Home

HyLoft 50175-10 Installation Guide

image

Contents

1. ASSEMBLY INSTRUCTIONS HH Item 00175 or HyLoft 60 x 45 Ceiling Mounted Shelf nets Wagas Storage MISSING A PART There is no need to return this item to the i store Instead call our Joists TOLL FREE HOTLINE AG a CON 4 Wire Grids 4 Downrods 1 5 x 45 2 Support Bars 8 Lag Screws 5 16 X 2 1 2 Q 4 Carriage Bolts 6 3 D nica 4 Hex Nuts 4 Washers O 16 Hex Bolts 1 4 x 11 2 6 32 ANNANN D A iB Tools Required OR i Eye Protection 3 16 7 16 Wrench 7 16 11 mm Stud Joist Framing Pencil Drill Bit 11 mm Socket Wrench Finder Square Ladder or 4 8mm or Nut Driver optional optional Tape Measure Step Stool IMPORTANT READ THROUGH ENTIRE INSTRUCTIONS BEFORE BEGINNING INSTALLATION Locate the ceiling joists in the area of desired installation and determine the direction in which they are running The ceiling mounting plates on Downrods B are installed parallel to the ceiling joists Refer to the diagram below for additional installation clarification INSTALL DOWNRODS Using Stud Joist finder locate any 2 Joists Outside edge of Downrod footplates must measure exactly 69 apart 24 to 32 apart _ Sa Place Downrod B against ceiling under joist location and mark holes running parallel with the joist Pre drill each hole location using a 3 16 drill bit Install Downrod B using 7 16 Socket Wrench or Nut Drive
2. ars D through the quad wire section of the Grids A using 4 x 2 Carriage Bolts J and 4 serrated nuts K as shown DO NOT TIGHTEN AT THIS TIME Attach two sets of outer Grids A together using two 6 32 x 2 Carriage Bolts F 6 32 washers H and 6 32 nuts G on both sides Tighten center Grids A to Support Bars D JJ i Mi HN AN 4 4 LA Make sure that all nuts bolts and screws are tight Do not load with more than 300 Ibs evenly distributed
3. r and two 2 4 x 3 Lag Screws E leas te T From the outside edge of the Downrod B footplate just installed measure 69 inches along ceiling joist and mark this location This mark will be the OUTSIDE edge of the second Downrod B Install second Downrod B and make sure it lines up with the first Downrod B installed on the joist Epannavnunnnnunenninnn fununu Repeat to install the remaining two 2 Downrods on a joist which can vary from 24 to 32 apart from the 1st joist IMPORTANT Downrods must be mounted perfectly in line and square to each other INSTALL CORNER RODS amp SUPPORT BARS T RS Attach two 2 Corner Rods C to each of the Support Bars D using four 4 x 172 Hex Bolts I and four 4 2 serrated nuts K Determine the length down from the ceiling you want the unit to hang from 32 to 40 Attach the Corner Rod B and Support Arm C assembly to each Downrod B at the predetermined length using two 2 x 172 Hex Bolts I and two 2 serrated hex nuts l for each Repeat Step 2 for the other set of Downrods B Place Grids A across the two hanging Support Arm D assemblies making sure the long wires of the Grids A are facing down and overhang is even on both sides Quad wires go to the inside on the center Grids A and to the outside on the outer Grids A Fasten 2 center Grids A to Support B

Download Pdf Manuals

image

Related Search

Related Contents

OSD Operation  Canada – Installation, Ballast & Specification Guide  Philips AJM180 User's Manual  Fortinet FortiAnalyzer-3500E  取扱説明書  AVIS - La-Z-Boy    Rexel Document Folder - Premium Qual  Untitled - POLITEC 配水用ポリエチレンパイプシステム協会  Mode d`emploi - Cartouchedencre.ch  

Copyright © All rights reserved.
Failed to retrieve file