Home

DreamLine DL-6210C-01CL Installation Guide

image

Contents

1. OREAMLINE dream in style Shower Door amp Base SHOWER Door AND SHOWER BASE INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page STEP 1 Install Shower Base STEP 2 Install Shower Door Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Kit please visit www BathAuthority com dream style BUTTERFLY SHOWER DOOR amp TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Symmetrical Model ns Asymmetrical Model Please read these instructions carefully before installing If you have any questions regarding installation please call our te
2. The strip flange should point Nc away from the shower faucet I Attach Magnetic strips 19 to both vertical edges of the Glass doors B amp B2 SE See Fig 30 for details B2 Fig 30 BUTTERFLY Rev 3 Ver 3 03 2014 24 Apply silicone along the Wall profiles 01 as well as along the bottom Guide 03 See Fig 31 for details Fig 31 Product Maintenance To ensure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To ensure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe off the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scouring agents as this may scratch the surface Never use bristle brushes or abrasive sponges To ensure a long lasting hardware finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally
3. used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning the shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless steel surfaces at least once a week When applying stainless steel cleaner or polish work with not against the grain Never use an abrasive sponge or cloth steel wool or wired brushes BUTTERFLY Rev 3 Ver 3 03 2014 19 lt BREAMLINE ream in style SLIMLINE SHOWER BASE SHOWER BASE DIMENSIONS AND INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter modify or redesign products at any time without prior notice For the latest up to date technical drawings manuals or any other details please refer to the support BathAuthority com web page Please read these instructions carefully before installing If you have any questions regarding installation please call our technical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Bases please visit www BathAuthority com Preparation 1 Examine boxes and packages for shipping damage Carefully remove Shower base from the packaging and check for any visual defects or shipping damages If the unit has been damaged has a finishing defect or has missing parts please contact our customer support departmen
4. plumbing installation period 4 Prior to installation please ensure that the installation surface is level and solid and will be able to support the total weight of the unit Also make sure that the walls are plumb Depending on the type of unit you are installing some adjustments in leveling may be possible However irregular installation surface level or out of square conditions can result in serious problems for your installation Please note that some adjustments and drilling may be necessary Please protect all primary surfaces of the product during installation Never set your glass down directly onto a tile floor Always use a piece of wood or cardboard to protect the bottom edge and corners of the glass 5 Please NOTE This door has 3 4 width or out of plumb adjustment per wall profile on each side Tools Required Level Bn EI e ctri C H fe Drill BUTTERFLY Rev 3 Ver 3 03 2014 2 Detailed Diagrams of Shower Door Components H 8 hr A2 18 19 Packing List Hinge top amp bottom Wall anchor 16 Rolerstoper 2sets 08 Big flat head screw STA2 12 8pcs_ 18 Hex wrench mm 4mm oe NOTE Unpack your unit carefully and inspect it Lay it out and identify all parts us
5. process your warranty claim 4 Proof of purchase You may submit this information by e mail mail or fax to DreamLine Warranty Service Center 75 Hawk Road Warminster PA 18974 F 1 866 857 3638 T 1 866 731 2244 Warranty bathauthority com dream in style TEL 866 731 2244 FAX 866 227 1533 WWW BATHAUTHORITY COM For more information on DreamLine Shower Doors please visit www BathAuthority com
