Magnetic Pickup Rotor Page 4 TRB UM 00288 EN 02 June 2015 Installation INSTALLATION THE METER SHOULD NOT BE SUBJECTED TO TEMPERATURES ABOVE 300 F 149 C BELOW 150 F 101 C OR THE FREEZING POINT OF THE METERED LIQUID HIGH TEMPERATURES WILL DAMAGE THE MAGNETIC PICKUP WHILE LOWER TEMPERATURES WILL LIMIT THE ROTATION OF THE ROTOR INCOMPATIBLE FLUIDS COULD DETERIORATE INTERNAL PARTS AND CAUSE THE METER TO READ INACCURATELY Plumbing Install the flow meter with the flow arrow which is etched on the exterior of the meter body pointing in the direction of fluid flow Install the meter horizontally with the magnetic pickup facing upward The liquid being measured must be free of any large particles that may obstruct spinning of the rotor If particles are present install a mesh strainer If small particles are present in the fluid install a strainer upstream of the meter See Table 7 for filtration recommen
10. dations Bore Size Ferrule Size Strainer Size Clearance 3 8 in 9 53 mm 0 984 in 24 99 mm 60 x 60 0 0092 in 0 23 mm 1 2 in 12 7 mm 0 984 in 24 99 mm 60 x 60 0 0092 in 0 23 mm 3 4 in 19 05 mm 0 984 in 24 99 mm 60 x 60 0 0092 in 0 23 mm 1 2 in 12 7 mm 1 984 in 50 39 mm 60 x 60 0 0092 in 0 23 mm 3 4 in 19 05 mm 1 984 in 50 39 mm 60 x 60 0 0092 in 0 23 mm 7 8 in 22 23 mm 1 984 in 50 39 mm 60 x 60 0 0092 in 0 23 mm 1 in 25 4 mm 1 984 in 50 39 mm 60 x 60 0 0092 in 0 23 mm 1 1 2 in 38 1 mm 1 984 in 50 39 mm 20 x 20 0 034 in 0 86 mm 2 in 50 8 mm 3 047 in 77 39 mm 10x10 0 065 in 16 51 mm Table 1 Straighter size recommendations Severe pulsation and mechanical vibration affects accuracy and shortens the life of the meter Install a bypass line to accommodate inspection and repair without interrupting flow See Figure 1 If a bypass line cannot be used install all control valves or restrictions that may cause the liquid to flash downstream of the flow meter Install air eliminators to make sure that the meter is not incorrectly measuring entrained air or gas See Figure 2 on page 6 Display Isolation FloClean Turbine Isolation Valve gt Flow Meter s Valve Ae AL 10 Pipe Diameters 5 Pipe Diameters Minimum Minimum a Q elle a E
11. ed by each gallon of liquid This K factor is used to recalibrate the monitor or other electronics for accurate output data Turbine Repair Kits Part Numbers Bore Size Ferrule Size Repair Kit Fits Meter Part Number Repair Kit Part Number 3 8 in 9 53 mm 0 984 in 24 99 mm B16C 003A XXX B16C KO3A 1 2 in 12 7 mm 0 984 in 24 99 mm B16C 005A XXX B16C KO5A 3 4 in 19 05 mm 0 984 in 24 99 mm B16C 007A XXX B16C KO7A 1 2 in 12 7 mm 1 984 in 50 39 mm B16C 105A XXX B16C KO5A 3 4 in 19 05 mm 1 984 in 50 39 mm B16C 107A XXX B16C KO7A 7 8 in 22 23 mm 1 984 in 50 39 mm B16C 108A XXX B16C K08A 1 in 25 4 mm 1 984 in 50 39 mm B16C 110A XXX B16C K10A 1 1 2 in 38 1 mm 1 984 in 50 39 mm B16C 115A XXX B16C K15A 2 in 50 8 mm 3 047 in 77 39 mm B16C 220A XXX B16C K20A June 2015 TRB UM 00288 EN 02 Page 9 Meter Repair And Cleaning Service Procedures HIGH PRESSURE LEAKS ARE DANGEROUS AND CAUSE PERSONAL INJURY MAKE SURE THAT FLUID FLOW HAS BEEN SHUT OFF AND PRESSURE IN THE LINE RELEASED BEFORE ATTEMPTING TO REMOVE THE METER 3 A Turbine Disassembly and Cleaning Procedure See Figure 6 for relative positions of the repair kit components 1 Remove the magnetic pickup from the meter body 2 Remove the retaining ring from one end of the meter 3 Keeping the meter upright pickup port at the top remove the rotor support from the body taking care not to rotate it in
