Home
        Swanstone SD00036OB.081 Installation Guide
         Contents
1.  pai  AO  f MA f  Pia    P  tT     F H CAULK ALL AROUND OUTSIDE  WHERE UNIT MEETS SHOWER  SHOWER BASE BASE AND WHERE WALL JAMBS  MEET    THE SHOWER WALLS ae       Fig  5  TO INSURE A LEAK PROOF INSTALLATION   First  Run a bead of clear mildew resistant caulking around the    outside of shower enclosure where shower unit meets the shower  base  see figures 5 and 5a            Second  From inside the shower unit  caulk the six  6  circled  areas indicated in figure 5 above  caulk the crevice where the  horizontal member meets the vertical member as shown in fig 5b            a    CAULK ALL  CREVICES   SEE   o  CIRCLED  AREAS IN  FIGURE 5                                                CAULK ALL AROUND  WHERE UNIT MEETS  SHOWER BASE  SEE FIG 5                       Fig  5a Fig  5b    Carefully follow caulking manufacturer s instructions before using  shower     SwanStone_07 18 06    
2. 43 SIDE PANEL CORNER POST 2  b4 834 SIDE PANEL ASSEMBLY SCREW  not shown  8 S  a  C      DOOR FRAME ASSEMBLY 1 a  c1 240 DOOR FRAME HEADER   SILL 2 3  c2 245 DOOR FRAME PIVOT POST 1 T  c3 241 DOOR FRAME STRIKE POST 1 a  c4 227 DOOR PANEL FRAMES 2 D  c5 229 DOOR PANEL PIVOT STILE 1 T pa   c6 226 DOOR PANEL STRIKE STILE 1  N    c7 CP201 PIVOT PIN  not shown  2    c8 CP209 PIVOT BUSHING 2    c9 FW 10 093 PLASTIC PIVOT WASHER 2      c10 9842 MAGNETIC STRIPS 2 2 cc  c11       designation not used     L a    c12 6112FHSL DOOR PANEL ASSEMBLY SCREW  not shown  4 S S z  c13 834 DOOR FRAME ASSEMBLY SCREW  not shown  8 Q  z a  c14 C173B DOOR GLAZING VINLY  not shown  B m 3    a    D 1329 PLASTIC SCREW ANCHOR 6 2 E z  E 834P  8 x 3 4  PAN HEAD PHILLIPS SCREW 6 a T    E 834PFH  8 x 3 4  FLAT HEAD PHILLIPS SCREW 6 2 ao He  G 638PHPT  6 x 3 8  SELF DRILLING PHILLIPS SCREW 6 2 E 3  H C176B VINYL SWEEP 1   s  l C202B PANEL GLAZING VINYL  not shown    e S    2 SwanStone_07 18 06    STEP 1    Positioning Wall Jambs                                                                         J     T         B  Po U  5 8    ale   ai  in     ALIGN OUTSIDE  ALIGN OUTSIDE LEG W OFFSET  LEG W OFFSET MARK   MARK  CURB CENTERLINE  Fig  1  STEP 2  Installing Wall Jambs  a A gt   WALL JAMB  A      r  WALL JAMB  INSTALLATION SCREW 7  r  r                      Mu       Fig  2    Reposition Wall Jambs  A  against shower walls  Re   align the Wall Jamb holes with the installation holes  drilled in the shower wall
3. a  FAX NO  SWANSTONE      314  231 8165    One City Centre   Ste  2300  St  Louis  Mo 63101    CHALLENGER    MODULAR NEO ANGLE SHOWER ENCLOSURE  INSTALLATION INSTRUCTIONS                                                                                                          i                                                                                                                                                                                              hone      TOOLS   MATERIALS NEEDED  1 8  DRILL BIT LEVEL SAFETY GLASSES  ELECTRIC DRILL HAMMER    MEASURING TAPE  PENCIL   FELT TIP PEN    CENTER PUNCH  PHILLIPS SCREW DRIVER      FOR CERAMIC TILE WALLS  USE A 3 16  MASONRY DRILL BIT    1                                  TELEPHONE NO    314  231 8148          CLEAR CAULKING OR SEALANT    EXPLODED VIEW OF MODULAR NEO ANGLE   LEFT HAND PIVOT SHOWN                                                                                                                                                                                                                                                                                                                                                                                                            Lat        78  amp  9                      top and bottom   top    H   PARTS LIST  KEY PART  LETTER NUMBER DESCRIPTION QUANTITY  A 201 WALL JAMB 2  B      SIDE PANEL ASSEMBLY 2  b1 210 SIDE PANEL RAILS 4  b2 202 SIDE PANEL EXPANDER 2  b3 2
