Home
Halsey Taylor 8634084883 Use and Care Manual
Contents
1. 37 TO oy covered under warranty BUBBLER I Di 9 Makeelectrical connections to the chiller See i 37 chiller instructions TT 10 Check stream height from bubbler Stream height is factory set at 35 40 PSI If supply pressure varies cile gt CHILLER greatly from this remove items 2 19 and 20 push 34 INLET arm and the bottom and the top actuator plates CHILLER Figure 20 by removing the screws holding assembly OUTLET p p s together and adjust the screw on the regulator Item Pe e 14 Figs 21 amp 22 Clockwise adjustment will raise ae i stream height and counterclockwise movement will i i lower stream height For best adjustment stream height should be approximately 1 1 2 38mm above the bubbler guard See Figure 16 11 Mount lower panel Loosen the two 2 10 24 x 5 8 C J 16mm screws at frame bottom lip Slide upper tongue of lower panel under lower edge of already 1 a installed upper panel Tighten previously loosened A ps screws securely fre 4 12 Replace bottom access panel to fountain basin B E using screws provided Tighten securely Figure 17 OVL II ER Q SR Q Tube Routing 37 TO ae P BUBBLER F 36 CHILLER
2. O1 2 110346220550 Drannu 2 2 4 4 28 101697451550 10 161637308640 Drain Plug S S a 100029040660 wane tue Gasket pee 13 tere70806550 sea aaa a a 14 estac Regulator Ett 2 x 2 z seo Regular 1 _2 e e eros Basn ss_ Ti Te Te Ta esso sese TT a a Basin Gay Gray Martine oo 1 1 2 J Bsn Goien Sand Marve opion 1 1 J Basn Biack Onyx Marbivte option 1 1 27000C Basin Liner S S Basin Liner A G 23 27888 ExtendedReacharm AG 1 4 i a 270040 StandardReaharm s o1 4 4 ps 278400 Standard Reacharm AG o1 4 a oa 22 283280 RegulatorMouniingBraki 1 1 2 2 15005C Nut Retaining 1 i aan kanu o 1 ite 2 2 978810 Rev E 4 07 2 J oa NINININI NIN NINININI NI N gt NO i il l t ii l t S 17 18 19 0 2 eb O W N ti ap NO NO N N l l l OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Parts List Continued OVL II OVL II OVL II OVL II 26 708866 Sorew 10 24x 38PHMS 1 1 2 2 21 Rod Pivot 2 2 21 32 Upper Panel OVL II ER S S N 4 4 4 4 4 NM 2 2 21 aLe e asl __ 1828 a 1828 ages f 13 23 Upper Panel OVL II SR A G Upper Panel OVL II SER A G Upper Panel OVL Il ESR S S Lower Panel OVL II ER SR S S 1
3. 34 INLET CHILLER Ei OUTLET a i Figure 15 Lower Panel Installation Figure 18 OVL II SER Q ESR Q Tube Routing 97881C Rev E 4 07 OVLERQ D OVLSRQ D OVLESRO G OVLSERQ G TROUBLESHOOTING amp MAINTENANCE Orifice Assembly Mineral deposits on orifice can cause water flow to spurt or not regulate Mineral deposits may be removed from the orifice by poking with a small round file not over 1 8 diameter or using a small diameter wire A CAUTION DO NOT file or cut orifice material Stream Regulator If orifice is clean regulate flow as in Step 10 of the installation instructions If replacement is necessary see parts list for correct regulator part number A CAUTION To preserve the quality and keep this AZTEC GOLD finish clean and spot free clean this surface with only mild detergent or window cleaner and polish with a soft cloth DO NOT use any abrasive cleaners or harsh chemicals They WILL damage the finish Figure 20 Push Arm Mechanism Actuation of Quick Connect Water Fittings Cooler is provided with lead free connectors which utilize an o ring water seal To remove tubing from the fitting relieve water pressure push in on the gray collar while pulling on the tubing See Figure 19 To insert tubing push tube straight into fitting until it reaches a positive stop approxi 22 28 mately 3 4 OPERATION OF QUICK CONNECT FITTINGS SIMPLY PUSH IN TUBE IS SECURED PUSH IN COLLET TUBE T
