Home

Arrow VS1014 Instructions / Assembly

image

Contents

1. 113 kg evenly distributed Some drilling required to fit buildings without mid wall bracing SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings SF Model No SS404 Model No SS900 A Makes 8 to 12 20 3 30 5 cm Grey color wide shelves in any length e 3 shelves Brackets braces Holds up to 85 Ibs 38 kg hardware included even weight distribution Lumber is not included Some drilling required to fit buildings without mid wall bracing po THIS PAGE WAS LEFT BLANK INTENTIONALLY po THIS PAGE WAS LEFT BLANK INTENTIONALLY Base F09 The Base For Your Building OPTION 1 ARROW FLOOR FRAME order No FB1014 A or 68387 A Arrow has the best base for your building in this simple kit It keeps stored items above the ground This kit should be used with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own base be sure to select the appropriate materials These are the recommended materials for your base 2 x 4 s 38 mm x 89 mm Pressure Treated Lumber 5 8 15 5 mm 4x8 1220 mm x 2440 m
2. ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools eDo not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 or assist arrowsheds com eDo not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe amp Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Contact Arrow as outlined on the order form to place an order Please include the model number of your building Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fastene
3. 1 Locate all of the wall panels and set each one alongside the building 2 Fasten the wall panels at the top and bottom with screws 3 Fasten the center of each panel to the wall channel with screws 4 Fasten overlapping ribs as before TR Crimped Rib Underneath aad Panels rest on frame as shown 41 m i Use bolts andnuts thru wall angle overlap at the top of panel at rear ilii 1 entrin STEP 4 te STEP P ie B Detail Showing Center of Panel Screwed to Wall Channel Ekat Bolt and nut does not go thru wall channel at overlap AT Step 10 Parts Needed For 9369 Door Jamb 2 Front Channel Door Jamb 9365 Front Wall Channel 2 S023 The door jambs reinforce the door opening and provide an attractive 9365 trim Follow these steps for both door jambs 1 Fasten the front wall channels in their positions between the end of the side wall channel and the cor 1 ner panel using screws Do not put a screw in the hole at the end be hind the door opening at this time INSIDE OF BUILDING TOP VIEW Door Track 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown A Hex Nut 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 2 09 Front Wall
4. 2 2 4 2 2 2 2 2 2 4 2 2 8 2 2 2 2 1 6 3 2 2 2 2 2 4 2 4 2 2 2 4 2 4 2 1 4 4 12 Assembly by Key No 8934 1 S 1 Parts Needed For 9367 Front Floor Frame 2 tep 8936 Rear Floor Frame 2 Floor Frame Assemblies 10387 Side Floor Frame 4 SO14 The front floor frame is made up MM three pieces The side floor frames and the rear floor frame are made up of two pieces The holes in these M pieces will align when the pieces are positioned with correct amount of overlap The illustrations below show 9367 the proper overall length for the sides rear and front Proceed as follows 8936 1038 1 Place the front floor frames as co oF Front Floor shown Center the ramp with drain oF 8934 ake Frame Assembly holes facing outside ontop of the two 1 E 107 3 8 303 2 front floor frames Join the frames by 9367 AL 9367 inserting eight screws g HOLES oe OUTSIDE 2 Overlap the side floor frames and 79 99 the rear floor frames as shown The 10387 holes in these pieces will align when Side Floor Frame 158 5 8 402 9 cm the pieces are positioned with cor EN rect amount of overlap See the illus ok O Q9 N trations below for the proper overall length ofthe side and rear floor frames b 58 Join the frames by inserting four five bolts in
