Home

Outdoor Living Today Bayside10 Use and Care Manual

image

Contents

1. 59 Secure each Deck Board with 4 2 Screws per piece 2 per side Note drill 1 8 pilot holes to prevent splitting 60 Place the Center Deck Piece into place an secure with 4 2 Screws Note drill 1 8 pilot holes to prevent splitting Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 22 61 Locate a Perimeter Deck Board Notched for Post Position equally between Posts and resting on the Rim Joist Expert Advise Position all Perimeter Deck Boards around gazebo as shown in Step 64 to even gaps between boards prior to attaching 62 With Perimeter Deck Board positioned correctly secure board with 5 2 stainless steel screws 63 Place 2nd Perimeter Deck Board into place and secure with 5 2 stainless steel screws 2nd Perimeter Deck Board F pi Ig J Fi L l N j 1 oe i ae I NI fi TT on i T TIR ff aa L hy tT ae J aE USS fe a ni FI l J H j 64 Complete positioning and securing remaining Perimeter Deck Boards as per Step 63 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 23 E Roof Section Panel will sit on Dado of Skybox 65 Starting at your entrance lift and position 1 Panelized Roof Section up and place equally on rafters The top of the panel will sit on the dado of the Skybox frame Roof Panel not to exceed
2. Must have Washer 15 From the inside slide a washer over bolt and tighten nut Important Only snug Carriage Bolts at this stage After Handrail and Upper Baluster Section are installed come back and firmly tighten all Carriage Bolts with a wrench Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 8 ih 2nd Post lywood Post pacing Template an i gol 16 Locate 2nd Post and Plywood Post Spacing Template Align and secure Post to Joist Assembly as per Steps 12 15 Using the Post Spacing Template slide between posts as illustrated above Level with top of T Push posts together oa uor oge tight against Template ak 17 Locate one Outer Rim Joist 1 x 5 1 2 x 48 3 4 and position evenly from side to side between each Post Level Rim Joist with top of T Post Mount Screw Rim Joist to Post with 2 3 screws Line up Mid Joist with F i s S 4 1 _ 3 s screw into N a Mid Rafter a i e 18 Before attaching opposite end of Rim Joist to Post m Post tight B Template and then attach Rim Joist to Post with 2 3 screws Line up Mid Joist with Mid Joist Template Marker and when correctly centered attach Mid Joist to Rim Joist with 1 3 screw Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 9 Toll Free 3rd Post 19 L
3. long Make sure the longer side of Core Brace is flush with the end of the joist and attach together with 2 3 screws Once again make sure Core Brace is centered and flush with joist Complete all 8 attachments fo 10 Set completed Mid Joist Core Brace A Assembly between the main Joist i I Assemblies but do not attach i o ooo Toll Free 1 888 658 1658 www ouldoonivineloday com sales outdoorlivingtoday com Page 6 11 Position remaining Mid Joist Core Brace Assemblies roughly between the main Joist Assemblies Some adjusting will be necessary to form a symmetrical pattern Angle Cut of Post or a high side inside _ 12 Locate 3 1 2 x 3 1 2 Posts Align P A F ie er lo first Post with four drilled holes in bottom vm Pama 6 gt R aligned with T Post Mount Plates GEN C T4 Holes Drilled Important Be sure to align Post so top Be icy iy tin botiom of f angle cut is high to the inside as Se each Post Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 7 13 When holes are aligned slide 4 Carriage Bolts from the outside through Post and T Post Mount Plates 14 Complete all four T Post Mount and Post Carriage Bolt attachments Important Once again only snug Carriage Bolts at this stage After Handrail and Upper Baluster Section are installed come back and firmly tighten with wrench