6. steel surfaces at least once a week When applying stainless steel cleaner or polish work with not across the grain Never use abrasive sponge or cloth steel wool or wired brushes SLIMLINE SHOWER Rev 3 Ver 5 07 2013 16 DREAMLINE EXCLUSIVE LIMITED WARRANTY AS OF 6 2013 This warranty extends only to the original owner end user for household use only and is not transferable to a subsequent owner This warranty extends for a designated period of time so long as it remains in use in its original place of installation This warranty applies only to DreamLine products purchased from an authorized dealer in United States or Canada Proof of purchase original sales receipt from the original consumer purchase must be provided with all warranty claims IN NO EVENT SHALL THE LIABILITY OF DREAMLINE EXCEED THE PURCHASE PRICE OF THE UNIT DreamLine products must be installed by a fully insured and licensed professional Installation of DreamLine product by anyone other than fully insured licensed professionals shall VOID THE WARRANTY DreamLine recommends that such licensed professionals have experience in the installation of bathroom products Installation of certain products including without limitation glass products i e shower and tub doors by an inexperienced installer may result in glass breakage and consequently cause personal injury or death PARTS ONLY WARRANTY This warranty is extensive in that it covers replacemen
7. the position of the Hinges on the glass See Fig 8 and Fig 10 for details 8 Connect the Glass door B2 05 to the Glass 1 door A2 04 using Middle hinges 11 Mind the position of the Middle hinges on oS the glass See Fig 9 and Fig 10 for details CALO BUTTERFLY Rev 3 Ver 3 03 2014 A2 SS a Su D oor assemb ly 2 2 2 9 Locate the Guide rails 03 and the Glass profile 02 Connect the left end of the Guide rails to the Glass profile using the Big flat head screws ST4 2 x40 09 E See Fig 11 for details NOTICE Make sure that the Seal strip flange on the Glass profile is pointing in towards the shower 2 11 BUTTERFLY Rev 3 Ver 3 03 2014 10 Slide the pre installed Door assembly 1 as showing in Fig 5 into the channel of the Guide rails 03 from the right side See Fig 12 and Fig 13 for details 11 Secure the Hinges 13 inside the Guide rails 03 using the Big flat head screw ST4 2x12 08 See Fig 13 for details BUTTERFLY Rev 3 Ver 3 03 2014
8. to the bottom of the shower base Install the cement board or the wallboard above the tile flanges and secure it to the studs Put the tiles or other finishing material over the cement board leaving 1 8 gap between the bottom of the tile and the Caulk Ceramic Tile splash rim of the shower base Use caulk to fill that gap See Fig 8 and Fig 9 for details SLIMLINE SHOWER Rev 3 Ver 5 07 2013 15 Product maintenance To insure long lasting life for your acrylic back walls wipe them off after each use with a soft cloth To clean the acrylic back walls use non abrasive sprays or cream based cleaners Never use abrasive cleansers metal brushes or scrapers that could scratch or dull the surface To insure long lasting life for your glass shower products wipe them off after each use with a soft cloth Rinse and wipe of the glass using either soft cloth or squeegee to prevent soap buildup Never use abrasive cleaners and cleaning products that contain scoring agent because this may scratch the surface Never use bristle brushes or abrasive sponges To assure a long lasting finish wipe off the metal parts after each use with a soft cloth Do not use abrasive cleaners or cleaning products containing ammonia bleach or acid If accidentally used rinse the surface as soon as possible to prevent finish peeling or corrosion After cleaning the shiny finishes rinse thoroughly and wipe dry with soft cloth Clean stainless
9. 10 12 Slide the pre installed Door assembly 2 that showing on Fig 10 into the channel of the Guide rails 03 from the right side See Fig 14 and Fig 15 for details Fig 15 BUTTERFLY Rev 3 Ver 3 03 2014 11 13 Attach the other Glass profile 02 at the right side of the door unit and fasten it to the Guide rails 03 with the Big flat head screw ST4 2x40 09 See Fig 16 and Fig 18 for details NOTE Make sure that the Seal strip flange on the Glass profile is pointing inside the Shower 14 Secure the right Hinges 13 inside the Guide rails 03 using the Big flat head screw ST4 2x12 08 See Fig 17 and Fig 18 for details BUTTERFLY Rev 3 Ver 3 03 2014 py G Ce 12 15 Attach the Roller stoppers 16 inside the top and the bottom Guide rails 03 with the Big flat head screw ST4 2x12 08 See Fig 19 for details BUTTERFLY Rev 3 Ver 3 03 2014 B2 Fig 18 A2 Fig 19 13 Shower Door Installation 16 The Tub or Shower base should be installed prior to installation The Shower base should be installed according to the Sho