5. 2 Fasten the roof panel ribs peak caps and ridge caps together using bolts and nuts 3 Fastenthe lower end of the panels to the side wall angles using screws and washers Reducing Large Gable Bulge Loosen eight bolts and nuts shown Apply pressure with one hand at the peak of the gable and tighten bolt 1 Keeping pressure on the gable work down the slope tightening each bolt Excess material will overlap smaller gable at seam Once material bulge is worked out tighten four vertical bolts that con nect the large and small gables Parts Needed For 6 Roof Assembly Weather Stripping and Fold Under 7861 Roof Panel 2 7863 Left Roof Panel 1 6797 Ridge Cap 3 7862 Right Roof Panel 1 Parts Needed For Roof Trim 6893 Left Side Roof Trim 2 6892 Right Side Roof Trim 2 6015 Side Roof Trim 2 1 Attachthe right leftand side roof trim to the lower end of the roof pan els on each side of the building using screws at each panel overlap NOTE A single screw fastens both trim pieces at the overlap 2 Using your thumb and index fin ger overbend the bottom flange of the side roof trim atthe corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw STEP 6892 6015 STEP Roof trim 1 6893 Hy ES Tuck Flange Inward to Fit Inside of Roof T
6. n Hint Follow the fastener sequence 2 Position a right roof panel at the shown for proper alignment back right corner and fasten to the top roof beam using screws 11 thru 13 7862 Right P 4 A Roof Panel 3 Remove edge trim from the left gable under the roof panel 14thru 16 4 Continue fastening the right roof panel to the gable and lower roof beams using screws bolts and nuts as shown Do not fas ten the lower end of the panels to the side wall angles at this time 27 7863 Left Roof Panel 1 7861 Roof Panel 2 6797 Ridge Cap 3 Parts Needed For Roof Assembly 1 install a left roof panel at the left rear corner of the roof 2 Install two roof panels in the se quence shown on previous page Follow fastener sequence while fas tening roof panels NOTE Narrow roof panel rib with bead on it is always overlapped by wide rib of adjacent panel 3 Cover the joint at the peak with weather stripping tape large roll Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do notcutthe tape until entire roof is completed 4 Cut the weather stripping tape small roll into 34 pieces each piece about 3 7 6 cm long Fold lower portion of roof panels down Press 10 pieces firmly over the notched areas of the roof panels 5 Install three ridge caps 6797 on the roof section using bolts and nuts 6 Fas
7. 220 0 141 0 cm 152 4 cm BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for successful results Flooring and Anchoring Your storage building must be anchored to prevent wind damage A base is necessary to construct a square and level building Anchoring and base materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building eAll part numbers can be found on the parts All of these numbers before the must agree with the numbers on the Parts List page e f you find that a part is missing include the model number of your
8. Channel Top View Front Wall Channel 419 p Screw Screw Y STEP E 4 Fasten the top ofthe doorjamb to j the door track with two screws Do the same for the bottom into frame Repeat steps 2 through 4 for the Q ome mime d ON Door Track v opposite door jamb 23 DOC g g 7859 Large Left Gable 2 6114 Small Right Gable 2 6115 Small Left Gable 2 6085 Roof Beam Bracket 4 7860 Mid Gable Brace 4 Parts Needed For Gable Assemblies The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Apply green edge trim to the top edge of the large left gables small left gables large right gables and small right gables cut to length 2 Apply clear edge trim to the edge of the large left gables and the large right gables cut to length 3 Join the large gables to the small gables on the left and right sides using four bolts washers and nuts on each side This part of the gable is called the outer gable leg 4 Attach the four roof beam brackets to the outer gable legs us ing two bolts in the two bottom holes of each bracket 5 Attach the four mid gable braces tothe gables using three bolts wash ers and nuts NOTE Mounting leg of brace must face toward center of gable CAUTION To