12. k of Badger Meter Inc Other trademarks appearing in this document are the property of their respective entities Due to continuous research product improvements and enhancements Badger Meter reserves the right to change product or system specifications without notice except to the extent an outstanding contractual obligation exists 2015 Badger Meter Inc All rights reserved www badgermeter com The Americas Badger Meter 4545 West Brown Deer Rd PO Box 245036 Milwaukee WI 53224 9536 800 876 3837 414 355 0400 M xico Badger Meter de las Americas S A de C V Pedro Luis Ogaz n N 32 Esq Angelina N 24 Colonia Guadalupe Inn CP 01050 M xico DF M xico 52 55 5662 0882 Europe Middle East and Africa Badger Meter Europa GmbH Nurtinger Str 76 72639 Neuffen Germany 49 7025 9208 0 Europe Middle East Branch Office Badger Meter Europe PO Box 341442 Dubai Silicon Oasis Head Quarter Building Wing C Office C209 Dubai UAE 971 4 371 2503 Czech Republic Badger Meter Czech Republic s r o Mafikova 2082 26 621 00 Brno Czech Republic 420 5 41420411 Slovakia Badger Meter Slovakia s r o Racianska 109 B 831 02 Bratislava Slovakia 421 2 44 63 83 01 Asia Pacific Badger Meter 80 Marine Parade Rd 21 06 Parkway Parade Singapore 449269 65 63464836 China Badger Meter 7 1202 99 Hangzhong Road Minhang District Shanghai China 201101 86 21 5763 5412 Legacy Document Number
13. n 50 4 mm B16C 1XXA XXX 6 25 in 158 8 mm 2 33 in 59 2 mm 1 984 in 50 4 mm B16C 2XXA XXX 6 50 in 165 1 mm 3 20 in 81 3 mm 3 047 in 77 4 mm 115 0 180 0 gpm flow range only Magnetic Pickup Rotor Assembly Jara Wut Sleeve Bearing Meter Body Thrust Ball Removable Rotor Support Retaining Ring Manufacturer s Label and 3 A Symbol June 2015 TRB UM 00288 EN 02 Page 15 Turbine Flow Meter FloClean Sanitary MODEL NUMBERS B16C X X X A X X X Sanitary Rating Bearing Material Calibration C COP SOP 3A Compliant A Ni Bindery A 5 Point std Tungsten B 10 Point Ferrule Size Carbide C 20 Point 0 0 984 in 1 1 984 in Meter Body Hub 2 3 047 in A With Hub B No Hub Meter Size Flow Range Pickup Option 03 0 6 3 0 gpm 2 27 11 36 lpm 0 NEMA 6 Magnetic 05 0 75 7 50 gpm 2 84 28 39 lpm 1 NEMA 6 Magnetic Amplified 07 2 0 15 0 gpm 7 57 56 78 lpm 2 Non NEMA 6 Magnetic 08 3 0 30 0 gpm 11 36 113 56 lpm 3 Non NEMA 6 Magnetic Amplified 10 5 0 50 0 gpm 18 93 189 27 lpm 4 Non NEMA 6 Active 4 20 mA B220 950 15 15 0 180 0 gpm 56 78 381 37 lpm 6 Non NEMA 6 High Temperature 20 40 0 400 0 gpm 151 42 1514 16 lpm 8 Non NEMA 6 Active 0 5V DC B220 951 9 None 11 2 in hub for body size 0 1 in hub for body sizes 1 and 2 Indoor use only Control Manage Optimize BLANCETT is a registered trademar