4. Page 13 Post will sit in notch of rafter i i 30 With the help of at least 2 assistants and Step Ladders lift up your partially completed Skybox Rafter Assembly and place Rafters on top of Posts The Post will sit in the notch of the Rafter angle screw from side 31 Angle screw each Rafter Post connection together with 1 3 screw from 32 Standing on ladders position and attach a 4th Rafter Post into Rafter Slightly countersink to the Skybox and Post as per Step 27 and Step 31 screwhead Remember to align the Rafter correctly with Skybox ledge 33 Complete remaining Rafter attachments and secure as per Step 27 and Step 31 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 14 l Left and Right Upper d ght Upp C Rail Section ie Rail End Caps l B _ Attach with 4 2 screws Outside View 34 Locate Upper Rail Sections 8 and Upper Rail End Caps 8 left 8 right Align Caps on Rail Section flush at the bottom and evenly Spaced from side to side See Pictures to the X right to confirm alignment prior to attaching p E Inside View sunk hole Flush at EEN to outside bottom Important Left and Right Upper Rail Ends Caps must be aligned correctly Upon completion of first Rail Section test fit Section as per Step 35 35 Lifta completed Upper Rail Section up and place between the Ra
5. building code to confirm M a oon a S y e p ii T 7 T Fi a zr 4 NY 2 46 With both the Upper Rail and Handrail Sections complete go back and tighten all the Carriage Bolts in the T Post Mount Plate and Rafter with a Wrench Be careful not to over tighten bolts Complete one side and then the opposite side This will create an equal tightening of all the components 4T To completely secure Rafter Post and Upper Rail Sections place 2 2 screws from the side framing of Upper Rail Section into Posts Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 18 Tin N 48 Locate 8 Mid Rafters 1 1 2 x 3 1 2 x 55 Center Mid Rafter from side to side on Skybox and on the same vertical plane as the Corner Rafters Use a Straight Edge to assist you Attach Mid Rafter from inside the Skybox with 2 3 screws Center Mid Rafter on Upper Rail Section the midpoint of the Upper Rail Sections is approximately 20 1 2 From the inside angle screw a 3 screw from Upper Rail Section into bottom of Mid Rafter 49 Complete remaining Mid Rafters as per Step 48 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 19 D Floor Section Important If you have purchased a Screen Kit Option Floor Screening must be installed prior to Step 50 Floor Panel installation please refer to screen Kit Option Assembly Manua
6. shaped 8 16 long 8 14 1 2 long 8 10 1 2 angle ends 1 Top Cap amp Ball Top G Miscellaneous Section Page 34 36 8 Facia Corner Detail Plates Small 8 Rim Joist Corner Detail Plates Large 80 Cedar Roof Ridge Cap Shingles 8 need to be trimmed for last row Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 2 10 BAYSIDE GAZEBO HARDWARE SHEET Hardware Kit Provided Note Hardware below shown as actual size He Prt Thika gt VA pil maa h Aaa Rah 7J 1 a 5 Bra ee ee ee a S in flak ph pi gt Shingle Me AAAA AAAA AAN Boba ba eee beep yh gh pipi AAAY a Stainless Steel Square Drive Bit Washers x 40 Nuts x 40 Hammer screw Gun Drill Tape Measure Wood Clamp Utility Knife 1 2 Wrench 1 8 Drill Bit Safety Glasses Work Gloves Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 3 A Floor Section Measure to center of Plate Long Main Floor Joist 55 1 4 long T Post Mount with Holes Drilled Drilled Holes Joist evenly spaced between 1 Locate both the Long Main Floor Joist and bolts the T Post Mount Plate Angle cut ends must be positioned to the outside Pre drilled holes will align with Posts later in Step 10 Please review this step to confirm correct T Post Mount Plate orientation Use 4 Carriage Bolts to align Joist with T Plate prior t
7. 10ft Octagon Bayside D 4 _ gt Gazebo Assembly OLT Manual Outdoor Living Today July 17th 2012 We recommend reviewing this Assembly Revision 16 Manual thoroughly before starting this project Become familiar with the tools required and where and when assistants are necessary If you re planning on finishing the Gazebo in a weekend we recommend completing up to Step 47 on your first day Thank you for purchasing a Say D ant aia TO 10 ft Bayside Gazebo Please take Hf yE i T h u we aT the time to identify all the parts prior E W Vag f y 7 f y i to assembly The parts list can be found i g E TITT oD liv on Page 2 of this Manual Sorting parts will help you organize and prepare for each section There are 7 sections Mi M ite A Floor Section B Rafter Section C Rail Section D Floor Section E Roof Section F Cupola Section G Miscellaneous Section Safety Points and Other Considerations Our products are built for use based on proper installation and normal residential use on level ground Please follow the instruction manual when building your Gazebo and retain the manual for future maintenance purposes Some of the safety and usage measures you may wish to consider include snow load ratings vary by geographical location If heavy or wet snowfall occurs it is advisable to sweep the snow Off the roof s if the product is elevated any structural and building code requirements ar