9. For 6 6403 Door Track Splice 1 Step 4 Door Track Assembly 9366 Door Track 2 NOTE Door Track Splice painted part The door track assembly supports the sliding doors and reinforces the front wall Itis made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side only Long Leg on Top Hint The holes in the top side of the doortrack assembly areforfastening the gable to the top of the front wall in a later step p e ShortLeg on Bottom 118 1 8 300 0 cm Position door slides onto the legs from the end of door track assembly as shown in the end view STEP STEP 3 4 4 Set this piece aside for later use 118 1 8 300 0 cm KT 000 A 000 lt 00072 END view 66769 118 1 8 300 0 cm e Parts Needed For e Front Floor Assembly 1 Side Floor Assembly 2 Floor Frame 6 Rear Floor Assembly 1 RIGHT 1 Assemble the four corners of the floor frame using two screws at each corner as shown Atthe front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square When Diagonal Measurements are Equal the Floor Frame is Square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your ba
10. after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws ZO11 65103 8 32 Hex Nut 276 66045 Handle 2 66769 Door Slide 4 Hardware Remove from bag of screws and save for the last step 65900A 10Bx1 2 13 mm Black Screw 8 Packed with Screws 66646 Washer 577 15 sheets of 40 Ju 66382 Lower Door Guide 4 67545 Weather Stripping 1 65923 8 32x3 8 10 mm Bolt 276 65109 118 32 Acorn Nut 4 Packed with Screws W 66183 Roof Trim Cap 2 right amp 2 left 67293 Weather Stripping 1 65004 8Ax5 16 8 mm Screw 490 67468 Peak Cap 6 Arrow Logo 6228 Track Support 2 Parts List Assembly Part Part Quantity Check Key No Number Description In Carton List Door Handle Brace Front Wall Panel Corner Panel Large Right Gable Large Left Gable Small Right Gable Small Left Gable Right Roof Panel Left Roof Panel Horizontal Door Brace Vertical Door Brace Wall Panel Roof Panel Right and Left Doors Door Jamb Edge Trim Clear Side Roof Trim Door Track Splice Ridge Cap Ridge Cap Right Side Roof Trim LeftSide Roof Trim Door Track Rear Wall Angle Rear Wall Channel Side Wall Channel Front Wall Channel Hoof Beam Bracket Hoof Beam Brace Hoof Beam Gable Brace Side Wall Angle Hear Floor Frame Side Floor Frame Front Floor Frame Ramp Edge Trim Green Mid Gable Brace
11. avoid mishap on the sharp edge the edge trim must remain in place on the top edge of the gable until right and left roof panels are in place 69835 Green Edge Trim Plastic Piece 69835 Green Edge Trim Plastic Piece 67521 Edge Trim Plastic Piece Right Gable Assemblies 2 Gables Roof Beams Single Roof Beam Assemblies 4 6636 Gable Brace 2 Parts Needed For Left Gable Assemblies 2 Step 12 ZO25 1 Lift and fasten a right and left gable under angle at corner to the door track and rear wall angle with screws Hint On the front gable leave out 2 screws closest to center gable leg On the rear gable use a bolt and nut at the overlapping rear wall angle 2 Fastena single roof beam small holes on top to the outer gable leg and mid gable brace as shown using bolts and nuts Repeat Step 1 forthe opposite side of building 3 Join the left and right gables together with a gable brace using a bolt in the second hole from the bottom only Do this step for both front and rear gables Repeat Step 2 for the opposite side of building 25 Step 13 Parts Needed For e e Main Roof Beam Assembly 1 Roof Beam Braces 6227 Roof Beam Brace 2 5526 1 Fasten the track supports to the front gable assembly only as shown 2 Wrap the weather stripping along the mating edge of the large left and right gables as shown Cut the weather strip
12. building behind door jamb into the front frame track 2 Position the top of the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Gable Horizontal Door Brace Door Track Door Slide Front Floor Frame Assembly Door Slide 10Bx1 2 13 mm Screw S STEP 3 Adjustment Holes Allow Doors to Meet Evenly Along Their Length LeftDoor STEP 4 Keep this Owner s Manual and Assembly Instructions for future reference 33 Anchoring and Floor Frame XA34hw Anchoring Anchor your building at this time Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time SOME FACTS ABOUT RUST XA35hw SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surfa
13. building and contact Arrow Shed LLC Customer Service Department 1101 North 4th Street Breese Illinois 62230 1 800 851 1085 or assist arrowsheds com eSeparate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later eFamiliarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles Work Gloves e No 2 Phillips Screwdriver Step Ladder Optional Time Savers Base Preparation With Hardened Magnetic Tip _ Utility Knife Scissors e Wrench Nut Driver e Hammer and Nails Note A power screwdriver or vari Pliers e E