14. personal injury or damage to property Considerations The installation of the FloClean Sanitary Meter must comply with all applicable federal state and local rules regulations and codes EXPLOSION HAZARD SUBSTITUTION OF COMPONENTS MAY IMPAIR SUITABILITY FOR CLASS I DIVISION 2 44 AVERTISSMENT RISQUE D EXPLOSION LA SUBSTITUTION DE COMPOSANTS PEUT RENDRE CEMAT RIEL INACCCEPTABLE POUR LES EMPLACEMENTS DE CLASSE I DIVISION 2 DO NOT CONNECT OR DISCONNECT EITHER POWER OR OUTPUTS UNLESS THE AREA IS KNOWN TO BE NON HAZARDOUS 44 AVERTISSMENT RISQUE D EXPLOSION NE PAS D BRANCHER TANT QUE LE CIRCUIT EST SOUSTENSION MOINS QU LL NE S AGISSE D UN EMPLACEMENT NON DANGEREUX IMPORTANT Not following instructions properly may impair safety of equipment and or personnel June 2015 TRB UM 00288 EN 02 Page 3 Introduction INTRODUCTION The Blancett FloClean turbine flow meter is designed with wear resistant moving parts for trouble free operation and long service life The durable 316L stainless steel construction is a cost efficient flow measurement system that offers excellent accuracy and repeatability The FloClean turbine meter repair kit is designed for easy field service of a damaged flow meter rather than replacing the entire flow meter See Repair Kits on page 9 for information OPERATING PRINCIPLE Fluid entering the meter passes through the inlet flow straightener which reduces its turbulent flow pattern
15. ry tungsten carbide Physical Turbine Nickel plated CD4MCU stainless steel Shaft Nickel bindery tungsten carbide Connections Sanitary clamp ends Electrical Pickup option 0 NEMA 6 150 300 F 100 149 C Accuracy 1 of reading Accuracy Repeatability 0 1 Certifications JAN Temperature 150 300 F 101 149 C Construction Pressure Rating 1000 psi maximum rating based on Tri Clamp sanitary connection Corrosion Contact Blancett to determine if operating liquid is compatible with materials of construction FloClean Flow Rate Chart ibi Flow Ranges K factor gpm Ipm Pulses Gal 0 984 in 24 99 mm 0 6 3 0 2 3 11 4 20 000 0 984 in 24 99 mm 0 75 7 5 2 8 28 4 13 000 0 984 in 24 99 mm 2 0 15 0 7 5 56 8 2750 1 984 in 50 39 mm 0 75 7 5 2 8 28 4 13 000 1 984 in 50 39 mm 2 0 15 0 7 5 56 8 2750 1 984 in 50 39 mm 3 0 30 0 11 4 113 5 2686 1 984 in 50 39 mm 5 0 50 0 19 0 190 0 870 1 984 in 50 39 mm 15 0 180 0 56 8 681 4 330 3 047 in 77 39 mm 40 0 400 0 151 4 1514 2 52 Page 14 TRB UM 00288 EN 02 June 2015 Dimensions and Drawing DIMENSIONS AND DRAWING Part No A B C Ferrule Size B16C 0XXA XXX 3 00 in 76 2 mm 1 46 in 37 1 mm 0 984 in 25 0 mm B16C 1XXA XXX 4 00 in 101 6 mm 2 00 in 50 8 mm 1 984 i
16. shown in Figure 3 Figure 4 on page 8 and Figure 5 on page 8 Option Number Description Number of Pins 0 NEMA 6 Magnetic 3 1 NEMA 6 Magnetic Amplified 3 2 Non NEMA 6 Magnetic 2 3 Non NEMA 6 Magnetic Amplified 3 4 Non NEMA 6 Active 4 20 mA 5 6 Non NEMA 6 Magnetic High Temperature 2 8 Non NEMA 6 Active 0 5V DC 5 9 No Pickup N A Pickup Option 0 1 Green Signal Standard 2 Red Black Signal Mag Pickup Socket End x 3 Red White Unused O Braided Shield to h Ground Eart Pins 1 Signal 2 Signal 3 Unused 1 Green Common C 2 Red Black Power 3 Red White Signal Pickup Option 1 Mag Pickup With Pre Amp Socket End Braided Shield to eh Ground Pins 1 Common Power return 2 Power 12 24 Vdc 3 Output Signal 10V DC Square Wave Figure 3 Wiring for NEMA 6 magnetic pickups June 2015 TRB UM 00288 EN 02 Page 7 Installation Standard Mag Pickup Pickup Option 2 8 6 Socket End B Yellow Signal A Blue Signal A Signal B Signal Amplified Mag Pickup Pickup Option 3 Socket End A Red Power 5 30V DC o gG B Black Common C Green Output Pulse or 0 10V DC Clear B Common C Output Signal Figure 4 Wiring for non NEMA 6 magnetic pickups Active Sensor 4 20 MA Socket End 3 Pickup Option 4 1 Red 4 20 mA 2 Black 4 20 mA 3 White Not Used Pins 1 Loop 2 Loop
