Home
Aston SDR976-TR-SS-60-10-L Instructions / Assembly
Contents
1. SUPPLIED PARTS Installation Guide Please read and follow the installation instructions and guidelines in this section Failure to follow the recommended instructions and installation techniques may lead to possible damage to the unit or the surrounding area This can affect warranty claims ATTENTION This unit requires assembly A minimum of two people are required for assembly as several of the sections can be large and unstable until assembled You will need the following tools Qo ke OS Um Caulk Tape Measure Pencil Phillips Screwdriver a E 4 8 dl R 0 Caulk Gun Level Electric Drill Drill bit 974 Hammer Miter saw or Hacksaw Locate the accessory box and remove the individual screw and hardware packages Lay them out in sequential order to aid in completing the rest of the installation Preparation of base for installation of shower tray WARNING THE Aston shower door and tray are designed to be used with tile walls If you are using a pre made Acrylic ABS FRP shower stall that will be thicker than average wall board plus tile then you must consider the offset of the pre made panel The shower tray has 1 4 of tolerance for over sized wall thickness The shower tray needs to sit on a flat level base for proper support Ensure that the area for the shower tray is properly prepared for installation Using the drawing provided place the floor drain in the proper location s
2. ASTON 28 Bringing Serenity to Your Hamre and Tranquility ta Your Every Day Life m Shower Door With Tray Model Number SDR976 01 60 L Please carefully read these instructions before you begin to install the products 03 14 Rev B P N SDR976 01 60 L Before you start Thank you for purchasing your Aston shower door We hope that it will provide you with years of satisfying use and enjoyment Please read this manual carefully because it contains information and instructions about the proper installation of the unit If you do not follow certain conditions of installation and maintenance your warranty may be affected 1 Inspect boxes for shipping damage If the product has been damaged is missing parts or has a finishing defect please contact our customer support department within 5 business days of delivery date 2 NOTE You should consult your local building codes with questions on installation compliance standards Plumbing and building codes vary by location 3 Before installation inspect installation surfaces or level and have to the strength to support the heavy weight of this shower door assembly This Shower Door should only be installed using the connection point to the studs or to pre installed 2x6 wood reinforcements behind the wall 4 This Shower Doors assembly is very heavy and requires professional installation Aston Shower door s feature e Tempered Safety Glass e High quality hardware e Easy mai
3. Inc Aston Global warrants to the original retail purchaser Owner of any Shower Door Tray product Product at the original installation site for a period of Five 5 years from date of purchase whether directly from Aston Global or an authorized reseller that the Product manufactured by Aston Global is free from manufacturing defects in materials and workmanship when used under normal conditions and when such Product has not been modified or changed in any manner after leaving Aston Global s warehouse or plant If any Product manufactured by Aston Global is found to have manufacturing defects in materials or workmanship such Product will be repaired or replaced by Aston Global This warranty applies only against defects discovered within the warranty period and extends only to the original purchaser of the Product Parts repaired or replaced under the terms of this Warranty will be warranted for the remainder of the original warranty period only Proof of purchase is required to exercise this Warranty Aston Global may at its option examine and inspect the alleged defective Product and Aston Global may request that parts be returned to Aston Global at Owner s expense for factory inspection The determination as to whether Product shall be replaced or in the alternative repaired shall be made solely by Aston Global If a Product is determined to be covered by the above Warranty Aston Global will ship the replacement part
4. install the threshold bar assembly Install the decorative screw plug covers into threshold end caps 12 See figure 6 16 Installing the door seals Installing the door handle Install the door handle 16 using hardware provided Follow the assembly sequence seen in drawing Final sealing Using Bath amp Kitchen silicone sealant seal the fixed glass 3 along bottom edge on shower base and side edge along shower wall Next seal around sliding door track divider 7 19 Care and Maintenance As with any other luxury item maintenance and care are critical to the long lasting quality and enjoyment of your shower door and tray The proper care and maintenance outlined in this section are necessary to ensure the longevity of the unit Damage caused by not following the care and maintenance guidelines in this section is not covered under the manufacturer s warranty The glass doors and panels can be cleaned using any commercially available glass cleaner We recommend that you clean the glass daily and squeegee the glass with a silicone or rubber squeegee after each use to help prevent water spots 20 Warranty PLEASE READ THESE WARRANTY TERMS AND CONDITIONS CAREFULLY BEFORE USING YOUR ASTON GLOBAL BATHROOM PRODUCT BY USING THE PRODUCT YOU ARE CONSENTING TO BE BOUND BY THE FOLLOWING WARRANTY TERMS AND CONDITIONS SHOWER DOOR SHOWER TRAY Aston Global Inc Parts Only Limited Warranty 5 years Aston Global
