Home
Handy Home Products 60351-8 Use and Care Manual
Contents
1. Bi nic 112 sends c Me ee Attention Load not to exceed 250 Ibs evenly distributed across loft 35 SHELF PANELS PARTS REQUIRED Ben 1 1 x 30 x 244 cm VGEGIN Place shelf panel onto the left wall shelf frame Shelf panel should be flush against shelf support and loft panel Attach using 2 nails as shown CAD Repeat on opposite side FINISH You have finished installing your shelf panels O Flush A lt _ LEFT WALL Flush LOFT AND SHELVING CAPACITY Attention Load not to exceed 250 Ibs evenly distributed across loft Attention Load not to exceed 100 Ibs evenly distributed across shelf 36 RAFTERS PARTS REQUIRED _ a 2 5 cm x120 x10 C D 6 x 24 15 x 61 cm 1 10 CAR 7 2x4x8838 x 10x 140 0m A f m VEGIN You will build FIVE assemblies Place two rafter halves in the corner of back and side walls Rafters should touch at peak Apply glue gusset and place on rafters Nail gusset onto rafter using 2 nails staggered as shown lt gt Flip over rafter assembly and glue and nail second gusset to back side G4 Repeat steps 1 4 to build four more assemblies A 29 Use floor and walls to help
2. HINT Use RK 1 9 cm 31 yA 1 1 2 as 1 1 2 gauge 3 8 cm Primed side up cn l 30 mn 3 Fig A 6 15 1 34 GAUGE BLOCK 3 4 1 9 cm _ 16 SIDE WALL PANELS PARTS REQUIRED gt CS 2 b cm x90 x2 48 x 84 3 4 GAUGE 122 x 213 cm BEOCGK x1 2x3x13 5x7 6 33 as SPACER Place center 48 panel on frame as For squareness maintain shown with primed side facing up flush and 1 1 2 measurement along panel edges Nail using 2 nails 6 apart on edges 1 1 2 and 12 apart inside panel Flush pn ED Place end 48 panel on frame as shown For squareness maintain flush and HINT with primed side facing up 1 1 2 measurement along panel E Flush di di Nail using 2 nails 6 apart on edges and 12 apart inside panel Carefully flip the sidewall over 122 cm STEPS 1 8 to assemble your second side wall FINISH You have finished building both your sidewalls 17 BACK WALL PARTS REQUIRED x1 48 x 96 122 x 244 1 1 2 3 8 cm x11 x1 2 x 3x 13 5 x 7 6 x 33 x1 2 x 3 x 35 1 4 5 x 7 6 x 89 5 cm _ PS __ E 2 x 3 x 91 5 x 7 6 x 231 cm WBEGIN Orient parts on flat on floor as shown EP Place panel on FS and PS with primed side up ED Nail FS first 1 2 5 cm from panel
3. P4 7 ARK temporary support 19 BACK WALL 1 1 2 3 8 cm x26 1 48 x 96 x1 122 x 244 cm 9 2 x 3 x 13 5 x 7 6 x 33 cm Place right panel onto frame primed side up o 4 m ve An B7 777 ED Nail using 1 1 2 nails 6 15 cm apart on edges i 4 and 12 apart inside panel lt O lt gt Primed side S UP Flush 74 5 8 189 5 cm RK temporary support 20 BACK WALL PARTS REQUIRED _ 1 1 2 3 8 cm x12 1 2 x 3 x 13 5 x 7 6 x 33 1x 30 5 x 61 cm 3 8 x 12 24 x1 1 x 30 5 x 61 cm e Nail left and right 12 x 24 30 5 x 61 cm panels primed side up using three 1 1 2 nails Nail RK on edge at each location using three 1 1 2 nails Fig A FINISH You have finished your back wall Primed side Flush UP Line up seams 2 1 2 6 4 cm a jd Fig A 2 5 cm RK dade I 12222 a Em RK m C 1 1 2 1 1 2 le 2 1 2 3 8 cm 3 8 cm 2 1 2 6 3 cm 6 3 cm 21 FRONT WALL FRAME PARTS REQUIRED x1 UX 2 x 4 x 64 5 x 10 x 162 5 cm x1 2 x 3 x 9 5 x 7 6 x 23 cm xi 1 x3 x 12 2 5 x 7 6 x 30 5 cm V GEGIN Orient NA and UX on flat on floor as shown Orient DI on flat on top of NA flush to top Fig A Nail DI to NA UX using 6 2 nails as shown n
4. GD Center sidewall on floor front to back Nail the lower backwall corner to the sidewall frame with one 2 nail Fig A DOOR the sidewall stud using 2 nails spaced 6 apart 2 5 cm Nail Be sure the measurement between Ho Ho gt LZ lt the panel edges is the same along the PN entire length Then secure with one 2 m MEASUREMENT nail in the upper corner Fig B T Fig B s 1 Da 15 cm SOM I 11 i lt Nail along the backwall panel edge into 2720 Py ft N 4 4 4 4 ov 3 AXI ma 22 pe 2227 e Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig C Nail down the bottom plate using two 3 nails between the wall studs Secure backwall horizontal supports with 3 screws Fig E F into sidewall corner stud Remove temporary brace Repeat process to secure the left sidewall 3 7 6 cm Screw FINISH You have finished standing your side walls 28 FRONT WALL INSTALLATION mo NARRA 3 7 6 cm x4 3 7 6 cm x2 acc VEGIN Stand frontwall on floor It is important to secure the frontwall in the following order QD Center frontwall on floor side to side Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig A Nail the lower frontwall corner to the sidewall stud wi
5. xi LEW ___ 1 2x 8x84 5 x 7 6 x 213 x2 2 x 3x 91 5 x 7 6 x 281 x4 2 x 8x 96 5 x 7 6 x 244 cm x10 C D 6 x 23 1 4 15 x 59 cm x10 1 2x 4 x 55 9 16 5x 10x 140 cm x3 1 x 4x 60 2 5 x 10 x 152 cm x3 5 8 x 2 1 2 x 9 1 6 x 6 3 x 23 cm X2 AAW C 2x3 41 718 5x 7 6 x 106 cm x2 2 x 4x 48 34 5 x 10 x 124 x2 5 8 x 2 1 2 x 72 1 6 x 6 3 x 183 cm X10 LF 38 1 34 x 82 14 0 9 x 4 4 x 209 om x4 2 2 x 84 6 5 x 213 METAL CORNER TRIM x2 2 x 4 x 96 5 x 10 x 244 4 PI 1111111111111011011110111711 OL PARTS LIST continued 1 2 x 8 x 28 5 8 5 x 7 6 x 73 x5 2 x 3 x 96 5 x 7 6 x 244 x2 2 x 4 x 96 5 x 10 x 244 x2 2x 8x 69 5 x 7 6 x 175 3 cm DOOR SHELF PANEL PARTS LIST NOTE Panel parts are not stamped 4 7 6 x 11 1 4 x 25 3 4 X 1 1 x 29 x 65 4 cm 4 7 16 x 25 3 4 x 48 0 X 1 1 x 65 4 x 122 cm aM Roof panels are 7 16 1 1 cm thick 7 16 x 48 x 96 x2 1 1 x 122 x 244 cm tc 7 16 x 44 1 4 x 48 2 1 1 x 112 x 122 W 2 lt Shelf panels 7 16 1 1 cm thick 7 16 x 23 7 8 x 91 1 1 1 x 61 x 231 W I 9 2 7 16 11 7 8 96 1 1 x 30 x 244 cm 2 10 1 2 x 32 1 2 X 27 x 82 5 cm WALL PANEL amp DOORS PARTS LIST x2 CN x2 X s 84 1x 122 x 213 cm Nr Lx NAIL BOXES Sh