10. E Center Drain Configuration U MODEL SPECIFICATION D1 in DLT 1132320 32x37 DLT 1136360 36 x36 DLT 1136480 36 x48 30760 327x607 Mex i9 3 _ 60 3 60 i9 30 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration MODEL SPECIFICATION D1 in W1 in 30 i7 32 15 DLT 1132601 32 x60 L 82 T _ 607 d5 wq 12 DLT 1134601 34 x 60 34 60 DLT 1136601 36 x60 SLIMLINE SHOWER Rev 3 Ver 5 07 2013 Right Hand Drain Configuration WI D1 MODEL SPECIFICATION D1 in W1 in 30 x 60 mo ox ow ode oam omaa 36x59 1 i17 _ 36 6 ix _ SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 NEO SHOWER 01722036360 36736 18 5 16 DLT 2088380 38538 38 20516 25 m DLT 2040400 40 22 5 16 14 3 8 DLT 2042420 arxar 4X SLIMLINE SHOWER Rev 3 Ver 5 07 2013 QUARTER ROUND SHOWER BASE DLT 7033330 33 x33 21 5 8 DLT 7036360 36 36 21 5 8 DLT 7038380 38 x 38 21 5 8 SLIMLINE SHOWER Rev 3 Ver 5 07 2013 DOUBLE THRESHOLD SHOWER BASE Corner Drain Configuration MODEL SPECIFICATION W in C in DLT 1032320 3232 DLT 1036360 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Left Hand Drain Configuration WI1 D1 MODEL SPECIFICATI
11. ON D1 in W1 in DLTA0M4B ir iX DLT 1036481 36 x48 DLT 1036601 36 x60 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 Right Hand Drain Configuration W1 D1 DLT 1034482 34 x48 MODEL SPECIFICATION D1 in W1 in 6 DLT 1036482 36 x48 DLT 1036602 36 x60 SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 10 Diagram of the Shower Base Cross Section Finished Wall ya board Shower Base OOOO Mortar Plaster 2 x4 Stud Drain 2 PVC Waste Pipe SLIMLINE SHOWER Rev 3 Ver 5 07 2013 11 Shower Base Installation Preparation 1 Ensure that the floor and the studs are at right angle Provide a 5 x5 opening the sub floor for the drain The 2 PVC waste pipe should extend above the surface of the sub floor according to the drain installation instructions and the height of the Shower base Refer to the product drawings in these installation instructions for the drain location See Fig 1 and Fig 2 for details SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 1 x 2 PVC Waste Pipe 5 x5 Opening See Product Chart for Drain Location Fig 2 12 2 Install the shower drain PROVIDED according to the drain installation manual supplied with the drain See Fig 3 for details 3 the tray into the designated p
12. chnical support specialists Monday through Friday 9 00 AM 5 00 PM EST at Phone 1 866 731 2244 Fax 1 866 227 1533 or e mail our technical support group at support BathAuthority com For more information on DreamLine Shower Doors amp Tub Doors please visit www BathAuthority com 1 After opening all boxes and packages read this introduction carefully Check that all of the needed parts are included in the package by marking all the components on the Detailed Diagram of Shower Door Components Examine boxes and packages for shipping damage If the unit has been damaged has a finishing defect or is missing parts please contact our customer support department within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions 2 Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project and will not accept any returns 3 If this unit is going to be installed in a new construction please install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all
13. e restrictions on installation or use and any such compliance is excluded from this warranty DreamLine reserves the right to modify this warranty at any time such warranty modifications will not alter the warranty applicable at the time of sale of the products in question The warranty terms for specific products for consumer non industrial non commercial non business use only are SHOWER BACKWALL SHOWER CABINS JETTED amp STEAM DreamLine warrants shower backwalls and shower cabins to be free from defects in workmanship for a period of one 1 year from initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER amp TUB DOORS SHOWER ENCLOSURES DreamLine warrants shower doors tub doors and shower enclosures to be free from defects in workmanship and materials under normal residential use for a period of five 5 years from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty for plastic strips shall be limited to one 1 year Warranty for any part in Oil Rubbed Bronze finish shall be limited to one 1 year SHOWER BASES DreamLine warrants shower bases to be free from defects in workmanship and materials under normal residential use for as long as the original consumer purchaser owns their home in which their product is installed SHOWER COLUMNS DreamLine warrants shower columns to be free from defects in workmanship and materials under nor
