Home
dVault DVCS0020-5 Installation Guide
Contents
1. veneering the unit with brick stone or other decorative materials properly prepare all contact surfaces and use manufacturer recommended adhesives Surface preparation may include lightly sanding contact surfaces only until the shine has become dull or prepare a scratch coat contact your materials supplier for proper surface preparation NOTE Do not veneer security drop access doors or alter the weight of the door mechanism in any way Doing so will cause the door mechanisms to malfunction IT IS IMPORTANT TO CONSULT WITH LICENSED PROFESSIONALS INCLUDING ELECTRICIANS WHENEVER WORKING WITH OR INSTALLING UNDERGROUND FEEDS LAMPS LAMPPOSTS OR ANY OTHER ELECTRICAL HARDWARE AND LICENSED CONTRACTORS FOR VENEERING FRAMING AND OR OTHER INSTALLATIONS IT IS IMPORTANT TO NOTE THAT IT IS NOT THE RESPONSIBILITY OF MAIL CARRIERS TO OPEN MAILBOXES THAT ARE LOCKED ACCEPT KEYS FOR THIS PURPOSE OR LOCK MAILBOXES AFTER DELIVERY OF MAIL Unit diagram including dimensions on the back dVault Company Inc e 9800 Mount Pyramid Court Suite 400 Englewood Colorado 80112 Phone 720 895 1908 Fax 720 895 1909 World Wide Web hitp www dvault com eVaulit
2. INSTALLATION INSTRUCTIONS CURBSIDE UNITS dVault Tools and or Materials Required 9800 Mount Pyramid Court e 5 3 8 X 2 Lag Screws with anchors Fourth Floor 20 Square flat hard level surface such as concrete Englewood CO 80112 Y2 inch open box end wrench or socket set Other tools materials may also be necessary INSTALLATION depending upon actual installation INSTRUCTIONS DVCS0020 DVCSO0030 Installation Procedure 1 General Installation Requirements Customers are required to contact the local Post Office before installing the mailbox to insure its correct placement and height at the street Generally mailboxes are installed at a height of 41 45 inches from the road surface to inside floor of the mailbox or point of mail entry locked designs and are set back 6 8 inches from front face of curb or road edge to the mailbox door lt is recommended that unit s are anchored to a flat level and solid surface such as concrete at least 20 W x 20 D x 3 H If pouring your own concrete properly prepare site mix concrete according to manufacturer s specifications and make the appropriate accommodations for concrete anchor nuts and underground feed for electrical wiring conduit if any After concrete is fully cured open access door of unit and remove false bottom Install 5 lag screws 5 3 8 x 2 to anchor the unit to the concrete pad Reinstall false bottom close and lock access door If
Download Pdf Manuals
Related Search
Related Contents
YAeHMOP - Yale Department of Chemistry Mikro-Tip Ultra-Miniature Pressure-Volume Catheter Animal 取扱説明書 (オペレータ用マニュアル) PD15X-X NI 9512 Operating Instructions and Specifications Copyright © All rights reserved.
Failed to retrieve file