6. Flush to TOP 32 77 5 cm B 22 FRONT WALL FRAME PARTS REQUIRED 2 9 7 6 cm 8 2 3 x 82 1 2 5 x 7 6 x 210 cm xi rw Temporary 2 x 3 x 84 5 x 7 6 x 213 cm Support Pre Assembled 7 16 x 25 3 4 x 48 1 1 x 65 4 x 122 cm Orient parts on edge on floor as shown Install FW to studs with 3 nails Fig A LAZ E Place one roof panel temporary support under pre assembled frame ED Orient Pre Assembled Frame on flat AN DI facing down Position Frame 9 from b bottom of FW Install Frame to studs using 2 3 nails Fig B 2 i cm 2 1 2 alls 6 3 jn T 213 QS 23 ca 23 am cm C 15 FW 3 2 Fig A SS SK DL e Y TEN q _ 2 3 10 cm N 3 1 2 Nails 9 lt Pre Assembled Support DI facing do Flush NL A EE Fig B 2 1 2 6 4 cm 210 cm 1 1 2 ti d Le 3 2 cm 23 FRONT WALL FRAME PARTS REQUIRED cuppa SSE 7 6 om x2 1 JT 7 16 25 3 4 48 3 7 6 cm x2 1 1 x 65 4 x 122 cm m S O Dm lt gt Secure NA with 2 3 nails Fig A OP Place two roof panels as temporary supports above frame Install FR centered as shown with 2 3 screws Fig B N Leave temporary supports in place until af
7. assemble rafters FINISH You have finished assembling your rafters 244 cm Fit base of rafters in corners of back wall N Temporary support 2x3 Touch at peak CENTER AA AA 3 RAFTERS P A R TS R E Q U R E D AE 3 7 6 cm x 20 2 5 cm x 10 Preassembled xb Locate rafters directly over studs and flush to wall panel ALA Check that you have the measurements shown pac 2 CD First secure ends of rafters with one 2 screw at each end Fig A Secure ends of e rafters with two 3 screw at each end Fig B Fig C BN ED Repeat steps to attach 4 rafters FINISH You have attached your rafters MEASUREMENTS ARE FROM INSIDE OF PANELS 5 MEASUREMENTS ARE TO CENTER OF RAFTERS 24 24 24 24 24 24 61 cm 61 cm T 61 cm T 61 cm 44 61 cm 61 cm lt Align over studs E i 9 H AN Maintain the measurements between rafters 2 3 7 6 cm Screws 2 2 5 cm Flush Screws each end AN y END VIEW Fig X 38 TRIM PARTS REQUIRED x4 1 1 4 3 2 cm x64 2 x 2 x 84 5 x 5 x 213 cm WBEGIN Install metal corner trim flush with top of side panel Fig A CA Secure trim to wall using sixteen 1 1 4 nails eight per side spaced evenly as shown FI
8. WOOD GLUE Exterior Rated OPTIONAL MATERIALS DRIP EDGE 50 Feet 15 ROOFING FELT To cover 122 Sq Ft of roof area 1 GALVANIZED ROOFING NAILS 1 4 Lb For roofing felt REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT PARTS IDENTIFICATION AND SIZES EDEN Treated lumber is stamped WOOD SIZE CONVERSION CHART letters are stamped on some parts Nominal Board Size Actual Size TREATED 1 1 2 x 3 1 2 3 8 x 8 9 cm RS 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm Check these locations for 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm part stamp PARTS LIST V INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in All treated lumber x2 2x4 x 48 5x 10x 122 stamped TREATED x7 2x 4 93 5 x 10 x 236 x2 mem 2x4x896 5x10x244 x1 1x8x5 2 5x7 6x12 7 cm GAUGE BLOCK FOR 3 4 1 9 CM MEASUREMENT a 1 9 cm 1 2 3 9 5 7 6 23 1 1 3 12 2 5 x 7 6 x 30 5 x2 2x 3x 13 5 x 7 6 x 33 x1 2 x 3 x 23 5 x 7 6 x 58 cm x1 2x 8x 81 5x 7 6 x 79 cm x2 FS 2x8x8514 5x7 6x89 5 xA NK 2 3 48 5 x 7 6 x 122 x1 2 x 4x 64 5 x 10x 162 5 cm 14 FU 1 1 1 2378 172 5 x 7 6 x 199 x2 2 x 3 x 82 1 2 5 x 7 6 x 210
9. gu FRONT OF SHED Install second ridge 5 back as shown 1 Nail per side through weather seal 12 7 cm M g 7 44 ZZ D _ 1 Nail per side through weather seal Q 5 Flush FRONT OF SHED 63 SHINGLES RIDGE CAP continued lt gt Continue installing ridge cap to back of roof Trim cap off flush to shingles gt When you have 4 minimum of shingle color cut one piece to cap your roof Cut at top of rain slot E gt Install flush to shingles FINISH You have finished your ridge cap WARRANTY Backyard Storage Solutions LLC warrants the following Limited Conditional Every product is warranted from defects in workmanship and manufacturing for one year All hardware and metal components are warranted for two years Trim is warranted for 10 years Waferboard siding and sheathing is warranted for two years SmartSide siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings Timber series buildings siding and trim are warranted for 10 years Solar Shed windows are warranted for 1 year Cedar lumber is warranted for 15 years Cedar doors and Cedar Garden Center are warranted for 10 years 0 Metal roof is warranted for 25 years Warranty o UNI OE EH ee Tuas Backyard Storage Solutions LLC will repair replace or pay for the affected part In no event shall Backyard Storage Soluti