14. id the warranty Use of cleaners containing abrasive cleansers ammonia bleach acids waxes alcohol solvents or other products not recommended for chrome or similar finish glass or acrylic will void the warranty For additional product maintenance instructions please refer to product installation manual DreamLine is not responsible for any issues arising in connection with errors or omissions in information provided on DreamLine s websites The warranty does not extend to any non DreamLine plumbing or components installed by installers end users or by any party other than DreamLine THE FOREGOING WARRANTIES ARE IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE BATH AUTHORITY LLC DREAMLINE AND OR SELLER DISCLAIMS ALL LIABILITY FOR SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES DREAMLINE IS NOT LIABLE FOR PERSONAL INJURIES OR DEATH TO ANY PERSON OR FOR ANY DIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGE LOSS OF USE LOSS OF TIME LOSS OF PROFITS INCONVENIENCE INCIDENTAL EXPENSES LABOR OR MATERIAL CHARGES OR ANY OTHER COSTS RESULTING FROM THE USE OF ITS PRODUCTS OR PERTAINING TO THE APPLICATION OF THE PRESENT WARRANTY OR RESULTING FROM THE REMOVAL OR REPLACEMENT OF ANY PRODUCT OR ELEMENT OR PART COVERED BY THIS WARRANTY PRODUCT WARRANTY PERIODS DreamLine is not responsible for product code compliance or for verifying building cod
15. ing parts diagram and part list in your manual as a reference Before discarding the carton check for small hardware bags that tend to fall to the bottom of the box If any parts are damaged or missing please contact DreamLine for replacement NOTE Retain these installation instructions for future reference BUTTERFLY Rev 3 Ver 3 03 2014 Shower Door Assembly Note There are two separate Butterfly models featuring two different glass variations Please refer to the drawings on page 1 as a visual guide for the product you purchased The Asymmetrical Butterfly model installation is depicted below These instructions can be used as a general guide for the Symmetrical Butterfly model installation However please note that it may be necessary to carefully flip the glass from one side to the other to determine the correct panel position for both models 1 Place the Glass door A 04 and the Glass door B 05 on a flat surface The distances from the glass edge to the paired holes on both sides of the glass doors are different The side of each Glass door where the paired holes are closer to the edge should be facing each other US RX 79 M See Fig 1 for details BUTTERFLY Rev 3 Ver 3 03 2014 2 Attach the top and the bottom Hinges 13 to the left edge of the Glass door A 04 Mind the position of the Hinges on the glass See Fig 2 and Fig 5 for details 3 Attach the top and the bottom Rolle
16. mal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer SHOWER SEATS DreamLine warrants shower seats to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer Warranty shall be VOID if the shower seat is not professionally installed on a properly reinforced wall VANITIES AND VESSEL SINKS DreamLine warrants bathroom vanities and vessel sinks to be free from defects in workmanship and materials under normal residential use for a period of one 1 year from the initial date of purchase by the owner end user contractor or builder from an authorized dealer STATE LAWS AND THIS WARRANTY Some states provinces do not allow limitations on how long an implied warranty lasts or the exclusion or limitation of special incidental or consequential damages so these limitations and exclusions may not apply to you This warranty gives you specific legal rights You may also have other rights which vary from state province to state province WARRANTY SERVICE The following information will be required for you to file a Warranty claim 1 Your name address and telephone number 2 Product model number 3 Brief description of problem please note that additional information such a photos may be required to fully
