Home
        USER MANUAL - Winter Holztechnik
         Contents
1.          sal  III  Safety warming and symbol                     2  IV  Main feature and using of the machine               3  V  Overall and structure of machine                       3  i   Overallofmachne Sr 3  ii  Main structure of machine                               4  VI  Main technology parameter of machine                 8  VIL Loading and transport of machine                      9  VIII  Install debug and operation of machine             9   E B Ba GUE 9   il  FO BOPA HON SFS en erg 10   IX  Failure and solution     11  X  Maintenance of machine                              11  XI  Electrical principle diagram                          13  XII  Electrical fittings detail lists                 14  XIII  Gluing working principle       _ __ _______        15  XIV  Fitting detail of machine                      16    Progress with the time and develop into the future    I  User manual  i  Operation of user manual   Who will operate the machine should be peruse well of the user manual    and must   understand the procedure   safety operation maintain etc the user manual   introduced and put it close to the machine in order to read convenience     ii  Copyrightof this user manual   This copyright of this user manual is belongs to Tongan company This   instruction is for the buyer and operator using    the content of it is   forbidden to copy send out and reading by other way  If who disobey this   principle    our company will be run the responsibility   II  Safety devi
2.    when the machine lifting    forbidden around    Forked vehicle    anyone  The right picture is the forklift loading   c   After loading put away all the safety device loading tool and temporary  device  VIII  Install debug and operation of machine  i  Install debug  A   Environment required of install the machine  The requirement environment of install machine  1 Install dimension       4000x4000x4000mm    temperature   10  C 55  C   Atmosphere humidity  85      Height above sea level hereinafter1000M  B   Lay out of machine  The machine should be lay out on the flat concrete  After lay out the machine    adjust  the level of the machine to make sure the front    back    right and left four point on the  same height  C   Distribution    According the distribution of the required    connect into the voltage    current and  frequency on the power terminal  ii  Operation  A   Safety check before operate the machine  Before operate the machine    first check the machine carefully to make sure safety  OD  Check every safety device correct    firmly or not        Check every rotating and connecting section firm or not      After carry out the safety protection switch    check every motor rotating section  agility    smooth or not        After finish above working point start the    Start button     check every rotating section  correct or not  The direction is Face to the machine the up chromeplate roller  that is up  glue quantity adjustable roller   rotating direction is clock
3.  caustic  It is widely used in the  veneer factory    furniture manufacturer   Acoustics device factory   V  Overall and structure of machine    i  Overall of machine       A      Workpiece thickness adjustable wheel   B     Electrical section D       Safety protection section  C      Gluing section E      Glue box section  F       Adjustable wheel of glue quantity   G      Dniving section    t    ii  Main structure of machine     The machine is compose of Gluing section   Workpiece thickness    adjustable  wheel  Electrical section  Driving section  Gluing section  body section and Safety  protection section     A   Gluing section           tap glue quantity  adjustoent    underside gule  adjustment wand       It is compose of up and low glue roll up and low glue quantity adjustable roll  side  board  glue quantity adjustable device etc Just as the photo  The glue roller is  made as steel tube processed and with the glue on the surface  The glue quantity  adjustable roller is made with the steel tube which after chromeplate  processing  The Quantity roll and adjustable roller is install on the right and left  side board  The roller and adjustable roller is install the rotating chain wheel  It is  used to finish the power rotating   You can use the nght and left hand wheel    A    to  adjust the quantity  When clock wise rotating  the glue quantity adjustable roller  close to the roller  when anticlock wise rotating  it is leaving     Note Before add the gluewater into the ro
4.  not    the machine whether install the       tread        working earth wire and close the breaker  V  Maintenance of machine  i  Daily maintain  A   Keep the machine clean    and keep every driving section and connection  lubricant  B   Forbidden to put anything on the machine  C   After every gluing working clean the machine must be drain out the sewage  ii  Weekly checking of machine  A   Every time before working  should be check every moving and safety device  correct or not and operate the machine one time and check the moving correct  agility and firmly or not    B   Every moth should be do a carefully checking   especially for checking the up  and low roller abrasion condition and every safety protection fitting condition and    adjust and replace      C   For the moving section every shift should be add the lubricant oil If operation       pbs    pe    the machine for a long time there are any abnormity sound should be stop checking  and maintain and replace the fittings      iii  Maintain when stock the machne  A   If the machine does not operating should be clean the machine and add lubricant  oil on every driving section and packing well    B   Should be put the machine inside the ventilative   dryness    room avoid the sun shine and rain directly    VI  Electrical principle diagram       DZ47 63 C25 3P          ee e    VII  Electrical fittings detail list                 zZ    Description    bebe   rr fiel   Conto mer   pri Izu  Ama   pese im    An   ma ie      