8. EEH ni Ih 66 With Roof Panel Section positioned equally on both rafters secure with 2 3 screws screwing from panel into rafters on bottom of Roof Panels Roof Panel Section positioned so it sits approx on half the Rafter Sections have been positioned and partially secured in Step 71 slight adjustments to some panels may be necessary to achieve best fit 67 Lift and position a second Roof Panel Section to the right of the first Roof section Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 24 68 When 2nd Roof Panel Section is positioned on the Rafters equally and on the Dado of the Skybox secure to Rafters as per Step 66 69 Continue positioning and secure Roof Panel Sections around the Gazebo Your 3rd section should be to the left of the entrance followed by the next immediate right side section E puu Z JE bg aa Fae vA 70 Complete remaining Roof Panel Sections finishing off at the rear Position and secure as per Step 66 Note gaps will appear between roof seams and covered by Ridge Caps in Step 110 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 25 KOR slight adjustments to some of panels may be necessary to get the best fit When correctly positioned secure with 4 additional 3 screws per panel as shown above Reach through Skybox while securing Roof Panels at the top Rememb
9. e solely the customer s responsibility and should be abided by in high or gusty wind conditions it is advisable to keep the structure securely grounded have a regular maintenance plan to ensure screws doors windows and parts are tight Customer agrees to hold Outdoor Living Today Partnership and any Authorized Dealers free of any liability for improper installation maintenance and repair In the event of a missing or broken piece simply call the Outdoor Living Today Customer Support Line 1 888 658 1658 within 30 days of the delivery of your purchase It is our commitment to you to courier replacement parts free of charge within 10 business days of this notification Replacement parts will not be provided free of charge after the 30 day grace period Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 1 Thank you for purchasing our 10ft Bayside Gazebo Kit Please take the time to identify all the parts prior to assembly Parts List A Floor Section Page 4 11 1 5 1 4 Diameter Octagon Core Block 8 1 1 2 x 5 1 2 x 55 1 4 Main Floor Joist 8 1 1 2 x 5 1 2 x 24 3 4 T Post Mount Plate Main Floor Joist 8 1 1 2 x 5 1 2 x 42 3 8 Mid Floor Joist 8 1 1 2 x 5 1 2 x 12 Interior Core Brace angle cut on ends 8 1 x 5 1 2 x 48 3 4 Outer Rim Joists 8 3 1 2 x 3 1 2 x 91 Posts Angle Cut on Top Drilled on Bott
10. ed as an unfinished product If exposed to the elements the western red cedar lumber will weather to a silvery gray color If you prefer to keep the cedar lumber looking closer to the original color we suggest that you treat the wood with a good oil base wood stain You may also wish to paint your new gazebo rather than stain it In both cases we recommend that you consult with a paint and stain dealer in your area for their recommendations We hope your experience assembling the Bayside Gazebo has been both positive and rewarding We value your feedback and would like to hear back from you on how well we are doing in the following areas 1 Customer Service 2 On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual 6 Overall Satisfaction The materials contained in this Assembly Manual may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modified edited or taken out of context such that its use creates a false or misleading statement or impression as to the positions statements or actions Please call write or email us at Outdoor Living T oday Canadian Address United States Address 9393 287th Street P O Box 96 M aple Ridge British Columbia Sumas W ashington Canada V2W 11 USA 98295 Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com Page 37
