Home
        Coastal Shower Doors 1842.66G-C Instructions / Assembly
         Contents
1.                              ki  a      5    
2. Coastal Industries Inc        FAX NO  P O BOX 16091 TELEPHONE NO    904  641 1697 JACKSONVILLE FLORIDA 32246  904  642 3970  Paragon  By Pass unit       Installation Instructions                                                                        l ms  B_5 20 A ig  6 7    W   D    Do   a e  4 AL   e 26   i     E2   B    Q D0 141 o et  2   D    Be Mia cam  Z a o     E       GIO  Pi o    A      he  Z    F o  Ta bo  f    al loto 6 H U  poof A   N  2   nse                                                 kI                               2 Paragon  a  EXPLODED VIEW           PARAGON_BYPASS_09 05 01    PARTS LIST                      KEV PART  LETTER NUMBER DESCRIPTION QUANTITV  A 620 HEADER 1  B 630 SILL 1  C 643 WALL JAMB 2  D      DOOR PANEL ASSEMBLY 2  E 8156 FINGER PULL  TOWEL BAR 2  F 832MSPHP TOWEL BAR W  NO FINGER PULL SCREW 2  G CP22 TOWEL BAR BRACKETS 4  H 21 TOWEL BAR 2  l PN193 ROLLER  attached  4  J 832HEX ROLLER SCREWS  attached  4  K 832114 TOWEL BAR W  FINGER PULL SCREW 2  L 8112 INSTALLATION SCREWS 5  M 1329 PLASTIC SCREW ANCHOR 6  N 5169 BUMPER 2  P CP1110 TRACK GUIDE 1  R CP110 JAMB GUIDE 1  S 35 HANGER BRACKET  installed  4  T 82F JAMB GUIDE SCREW 1  U CP104TW BUMPER WASHER 2  V 8157 CI LOGO  STICKER  2  TOOLS NEEDED  HACKSAW STANDARD SCREW DRIVER OR 1 4  WRENCH  ELECTRIC DRILL LEVEL  3 16  MASONRY DRILL BIT HAMMER  PENCIL   FELT TIP PEN CENTER PUNCH  SAFETY GLASSES PHILLIPS SCREW DRIVER  MEASURING TAPE CLEAR CAULKING OR SEALANT  MILDEW RESISTANT   MASKING TAP
3. E  Unit Installation Screws  shown full size for reference   hum  cc pa    Gin AANA D   J  7 BS2HEX  F _832MSPHP 7 852114 TOWEL  D  8112 INSTALLATION SCREW  ROLLER SCREW TOWEL BAR SCREW WITH FINGER enh Casey  PAV A     M_82F JAMB GUIDE SCREW    BEFORE STARTING    Please check the box contents against the parts list  Make sure  that all material is accounted for before starting unit installation     STEP 1 Measure base opening  amp  cut Sill         l LI       H CI      Lf ft tt  IiI HI    AE MEASURE BASE OPENING      LI LIL                                                                                                                                  OOU   J                                              LJ  LLI                      COOL   JODIO     CI     Measure base opening along the center of the shower curb as  shown in step 1  Using a hacksaw       cut the Sill  B  to 1 3 16   less than the base opening  With high lip to the exterior  position  Sill  B  on the shower curb       insuring that it is centered left to  right and front to back  When satisfied that Sill  B  is properly  centered       tape Sill to curb and pencil mark it s position  Check  to see that Sill has been cut to the proper length by temporarily  placing Wall Jambs at either end of Sill  B   as shown in step 4   and checking for proper fit  Remove Sill from curb        STEP 2 Snap on Track Guide        ENGAGE HERE FIRST    ii         THEN  SNAP INTO  PLACE    o    For proper operation  Track Guide  P  
4. Note that both inner Brackets must be installed first  Do so at this  time and secure to Panels with a  832 x 3 4  Towel Bar Screw  F      Now finish Towel Bar installation for each Door Panel as shown in  exploded view and secure with a 832 x 1 1 4 Towel Bar Screw   K   Don t forget the Finger Pulls  E      Finish Towel Bar installation by pealing the back off the metallic Cl  logo  V  and installing it over the screw head on the Finger Pulls   E  as shown in exploded view   front sheet                                                                                                                                                                                               L       gt _   l Tua INSTALL INNER    REEE BRACKETS FIRST 4  L X    l 7 OUTSIDE PANEL    he SHOWER HEAD WALL  FIGURE 7A   SHOWER HEAD ON LEFT   SHOWER HEAD WALL a   4 F INSIDE PANEL l 4  ES i OUTSIDE PANEL LS   INSTALL INNER fi   BRACKETS FIRST                      FIGURE 7B   SHOWER HEAD ON RIGHT     STEP 8 Leak Proof Installation    To insure a leak proof installation       Run a bead of clear mildew  resistant caulking down the full length of each Wall Jamb outside  where the Wall Jambs meet the walls  Now caulk the crevise  where the sill meets either Wall Jamb  Follow caulking  manufacturer s instructions before using shower  Installation is  now complete  ENJOY            3a ha  o f Pa   a 2  CAULK CREVISE  gt  dl  WHERE SILL  MEETS JAMBS LA   Je    CAULK OUTSIDE      FULL LENGTH BE  OF WALL JAMBS   