5.  wise  the up roller direction is  anti clock wise If you find any un correct direction  that you can exchange any two wire  of the three phase wires    B   Operation      Adjust the required workpiece thickness by the right and left side worm wheel       Adjust the required glue quantity by front and back worm  The right and left wheel  linkage till quantity of right and left is even        After make sure the above processing    that you can start working    press the    Start  button    to start the machine  Then you can start working        After finish working    press the red stop button to make the machine stop    C   working after operated  After the machine stop  anti clock wise to rotating the adjustable hand wheel to enlarge  the clearance between roller and glue quantity adjustable roller then use the long handle    brush to rinse till it clean then drain out the sewage      IV  Failure and solution    Failure Reason    Close the general power    Open the power switch                 and control power            The breaker does not   Open the electrical case and close the                 Press the operation   close breaker       button but can not          The connector does not   Check the circuit whether broken or           operate       work or hot relay broken   overload and repair        Does not cover the safety  Cover   t       protecton         The machine sudden Check the motor isolation qualify or         Short circuit or breaker         stop when it is
6. USER MANUAL    DOUBLE FACE GLUE SPREADER  MASCHINE    Henrik Winter Holztechnik GmbH  Druckereistr  8  04159 Leipzig    Tel   49  0 341  4619021 Fax   49  0 341 4618358 Funk   49  0 171 2820443  Em il  info winter holztechnik de Internet  www winter holztechnik de            Operator should read user manual carefully    to truly understand the   function and operating skills      Reliable earthed device should connect with machine before operation  The machine should connect with suitable power    check   f the   currency frequency voltage are right      Before operation  confirm if the direction of running cutter saw are all   right     Checke the safety protecting device are normalor not  if it is loose or   damaged replace it in time      Operator should wear tighten clothes in operation  it is forbidden to   wear loose clothes or wear tie    watch    necklace    who have long hair   need to wear hats      All safety device can not be removed in running time       Operator are forbidden to leave position when machine is running       It is forbidden to process workpiece which exceed the processing range    of machine      10 Some one drink too much or not in good healthy are forbidden to    operate machine     11  Shut down main power supply before checking  maintenance cleaning     12  Shut down main power supply after operation  it is forbidden to leave    before machine stop completely     CATALOGUE             I  Ser manual nor 1   II  Safety device and protection     
7. ba mn    an   wew foe   man   o a    me     me     Line       10 Emergency stop LA38 10 be  button    VIII  Gluing working principle    double face glue  working principle    top glue wand zlue   top glue quantity  adjustment   workpiece     thickness KE   adjust   glue es quantity __ feeding d direction  adjustment    underside gule    adjustment vand LLL MV LLLLLLLL SAL LLL LLL LLL    N di  xD    adjust the gule quantity i gt  underside gule wand  pastern  basin    single face  gluing principle  guling wand       gule    oH  YS  out direction of    guling  working    gule quantity  adjustment       support pole    pastern basin     IX  Fittings detail of machine    I Light roller bearing room    f       Note           Light roller bearing cover    Chain wheel              nm       wy  Double chain wheel  Driving big gear wheel              oO  or               periz  Gerezi    23  24  25  Model A belt  EF  36    l  2  2  4       31   Big belt     Deep channel all bearing   30  Pash charnel bali vering lu  peda    enna       Packing List  DOUBLE FACE GLUE SPREADER MACHINE    lset Weight  750kg  7 User Manual 1 copy rf    User Manual                     1  2  3              1 copy    Cia pe       Packing list          Inspector for packing   seal  TI Date              
8. ce and protection    i  Before operate the machine should be install the safety protection  device correctly  make sure working under safety condition    li  The safety device can be knock down under the condition of power  shut down     iii  You can operate the machine under the all the safety device is  working normal     iv  All the procedure transport install  debug and maitain should be  operate by the professional    v  Refer to the electrical install and maintain should be in charge by the  professional   vi  Check the electrical device timing and deal with the loosen or broken  electrical fittings in time Forbidden maintain with electrical  when  check and maintain should be shut off the power and keep somebody  to see the power make sure the examine and repair person safety     vii  This machine just only can be used the no volatility    flammable    gluewater      Sa SO t    _ e LI e e e nm nn     7      III  Safety warming and symbol    i  i    The operator should be obey to  the warmings if ignore will be    injure anyone       This symbol means when connect the  power   do not open this section or will    be got electric shock       This symbol means when operating   do not    put the hand into or it will injure         IV  Main feature and using of the machine   This machine is mainly use to adhibit Veneer cabinetwork cord board  corde  board of furniture board and PVC or Double faces timber lamination  It can be use  every kinds Gluewater which is no fierceness