11. er gaps between Roof Panel Sections will be covered later by Roof Ridge Caps lt P ee a pp N f j 1 Cy i is a i fia a Woy be Dar 2 Locate 1 x 4 1 2 x 54 5 8 long HE A A Wo Facia Boards Facia Boards are angle cut on each end Place 1 board over the entrance way underneath the roof and against the rafter ends Facia Board should be positioned flush underneath the roof panel and angle cut end of board should sit approximately halfway on Rafter end Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 26 73 With the Facia Board positioned correctly on Rafter ends secure with 4 2 screws per side Drill 1 8 pilot holes to prevent splitting Note Align screws so Facia Detail Plate will cover See Step 119 for details 14 At Mid Rafter secure Facia with 1 2 stainless screw as shown to the right Position and secure the 2nd Facia Board to end of Rafters as per Step 73 74 Important It is normal for gaps to occur between Facia Boards Later Corner Facia Detail Plates will be added to cover any gaps exposed screws ll i 15 Complete positioning and securing Facia Boards to Rafter ends Use the same pattern as for the Roof Panel Sections Secure as per Step 73 74 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 27 Upper Baluster bottom rail Right Side Corner Brack
12. et 16 Locate 16 Corner Brackets 8 Left 8 Right Side Place into position on Post and on the Upper Baluster Section bottom rail With Bracket Centered on Post and Upper Baluster Section drill 1 8 pilot hole in Bracket to prevent splitting before securing with 2 3 screws 78 Complete all Corner Bracket attachments Important If installing a Outdoor Living Today Optional Screen Kit Do not install Doorway Corner Brackets Toll Free 1 888 658 1658 www outdoorlivingtoday com Page 28 aaa N AN i A i J i A TAN 1 i Tf Complete both left and right Corner Bracket attachments making sure to position and drill 1 8 pilot holes prior to securing with 3 screws 1 i 1 sales outdoorlivingtoday com F Cupola Section Cn 19 Locate 8 Side Rail Cupola Sections and place in octagon shape as shown above 80 Screw each section together with 2 2 SCrews 82 Complete Side Rail Section and move to he si 81 Continue attaching sections together Ne aing 2 from top Cupola Rafter Core Block T Seat Cut in Rafter facing down 83 Locate Cupola Rafters and Core Block 84 Angle screw Rafter into Core Block Place one Rafter against Core Block as shown 2 from top with 3 screw above Important Drill 1 8 Pilot Hole in Rafter end to prevent splitting Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorl
13. fters and Posts Once Upper Rail alignment is confirmed complete remaining Upper Rail Assemblies Bang Carriage Bolts through holes 36 Position Upper Rail Section so Pre drilled holes in End Caps line up with Pre drilled holes in Rafter With holes aligned carefully hammer Carriage Bolt through Upper Rail Section and Rafter Do not secure washers and nuts of Carriage Bolts until Step 37 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 15 K f 37 Lift a second Upper Rail Section into place and 38 a Bo slide carriage bolt through End Cap hole Place a Hammer in os aria Bolt into left side of washer over bolt and snug nut down second Upper Rail Section as per Step 36 te wo j Ji n B pea 40 on your last Upper Rail Section use Carriage Bolt from the first section to secure Use Wood Clamps or have assistant push Rail Rafter together Rounded edge to inside 39 Lift up position and secure all remaining Upper Rail Sections using Steps 36 38 Important Snug Bolts down but don t over tighten Hand Rail Section Hand Rail alt End Caps N 41 To complete Handrail Sections locate Hand Rails and Hand Rail End Caps Position End Cap flush with Bottom Rail Evenly space End Caps from side to side with both Top and Bottom Rails Align rounded corners of End Caps against ra