5. or other wall covering 2 Measure the width of the shower opening at the top between the 2 walls Note this is dimension X The following equation is used to determine the length to be cut from the rail in order to fit the shower opening You 3 Measure distance Y from the end of the Top Rail 2 with mounting holes and mark the rail 4 Using a Hack saw or Jig saw cut the Top Rail 2 at the mark Carefully remove any burrs or sharp edges remaining on Top Rail 2 after the cutting 8 Mark the Top Rail Location ATTENTION A minimum of two people are required for the next assembly steps Preassembly the top rail onto the fixed glass to locate the mounting points on the wall relative to your desired location Painters tape or masking tape in the general location of the of the final installation will aid in marking the wall and floor mre ili SSS Slide the door stoppers 1 onto each end of the the top rail 2 The bumpers on door stoppers 1 should face inward and be on top for final installation See figure 1 Assemble top rail 2 to fixed glass 3 following the assembly sequence shown in figure 2 Note the door stopper 1 is positioned between the Fixed Glass assembly hardware See figure 2 Note The top rail 2 is attached to the inside of the fixed glass 3 Install both rail ends onto the rail Loosen set screw on rail ends 5 and remove wall mounts 6 from rail ends 5 Next slide rail end
6. AL OR INCIDENTAL DAMAGES RESULTING FROM THE BREACH OF ANY EXPRESS WARRANTY Some states do not allow the exclusion or limitation of incidental or consequential damages so the above limitations or exclusions may not apply No dealer distributor service company or other party is authorized to change modify or extend the terms of this warranty in any manner whatsoever Aston Global and it representatives shall not be liable for any injury loss cost or other damages whether incidental or consequential arising out of any defect covered by this Warranty including and without limitation loss of use of the Product and cost for removal of defective Product even if Aston Global has been advised of the possibility of such damage The liability of Aston Global under this Warranty if any shall not exceed the original amount paid for the Product covered by the Warranty Coverage under this Warranty shall commence as of the original date of purchase and the duration of such coverage shall not extend for any reason whatsoever beyond the stated time period The 22 Customer is required to provide adequate access the Product for any repair or inspection Aston Global shall not be liable for expenses or damage which may include but are limited to water damage removal of any and all common building product such as tile flooring wood sheet rock plumbing fixtures concrete board vanities bathtubs and toilets or any other custom items THIS WARRANTY GIV
7. ES YOU SPECIFIC LEGAL RIGHTS AND YOU MAY HAVE OTHER RIGHTS WHICH VARY FROM STATE TO STATE ASTON GLOBAL S FAILURE TO ENFORCE ANY TERMS OR CONDITIONS STATED HEREIN SHALL NOT BE CONSTRUED TO BE A WAIVER OF SUCH PROVISION For prompt service notify the original installer who in turn will notify the Aston Global distributor who supplied the Product If this does not result in prompt service contact Aston Global Inc at the address below with details in support of the warranty claim For any questions about coverage of this Warranty contact Aston Global at the address below Aston Global offers free phone support for the life of the Product to the original Owner The Warranty applies only to Products manufactured on or after January 1 2012 This Warranty may not be combined with any other warranty offered by Aston Global 23 ASTON CERA Erinseng Serenity to Your Hane and Trangniity to Your Every Pay Life Customer Service 877 424 9699 Aston Global Inc 10480 Brockwood Rd Dallas TX 75238 If further assistance is needed or you have a question please visit our web site at www astonbath com
8. f your surface is prone to cracking or chipping then it is recommended that you pilot drill first using a smaller drill bit and then step up to the final size 9 Using the appropriate drill bit for your tray surface drill hole locations with 1 8 diameter drill bit Position the sliding door track divider 8 over drilled holes and secure sliding door track divider 8 to tray using hardware in screw pack 2 See figure 9 12 Install Wheel Rollers onto the Door Assemble the upper roller assemblies 9 onto sliding door 4 as seen in figure 1 Note The door handle mounting holes should be positioned to left The upper roller assemblies 9 will be on the outside of sliding door 4 The sliding door should be to the inside of shower area 13 Hanging the Door UPPER ROLLER CAM Bottom Roller Guide ADJUSTMENT Assembies Rotate the outer edge of roller assembly using the small hex while holding the large hex wrench in place End View upper roller assembly 9 top rail 2 bottom roller guide assembly 10 Suspend the sliding door 4 on the top rail 2 Slide the bottom edge of sliding glass door 4 into the groove of the sliding door track divider 8 Adjust the fasteners on both upper roller assemblies 9 to insure the bottom edged of sliding glass door 4 does not touch the bottom of sliding door track divider 8 Install the bottom roller guide assemblies 10 on the slidi