10. 16767 Call Us First DO NOT RETURN TO STORE For immediate help with assembly or product information call our toll free number 1 800 221 1849 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 7 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST This page intentionally left blank 16767 04 21 2011 HOME ail ASSEMBLY MANUAL A Backyard Products Company MARCO SERIES MAJESTIC 8 x 12 244 x 366 cm ACTUAL FLOOR SIZE IS 96 x 144 244 x 366 cm KEEP THIS MANUAL FOR FUTURE REFERENCE 5 IMPORTANT READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY BEFORE YOU BEGIN BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on page 8 e CHECK ALL PARTS Inventory all parts listed on pages 4 6 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 3 for required and optional materials and quantitie
11. 2 1 2 5 x2 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 974 N ED Measure and mark location of hole on outside of right door as shown Fig A 227 5 Pre drill hole with 1 4 drill 57 He drill hole with 1 2 drill Fig B Keep drilled hole square to trim to avoid breaking RIGHT DOOR Fia A edge of 2x3 9 i 1 2 Fig B m 2 O RA 8 E 35 3 4 1 1 2 1 4 Pre drill and SIDE VIEW 90 cm i 1 2 Drill through CS Secure backplate with 1 screws and handle with 1 1 4 screws as shown FINISH You have finished installing your door handle 1 25 mm x2 cB ge 1 1 4 32 mm x2 58 Use acrylic latex caulk that is paintable Caulk at all horizontal and vertical seams between the trim and walls and all around the door trim Use a high quality exterior acrylic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Note Prime all un primed exterior wood before painting Follow directions provided by manufacturer ROOF FELT NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place OK to overlap at ridge 3 OVERLAP DRIP EDGE NOT INCLUDED Install drip edge over roof felt on gable side and under roof felt on eav
12. 2 5 m Notch Flush with rain slots Flush with rain slots Cu Continue installing rows of shingles by staggering at front FRONT OF SHED Notch SHINGLES continued Continue installing rows of shingles to the peak At the peak make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak with a utility knife 5 4 12 7 MAX lt Cut Off Top of rain slot If more than 5 to rain slot you must install another row of shingles C3 Hepeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge C Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line FINISH You have finished shingling your roof Proceed to capping the ridge 62 SHINGLES RIDGE You will finish off the top of the roof with a ridge cap made from shingles Cut shingles into THREE pieces Hint Use cut off pieces first 2 2 5 5 2 2 22 5 5 5 PS pii 5 cm 9 Score shingle then snap off angled cut Weather Seal Top of slot Note You will need about 28 30 cut pieces 28 to 30 Pieces 2227 Install first ridge cap flush to shingles at front as shown
13. ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS This shed kit includes a complete wood floor frame system It does not include any floor panels See page 7 for the additional floor panel sizes and quantities required This shed kit does not include ANY leveling materials See the FLOOR LEVELING section page 8 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific site REINFORCED WOOD FLOOR FRAME OPTIONAL IMPORTANT The included floor has been designed for general use Depending on your specific use you may want to construct a heavy duty floor frame by adding additional floor joists Shown below as shaded Below is a list of additional materials not included x6 2 4 8 5 10x 244 cm Treated Lumber Cut to 6 2x 4 x 98 5 x 10 x 236 cm X24 ea 3 7 6 cm Hot Dipped Galvanized Nails a Optional 12 30 5 cm spacing Standard 24 61 cm spacing COMPLETING YOUR SHED You will need these additional materials 3 TAB SHINGLES 5 Bundles 1 GALVANIZED ROOFING NAILS 3 Lbs For shingles PAINT FOR SIDING 2 Gallons PAINT FOR TRIM 1 Quart Use 100 acrylic latex exterior paint 2 coats recommended Use 100 acrylic latex exterior paint CAULK 3 Tubes Use acrylic latex exterior caulk that is paintable
14. NISH You have finished installing your corner trim Trim is flush with top of side wall panel 39 GABLE TRIM PARTS REQUIRED x4 2 X 4 x 59 1 8 5 x 10 x 150 cm x1 OO 2 x 3 x 69 5 x 7 6 x 175 3 Straight Edge VEGIN D Orient AG on floor as shown Using OO as a straight edge mark a line 1 1 2 down length of AG Fig A Repeat step 1 to mark all trim 1 1 2 3 8 cm 4 Flush Fig A Mark Line 40 GABLE TRIM PARTS REQUIRED x4 2 X 4 x 59 1 8 5 x 10 150 cm ED Position one AG 1 1 2 up from front panel edge and center with panel seam Fig A Attach trim with seven 1 1 4 screws from inside Install two oZ di screws at seam Fig B EP Position second AG 1 1 2 up from panel edge and flush to AG already at Sl tached Fig A Attach trim with seven 1 1 4 screws from inside Install two K L screws at seam Fig B 4 CE Repeat steps 3 4 to attach the back trim FINISH You have attached your upper trim A 1 1 2 WT 3 8 cm N Clamp in position Pre marked before screwing ZA AG ru Line up Flush seams 1 1 2 3 8 cm 41 GABLE TRIM A PARTS REQUIRED i 2 m 2 X 3 x 41 7 8 5 x 7 6 x 106 cm WBEGIN Install AW level over seam of front wall panels with twelve 1 1 4 screws from inside a