4. cases by using recommended materials during installation Any drain fittings provided by the installer should be made of plastic which will electronically isolate the fountain from the remainder of the building s plumbing circuits 97881C Rev E 4 07 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Installation Package 1 4 O D TUBE 3 8 O D UNPLATED WATER INLET COPPERTUBECONNECT BUILDING WATER TOCOOLER COLD WATER SUPPLY INLET The components for installation are packed in three separate boxes regardless of the type of unit being installed The boxes contain the following A Ei 2 Box No 1 Wall Frame s NOTE WATER FLOW SERVICE STOP Box No 2 Remote Chiller SJ8 Q DIRECTION NOT FURNISHED Box No 3 Fountain s Arm s and Panels Additional materials as noted in the Parts List are also Parts List Number Required t 26990C 26988C 55836C Bottom Cover Standard Reach OVL II OVL II OVL II OVL II Description ER Q SR Q SER Q ESR Q A 0 00 Oo TO Bottom Cover Extended Reach E KA it tH sb N O Push Arm Actuator 55991C Push Arm Actuator A G 51546C Bubbler S S 1 2 3 Meres ite e 23 160270508640 Strainer Plate S S 1 45400C Strainer Plate A G 23 3 101570540560 DrainGasket J 4 1 2 2 28 515750 PackingRing 2 2 os MIN SK L Mia MSNIN A NIN AA eb SR IN IN N
5. to the left within the guides on the shelf NOTE Building construction must allow for adequate air flow on both sides top and back of chiller A minimum of 4 102mm on both sides and top is required See chiller installation for additional instructions iii 5 i RAI ri ee we Tim da Vis j T bi la F i nati si i ie Ft Na ci e a Js Figure 12 Chiller Installation 3 Make water supply connections Inlet port is marked on the chiller 1 4 O D copper tube Bend the copper tube provided at an appropriate length from the chiller to opening in frame Install the in line strainer provided with chiller by pushing it in until it reaches a positive stop approximately 3 4 19mm on the marked chiller inlet port Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thoroughly 4 Hang the upper panel on the mounting frame hanger Align holes in the panel with the holes in the mounting frame Be sure that panel is engaged with hanger at top of frame before releasing it 97881C Rev E 4 07 5 Install fountain Remove access cover plate on underside of fountains and SAVE the screws Mount the fountains to the upper panel and frame with 4 5 16 x 3 4 19mm long bolts and nuts provided Tighten securely Figure 13 Upper Panel Insta
6. Lower Panel OVL II SER ESR S S Lower Panel OVL II SER ESR A G 1 56092C Poly Tubing 1 4 Cut To Length 56159C Bubbler Nipple Assembly 1 2 rr 1 1 1 1 1 1 1 NOTE S S means Stainless Steel A G means Aztec Gold N S means not shown 97881C Rev E 4 07 OVLERQ D OVLSRQ D OVLESRQ G OVLSERG G Models OVL II SER Q OVL II ESR Q 1 Cuta rectangular wall opening 37 1 2 953 mm W x 37 3 4 H 959 mm and 4 1 2 114 mm above the floor line see Figure 7 The dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to 150 Ibs static load and provide a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit a minimum of 4 102 mm is required 3 Install plumbing and electrical rough ins A junction box for a 3 wire 10 amp branch circuit is provided on the inside of the chiller Standard 120 Volts 60 Hz and single phase Figure 6 OVL II SER Q Rough In 4 Remove frames and related hardware from packaging Release the two shelf rods by cutting i cable ties Attach the two frames together through the A upright supports with 4 5 16 x 3 4 19 mm long bolts and nuts provided Tig
7. O ATTACH IN POSITION TO RELEASE TUBE PUSHING TUBE IN BEFORE PULLING IT OUT HELPS TC RELEASE TUBE Figure 19 Quick Connect Fittings Stream Height Adjustment Figure 21 Regulator Mounting Mechanism 97881C Rev E 4 07 10 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G REGULATOR MOUNTING BRACKET Figure 22 Regulator Assembly 32 3 4 16 See Fig 22 17 See Fig 20 See Fig 21 33 U I ima lb O E I AZ Figure 23 Fountain Assembly Side View 97881C Rev E 4 07 11 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Haksey Taylor 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTED FOR PARTS CONTACT YOUR LOCAL DISTRIBUTOR OR VISIT OUR WEBSITE WWW HALSEYTAYLOR COM 97881C Rev E 4 07 12
8. OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G HALSEY TAYLOR OWNERS MANUAL OVL Series Barrier Free Water Coolers Refrigerated Fountains with Back Panel Figure 1 OVL II ER Q Figure 2 OVL II SR Q Figure 3 OVLII SER Q Figure 4 OVL Il ESR Q OVL II ER Q OVL II Series Extended Reach OVL II SR Q OVL II Series Standard Reach OVL II SER Q OVL II Series Dual Installation OVL II ESR Q OVL Il Series Dual Installation INSTALLER A CAUTION Review these instructions before beginning installation Be sure that installation conforms to all plumbing electrical and other applicable codes A WARNING When installation is complete ensure these instructions are left in the plastic bag provided inside the installed unit for future reference A WARNING Service to be performed by authorized service personnel only NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit which results in an electrolysis effect occurring in the fountain This may result in water which has a metallic taste to it or has a noticeable increase in the metallic content of the water When inspecting plumbing circuit remember the line may be grounded some distance from the installation and may occur outside the building or area in which the unit is being installed This condition can be avoided in most
9. g using appropriately sized screws or bolts and nuts not provided MODEL OVL SER SHOWN 1 1 8 29mm DS P ll M it MODEL OVL ESR a WALL LINE 3 1 8 79mm A 18 3 4 ES SEI 55 8 143mm ii 9 3 8 238mm X 12 BACK WALL LINE 305mm MINIMUM DEPTH gt lt C Y 7 A a 4 40 n fotemm sd 864mm 28 1 2 724mm D FINISHED FLOOR i 114mm Ji 25mm it 2f9mm Legend Item Description A 1 4 O D Tube Water Outlet Connection B 3 8 O D Tube Water Inlet Connection C 1 1 4 O D Waste Tube D Electrical Inlet on Chiller Figure 8 OVL II SER Q OVL I ESR Q Rough In Dimensions 97881C Rev E 4 07 5 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Models OVL II ER Q OVL II SR Q 1 Figure 9 OVL II ER Q OVL II SR Q Rough In ACTUAL FRAME MAY VARY FROM THE ONE ILLUSTRATED REFER TO YOUR MODEL FOR ADDITIONAL INFORMATION 5 16 SCREWS OR BOLTS gt 10 REQ D NOT PROVIDED vi HOOK RODS 2 P N 101567443730 e SCREWS OR BOLTS NOT PROVIDED INSTALL 2 SCREWS P N 111008343890 IN FRA ME BEFORE INSTALLING IN OPENING CHILLER SHELF Cut a rectangular wall opening 18 3 4 475 mm W x 37 3 4 H 959 mm and 4 1 2 114 mm above the floor line see Figure 10 The dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 Reinforce the wall opening on all sides to adequately suppo
10. he required screw guantity and size MODEL OVL ER MODEL OVL SR A WALL LINE 12 305mm 18 MINIMUM DEPTH dl t 279mm a a 1 25mm 11 27 IMM FINISHED FLOOR Legend Item A B C D i 8 4 172 203mm Tu COTTO Ka kee 33 M 2 Ji Oi 33 ies 5 5 8 f p Am if a I 9 3 8 S lm Fal WALL LINE E BACK WALL LINE 13 5 16 BACK WALL LINE 338mm 11 279mm C C 178mm I z 40 1016mm 24 1 2 28 1 2 876mm 724mm D 8 114mm 114mm FINISHED FLOOR a 25mm ET 1 279mm Description 1 4 O D Tube Water Outlet Connection 3 8 O D Tube Water Inlet Connection 1 1 4 O D Waste Tube Electrical Inlet on Chiller Figure 11 OVL II ER Q SR Q Rough In Dimensions 97881C Rev E 4 07 7 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G REQUIRED TOOLS AND MATERIALS These tables show special tools and or additional materials not provided which are necessary to complete installation of these units Special Tools Wem Description Quantity NONE Additional Materials item Description Quantity Unplated copper inlet pipe a 2 Sevicestop OVL II ER Q SR Q SER Q ESR Q INSTALLATION 1 Assemble and place frame in wall as shown on preceding pages 2 Install chiller Remove front panel of chiller Remove and discard cardboard inner pack from between compressor and side panel Slide chiller onto the shelf and position it