9. ng door 4 to secure the sliding glass door 4 to top rail 2 Adjust the bottom roller guide assemblies 10 so that the distance between the bottom of top rail 2 and the top of bottom roller guide assemblies 10 has a gap of 1 32 This gap is a starting gap check that the sliding door rolls smoothly along the the top rail Make adjustments if needed 14 Install the Door Threshold The Door Threshold is used to prevent water from seeping out while bathing Install the threshold according to these instructions 1 Measure the distance between the fixed glass 3 and the shower wall See figure 1 2 Using a hacksaw cut the threshold bar 11 to fit distance measured between the fixed glass and shower wall Remove any sharp edges or burrs after cutting threshold bar 11 See figure 2 3 Position the threshold bar 11 to shower base by aligning in door opening with fixed glass 3 Mark the threshold end cap 12 mounting hole locations See figure 3 15 NOTE If your surface is prone to cracking or chipping then it is recommended that you pilot drill first using a smaller drill bit and then step up to the final size 4 Using the appropriate drill bit for your tray surface drill the hole locations with a 1 8 diameter drill bit Repeat for the other side See figure 4 5 Add a small amount of silicone sealant to bottom of threshold bar assembly place into position See figure 5 6 Using the hardware from screw pack 3
10. ntenance durable fiberglass reinforced acrylic WARNING The Aston Shower door is designed to be used with tiled walls If you are using a pre made Acrylic ABS FRP shower stall that will be thicker than average plus tile then you must consider the offset of the pre made panel thickness If applicable the shower tray has 1 4 of tolerance for the oversized wall thickness Certifications All Aston Shower doors are 3rd party tested to meet the following US Canadian and International Standards e CPSC 16 CFR1201 II ANSI Z97 1 2009 Class A e CSA B45 Series 02 e ANSI Z124 1 2 Detailed Diagram of Shower Door Components 11 Di f i f 4 p Key Key Number Description QTY Number Description QTY 1 Door Stopper 2 12 Door ThreaholdEndCap 4 2 Top Rail 1 13 Door Seal 1 3 Fixed Glass 1 14 Door Seal 1 4 Sliding Door 1 15 Door Seal 1 5 Rail End 2 16 Door Handle 1 6 Wall Mount 2 17 Fixed Glass Bolt Assembly 2 7 Glass Clamp 1 18 Screw Pack 1 1 8 Sliding Door Track Divider 1 19 Screw Pack 2 1 9 Upper Wheel Assembly 2 20 Screw Pack 3 1 10 Bottom Roller Guide Assembly 2 21 Shower Tray 1 11 Door Threshold 1 PLEASE NOTE During unpacking carefully inspect all parts and use the exploded view drawing to identify all parts in the parts listing Before discarding the packaging check for any parts or small hardware bags that may have been overlooked SUPPLIED HARDWARE SCREW PACK M4x40 1 Anchor SCREW PACK M4x40 3 Anchor
11. o that the shower tray drain and the floor drain are in line after final installation Place the shower tray in the final installation position line up the drain holes and check for level If not level make adjustments to the floor at this time 5 This can be accomplished by leveling the subfloor by use of Shims Leveling compound or placing the shower tray into a mortar base The shower tray must be installed so that the tile lip is against the wall studs It is recommended that the tray is attached to the studs using screws IMPORTANT If you are using screws to secure the tray to the studs it is recommended that you pilot drill the screw location as to prevent the acrylic tray from chipping or cracking Left Handed Shower Tray Installation Note This shower door is not reversible when in use with the shower tray The left handed shower base requires the door to open from right to left and cannot be reversed Note the location of the fixed glass panel and sliding door for the left handed shower tray installation Fixed glass Sliding Door If your project requires the door to open from the opposite direction you will need to purchase the right handed shower tray drain located on the right side of the tray Shower Door Installation 1 Install all of the wall material or materials you intend to use before measuring the width of the opening This includes all moisture resistant wall board rock board tile stone