17. osition so that the Drain Body drops around the Drain Pipe and butt the Shower Base up against the studs See Fig 4 for details Lift and lower base over the center of The drain pipe and set it into the place Fig 4 SLIMLINE SHOWER Rev 3 Ver 5 07 2013 13 4 Level the tray and place marks the studs above the upper edge of the tile flange See Fig 5 for details Level base in two directions Fig 5 5 Mix the bedding material Mortar Plaster etc Concrete 15 recommended Apply enough bedding material to support the entire bottom of the shower base See Fig 6 for details Mortar Plaster Fig 6 SLIMLINE SHOWER Rev 3 Ver 5 07 2013 14 6 After the bedding material has been poured and before it sets place the shower base into the position with the drain assembly sliding over the PVC waste pipe It will be necessary to push the shower base until the top of the tile flange aligns with the marks drawn on the studs and the front edge is contacting the rough floor along the entire length of the shower base Ensure that the base is level all directions You may need to use shims to hold the tray in the level until the bedding settles and supports the tray Remove all extra mortar See Fig 7 for details Fig Waterproof Drywall Waterproof Drywall 7 Allow the bedding material to completely harden before applying weight
18. r hinges 12 to the right edge of the Glass door B 05 Mind the position of the Roller hinges on the glass See Fig 3 and Fig 5 for details BUTTERFLY Rev 3 Ver 3 03 2014 4 Connect the Glass door 04 to the Glass 1 3 door 05 using the Middle hinges 11 DPD 7 N Mind the position of the Middle hinges on the gt See Fig 4 and Fig 5 for details BUTTERFLY Rev 3 Ver 3 03 2014 5 Place the other Glass door B2 05 and the other Glass door E A2 04 on a flat surface The distances from the glass edge to the paired holes on both sides of the Glass door are different The side of each Glass door where the paired holes are closer to the edge should be facing each other n B2 See Fig 6 for details A2 6 Attach the top and the bottom Roller hinges 12 to s i the left edge of the Glass door B2 05 Mind the II position of the Roller hinges on the glass See Fig 7 and Fig 10 for details B2 BUTTERFLY Rev 3 Ver 3 03 2014 7 Attach the top and the bottom Hinges 13 to the 4 right edge of the Glass door A2 04 Mind
19. t within 5 business days of the delivery date Please note that DreamLine will not replace any damaged products or missing parts free of charge after 5 business days or if the product has been installed Feel free to contact DreamLine if you have any questions Install all of the required plumbing and drainage before installing the shower Use a competent and licensed if required by local code plumber for all plumbing installation Please note that you should consult your local building codes with questions on installation compliance standards Building and plumbing codes may vary by location and DreamLine is not responsible for code compliance standards for your project Please insure that prior to the installation the installation surface is leveled and solid and will be able to support the total weight of the unit Also make sure the walls are at right angles While some adjustment in leveling of the tray is possible irregular installation surface level or improper angle of side walls will result in serious problems for your installation Please note that some adjustments and drilling might be necessary during the installation process IMPORTANT NOTE Dimensions provided for reference only You must measure the actual shower tray sizes before installation Allowed tolerance for center of the drain is 1 2 Tools Required Tape Measure Pencil L evel SLIMLINE SHOWER BASE Rev 3 Ver 5 07 2013 2 SINGLE THRESHOLD SHOWER BAS
20. t of all defects LABOR CHARGES AND OR DAMAGE INCURRED IN INSTALLATION REPAIR OR REPLACEMENT AS WELL AS ANY OTHER KIND OF LOSS OR DAMAGE ARE EXCLUDED COMMERCIAL USE AND OTHER EXCLUSIONS This warranty excludes all industrial commercial and business usage whose purchasers are hereby extended a one 1 year limited warranty from the date of purchase for shower and tub doors a three 3 month limited warranty from the date of purchase for vanities and sinks with all other terms of this warranty applying except the duration of the warranty DREAMLINE JETTED AND STEAM SHOWER CABINS DREAMLINE SHOWER COLUMNS AND DREAMLINE SHOWER SEATS ARE NOT INTENDED FOR COMMERCIAL USE AND THERE IS NO WARRANTY EXTENDED FOR THESE PRODUCTS FOR COMMERCIAL USE DreamLine hereby disclaims all warranties for products sold as dealer or store displays DreamLine hereby disclaims all warranties for products used outside of the United States or Canada whether expressed or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose WARRANTY TERMS DreamLine will at its election repair or replace the product found by DreamLine in its sole judgment to be defective within the warranty period under normal residential use and maintenance The replacement of a product is limited to supplying a replacement product or part same as existing or if not available comparable product DreamLine warranty obligation shall be discharged