11. hten securely MAKE SURE FRAME CONFIGURATION MATCHES THE COOLER TO BE INSTALLED WOOD OR STEEL FRAME SHOWN NOT PROVIDED REVERSED CONFIGURATION HIGHER UNIT ON THE RIGHT 37 3 4 959mm ELECTRICAL INLET LOCATION ON CHILLER 5 16 SCREWS OR BOLTS 12 REG D NOT FU GRY i mm TO FLOOR LINE NN BACK OF WALL i TO BE 12 ar 305mm MIN FLOOR LINE DEPTH FRAME 5 16 HEX NUT 4 REG D PROVIDED P N 111577343890 SCREWS OR BOLTS NOT PROVIDED INSTALL 3 SCREWS P N 111008343890 IN FRAME BEFORE INSTALLING IN OPENING HOOK RODS 2 P N 101567443730 STANDARD CONFIGURATION BOLT FRAMES TOGETHER __ HIGHER UNIT ON THE LEFT 4 REGID PROVIDED P N 111577243890 Figure 7 Rough In Assembly Dual Station Mounting Frames 97881C Rev E 4 07 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Install the frame assembly squarely in wall opening with frame upright support edges flush with the finished wall face Secure the frame to the wall through holes with 12 5 16 bolts or screws not provided Tighten securely NOTE Be sure that frame is squared in location Do not use less than required screw quantity and size 6 Attach the chiller shelf support rods to the right side of the frame uprights at the second set of holes counting from the bottom and to the shelf at the 2 side holes Line up the other shelf holes with the frame bottom holes and fasten the assembly to the wall openin
12. llation Note With OVL II SER Q or OVL II ESR Q models the standard reach fountain must be mounted at the upper position on panel Figure 14 Fountain Installation 6 Connect the fountain drain waste tube to the building sanitary sewer system Connection should be made in compliance with local plumbing code requirements Note Plumbing trap is not included with the fountain 7 Make connection between remote chiller outlet tube and fountain s Outlet port is marked on the chiller 1 4 O D copper tube Install a 1 4 union tee provided on the marked chiller outlet port Insert the 1 4 poly tubing coming from the fountain s into the union tee Turn on water supply and check for leaks OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G A CAUTION DONOTSOLDER tubes while inserted into the strainer as damage to o rings may result lll 1 2 38mm 8 These products are designed to operate on 20 105 i PSIG supply line pressure If inlet pressure is above 105 PSIG a pressure regulator must be installed in the supply line A CAUTION Any damage caused by connecting these products to a supply line with Figure 16 Stream Height pressure lowerthan 20 PSIG or higher than 105 PSIG IS NOT
13. rt the water fountain This reinforcement must support up to 150 Ibs static load and provide a means for securing the frame assembly in place NOTE Building construction must allow for adequate air flow on both sides and top of remote chiller unit Minimum of 4 102 mm is required Install plumbing and electrical rough ins A junction box for a 3 wire 10 amp branch circuit is provided on the inside of the chiller Standard 120 Volts 60 Hz and single phase Remove frame and related hardware from packaging Release the two shelf rods by cutting cable ties WOOD OR STEEL FRAME SHOWN NOT PROVIDED ELECTRICAL INLET LOCATION ON CHILLER 8 203mm I FLOOR LINE BACK OF WALL TO BE 12 305mm MIN DEPTH P N 27638C FLOOR LINE Figure 10 Rough In Assembly Single Station Mounting Frames 97881C Rev E 4 07 6 OVLERQ D OVLSRQ D OVLESRQ G OVLSERQ G Install the frame squarely in wall opening with frame not provided fasten the shelf and frame to the upright edges flush with the finished wall surface bottom of wall opening Secure the frame sides and Place shelf inside frame and line up the 2 holes on top to the wall opening using 10 5 16 bolts or each Insert loose ends of rods into holes on sides of screws not provided shelf panel Using appropriately sized screws or bolts NOTE Be sure that frame is squared in location Do M No aal 34 864mm not use less than t
Download Pdf Manuals
Related Search
Related Contents
rIDCOJ~COJ1T~ Des jeunes talents dans les entreprises 取扱説明書・仕様書 - プライム・スター株式会社 SNLL121 ADLER PUR-Strong 26303 suiv. HERON2-C6203 User Manual Cellular Line Active Deluxe, Type 1 Samsung Духова шафа BFN1391T Керівництво користувача INSTRUCTIONS / INSTRUKTION Copyright © All rights reserved.
Failed to retrieve file