Home
        Operating Instructions PS12 - PKP Prozessmesstechnik GmbH
         Contents
1.    PKP Prozessmesstechnik GmbH    Borsigstrasse 24  D 65205 Wiesbaden Nordenstadt  Tel  06122   7055   0    Fax  06122   7055     50    Operating Instructions    PS12    Electronic miniature pressure switch    Contents    1 Introduction   2 Safety Information   3 Electrical Connection   4 Adjusting the Switching Point  5 Maintenance   6 Specifications  See data sheet in the appendix    BRWWN WN    1 Introduction    Series PS12 pressure switches are noted for their reliable function and easy operation    To obtain the greatest benefit from this device  please observe the following cautionary  statement    Persons who are responsible for setting up or operating this device must be sure to read  the and understand the operating instructions and the safety information pertaining to  it     2 Safety Information    2 1 General Instructions   To ensure safe operation  the device must only be operated according to the information in the  operating instructions  When the device is in use  the regulations and safety standards  applicable to the specific application must also be observed  This statement also applies to the  use of accessories     2 2 Proper Usage   Series PS12 are designed to transform a pressure into one or two electrical output signals   Any application extending beyond this specific intended use does not constitute proper usage   Series PS12 pressure switch must not be employed as the sole means of avoiding hazardous  conditions in machinery and installations    The 
2. machinery and installations must be designed in such a manner that faulty conditions and  malfunctions will not present hazardous situations for operating personnel     2 3 Qualified Personnel   Series PS12 must only be used by qualified  knowledgeable personnel trained in correct use  of these devices  Qualified personnel are those persons familiar with setting up and  assembling these devices  placing them in service and operating them  In addition  such  personnel must also be qualified to perform the work associated with the application for  which the device is being used     PS12 E 1 SAM 03 05 05 Page 2    3 Electrical Connection    Round plug connector M12x1  4 pin  Cable outlet  P switching   N switching P switching   N switching                                              M12x1 Cable outlet  Power supply UB 1 brown  OV OV 3 blue  Switching output SAI 4 black  Switching output SA2 2 white       4 Adjusting the switching point    The switching point is adjusted with the system under pressure  The switching point is adjusted with setting  screw as follows    Turn the setting screw clockwise to increase the switching point  The setting screw is self locking and does  not have to be secured against turning  The torque applied should not exceed 30 Nm  The integrated  switch status LEDs are located in the lower part of the black plastic upper section  These LEDs illuminate  when the switching output is occurring     4 1 Adjustment procedure for variants  NC contact with adj
3. rigeration systems  compressors  etc     In addition to generally accepted safe practices  all applicable regulations must be observed   Be sure to take proper precautions during maintenance work     PS12 E 1 SAM 03 05 05 Page 4    
4. ustable hysteresis   The switching point and the hysteresis are adjusted with the two setting screws S1 and S2  Screw S2 adjusts  the switch for the pressure value  screw S1 adjusts the maximum pressure value  If the S2 switching point is  set above the switching point for S1  then the output acts like a normal pressure switch with a hysteresis of  5   S2 determines the switching point  S1 has no effect  To correctly adjust the switching point and the  hysteresis  proceed as follows     PS12 B 1 SAM 03 05 05 Page 3    1  Turn the S2 setting screw counter clockwise all the way to the left hand stop   minimum     2  Turn the S1 setting screw clockwise all the way to the right hand stop  maximum     3  Apply the switching point pressure to the pressure switch in a test system    4  Turn the S1 setting screw counter clockwise to adjust the switching point    5  Set the pressure for the lower switching point    6  Turn the S2 setting screw clockwise to adjust the hysteresis     Caution  The leads for pressure switches with M12x1 plug connectors must not have any  integrated LEDs     5 Maintenance    Mechanical pressure switches are maintenance free    The measuring accuracy  as per DIN EN 837  of the pressure switch should be checked  regularly  Testing or recalibration must be performed only by trained personnel with suitable  equipment     Caution    When working with hazardous media such as oxygen  acetylene  combustible materials or  poisonous materials and when working on ref
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Interface Explorer for HL7 Professional User Manual  Chain Sling User`s Manual  Kodak NOVAJET 500 User's Manual    Copyright © All rights reserved. 
   Failed to retrieve file