14. g Top Cap Ball Top to Core Bi Block drill pilot holes to prevent splitting of wood 106 with your helper lift completed Cupola Once complete secure with 2 2 screws up on top of gazebo roof Lift Cupola from the Side Rail Sections aie of z E i a puaa a i Te a K i T i 4 a l Ne r s i 107 Place Cupola so bottom of Side Rail Section 108 Val Side Rails sitting on SIO evenly sits on top of Skybox See Step 108 for alignment secure with 8 3 screws from the inside De om m Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 33 G Misc Section PAT r a 3Y Xe ta MM j f 7 i mg We W K A i 110 Locate all Gazebo itis Sia iioi there are left and right offset Ridge Caps See eted Cupol b Step 112 for detail illustration of the difference A A AEEA a Place 1st Ridge Cap on roof seam slightly overhanging roof end and attach with 2 nails 109 Picture above shows illustration of 111 Locate and place opposite 2nd Ridge Cap 112 Attach 2nd Ridge Cap approx 9 from on so slight overhanging or recessed on shingle butt with 2 1 1 4 shingle nails initial Ridge Cap 114 Start the 3rd Ridge Cap approx 8 from bottom of 2nd Ridge cap butt Attach with 2 1 1 4 shingles nails 9 from butt 113 Piace 3rd Ridge Cap on roof seam Make sure to choose shingle with opposi
15. il ie Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 16 J 42 When correctly positioned attach with 4 2 screws Complete all Handrail Sections now Important Drill 1 8 Pilot Holes in End Caps to prevent splitting Be sure to drill into Handrails n Measure 4 1 2 from lt a __ top of Rim Joist j Po 4 ee 43 starting on right side of Doorway position first Handrail Section between Posts Position bottom of Handrail Section 4 1 2 above top of the Rim Joist Position End Cap of Handrail Section equally from front to rear or best fit on Post 44 With Handrail Section positioned correctly screw End Cap to Posts with 3 2 screws per side Position and secure a second Handrail Section between Posts moving Counter Clockwise direction Once again use 3 2 screws per side to secure Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 17 Cd Tn fj y F s Mi iy Mh F k PUL Ne 45 Complete remaining Handrail Sections positioning and securing as per Step 44 ry f Pal oe gt _ In Florida additional hardware may be required that is not oars Rie jincluded in kit due to hurricane Tighten w i ENE z a Aa ee lt Fi Ith e 4 winds Please check with local Wrench T _
16. ivingtoday com Page 29 85 Continue attaching Rafters to Core Block 86 Complete all Rafter Core Block securing with 3 screws 2 from the top attachments Straight Edge Facia sits below Rafter 87 Locate 8 Cupola Facia Pieces and place 88 Position Rafter so it sits equally on both Rafter against Rafter ends ends Also use a straight edge to make sure Rafter sits approx 3 8 below rafter top Attach Facia to Rafter end with 2 2 screws per Facia 89 Position and secure second Facia Piece 90 Place and secure all Facia Pieces as per Step 88 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 30 91 Place completed Rafter Facia Section on Side 92 Line up Rafter equally on each corner of Rail Section the Side Rail Section m a iia T TI 93 With Rafter Facia Section orm 94 Locate and place 1st Cupola Roof equally on Side Rail Section attach together by Panel on Rafters screwing with 1 2 screw per Rafter 95 Place Roof Panel centered equally on Rafters and against Core Block Attach panel to rafter with 1 2 screw at top Later In Step 99 you will completely secure Roof Panels Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 31 96 Place 2nd Cupola Roof Panel in place 98 Continue to position and attach Cupola 97 Position and attach 2nd Cupola Roof Panel Roof Panels Gaps ma