5. must be centered on Sill   B   Measure the length of Sill  B  and pencil mark the center   Now center the Track Guide  P  on the center mark and snap into  place as shown in figure above     STEP 3 Caulk Sill 8  reposition       CAULK FULL LENGTH ALONG CORNERS       Turn Sill over and apply a bead of caulking the full length of   the Sill as shown in figure  Apply enough to slightly overfill  both corners  Reposition Sill on shower curb in the exact location  previously pencil marked in step 1  At this time the sill may be re   taped to the shower curb to prevent drastic movement while  installing the wall jambs     STEP 4 installing Wall Jambs       Rl   FI                                                                                                       Position Wall Jambs  C  onto ends of Sill  B  and up against  shower walls  Use a level to plumb the Wall Jambs  C   then  make a pencil mark on the shower walls thru each of the six  6   installation holes  fhree per jamb   Remove Wall Jambs  C  and  lightly center punch installation hole locations  Drill 1  deep  installation holes using a 3 16  masonry bit and Insert Plastic  Screw Anchors  M   Reposition Wall Jambs as before and secure  to shower walls using five  5   8 x 1 1 2  Installation Screws  L    Insure that both Jamb Bumpers  N  and Bumper Washers  U  are  secured to the Wall Jambs  C  using the center installation screw   see exploded view   Use the  8 x 2  Flat Head Screw  T  to  secure Jamb Guide  R  to lo
6. wer installation hole of Wall Jamb  attached to shower head wall     STEP 5 Measure Header opening  amp  cut Header                                                                                                                                                    A i       Measure the wall to wall opening at the top of the Wall Jambs  C   and cut the Header  A  to 1 16  less than the measurement  obtained  Position Header  A  on top of the Wall Jambs  C  and  leave it there as we make preparations for panel installation     PARAGON_BYPASS_09 05 01    STEP 6 Door Panel Installation                                     Install the outside Door Panel  D  by Lifting Panel up and into the  Header  A   Lower Panel into the Track Guide  P  and engage  the Rollers  I  with the roller track        Slide outside Door Panel into Wall Jamb located on wall opposite  of shower head  Check Panel to make sure that it is parallel to  the Wall Jamb  If it is not  remove the Door Panel and adjust the  rollers either up or down by loosening the Roller Screws and  sliding the Rollers  When satisfied with outside Door Panel  alignment  proceed with inside Door Panel installation           When installed  slide inside Door Panel into Wall Jamb located on  shower head wall and check for alignment with Wall Jamb   Adjust Rollers as necessarv     STEP 7 Towel Bar Installation    Close Door Panels  inside Panel against shower head wall and  outside Panel against opposite wall   See figures 7A and 7B     
    
Download Pdf Manuals
 
 
    
Related Search
    
Related Contents
Fahrzeug-Kommunikations- Software OBD  Gateway LCD13TV 13 in. Television  Samsung Galaxy Camera 2 Kasutusjuhend    X - Abamotor Energía,SL Grupos electrógenos, motobombas  Sartor Indústria e Comércio LTDA MANUAL DE INSTRUÇÕES NO  www . ElectricalPartManuals . com  Sentry Xpress - Paragon Kilns  RC PDALPD 77 - Préfecture de Seine-et  PC Assemblage    Copyright © All rights reserved. 
   Failed to retrieve file