15. WALL FRAMES PARTS REQUIRED x4 2 x x a0 5x 7 6 122 om 5 76 om x64 x14 FUT 2x3x EAR 6X 16x 199 em x4 2 x 3 x 96 5 x 7 6 x 244 cm WBEGIN Orient parts on edge on floor Measure and mark IMPORTANT You will build two walls the same 222 Use two 3 nails at each mark HINT For easier nailing C stand on frame 527 144 866 cm 120 305 cm 48 244 gt 122 72 183 gt 122 Offset Seam NK Ag Offset Seam an 244 cm 15 SIDE WALL PANELS PARTS REQUIRED gt 2 b cm x45 B x1 48 x 84 122 x 213 cm 3 4 GAUGE ex3x13 5x 7 6x33 cm as SPACER BLOCK Ensure your wall frame is square by installing one panel and squaring frame Place the 48 84 panel onto wall frame with primed side up as shown Use the gauge block to mark the 3 4 measurement on the wall stud Use RK as a 1 1 2 gauge block at top Secure panel with two 2 nails in the corners Fig A Ca Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Fig B CE Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel N squareness maintain 3 4 and 1 2 measurement along panel edges 2 Nails 3 4
16. bottom AN Use 1 1 2 nails only 6 15 cm apart lt Place PS flush to FS Hold the 36 1 4 92 cm measurement nail with 1 1 2 nails 12 30 cm apart Primed side UP PS temporary support Use only 1 1 2 3 8 cm long nails PS 2 1 2 6 3 cm Flush FS SRL m 36 1 4 92 cm ocn 92 cm 2 1 2 6 3 cm RK 2 5 cm temporary support BACK WALL PARTS REQUIRED x1 EY TEMPORARY SUPPORT k 1 1 2 3 8 cm x15 5 8 x 3 x 9 1 6 x 7 6 x 23 cm x1 x1 2 x 3 x 31 5 x 7 6 x 79 cm 2 x 3 x 35 1 4 5 x 7 6 x 89 5 cm 2 x 3 x 91 5 x 7 6 x 231 Orient parts on flat beneath panel as shown A 2 7 Place the EY 5 8 1 6 cm spacer on the lower PS Place FS flush to spacer and nail Use 1 1 2 3 8 cm nails only 6 15 cm apart e lt N S Place PS flush to FS Hold the 74 5 8 189 5 cm measurement and N E nail with 1 1 2 3 8 cm nails 12 30 cm apart Orient AQ on flat and beneath panel shown Place AQ flush to EY spacer and nail AN Use 1 1 2 3 8 cm nails only 6 15 cm apart AQ lt 2 1 2 6 4 cm 2 1 2 44 1 4 44 1 4 6 3 gt 112 1 1 4 3 2 Use as spacer Flush 5 8 1 6 cm PS Flush 1 1 4 FS 3 2 cm 74 5 8 74 5 8 189 5 cm EY 189 5 cm Use as spacer Flush 5 8 1 6 YV f f v PS A
17. cm panels on front wall frame with primed side up as shown Nail with 1 1 2 nails 6 15 cm apart FINISH You have finished your front wall Flush Temporary Supports Primed side ine up seams Pp UP ee _ 12 1 4 0 6 BELOW PANEL L gt HANDLE WITH CARE TO PREVENT BREAKING AT CORNERS MAINTAIN MEASUREMENT BETWEEN STUDS 64 162 5 cm 26 BACK WALL INSTALLATION x1 PT 3 7 6 cm x6 2 x 8 x 96 5 x 7 6 x 244 cm 3 7 6 cm x4 e fe 2 5 cm x18 WBEGIN Center back wall assembly on the 96 244 cm floor dimension CH Use PT as a temporary brace Secure with two 3 screws 2 3 96 5 x 7 6 x 244 cm Screws GD First nail lower edge of panel to floor frame using 2 nails 6 apart Angle nail to hit floor frame Fig A ED Attach RK using three 3 7 6 cm nails as shown Angle nails to hit floor frame Fig A C85 Secure back wall upright to floor using two 3 screws Fig B AN Nail 2 nails first Angle to nail into floor frame 2 5 cm Nail 3 7 6 cm Nail FINISH You have finished standing your back wall 27 SIDE WALLS INSTALLATION b 3 7 6 24 3 7 6 4 a VEGIN d Stand right sidewall on floor It is important to secure the sidewall in the following order
18. de of sidewall studs at each side as shown S25 or Install PT level against back side of studs at mark with two 3 nails at each SK m d Workbench Support ud Mark stud lt 2 2 1 1 01 37 f SAME MEASUREMENT te FLOOR 27r el 33 PAR TS RE Q U IRED RA V AAA x1 3 7 6 cm x4 2 X 3 x 28 5 8 5 x 7 6 x 73 cm C 5 cm x20 7 16 x 23 7 8 x 91 E x1 1 1 x 61 x 231 cm rm Place workbench into gap in back wall upright IE 223 Secure with 2 nails as shown Fit panel into gap e 23 7 8 61 cm Qua FQ to upright and workbench using four 3 7 6 cm screws as shown Fig A FINISH Angle top screw You have finished installing your workbench Flush CN p Fig A ue FQ 4 3 7 6 cm Screws A N Angle bottom screw so it does not protrude past panel 4 LOFT PANELS PARTS REQUIRED x2 Tee nd 2 5 cm x8 V GEGIN GD Place loft panels onto the three loft supports centered from side to side and flush with the back wall panel Fit panels into gap 1 274512 Ca IMPORTANT Use only FOUR 2 nails in each panel to allow squaring the roof CM 28 You will complete nailing the loft panels later FINISH have temporarily finished your loft panels CENTER Fit panels into gap Flush CEDE
19. e page 8 for the preferred floor leveling method Use level and check the frame is level before applying floor panels ED Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 173 1 16 440 cm Cu When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A FINISH Once the floor frame is level and square fasten the frame to the 4x4 runners at each point the frame contacts the 4x4 runners First secure at ends with i Fig A one fastener AE FA lt lt SA Wass 173 1 16 VW F 440 cm lt lt SV Second secure at ends with one fastener FLOOR PANELS PARTS REQUIRED FLOOR PANELS NOT INCLUDED SEE _ PAGE 7 FOR PANEL SIZES 2 5 cm x55 AND QUANTITIES T 5 8 x 48 x 96 1 1 1 6 x 122 x 244 Ensure your floor frame is square by installing one panel and squaring frame wa Attach the 48 x 96 panel with the rough side up painted grid lines side with the 48 edge and corner flush to the floor frame Fig A Secure panel with two 2 nails in the corners Move to the opposite side Using the long edge of the panel as a lever m
