Home
Great Day RR100SB Instructions / Assembly
Contents
1. eae MODELS RR100SB amp RR100LB READ ALL INSTRUCTIONS BEFORE INSTALLING RUGGED RAILS Instructions for Installation and Use Contents See Fig 1 2ea Rugged Rails 4ea 2 x 1 1 4 Bolts 4ea Locknuts 8ea Flat washers 4ea 4 x 1 1 4 Lag Screws UT 280 Ss OPO Fig 1 Select desired location on sides of truck bed Mark selected holes with a short pencil for drilling See Fig 2 Fig 2 Once holes are marked and before drilling feel under truck bed top to check for clearance If clearance is available holes should be drilled with a drill bit and the 7 1 1 4 bolts with flat washers and locknuts will be used If there is no clearance available holes should be drilled with 1 8 drill bit This will allow rails to be attached to truck using the lag screws and flat washers provided See Fig 3 Remove rails and drill appropriate size holes for suitable method of attachment Make sure holes are in the desired position and marked accurately before drilling See Fig 4 Fig 4 Replace rails over drilled holes and secure to truck with necessary hardware Tighten thoroughly NOTE To avoid stripping hole when using lag screws do not over tighten See Fig 5 Fig 5 A WARNING NEVER STAND ON RUGGED RAILS A WARNING NEVER SIT OR STAND ON RUGGED RAILS WHILE VEHICLE IS IN MOTION NEVER PLACE FOOT OR HAND ON RUGGED RAIL WHILE JUMPING OR CLIMBING FROM VEH
2. ICLE For more information about this or other products contact us at Great Day Inc 604 Kimbrough Dr Tallulah LA 71282 866 649 1918 www greatdayinc com
Download Pdf Manuals
Related Search
Related Contents
1(558KB) PYLE Audio PLCD67 User's Manual Samsung GT-C3510T คู่มือการใช้งาน Samsung SM-T2105 User Manual Neutron Engineering Inc. Samsung T23B550EW Manual de Usuario TECHNICAL MANU TECHNICAL MANUAL 化学物質管理基準 - 京セラドキュメントソリューションズ Copyright © All rights reserved.
Failed to retrieve file