21. the bottom Guide rail 03 2 A 5 Place the assembled Door unit back to the designated A AY position on the Shower base or the Tub y po Fasten the Wall profile to the wall with the Big flat head screw ST4 2x40 09 See Fig 26 for details BUTTERFLY Rev 3 Ver 3 03 2014 20 Make final adjustment if required Drill the holes through the first layer into the Wall profiles 01 and the Glass profiles 02 using O 1 8 drill bit Secure the Wall profiles and the Glass profiles with the Round head screws ST4 2x10 07 Use the raised white washer with the screw and attach the Decorative Covers 10 See Fig 27 for details 21 Adjust the Roller hinges 12 to make the door slide smoothly See Fig 28 for details BUTTERFLY Rev 3 Ver 3 03 2014 Fig 28 17 22 Mount the Handles 17 onto the both Glass doors amp 2 1 05 Cover the screw holes on the Handles with the provided decorative plugs See Fig 29 for details 23 Open the door and attach Side anti water 1 N 3 Strips 15 to both vertical edges of the I E Glass doors
22. upon tender of parts replacement or repair of the product Purchaser s refusal to accept the tender terminates all warranty obligations and VOIDS THE WARRANTY Cost of freight for returning products to DreamLine for repairs or replacement under this limited warranty are the responsibility of the customer Cost of freight associated with shipping of replacement product or parts to the customer may be charged to customer Any product replaced or repaired during the warranty period will be covered only for the remaining period of the original warranty In no event will DreamLine be liable for costs of repair or replacement of any installation material including but not limited to tiles marble etc DREAMLINE IS NOT RESPONSIBLE FOR INSTALLATION REMOVAL OR REINSTALLATION COSTS OF ANY PRODUCT REQUIRING WARRANTY SERVICES Any modification or alteration of any DreamLine products will void the warranty DreamLine product installations and repairs must be performed by either a DreamLine authorized agent or a licensed insured and experienced professional contractor installation or repairs performed by any other party shall void the warranty This warranty shall not apply to breakage or damages caused by normal wear and tear fault carelessness abuse misuse misapplication improper maintenance alteration or modification of the unit as well as chemical or natural corrosion accident fire flood act of God or any other casualty Improper care and cleaning will vo
23. wer base installation manual See Fig 20 and 21 for details Fig 20 Fig 21 BUTTERFLY Rev 3 Ver 3 03 2014 17 Push the Wall profiles 01 over the Glass profiles 02 on 1 both sides sure that the flanges with predrilled holes e pointing in towards the shower See 22 and Fig 23 for details Fig 22 B2 A2 Fig 23 BUTTERFLY Rev 3 Ver 3 03 2014 18 the assembled Door unit the Shower base or the Tub and butt the Wall profiles 01 up against the walls Level the Door unit vertically You can adjust position of the Door unit by slightly pulling the Glass profiles 02 out of the Wall profiles See Fig 24 and Fig 25 for details Symmetrical Model NL di Asymmetrical Model B Fig 24 Fig 25 19 Trace the drilling holes on the wall through the predrilled holes in the Wall profile 01 Move the Door unit aside Drill the holes on the wall using 5 16 drill bit and insert the Wall anchors 06 _ Apply a bead of silicone on the wall along the drilled holes and around the holes Apply bead of silicone on the shower along

Download Pdf Manuals

image

Related Search

Related Contents

800  Stell SHO 1160 flat panel wall mount  Guida all`implementazione di CA ARCserve Backup per Windows  PDFファイル    Manuale dell`utente del notebook Sony  

Copyright © All rights reserved.
Failed to retrieve file