20. e side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top of drip edge as shown Roof Felt gt Drip Edge P Fig m Edge flush to trim fE Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer Familiarize yourself with a 3 Tab Shingle Notch Notch SHINGLE NAIL PATTERN 1 2 5 cm Full Rain Slot NAILS NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS GP Install first starter row upside down and color up with a 1 overhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge FRONT OF BACK OF SHED SHED gt lt 1 2 5 cm overhang or flush with drip edge Shingle overlaps 1 2 5 cm overhang roof decking past roof deck 60 SHINGLES continued Beginning at front of shed install first row of shingles with notch at 1 past roof edge or flush with edge Roof Deck FRONT OF SHED 1 2 5 cm BACK OF SHED Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row FRONT OF SHED BACK OF SHED
21. es of doors Gazebos Pergolas amp Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement The minimum ground clearance for siding must be one half inch 2 inch from concrete slab or two and one half inches 2 1 2 from the ground when building is erected or constructed on a treated wood floor kit Water from sprinklers must be kept off unit In no event will Backyard Storage Solutions LLC be responsible for any indirect incidental consequential or special damages nor for failure s that are caused by events acts or omissions beyond our control including but not limited to misuse or improper assembly improper maintenance which eventually leads to rot or decay and acts of God Backyard Storage Solutions LLC will not be held responsible for any labor costs incurred to construct your unit This warranty gives you certain specific rights that vary from state to state CLAIM PROCEDURE To make a claim under this
22. into wall supports and floor using ten 3 screws as shown AN Make sure screws go into framing and floor Fig C D D Remove temporary supports and check doors open properly FINISH You have finished installing your doors Fig C 3 7 6 cm Screws into the wall Angle 3 7 6 cm support and floor frame X Fig D 50 PARTS REQUIRED 3 4 1 9 cm x38 al Sar WBEGIN LA fs ee Reinforce the door trim using 3 4 screws through door panel into trim Fig A LOL VF Locate screws as shown in Fig B Use two screws at seams 229 FINISH You have finished reinforcing your doors Door Panel Install 3 4 screws I I D from inside LEE Fig A Door Trim lt CENTER 7 No screws in this area of RIGHT DOOR Door hardware will be installed here later 51 PARTS REQUIRED 10 1 2 32 1 2 A 2 u _ Jerem m VEGIN Apply high quality exterior grade caulk to seal window 7 A From outside of shed position windows in opening and level Use 2 screws at top of windows SF Do not fully tighten screws Adjust gap between windows to approximately 1 2 2 Screws 2 Screws behind frame near edge before installing 52 PARTS REQUIRED xi 5 8 x 2 1 2 x 72 1 6 x 6 3 x 183 Center ZJ over doors and secure using fourteen 2 fini
23. l JF on rafter facing away from door opening Jg lt 2 e Glue JF and attach with 2 nails as shown FINISH You have finished installiing your collar ties p 45 VGEGIN Cu Continue nailing 2 nails in each loft panel as shown FINISH You have finished your loft panels num Attention Load not to exceed 250 Ibs evenly distributed across s 46 SOFFIT TRIM P A 5 R E Q U R E D asses eee x2 3 7 6 1 1 4 8 2 x40 2 4 48 3 4 5 x 10 x 124 cm x2 T 0 05 05 0 0 0 0 0 0 0 0 0 0 CA m 2 X 4 x 96 5 x 10 x 244 cm VEGIN Attach soffit trim flush to sidewall panels and under roof panels Fig A using 1 1 4 screws as shown Ce Secure ends of TP and AN with 2 3 screws through gable trim Fig A ED Repeat step 1 2 to attach soffit trim on opposite side 1 5 FINISH You have attached your soffit trim Screws 3 7 6 cm 48 3 4 124 cm Screws 3 7 6 cm Screws 3 7 6 cm 47 BATTENS 6 PARTS REQUIRED 2 5 cm x40 z 3 8 x 1 3 4 x 82 1 4 0 9 x 4 4 x 209 cm V EGIN Install top of battens positioned against TP and AN on side wall panels Fig A using 2 nails as shown Evenly space battens 24 apart covering any seams on panels ED Repeat steps to attach battens on opposite
24. l into each rafter Fig E Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Flush Attach the second 11 1 4 x 96 lower roof panel flush to first panel along edge 7 16 x 11 1 4 x 96 7 7 and with the 3 4 measurement Fig F 1 1 28 6 244 cm A At one end attach a lower 25 3 4 x 48 roof panel flush to the center panels Fig G and with 1 8 at gable trim Fig H Nail the roof panel using 2 nails 6 apart 22 1 4 gt 24 gt 24 24 24 gt 9 cm 61 61 61 61 89 Attach one upper 11 1 4 25 3 4 roof panel Fig E flush to the installed panel Fig G and flush at 2 Nail peak Fig H and with 1 8 at gable trim Fig J ye 0 32 cm Gable Nail the roof panels using 2 nails 6 apart Trim 7 Fig J Flush Move to opposite end to install two more panels 25 11 1 4 process to attach roof panels 28 6 cm on the opposite side FINISH ou have finished installing your roof panels 3 4 1 9 mm X 44 COLLAR TIES PARTS REQUIRED 2 5 cm x18 xa 1 4 60 2 5 x 10x 152 cm th VEGIN Position and level each JF on first three rafters past door opening Do not install JF over loft Og HINT For best appearance instal