4. s  Secure each Wall Jamb  A   with three  3   8 x 3 4  pan head screws  E         Determine the curb centerline  then offset and mark a line  5 8 of an inch toward the outside of shower as shown in  figure 1     Separate the Wall Jambs  A  from their respective End  Panels  B  as shown in exploded view     Position Wall Jambs  A  up against shower walls       aligning their outside legs with the offset mark previously  marked on base ledge     Use a level to plumb Wall Jambs  A   Then using a felt tip  pen  make a mark on the shower walls thru each of the  three  3  installation holes  Remove Wall Jambs  A  and  lightly center punch installation hole locations     Drill 1  deep installation holes in the locations previously  marked  Use a 3 16  masonry bit when drilling thru ceramic  tile  marble or any masonry type surface and insert Plastic  Screw Anchors  D                                                                                                                               STEP 3  Installing Side Panels  SIDE PANEL aa  EXPANDER JAMB gt  gt  7     ee  Q  ZA    A   WALL  JAMB  o  o  PA ADJUSTMENT  HOLES TO  THE INTERIOR  g  SIDE PANEL  e  C  Fig  3    Lift Side Panel  B  onto base ledge and slide Panel  Expander Jamb over Wall Jamb  A   Insure that  Expander Jamb adjustment holes are toward the interior  of the shower  Repeat step for other side     STEP 4  Vinyl Sweep Insert  amp  Door Frame Installation       DOOR WIDTH     3 8       VINYL SWEEP LENGTH          Mea
5. sure the Door Assembly width  then trim the Vinyl Sweep to  3 8    less than measurement obtained  see figure above         NOTCH VINYL SWEEP AS  SHOWN  INSERT NOTCHED  END FIRST AND CRIMP SLOT             VINYL SWEEP SLOT    Notch end of Vinyl Sweep as shown  Determine bottom of Door  Assembly and insert Vinyl Sweep into bottom rail  Insert 3 32     notched end first     ENGAGE ASSEMBLIES HERE    Fig  4b    Place Door Frame Assembly  C  between the Side Panels  B    Starting with the pivot side first      engage the length of the Panel  Assembly with the Door Assembly as shown in figure 4b  Secure  Door Frame Pivot Post to the Side Panel with three  3   8 x 3 4   flat head screws  F   Repeat procedure for the Strike Post side                 oO  6880  SIDE PANEL so  SIDE PANEL  ASSEMBLY ASSEMBLY   amp         amp   TOP VIEW    LEFT HAND PIVOT SHOWN       DOOR FRAME  ASSEMBLY             Fig  4c    Center shower enclosure on base ledge  Using the Panel Ex   pander Jamb adjustment holes as guides       fasten Side Panels   B  to Wall Jambs  A  using three  3   6 x 3 8  self drilling panel  adjustment screws  G  as shown in figure 4c     STEP 6 Caulk for a leak proof installation                                                                                                                                                                                                                                                          Yi  SEE FIG 5b  BELOW   TYPICAL 5  PLACES    I       x
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
  PT 3A 75mm/3in Bomba centrifuga de barrido  D 10635 - Agence de l`eau Artois Picardie  Sexualité, handicap et manifestations atypiques  Philips Forecast Capitola  Léxique Décret exécutif n 13-378  Télécharger  User Manual - OptoLyzer OL3150o  2. 消防防災用設備機器性能評定細則 - 一般財団法人日本消防設備安全  Datasheet    Copyright © All rights reserved. 
   Failed to retrieve file