1. Operating Instructions for 3 mm Evacuable Dies Parts supplied 1 Sleeve with evacuation tube 2 amp 3 Stepped pellets 4 Funnel for loading sample 2 5 Sample extractor 6 V mount slide holder PLEASE NOTE Pmax 3 mm 0 5 tons 1 Step 1 After ensuring that all parts are clean assemble one stepped 3 pellet to the vacum tube end of the sleeve die body Step 2 Place the load funnel into the opposite end of the die body Step 3 Do not overfill bore of die body with sample Leave about 1 0 1 5 mm for location of the second stepped pellet Step 4 Release the vacuum and remove the vacuum tube Step 5 Remove both stepped pellets The V mount will hold the die body for analysis in a spectrophotometer Step 6 After analysis the sample is removed from the die body by means of the sample extractor After use clean all parts thoroughly We reserve the right to change technical specifications without notice Copyright msscientific Chromatographie Handel GmbH All rights reserved