17. l for instructions 50 Locate the 8 pie shaped Panelized Floor Panels Floor Panel 51 Lift up and lay your first Panelized Floor Panel on Floor Joists 52 Position Floor Panel so it sits equally on Floor Joists Important Do not secure Floor Panel to Joists until all Floor Boards are in place and properly positioned See Step 55 to secure Floor Panels completely Floor Joist P i bo _ Sits equally on Joists Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 20 53 Place and position 2nd Floor Panel on Floor Joists Position as per Step 52 2nd Panelized Floor Panel 54 Place and position remaining Floor Panels around the Floor Joists Position as per Step 52 55 With all panels evenly spaced and and in their correct position secure each panel down to floor joists with 8 2 screws per panel Note drill 1 8 pilots hole to prevent splitting 8th Floor Panel 2nd to Last Deck Board 56 Place the 2nd to Last Deck Board on Floor Joists and position between joists Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 21 57 Place Last Deck Board on Floor Joists and position between joists Do not secure until all remaining Deck Boards are positioned 2nd Sections 58 Position all remaining Deck Boards around the center of the floor Position so they fit evenly around the floor
18. ll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 11 B Rafter Section o 24 Locate 8 Skybox Pieces placing them with Dado cut facing out and to the top 25 Position 2 pieces together so angle cut ends line up When correctly aligned screw together using 2 3 screws and 1 2 screw in top dado ledge as shown in left illustration Attach remaining pieces to complete Skybox 3 screws Angled Ledge not accurately 3 screws V Notch in end l Octagon Skybox Rafter 26 With your helper lift the Octagon Skybox up with the dado or notch of the Skybox facing up Place the V end of the Rafter in a corner of Skybox Notch on bottom Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 12 Align Rafter Corners flush with ledge of Skybox 2 Align and secure Rafter end as illustrated above with 4 3 screws from the inside of the Skybox Important Be sure to support Skybox Rafter Assembly as unit will be unstable until at least 3 Rafters are attached 28 With your helper still supporting the Skybox Rafter Assembly position and attach a second rafter as illustrated to the left and as per Step 27 29 Complete 3rd Rafter attachment as shown above and as per Step 28 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com
19. o attach ing Joist must be evenly spaced between bolts Remove Carriage Bolts when correctly aligned 2 With pieces properly orientated screw T Plate and Joist together with 2 3 screws Make sure pieces are flush with each other on the top and bottom Complete all 8 Long Main Floor Joist and T Post Mount Plate Connections Once again check alignment prior to attaching together 3 Locate the 5 1 4 Diameter Octagon Core Block Place at end of one of the Long Main Floor Joists Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 4 4 Position end of joist equally on one side of the Core Block Angle screw with 3 3 screws from the top and sides Joist and top of Core Block should sit flush with each other Note Drill 1 8 pilot holes in joist prior to screwing to prevent splitting 5 Lay completed Core Block Joist Assembly on flat level surface 6 Position and angle screw the second joist assembly to opposite side of Core Block f Continue to add Joist Assemblies to Core Block Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 5 8 At this stage your gazebo floor should look similar to the illustration to left Mid Floor Joist tS Interior Core Brace a angle cut on ends x a 12 long 9 Locate and position a Mid Floor Joist 42 3 8 long and an Interior Core Brace 12
20. ocate 3rd Post Align and secure Post as per Steps 12 15 Using the Post Spacing Template position 3rd Post as per Step 16 20 With 3rd Post correctly positioned align and attach the Outer Rim Joist as per Step 17 18 Any gaps between the ends Rim Joists will be covered by Rim Joist Detail Plates in Step 121 ra Angle Cut of Post high side inside 21 Continue to attach Posts and Outer Rim Joists until all 8 are complete Continue to use Post Spacing Template to confirm correct spacing Remember Align Post with high side to the inside 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 10 22 Secure Core Brace Assembly to Main Joists with 4 3 screws Make sure tops of N Interior Core Brace and Main Joists are flush with each other as Decking will sit on this attached in Steps 50 64 os Post Mount and Rim Joist at 23 With all Mid Joist Assemblies secured same height screw the T Post Mount into Rim Joist from inside with 2 3 screws on angles Be care ful to screw on angle so fastener does not come through Rim Joist Complete all 8 sides Important Use a level to confirm all Floor Joists are level and that the overall Floor is level Adjust as necessary Support Floor Structure as required Make sure that Posts are plumb Check each Post in both directions with a level and adjust as required To