14. 399 7 cm 2 10391 STEP STEP 3 4 Rear Wall Channel 1181 8 300 0cm Side Wall Channels 157 3 8 399 7 cm 2 Assemblies Rear Wall Angle 118 1 8 300 0cm Side Wall Angles 157 3 8 399 7 cm 2 Assemblies Step 3 9516 The roof beams join the two gables and supportthe roof panels The main roof beam is made up of four pieces overlapped back to back at the cen ter The left and right roof beam as semblies are made up of two pieces Hint These pieces are force fitted so you may have to press hard to join them together 1 Place one end of a roof beam inside another roof beam so that the six holes in each piece align Make six sets of roof beams by repeating this procedure Do not insert bolts yet 2 Take two of the pressed together roof beams and join them as shown toform the main roofbeam assembly Hold the assembly together and fas ten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the other four pressed together roof beams with eight bolts to make the left and right roof beam assemblies 4 Double check the length of each and set these pieces aside for later use 16 Parts Needed For 10386 Roof Beam 12 Roof Beam Assemblies Roof Beam 159 3 8 404 8 ASSEMBLED END VIEW Build one Doubled Main Roof Beam Assembly for Peak in Roof 159 3 8 404 8 cm 159 3 8 404 8 cm Build four Single Beam Assemblies Parts Needed
15. For e Mid Frames Rear Wall Channel Assembly 1 Side Wall Channel Assembly 2 The mid frame pieces give rigidity to the side and rear walls 1 Fasten the rear wall channel across the middle of the rear wall using screws 2 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with bolts and nuts at two locations See the figure NOTE The wall channels behind the front wall panels will be installed in a later step Door Track Assembly 1 Parts Needed For e Rear Wall Angle Assembly 1 lop Frames Side Wall Angle Assembly 2 The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof 1 Fasten the rear wall angle across the inside top of the rear wall using screws 2 Fasten the side wall angles across the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 3 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure Wall Angles Must Face Inside LongLeg Building on Top STEP amp Opening STEP Me 1 t facing in 2 5986 Short Leg 10391 on Bottom 21 Parts Needed For e Wall Panels 6515 Wall Panel 10 Each wall panel has a crimped rib on one side The crimped rib should go under the rib of the panel that follows it
16. Owner s Manual amp Assembly Instructions 2001 Model No VS1014 D1 697 68604 B1 L ARROW World s Leading Maker of Storage Buildings a xD gt UITIUM eta aa haath at PP m qt Ma nera tatg p tate erate Rete Pula nm TTT TTS r me a a a TaT P E OA a aaa MM A A Ae 2 E I M vot Y 236 9 A ny seg 2955 Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle your requests 716970211 CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Storage Area 129 Sq Ft 852Cu Ft 12 0 m 24 1 m Exterior Dimensions Interior Dimensions Door Approx Base Roof Edge to Roof Edge Wall to Wall Opening Size Size Width Depth Height Width Depth Height Width Height 10 x 14 121 x 160 1 4 123 1 4 1623 4 87 7 8 118 1 4 157 1 2 86 5 8 55 1 2 60 3 0 4 0 307 3 cm x 407 0 cm 313 1 413 4 223 2 300 4 400 1
17. ce inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint
18. lectric Cordless Drill e Spade or Shovel able speed drill with Phillips tip at i eS e Hand S IP S tachment can speed assembly by Carpenter s Level quare ANSAN qo ONE AYN as much as 40 Tape Measure e String for squaring frame e Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage eAllow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside eBefore you begin the first steps in assembling your parts a base should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing fety edge 4 safety edge eKeep children and pets away from worksite to avoid distractions and any accidents which may occur eNever concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it
19. m Plywood exterior grade NOTE Pressure Treated Lumber must not be used where it will make contact with your storage building The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided 10 amp 4 penny Galvanized Nails 6 Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Note Platform Slab will extend 9 16 1 4 cm beyond Allow 6 7 hours for construction floor frame on all four sides Seal this 9 16 1 4 cm of wood with a roofing cement not included or bevel this 9 16 1 4 cm of concrete when pouring OPTION 3 Concrete Slab for good water drainage The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea si