25. ons LLC pay the cost of labor or installation or any other costs related thereto All warranties are from date of purchase If a cash refund is paid on an affected part it will be prorated from the date of purchase CONDITIONS The warranty is effective only when 1 The unit has been erected in accordance with the assembly instructions 2 The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter 3 The failure occurs when the unit is owned by the original purchaser 4 Backyard Storage Solutions LLC has received the warranty registration card within thirty 30 days of purchase and notification of the failure in writing within the warranty period specified above Backyard Storage Solutions LLC has had reasonable opportunity during the sixty 60 days following receipt of notification to inspect and verify the failure prior to commencement of any repair work REQUIREMENTS Storage Buildings amp Playhouses To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit shingle the roof and paint or solid colored stain the siding using 10096 acrylic latex exterior product with a minimum of two 2 coats within thirty 30 days of assembly caulk above all doors and all horizontal and vertical trim boards paint and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edg
26. ove the panel side to side until the top corner is flush to the floor frame Fig B Secure panel with two 2 nails in the corners Check the floor frame is square by measuring diagonally across the frame corners If the measurements are the same your floor frame is square The measurement will be approximately 173 1 16 440 cm Fig C Continue attaching the panel using 2 nails 6 apart on edges and 12 apart inside panel Use a chalk line or use pre painted grid lines to nail into joists under panel Grid lines up 2 Nails 2 Nails us 2 Flush id e gt gt 173 1 5677 440 Fig C 12 FLOOR PANELS PARTS REQUIRED 2 5 cm x110 2 5 8 x 48 x 96 X 1 6 x 122 x 244 cm Continue installing panels with rough side up painted grid lines Use grid lines on panel for 2 nails 6 apart on edges and 12 apart inside panels FINISH You have finished attaching your floor panels E cocco Grid lines T 1 111 111 1 11 111 1 Flush Flush 13 IMPORTANT Check the floor frame is level after installing floor panels Re level if needed j The floor should used as a stable work surface for wall construction Organize your assembly procedure during the build process HINT to avoid over handling of the walls Back wall yA Side wall Front wall 0 0 14 SIDE
27. own Actual Size X3 BOXES 3 7 6 cm X4 BOXES H 2 5 0 cm FASTENER HARDWARE BAG Shown Actual Size 113 1 1 2 3 8 110 gt 5 0 cm x64 rere 1 1 4 3 2 cm 1 70 3 7 6 x20 Deest 2 5 0 96 5 Deme 1 1 4 3 2 cm 3 4 1 9 DOOR HARDWARE Not Actual Size 2 xe Dunt 3 4 1 9 om x2 Deme 1 1 4 3 2 cm 6 FLOOR PANELS Not Included You will need floor panels and nails to complete your floor Floor panel sizes and quantities are shown below NOTE Use a minimum of 5 8 1 6 cm oriented strand board OSB 3 8 48 96 1 6 x 122 x 244 cm x1 11b of 2 5 0 cm Hot Dipped Galvanized Box Type Nails 2 5 0 cm NOTES FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame Our recommended leveling method is shown below Leveling materials are not included in this kit PREFERRED METHOD 4x4 TREATED RUNNERS 3 Screws angled into 4x4 2 at each point frame and 4x4 touch 30 5 cm Measurements to centers of 4x4 s MATERIAL REQUIRED X2 4 x4 x 12 10 x 10 x 366 cm Treated Lumber Fasteners for Frame to 4 4 3 Screws shown as one option Minimum 28 3 screws exterior grade N Use only wood treated for ground contact and fasteners approved for use with treated wood Always su
28. plate is required when installing your shed on concrete Hint Use treated lumber in your kit or purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x A 5 x 10 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements NOTES FLOOR FRAME PARTS REQUIRED 2 3 7 6 cm x32 2 x 4x 96 5 x 10 x 244 cm X7 mew Ec for T 2 x 4x 93 5 x 10 x 236 cm TREATED x2 mw 2 4 48 5 x 10 x 122 Stamp V GEGIN QD Orient parts as shown on flat surface Measure and mark Cn Use two 3 nails at each mark p Mw ww 22 FINISH Zz You have finished your floor frame Proceed to level and square frame WS HINT For easier nailing stand on frame 144 366 cm 120 305 cm 96 244 cm 72 183 48 Ef 244 cm 122 cm 2 61 cm T Wa WIL Flush Offset Seam SO BN Center on marks 93 244 cm 236 cm Offset Seam uz cm 2 r 244 cm NENNEN Flush 10 lt Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed N LEVEL AND SQUARE FLOOR FRAME e WBEGIN C Se