12. or use of the Products including but not limited to flooring subfloor tile walls sheet rock concrete board paint plumbing fixtures and ceilings 5 Labor costs incurred in the removal disassembly reassembly or installation of the Product s including replacement Products issued under the Warranty or costs for transportation to Aston Global and any other materials necessary to return Product to Aston Global 6 Any Product that has been damaged as a result of being improperly serviced or operated including but not limited to the following operated with insufficient water allowed to freeze subjected to flood conditions operated with water conditions or additives which cause unusual deposits or corrosion in or on the Product or subject to any other abuse or negligence 7 Any Product that has been damaged as a result of natural disasters including but not limited to lightning fire earthquake hurricanes tornadoes or floods 8 Product used for any purpose other than residential bathroom usage LEGAL DISCLAIMERS ALL IMPLIED WARRANTIES INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY DISCLAIMED IN THEIR ENTIRETY WITH RESPECT TO ALL PURCHASERS OR OWNERS FAILURE TO RETURN THE WARRANTY CARD SHALL HAVE NO EFFECT ON THE DISCLAIMER OF THESE IMPLIED WARRANTIES ALL EXPRESS WARRANTIES SHALL BE LIMITED TO THE DURATION OF THIS EXPRESS LIMITED WARRANTY AND EXCLUDE ANY LIABILITY FOR CONSEQUENTI
13. ot drill first using a smaller drill bit and then step up to the final size 2 4 Using the appropriate drill bit for your wall surface drill the hole locations with a 5 16 diameter drill bit Install the plastic anchors provided into the drilled holes Repeat for the other side Remove the wall mounts 6 from the rail ends 5 Using the hardware from Screw Pack 1 install the wall mounts 6 on the wall Repeat the installation on the other side Reinstall the rail ends 5 onto both ends top rail 2 so the the top rail 2 end is exposed ATTENTION A minimum of two people are required for the next assembly steps 5 Position the top rail fixed glass assembly into place in your shower opening Slide the rail end 5 over the wall mount 6 and secure using the set screw Repeat on other side Install the glass clamp 7 to fixed glass 3 using hardware provided See figure 6 for details Flat smooth surface of glass clamp 7 should be installed on outside of fixed glass 3 Insure plastic sliding door glide is in place in underside of sliding door track divider 8 and positioned to proper location for 10mm glass thickness See figure 7 Position the sliding door track divider 8 into position as seen in figure 8 and mark the 2 shower tray hole positions Note In drawing 8 the hole locations for attaching sliding door track divider should be 1 13 16 from edge of fixed glass See details in figure 8 NOTE I
14. s 5 onto each end of top rail 2 See figure 3 Place the fixed glass top rail assembly into your desired location Note The top rail 2 attached to fixed glass 3 should face inside the shower Using a level verify the top rail 2 is horizontal and the fixed glass 3 is plumb Using a pencil mark the rail ends onto the wall Remove pre installed screw from pre assembled glass clamp 7 Position the side of the glass clamp 7 with shower tray mounting hole on the shower tray and align with large hole opening on bottom of fixed glass 3 Mark the mounting hole of glass clamp 7 at this position See figures 5 NOTE If your surface is prone to cracking or chipping then it is recommended that you pilot drill first using a smaller drill bit and then step up to the final size Using the appropriate drill bit for your shower tray surface drill hole locations with 1 8 diameter drill bit 10 Mounting the Top Rail mounts Brackets 1 Remove the rail ends 5 from the top rail 2 Install the wall mounts 6 into one of the rail ends 5 using the set screw to locate the Wall Mount 6 within the rail end 5 A hex wrench is provided for this set screw Place the rail end 5 with wall mount installed onto the location you marked in earlier step and mark the mounting holes Use only the top hole Repeat for the other side 11 NOTE If your surface is prone to cracking or chipping then it is recommended that you pil
15. s to Customer by either ground shipping or US postal service Increased costs for expedited delivery if requested by Customer are the responsibility of Customer Parts not currently in stock may require up to a 6 week delivery time after placement of order The above warranty is subject to the following conditions 1 the Product must be installed in a single family dwelling unit where the original purchaser of the Product resides and 2 the Product must be maintained as described in the owner s manual supplied with the Product For glass and acrylic panels the customer must a open and inspect the Product upon delivery without releasing the delivery driver until visual verification that the Product arrived in a good and acceptable condition and b clearly notate damage on the delivery acknowledgment receipt Failure to do so and any damage discovered to glass or acrylic panel after delivery will be repaired or replaced at the sole discretion of Aston Global 21 THIS WARRANTY DOES NOT COVER 1 Product installed in buildings other than single family dwelling units 2 Product installed outdoors or any other non standard bathroom location 3 Component parts not manufactured by Aston Global 4 Workmanship of any installer of Aston Global Product This warranty does not assume any liability of any nature for unsatisfactory performance caused by improper installation or any damages to property resulting from improper installation
Download Pdf Manuals
Related Search
Related Contents
Betriebsanleitung Operating Instructions Instructions de service SPI-C2160-LLVA SPI-Q7700 AQ2170 Series User`s Manual - Electro OPERATING INSTRUCTIONS: Samsung 22" FHD-skärm med Touch of Color Bruksanvisning SONY HVR-V1U HDV CAMCORDER STUDY GUIDE Copyright © All rights reserved.
Failed to retrieve file