20. ping to length 3 Spread the two halves of the double roof beam and fasten to the gable brace of the front gable 4 Fasten the other end of the double roof beam to the gable brace of the rear gable Spread Two Halves Of Roof Beams 5 Fasten a roof beam brace to the double roof beam behind the front gable by placing the tab on the end of the brace between the roof beams Align the tab with the second hole and fasten the brace with a bolt and nut 6 Fasten the lower end of the roof beam brace to the track support with a bolt and nut 7 Fasten a roof beam brace be tween the rear gable and the roof beam at the first hole as shown Roof Beam Brace 6227 Ss 5 el di ep STEP m xd So da Roof Beam Brace 6227 E STEP P v 26 Parts Needed For e 7862 Right Roof P 1 Right Roof Panel Installing the roof panels is best done with a step ladder Begin installing roof panels at the back right corner of the building Each screw and bolt in the roof requires a washer STEP NOTE 1 Measure the building diagonally again and make adjustments to make sure the building is square and level This will make the roof panels fit better and holes will align Don t anchor the floor frame NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels and find the EI right roof panel part number 7862 2 4
21. rim Cap STEP 2 31 3719 Door Handle Brace 2 Parts Needed For 10475 Right and Left Doors 2 10497 Horizontal Door Brace 4 Door Assembly 6278 Vertical Door Brace 2 The steps on this page tell how to assemble the right door You will perform exactly the same procedures for the left door Each bolt and screw in the door requires a washer Pro ceed as follows 1 Attach the door handle brace and handle to the door with 1 bolt as shown Dont tighten the bolt yet 2 Swing the door handle brace up to the hole on the center of the door and insert a screw Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below center connection using 2 screws 4 Insert a second bolt in the door handle and tighten both bolts 5 Put a horizontal door brace onto the top edge and bottom edge and fasten with 7 bolt in the center 6 Attach the lower door guides and bolts as shown 7 Repeat steps 1 through 6 for the left door 32 10475 Right Door 10475 9 Left Door 65582 END VIEW SHOWING Horizontal Door Brace Parts Needed For e Right Door Assembly 1 Door Installation amp Adjustment eftDoor Assembly 1 1 From inside the building put the bottom of the right door assembly on your left when you are inside the
22. rs Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips e Wash off inked part numbers on coated panels with soap and water e Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES We recommend that you purchase accessory items from your local storage building dealer whenever possible however because the full line of accessories is not always available from all dealers Arrow is offering them to you on a direct basis For prompt shipment please fill out order form and mail ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18 m of steel cable and 4 cable clamps No digging or concrete pouring just insert cable under roof over roof beams into augers and twist auger
23. s into the ground For buildings larger than 10 x9 3 0 m x 2 6 m use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel corner gussets and 4 earth anchors TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels N plus five heavy duty snap in 9 hangers and a small tool holder for d screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings FLOOR FRAME KITS MODELS FB47410 FB5465 FB106 A FB109 Aand FB1014 A Asimple newfloorframe system made of heavy duty hot dipped galvanized steel Use as base for plywood sand or stone ATTIC KIT WORKBENCH KIT Model No AT101 Heavy duty galvanized steel bars that fit all 10 8 0 m wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs
