Home
Rubbermaid Commercial Products FG400400ROCK Instructions / Assembly
Contents
1. x Xx fo eis fF IMG ie a Sv f EIN Step 5 Refuse Top Funne Top Fastening 3967 3970 3972 3975 3977 Refuse Top Bolt or F Funnet Top Woh ae Flat z D lt Washer E P 7 e Collar a Figure 5 1 Attaching Polyiiner 0 9 lt Q Front Side Parts Needed 4 Bolts 4 Lock Washers 4 Flat Washers 1 Pivot top backwards to expose the square sockets in the collar Do not let the top pivot back all the way or it could pull col lar from legs 2 Fasten the front side of collar down with 2 bolts 2 ock washers and 2 flat washers See Figure 5 1 3 Fasten hinge side of collar with 2 bolts 2 lock washers and 2 flat washers 4 Tighten all bolts securely 5 Place rigid liner through opening in the collar Settte liner squarely in the base 6 Place optional Polyliner inside of rigid liner Wrap around bag hooks See Polyliner detat 7 Your container is ready for use a Step 6 Ash Trash Assembly 3971 3976 only a SES Ashtray o Thum Screw B 2 Ash Trash Top Bolt Lock z ins lt Washer RS Fiat N Washer Figure 6 1 Rubbermaid Attaching Polyliner OR 1998 by Rubbermai d Commercial Products LLC 3124 Valley Ave Winchester VA 22601 www mubbermaid com Parts Needed Ash Trash Top Collar 4 Bolts 4 Lock Washers 4 Flat Washers 1 Place collar on container as shown
2. eee andmark Series Container s Landmark SeriesTM Container Here are the directions to assem ail components before Congratulations on your purchase of Rubbermaid ble the following containers Please read ail of the instructions and be sure you have received assembling the container 3966 20 Gallon Ash Trash Container 3972 35 Gallon Funnel Top 3967 20 Gallon Funnel Top 3975 45 Gallon Refuse Container 3970 35 Gallon Refuse Container 3976 45 Gallon Ash Trash Container 3971 35 Gallon Ash Trash Container 3977 45 Gallon Funne Top 39145 21 TOOLS REQUIRED 1 large flat screwdriver Components Chart 3966 3967 3970 20 Galion 20 Galion 35 Gallon Base 3961 L2 X 3971 3972 3975 3976 3977 45 Gallon 35 Gallon 45 Gallon 45 Galion 45 Gallon Ash Trash Funnei Top Retuse Ash Trash Funnel Top Base 3975 L2 Funnel Top Assembly consists of Rainnood 3975 L1 Collar 3962 L2 Funnel Top Assembly consists of Rainhood 3975 L1 Rain Collar 3975 L3 or Rainhood Collar w lock 3975 4 Collar 3975 L5 CX A KAE X x x LL re te ee Ash Trash Top 3961 L1 X pena i D ee Ash Trash Top 3976 1 Funnel Top 3972 L1 X x x Collar 3975 L5 35 Gallon Rigid Liner 3958 45 Gallon Rigid Liner 3959 xX Ashtray 3961 L3 xX X 4 28 Panels separate carton x Xx X 4 3412 Panels separate carton
3. g Assembly Detail Step 3 Pane Assembly Parts Needed 4 Decorative Panels 1 Slip 4 panels into the channels in the plastic legs Do not drop into place See Figure 3 1 Plastic Leg 2 Press panels firmly into the channels in the base until they are securely seated Step 4 Ash Trash Assembly 3966 only TE tattray Parts Needed Ash Trash Tco Ash Trash Top Collar Ashtray 4 Bolts 4 Lock Washers 4 Flat Washers ne na Bolt 1 Place collar on container as shown in Lock Figure 4 1 Adjust one corner at a time 7 Wasner until collar is seated firmly on the plastic 2 Ta gt Flat legs and the metal legs are seated in P GR Washer the square sockets in the collar 2 Fasten collar to uprights with 4 bolts 4 lock washers and 4 flat washers 3 Tighten all boits securely 4 Place rigid liner through the opening in the collar Settle liner squarely in the base 5 Place optional Polyliner inside of rigid liner Wrap around bag hooks See Polyliner detail 6 Place AshiTrash Top onto fastened collar 7 Ash Tray can be secured to Ash Trash Top with thumb screw Figure 4 1 8 Your container is ready for use Polytiner Detail
4. in Figure 6 1 Acjust one corner at a time until collar is seated firmiy on the plastic legs and the metal legs are seated in the square sockets in the collar 2 Fasten collar to uprights with 4 bolts 4 lock washers and 4 flat washers 3 Tighten aff bolts securely 4 Place rigid liner through the opening in the collar Settle liner squarely in the base 5 Place optional Polyliner inside of rigid liner Wrap around bag hooks See Polyliner detail 6 Place Ash Trash Top onto fastened collar 7 Ash Tray can be secured to Ash Trasii Top with thumb screw 8 Your container is ready for use J71 3972 00 Step i Base Assembly Bolt l f Lock Wasner i Parts Needed Fiat Washer ne Base 4 Metal Legs 4 Bolts i e x pE 4 Lock Washers 4 Flat Washers O staite 1 Place base on its side Base should be Qs Ld placed on cardboard or soft surface to prevent scratches 2 Insert metal legs into the 4 square sock ets in the base See Figure 1 1 i 3 Attach metal legs to base with the boits lock washers and flat washers SS Tighten ail bolts securely Figure 1 1 Step 2 Plastic Leg Assembly Parts Needed 4 Plastic Legs atte r Metal Leg 1 Turn base over as shown Slip 4 plastic legs over the metal legs As 2 Make sure plastic legs are seated firmiy in position over the tabs See leg assembly Sasne teg a DO NOT USE MALLET OR HAM Figure 2 1 Le
Download Pdf Manuals
Related Search
Related Contents
Furuno CH-250 User's Manual verifica bozzello e gancio VM 076 - Phonocar MALDI Biotyper CA System Pioneer A-109 WARM CS-CBM CABINET USER MANUAL AND MAINTENANCE STIHL GS 461 User`s Guide 正常ヒト皮膚3次元モデル関連製品購入ガイド Copyright © All rights reserved.
Failed to retrieve file