9. ller and adjustable roller  first should be  adjust the opening between roller and adjustable roller  When adjust  rotating the  left adjustable hand wheel till the two roller almost touch each  Then you can add  the gluewater into  Note Before add the gluewater  forbidden to put the adjustable  roller close to the roller to start the machine or it will injury the surface of the    roller       u a A A     B   Workpiec thickness adjustable section  It is  compose of the adjustable hand wheel connected  pole  pole jointer and right and left worm wheel case  etc   Spreading thickness finished by rotating the two    sides hand wheel   The function of the worm wheel    A          is to adjust the thickness of gluing workpiece  When A Connect pole  clock wise rotating the up roller rising   when  anticlock wise    it will downing     For example if the workpiece thickness is 10mm rotating the hand wheel with  clock wise  to make the pointer point 9mm on the staff guage  note  Avoid to  make the rubber on the roller abrasion too early  So the opening between roller  can not less then workpeice thickness  generally about 0 5 2mm is perfect    When  spread the small workpiece  should be use the length gluing or the roller can not  using smooth to abrasion the roller that will cause the roller no even      C   Electrical control section  It is compose of an AC connector and one Hot  relay  and the relay should be protect the 0 and short voltage and voerload  protection  and with tow a
10. n section  There is install tt  safety protection net to avoid the hand touch the roller  moving section when the machine is working  avoid to injure the GN    Every  time before operate the machine should be check the protection net normal or  not  If there are any broken    should be adjust or replace in time  The following  picture    A      s travel switch   When operating the machine    the operate should be  open the safety protection carefully  Cover jointer pole rotating touch the travel  switch then cut off the AC connector on the roller start to make the roller stop    immediately to protect        Safety net locknut    VI     Main technology parameter of machine    Preduct  MH6206 MH6106 MH6113 MH6213  Parameter name                           VII  Loading and transport of machine  This machine is the whole set structure  When transporting must be fixed all the  shockproof    dampproof    defend strike etc measures  When the user loading should be  required the professional person to carry out    i  Transport and stock environment requirement  Transport and stock should  be during  25  C 55  C  If Under more than 55  C but less than 70   C  environment    the machine can not working over 24 hours   li  Loading  a   When loading the machine should be evacuate  people and set the safety protection  b   Use the crane or electrical forklift which weight  enough to loading the machine  During the whole    loading procedure should be make sure the machine 1s       steady 
11. uto recovery button to start and stop control the  machine  The reasonable circuit designed and easy operate control panel to  operate the machine convenience and easy      a  Electrical section          r    A       Control transformer   B       break phase and phase sequence protection relay  C      Roller start AC connector   D    Hot relay  To protect the motor   E    Breaker   To protect the short circuit    A Controll panel       A   Start button  Press this button to start the machine  B      Stop button  Press this button to stop the machine  D   Glue tray section and drain  The glue tray is made of the steel    there is    drain switch under the tray Every time finish gluing and clean  you can press the    switch to let the sewage out         B drainage pipe    Safety    net    Step of drain       Cleaner     Open the drain case on    A        Press the switch    B    to  let the sewage to the tray      After finish drain close the switch     B    then close the door    E   Driving section  It is compose of motor    A     Reducer    B    elastic tighten chain    C     Motor is  100L 4 2 2KWInstalled way  B3  Reducer is  WD80I  The rate is 1 30 the power is give out by        motor    drive the chain to up and low roller and up and  low adjustable roller by reducer    to finish gluir C we  working  Spring    D    is to auto adjust gear driving     F   Body section  It is compose of steel and  steel board  The structure is simple ar A  goodlook     G   Safety protectio
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
FMS950C取扱説明書  - Smart Antenna by NISSEI  Taro-BN-2320-8 No.779.jtd  m-ic710 user manual  SilhouetteTM - Silknsilhouette.eu  BLD75-1 User's Guide  Gigabyte GV-R557D5-1GI AMD 1GB graphics card  "取扱説明書"  Thomson 32HU2253 LCD TV  Points importants lors d`une « progression encordée » (escalade  Daito Industrial Printing    Copyright © All rights reserved. 
   Failed to retrieve file