29. pport frame seams Maximum between leveling Shingle 4x4 Runner material locations Level 48 gt 12 E Gravel 2 Block Gravel LEVELING METHODS 4 Block 2x4 Treated Lumber 8 Block Level under 4x4 runners only Locate leveling material 12 from ends of runners and no more than 48 apart Asphalt shingles should be used between 4x4 runners and blocks or treated lumber Never use shingles in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING MATERIALS Gravel Solid Masonry Blocks in 1 2 4 or 8 thickness 2x4 Treated Lumber Asphalt Shingles N Leveling higher than 16 not recommended CONCRETE e f you are building your shed on a concrete foundation see the following page 8 FOUNDATION Your kit contains all materials to construct a wooden floor If you choose to install your kit on a concrete slab refer to the diagram below Treated Sill Plate Caulk between sill plate and concrete Building Size Actual Size A B C 8 x 12 244 x 366 cm 96 x 144 244 x 366 cm 96 244 cm 137 345 cm 144 366 cm Requires 2 2 x4 x 12 5 x 10 x 366 cm MUST be treated lumber 2 2 4 8 5x 10 x 244 MUST be treated lumber x1 Cauk A Allow new concrete slabs to cure for at least seven 7 days A treated 2 x 4 5 x 10 cm sill
30. s 2 CUSTOMER SERVICE Call 1 800 221 1849 email customerserviceGbackyardproductsllc com TOOLS Phillips Utility Knif Tool Belt Nail Pouch Shingle Blades Q Drill Driver C 1 4 Drill Bit Tin Snips 2 3 8 Drill Bit 4 Caulk Gun drip edge SEI 1 2 Drill Bit 2 Philips Drive Bit Chalk Line Paint Tools ye Hammer oom Nail Gun 1 Level Safety Glasses Se gun nails A Ladder O Gloves E Square Safety Always use approved safety glasses during assembly HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual Assistance Required two or more people 27 Mark part with pencil Ensure squareness BEGIN Beginning of steps for assembly or installation Important required step or operation Qi usn You have finished the assembly or installation Helpful assembly hint Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C P
31. s shown ED Repeat step 1 installing AW over seam at back side FINISH 5 You have finished installing your horizontal gable trim 1 1 4 3 2 cm x24 AW 42 ROOF PANELS PARTS REQUIRED 2 5 4 21 7 16 11 1 4 96 3 4 1 1 x 28 6 x 244 cm GAUGE BLOCK 7 16 x 48 x 96 1 1 x 122 x 244 cm 7 16 x 11 1 4 x 25 3 4 7 16 x 25 3 4 x 48 S H 1 1 x 29 x 65 4 cm 1 1 x 65 4 x 122 cm Roof panels may cause serious injury until securely fastened f You must square the roof by attaching one panel fist You will use the panels long edge as a lever to bring your roof into square Commonly known as racking aK VGEGIN Attach the 48 x 96 panel with the rough side up painted grid lines side with a 3 4 Two Nails measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is 3 4 measurement to the rafter Fig D You may need to move your rafter to get the 3 4 measurement Secure panel with two 2 nails in the corners 43 ROOF PANELS PARTS REQUIRED Gr 2 5 cm x174 S 4 21 GAUGE BLOCK _ amp Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nai
32. sh nails into framing Via as shown GAZ Do not nail into window flange lt p HINT Mark edge of window frame on ZJ Inside Framing K l CENTER coL ZJ o3 WINDOW TRIM PARTS REQUIRED x3 2 5 cm x14 5 8 x 2 1 2 x 9 1 6 x6 3 x 23 cm QQ install three EY using 2 nails into framing as shown NOTE Use marks ZJ for locating window flange WELZ 27 A N Do not nail into window flange Lr DOS CED Remove temporary screws after installiing three EY EY x3 Mark Kee aligned Flush Ncaumow Do not nail into window flange 54 PARTS REQUIRED 4 0 E 5 8 x 3 x 72 1 6 x 7 6 x 183 E frm Install ZJ centered over windows using seven 2 finish nails into framing N Do not nail into window flange L4 P lt gt we SK Keep aligned 1 JIE Keep aligned HW CAUTION Do not nail into window flange From inside install 3 4 screws into ZJ and outer two EY N Do not screw into window flange Install 3 4 1 9 cm screws from inside Woe CAUTION Do not screw into window flange 55 DOOR WEATHERSTRIP PARTS REQUIRED X2 AA 2 x 3 x 69 5 x 7 6 175 cm Y WBEGIN GP With left door closed center a weatherstrip OO
33. side FINISH You have installed your battens Nails q 2 5 cm 48 DOORS PARTS REQUIRED 1 1 3 5 2 5 7 6 12 7 cm x1 1 1 4 3 2 cm x2 2 x 3 x 69 5 x 7 6 x 175 3 cm 3 7 6 4 HINT Look for 3 8 SPACER attached to doors al i x1 Y Left Door Right Door 9 WBEGIN Orient parts as shown on flat surface N offset is to top Look for red 5 2 right and green left on hinge board 2206 Attach temporary support OO with 3 screws in middle and at ends Tighten securely ED Attach temporary support GAA at bottom with 1 1 4 screws Tighten securely GREEN RED OFFSET OFFSET dem Make sure spacer da i is attached 1 cm 23 1 2 1 59 7 4 3 7 6 Crews DX Screws securely O 14 3 cm NOTE Screw hole will be used later 23 1 2 59 7 cm S Q N 43 a DOORS PARTS REQUIRED D SNR 3 7 6 cm x13 1 2 x 3 x 69 5 x 7 6 x 175 3 cm Attach temporary support OO as ledger board flush under wall panels for doors to rest on using three 3 screws Fig A 27 OO Flush AN against wall panels a _ OO J Fig A CED Center doors on panel seam as shown Fig B N Check ledger board is still flush under panels Screw hinge boards