17. te the weep holes on each rotor support These weep holes must be facing down toward the bottom of the meter body when installed The meter must be reassembled with the arrowheads on the rotor pointed in the direction of fluid flow The magnetic pickup side of the body signifies the up position This is the position that the repair kit was calibrated Due to the polished surfaces there are no arrows on the rotor support to indicate which rotor support is to be placed upstream or downstream Install the repair kit as it was received in the box using the arrow on the rotor to determine the placement of the rotor support 1 If required by process procedures clean the meter prior to installing it 2 Drop a thrust ball into a rotor support through the hole in the side 3 Insert the rotor support into the meter body 4 Keepthe thrust bearing hole pointed upwards to keep the ball in place 5 Secure a retaining ring in the groove Be sure that the retaining ring is completely installed in the groove 6 Drop a thrust ball into second rotor support through the hole in the side 7 Locate the rotor in the support sleeve bearing 8 Insert the rotor support and the rotor into the meter body and the first support sleeve bearing 9 Keep the thrust bearing hole pointed upwards to keep the ball in place 10 Secure the second retaining ring in the groove Be sure that the retaining ring is completely installed in the groove EXCESS AIR PRESSURE MAY DAM
18. thout turning Isolate meter No flow indication full or partial open position Fluid shock full flow into dry meter or impact caused bearing separation or broken rotor shaft Rebuild meter with repair kit and recalibrate monitor Move to location where meter is full on startup or add downstream flow control valve Erratic indication at low flow good indication at high flow Rotor has foreign material wrapped around it Clean meter and add filter No flow indication Faulty pickup Replace pickup System works perfect except indicates lower flow over entire range Bypass flow leak Repair or replace bypass valves or faulty solenoid valves Meter indicating high flow upstream piping at meter smaller than meter bore Fluid jet impingement on rotor Change piping Opposite effects of above Viscosity lower than calibrated Change temperature change fluid or recalibrate meter Page 12 TRB UM 00288 EN 02 June 2015 3 A CERTIFICATE ISSUE DATE MARCH 19 1998 CERTIFICATE AUTHORIZATION NUMBER 956 THIS IS TO CERTIFY THAT Badger Meter Inc PO Box 245036 Milwaukee WI 53224 9536 USA is hereby authorized to continue to apply the 3 A Symbol to the models of equipment conforming to 3 A Sanitary Standards for Number 28 04 Flow Meters set forth below B16C 003A xxx B16C 005A xxx B16C 007A xxx B16C 105A xxx B16C 107A xxx B16C 108A xxx B16C 110A xxx B16C 115A

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 (3427KB)  M1GA3 / M512A3 / M256A3  

Copyright © All rights reserved.
Failed to retrieve file