24. se at this time You will anchor the building after it is erected The floor frame must be square and level or holes will not align 18 Parts Needed For 6515 Wall Panel 2 9373 Front Wall Panel 2 Corners 6020 Corner Panel 4 Narrow NOTE Side The remainder of the building assembly 6020 requires many hours and more than one Wide Side person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall SIDE requires a washer CORRECT INCORRECT 1 Position a corner panel at the corner of the floor frame as shown The widest part of each corner panel must be placed along the side of the building for all four corners Fasten the corner panel to the floor frame with three screws Support the corner panel with a step ladder until a wall panel is attached 2 Attach the front wall panelstothe frontcorner panels as shown Asmall 4 gap will exist between front wall panel and ramp 6020 6020 3 Attach the wall panels to the rear corner panels as shown T UE NOTE Be careful to install the correct panel in each position as shown TE 4 Double check the part numbers of the wall panels before proceeding The floor frame must be square LL Panels rest on and level or holes will not align frame as shown 19 Parts Needed
25. ten the roof panel ribs peak Caps and ridge caps together using bolts and nuts 28 Screws RoofBeam Fasten At e Fasten At Overlap amp Overlap With Bolt With Bolt Screws To Roof Beam Do Not Fasten At This Time STEP Weather Stripping Tape STEP 6 STEP s 6797 7663 7861 m ROCA p E me ralem m 790 nem p ram umm ee ee Cedo el EMI ee PLE RICO FOR M ia p a pla at ula Mum mo RS Step 16 2029 1 Install two roof panels 7861 work ing side to side Cover the notched areas of the roof panels with strips of weather stripping tape and continue weather stripping the ridge 2 Install the second ridge caps 6869 overlapping the first ridge caps Hint The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof panel Install two roof panels 7861 as before working side to side while fastening down ridge caps Parts Needed For 7861 Roof Panel 4 Roof Assembly 6869 Ridge Cap 3 NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up STEP Step 17 2030 1 Install two roof panels left roof panel three ridge caps 6797 and right roof panel on the front of the roof as before
26. to each frame set as shown 7 Rear Floor Frame 119 3 8 yy 303 2 cm 8936 at 8936 e 3 Double check the length of each and set these pieces aside for later use 158 5 8 402 9 cm Sides 158 5 8 402 9 cm 119 3 8 303 2 cm Front amp Rear 119 3 8 303 2 cm 14 5986 Rear Wall Angle 2 Parts Needed For e 6 10389 Rear Wall Channel 2 e 10388 Side Wall Channel 4 Frame Assemblies 10391 Side Wall Angle 4 The main frame pieces reinforce the walls These pieces will later be in stalled in the center and at the top edge of the side walls and the rear wall Proceed as follows 1 Overlap the rear wall channel pieces as shown in the figure and fasten the two pieces together with eight bolts as shown 2 Make two side wall channels by overlapping the side wall channel pieces as shown Fasten each set together with eight bolts as shown 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one bolt thru the sec ond large hole from the end of each part D Double check the length of each and set these pieces aside for later use Rear Wall Channel 118 1 8 300 0 cm Side Wall Channels 10388 Rear Wall Angle enu f _ 118 1 8 300 0 cm 4 Side Wall Angles 10391 157 3 8
27. zed gravel 2 1 2 parts clean sand Prepare the Site Construct a Base 1 Dig a square 6 15 2 cm deep into the ground remove grass 2 Fill up to 4 10 2 cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 19 mm x 89 mm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 10 2 cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 5 hours for construction and a week for concrete curing time 9 10 Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 6 mm Wood Screws There are 1 4 6 mm Contains 4 Anchors with Cable Clamps and dia holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete base 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 6 mm x 51 mm Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured

Download Pdf Manuals

image

Related Search

Related Contents

Manual do Produto  Samsung 510T Užívateľská príručka      Moen Vestige T2503 User's Manual  で つ な が る 、 を つ な ぐ  監視カメラ構築サービス  Satellite L650 - TOSHIBA FORUMS  Voyager Legend CS  LG VN271 Quick Start Guide  

Copyright © All rights reserved.
Failed to retrieve file