34. tall PT level against studs and with top edge of loft support Secure PT with two 3 nails at each stud and at door side with two 3 screws ext Flush at top of loft support 2 3 7 6 cm 3 7 6 cm 2 3 NU 6 cm Screws at end only Nails Flush Nails 9p j T TT ag WZ Loft Support NOTE There will be a gap at the end of PT PT oo LEFT SIDE WALL Zo 31 SHELF FRAME PARTS REQUIRED 3 7 6 8 x1 PT CU 2 x 8 x 96 5 x 7 6 x 244 cm S KONE _ 9 AN Assistance may be required to install PT Place PT against loft support Fig A and secure flush using two 3 screws lt gt AN Check PT for level and secure at front wall with two 3 screws FINISH You have finished installing your left side shelf frame Repeat steps 1 through 4 on right side for second shelf frame Front Wall 2 4 7 6 cm Support crews 44 2 3 7 6 Loft Screws Support PT S e AFN Iri MSN 2 Flush _ gt There will be a gap at the end of PT EE im 32 A M WORKBENCH 3 7 6 cm x4 xi PT 1 1L 2 X 3 x 96 5 x 7 6 x 244 cm mg WBEGIN e Measure the top of back wall workbench support from floor Measure and mark the 2 222 same measurement on the back si
35. ter front panels are installed FINISH You have finished your front wall frame Fig A 2 3 10 cm Nails Flush l 2 1 2 Support 6 3 cm Fig B 2 3 10 cm Screws 2 1 2 Flush 6 3 cm FR we 42 lt n 106 7 cm 106 7 cm FRONT WALL PANELS PARTS REQUIRED 1 1 2 3 8 cm x24 t 89 N Handle panels with care to avoid breakage WBEGIN Place left panel on front wall frame with primed side up as shown Hold the 1 1 4 and 1 4 measurement nail with 1 1 2 nails 6 15 cm apart Maintain 64 162 5 cm measurement between studs and square frame Temporary Supports 1 1 4 3 2 cm N Primed side UP 2 12 le 30 5 Du rs e e e Y _ cA I l i 1 4 0 6 cm BELOW PANEL E 1 1 4 8 2 cm HANDLE WITH CARE PREVENT BREAKING AT CORNERS HOLD MEASUREMENT AN E m 15 le i MAINTAIN MEASUREMENT BETWEEN STUDS 64 162 5 25 FRONT WALL PANELS PARTS REQUIRED gt 2 1 1 2 8 8 x80 _ 1 30 5 x 61 cm HU f 48 GD Place right panel on front wall frame with primed side up as shown 3 Nail with 1 1 2 nails 6 15 apart Maintain 64 162 5 cm measurement between studs and square frame Place right and left 12 24 31 x 61
36. th one 2 nail Fig B 2 b cm Nail gt uS S al On x Be sure the measurement between the panel T E 112 SAME edges is the same along the entire length Then secure with one 2 nail in the upper 7 corner Fig C e x Fig C 15 am Nail along the panel edge into the sidewall stud using 2 nails spaced 6 apart Secure the frontwall frame using two 3 screws Fig D Repeat process to secure the right side of the frontwall 2 3 7 6 cm Screws FINISH You have finished standing your front wall 29 LOFT FRAME PARTS REQUIRED 7 6 cm x8 x2 EE 2 V GEGIN ED Measure the top of back wall loft support to floor Measure and mark the same measurement on the back side of sidewall studs at each side as shown Ce Install one TP level against back side of studs at mark with two 3 nails at each end Hepeat steps 1 2 to install second TP FINISH You have finished installing your loft frame A 2 lt 9 27 2 V monn V d 1 fh Loft Support SAME MEASUREMENT ZA E TN FLOOR SHELF FRAME PARTS REQUIRED ARAS 3 7 6 cm x4 xil PT 2 x 8x 96 5 x 7 6 x 244 cm 3 7 6 cm P mono 7 O WBEGIN C5 Place PT flush to top of loft support as shown Fig A Ca Ins
37. vertically on the left door in the door c7 7 A A opening Fig A OO will offset the left door 1 OUT past the door trim 1 Fig B 3 secure OO using seven 3 screws through outside trim into OO Fig ED On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig Secure OO using seven 3 screws through outside trim into OO Fig C FINISH p You have finished installing your door weatherstrips 1 OFFSET 2 5 cm ae Center OO in door opening OFFSET 2 5 cm Fig B A N P DOOR PARTS REQUIRED x2 3 4 1 9 cm x12 V GEGIN s 9 Mount one barrel bolt flush at top of OO on left door using 3 4 screws rS AZ as shown Fig 3 Mount the second barrel bolt flush at bottom of OO on left door using 3 4 screws as shown Fig B With door closed mark bottom hole location for bolt to extend into HINT Extend lower bolt to leave mark in wood Tap bolt with hammer Drill 3 8 hole through floor deep enough for lower bolt to slide into FINISH You have finished installing your barrel bolts LEFT DOOR HINT With door closed Ww extend bolt and tap with hammer to leave a mark in wood for drilling Drill 3 8 hole in line with bolt 57 DOOR HARDWARE PARTS REQUIRED 1 1 4 3 2
38. warranty you can either call 1 888 827 9056 or prepare a letter Please have ready the information below when you call or include the information when writing 1 The model and size of the product 2 A list of the part s for which the claim is made 3 Proof of purchase of the Backyard Storage Solutions LLC item as shown on the original invoice 4 Run code as listed on the yellow warranty card enclosed in the product package Mail the above information to Backyard Storage Solutions LLC Attn Customer Service 1000 Ternes Monroe MI 48162 WARRANTY TERMS MAY VARY OUTSIDE THE U S A IMPORTANT This is your warranty certificate Please complete and mail your warranty card to properly validate your warranty 65
Download Pdf Manuals
Related Search
Related Contents
DRM025, 3-Phase BLDC Motor Control with Hall Sensors Using Power Meter - Schneider Electric Le caoutchouc est sur mesure Matériau fascinant et durable Selon NmxToCD1 Version 1.41 User Guide Sony Mobile Communications AB お客様へ 益 重ゴ Insys GSM 4.2 LOGO! compact KIT Copyright © All rights reserved.
Failed to retrieve file