21. om 1 Plywood Post Spacing Template Angle cut on ends B Rafter Section Page 12 14 8 3 1 2 x 3 1 2 x 58 1 8 Rafters Angle Cut on each end 8 1 1 2 x x 14 7 8 Octagon SkyBox Pieces Cut Dado and Drilled C Rail Section Page 15 19 7 43 9 16 x 36 Hand Rail Section 14 5 8 x 3 1 8 x 40 Hand Rail End Caps Dog Ear and Router edges 8 43 9 16 x 10 Upper Rail Section 8 5 8 x 3 1 8 x 15 1 4 Upper Rail End Caps Right Side Angle Cut One End with Hole 8 5 8 x 3 1 8 x 15 1 4 Upper Rail End Caps Left Side Angle Cut One End with Hole 8 1 1 2 x 3 1 2 x 55 Mid Rafters D Floor Section Page 20 23 8 Pre assembled Deck Floor Panels Triangular Shaped 8 1 x 5 1 2 x 50 5 8 Perimeter Deck Board notched for Post 8 1 x 5 1 2 x 13 1 4 2nd to last Deck Board 8 1 x5 1 2 x 8 5 8 Last Deck Board 1 1 x 10 Octagon Center Deck Piece E Roof Section Page 24 28 8 Large Roof Panels 8 Facia Boards 1 x 4 1 2 x 54 5 8 Angle Cut on ends 16 1 1 2 x 5 1 2 x 22 5 8 Corner Brackets 8 left 8 right F Cupola Section Page 29 33 8 Side Rail Sections 14 7 8 wide 1 Small Core Block Octagon 8 1 1 2 x 1 1 2 x 24 Rafter angle on both ends 8 3 4 x 1 1 2 x 17 7 8 Facia 8 Small Roof Panels 24 Cupola Ridge Caps 2 1 2 wide V
22. te angle offset Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 34 Cut slightly smaller O a7 lt a if i W 116 as The last Ridge Cap to complete a side 115 Continue to attach Ridge Caps positioning j P j d Steb 114 must be cut shorter to fit against the Cupola and securing as per Step 114 Use a Utility Knife to score cap 118 Complete all Ridge Caps to cover all roof seams 11 9 Locate Facia Corner Detail Plates and place in each corner where Facia Boards come together Detail Plates will hide any gaps that may exist between both Facia Boards Facia Corner Detail Plates are smaller than Rim Joist Corner Detail Plates shown in Step 121 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 35 iN PANEER EEY 75 Tar ios Facia Corner Detail Plates 120 When centered in each corner of Facia attach with 4 1 1 finishing nails per plate 121 Position Rim Joist Corner Detail Plates in each corner where Rim Joists come together to hid the gap Attach with 4 1 1 finishing nails per plate i 1 ii D ELL im CLL LN fi Rim Joist i Corner Detail Plates Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 36 OLT Outdoor Living Today Congratulations on assembling your 10ft Bayside Gazebo Note Our Gazebos are shipp
23. y appear between as per Step 95 Roof Panels but will be covered later by Roof Ridge Caps 99 Position 8th Cupola Roof Panel in place 100 Locate 16 long Cupola Ridge Cap and and make any necessary adjustments to position on corner overhanging roof by approx 1 achieve best fit Secure with 3 additional Secure with 2 1 1 4 shingle nails 10 from butt 2 screws per panel as per Step 95 Angle cut at top 10 1 2 long with angle cut ends Lf ms s i p k f 7 i i Fi t i i k r i q A sy k aa z i o k k F J P in fF j i ka 4 j aie ue f F i l te RE oe 101 Place a 14 1 2 long Cupola Ridge Cap 102 Place a 10 1 2 angle cut end Cupola Ridge Cap i 8 1 2 from the butt of first cap Secure with over 2nd cap 8 1 2 from butt and secure with 2 1 1 4 2 1 1 4 shingle nails 10 from butt shingle nails Drill pilot holes to prevent splitting first Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 32 103 Complete remaining Cupola corner Ridge Caps as per Steps 100 102 going around ina 104 Locate and place Top Cap Ball Top on windmill design top of Core Block Important Placing Cupola on Roof requires heavy lifting Your helper will need to be positioned on the root Pick Cupola up by the side Rail Sections only rir 105 Prior to attachin

Download Pdf Manuals

image

Related Search

Related Contents

Verriegelungseinheit „SuperLock“ für HSK-Spannsysteme  Almacenamiento masivo de datos de posicionamiento GPS en un  en savoir plus sur la garantie de Clinique Sonic System.        

Copyright © All rights reserved.
Failed to retrieve file