Home

Minka Lavery 4955-267B Instructions / Assembly

image

Contents

1. INSTALLATION INSTRUCTION FOR 4955 WARNING SHUT POWER OFF AT FUSE OR CIRCUIT BREAKER AVERTISSEMENT COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR READ AND SAVE THESE INSTRUCTIONS SSEMBLING THE FIXTURE Fig 2 1 Shut off the power at the fuse box or circuit breaker If necessary remove old fixture including the mounting hardware 2 Carefully remove the fixture from the carton and check that all parts are included as shown in the illustration T Set A 016 3 Remove the decorative ring A1 from the shade Y T Crossbar 4 Place the glass panel Z into the decorative ring A1 then bacem Ground screw using the sheet metals C1 to compact the glass panel Z T Mounting screw 2 5 Secure the decorative ring A1 to the bottom of shade Y with the screws B1 6 Thread the rod O onto the nipple P and the nipple N 7 Place the coupling M and the tube L over the nipple N then secure with the loop K 8 Secure the top of the arms Q to the coupling M with the screws R 9 Secure the lower end of the arms Q to the decorative ring T with the screws S 10 Install the light bulb s not included in accordance with the fixture s specification DO NOT EXCEED THE MAXIMUM WATTAGE RATING NE PAS DEPASSER LA PUISSANCE NOMINALE MAXIMALE 11 Secure glass panels U to iron plate V with screws W and plastic washes X HANGING THE FIXTURE Fig 1 12 Thread
2. g COMPLETING THE INSTALLATION Fig 2 Smooth eee 22 Raise the canopy F all the way to the ceiling Raise the Ground screw collar ring H and thread onto ceiling loop G protruding through canopy F Fig 1 i HOUSE HOUSE Neutral Green or Bare Copper Ground Your installation is now complete Return the power to the junction box and test the fixture se lighting Notice lt is important to use proper chain pliers not included eee yee To OPEN and CLOSE the chain included with this fixture Do not association E N open them with other tools that may twist or stress the chain inks It is important to use proper chain pliers like the ones shown in the diagram
3. the nipple E into the ceiling loop G until snug 13 Thread hex nut D onto nipple E Place lock washer C over end of nipple E 14 Thread other end of nipple E with loop attached into crossbar A until snug 15 Take this crossbar A assembly and mount to ceiling junction box with mounting screws B Size 8 32 0 6 L The side of the mounting bar marked GND must face out 16 Connect quick link J to end of chain I then connect quick link J to fixture loop K 17 By measuring determine correct number of links needed for desired hanging height 18 Lace the fixture wires through the chain links and slip screw collar ring H and the canopy F over the chain 19 Open one link of the other end of the chain I and connect it to the ceiling loop G 20 Feed the fixture wires through the ceiling loop G and nipple E and pull until tight CONNECTING THE WIRES Fig 3 21 At this point connect the electrical wires as shown in Fig 3 making sure that all wire connectors are secured If your outlet box has a ground wire green or bare copper connect the fixture s ground wire directly to it If not connect to the mounting plate using the green screw Fig 3 provided After the wires are connected tuck them o TO GT carefully inside the outlet box WIRES pes pi

Download Pdf Manuals

image

Related Search

Related Contents

  簡易取扱説明書  プレスリリース  Annales / épreuves des concours d`entrée  ノ*\ GREEN H。USE” 取扱説明書  BWB_groen-(v-def-low-res)  Public Viewer User Manual - Arizona WRAP - Home    

Copyright © All rights reserved.
Failed to retrieve file