Home
Outdoor Living Today SM812 Instructions / Assembly
Contents
1. E at _ i i 7 4 7s hk i 52 Position and attach all Roof 53 Make sure to attach Roof Panels Panels as per Steps 48 51 down to Rafters as shown above Attach above the exposure line Exposure Line 54 Roof Filler Shingles are included to cover roof seams Starting at the 55 Screw first filler shingle down to bottom slide the first Long Shingle in until rafters using 1 2 1 2 screw per panel flush with other bottom shingles See 2 in total Make sure to screw into both diagram step 55 for proper attachment rafters 4 90 degree Simpson Ties Gable 56 Slide in another filler shingle and attach as per Step 55 On your last row of shingles the filler shingle is precut to fit properly Attach to roof with 2 1 1 4 Shingle nails per shingle Position Simpson Strong ties on plywood and outside rafters and secure with 4 1 1 2 screws There are 4 ties per gable ri ia f T Le Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 22 Angle screwed 3 2 1 2 screws angle screwed in each Mid Rafter 1 57 To further secure roof panels from the inside drill pilot holes in each Mid Rafter 3 per Rafter on an angle Using 3 2 1 2 screws secure rafters to roof plywood Note from outside have a helper push roof panel down so plywood sits flush against rafter when securing Exploded view of all parts n
2. finishing nails per piece Gap where facia boards come together at peak will be covered in Step 64 Do a dry run using Fascia to help you correctly position before attaching Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 25 Pentagon Facia Plate a Pai a 64 Attach Side Facia to roof rafter ends There 65 Attach Pentagon Facia Plate where are 2 Facia pieces per side Secure with 8 1 1 2 End Facia meets at the peak Use 4 1 1 2 finishing nails per piece finishing nails per piece to secure p Horizontal Gable Trim to cover flashing equally over gable and wall seam Use 4 1 1 2 finishing nails per piece to secure 2 pieces per side fat Flush with door jamb 67 Position Door Trim pieces 2 1 2 x 2 1 2 x 77 1 2 tight at top with Horizontal Gable trim and flush with door jamb Attach with 4 1 1 2 finishing nails per piece Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 26 B i 68 Attach Facia Trim Detail Plates to cover seam where facia and horizontal trim pieces come together Secure each with 4 1 1 2 finishing nails thin end Undercourse Important Butt thick aw A Ridge Cap Jend of Ridge Cap will P be facing towards the a outside of shed thick end 69 Place First Roof Ridge Cap Lower Grade U
3. Note prior to attaching try each combination of Gables for best fit Toll Free 1 888 658 1658 www outdoorlivingtoday com Page 13 sales outdoorlivingtoday com Framing flush with Top Plate 30 Lift up a completed gable section and place on top of Rear Top Plate on wall The rear gable framing should sit flush with the inside of the top plate Gable Framing Ag iy r N straight edge Flashing to overhang wall ae ai ae it P z r ai i r ail ee ll am x 7 7 a a a gt s a gi a 31 The gable should be centered sideways left to right on the top plate Hint use a straight edge to check the angle of the gable framing and top plate Both angles should line up Adjust gable accordingly i l i i L i i I i i a ee a S i 1 32 Temporarily attach gable to walls and top plate with 2 2 screws Gables may need slight adjustment in Step 44 Complete attachment in Step 44 with additional 6 2 screws Screw from the bottom of gable framing down into Top Plate and Wall Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 14 34 Locate both Vertical Door Jambs and position flush against front narrow wall stud The Jamb is 3 wide and will sit flush to outside of wall siding When positioned correctly secure Jamb using 4 2 1 2 screws Complete both sides Toll Free 1 888 658 1658 www outdoorlivingtoday com
4. Page 15 sales outdoorlivingtoday com C amp D Rafter and Roof Section Exploded view of all parts necessary to complete the Roof Section Identify all parts prior to starting Roof Filler Shingles Missing Outside Middle Roof Outside Roof Panels 2 Roof Panels 2 Panels 2 Metal Ridge Board Connectors 2 Ridge Boards 4 84 amp 52 1 2 long Roof Rafters 9 per side 18 Tot Soffits 4 1 2 x 4 1 2 x 68 1 4 ma Roof Gussets 3 Metal Ridge Board Connector 8 3 4 Screws Ridge Board Ridge Board 35 Locate 1 each 3 4 x 4 1 2 x 84 amp 52 1 2 Ridge Boards and attach together with Metal Ridge Board Connector using 8 3 4 screws Total Length when connected is 136 1 2 Complete two Seis Position Metal Ridge Board Connector evenly on Ridge Boards Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 16 36 Locate 9 Rafters 2 Soffits and completed Doubled up rafters Ridge Board Lay out on level ground as shown to the right Double up Rafters as illustrated Screw Ridge Board doubled up Rafters together with 3 2 1 2 screws per piece Note completed rafter section will be flipped over in Step 38 2 1 2 screws into doubled up rafters 37 Attach completed Ridge Board to ends of both outside al rafters with 2 2 screws per end Measure and position interior Rafters as illustrate
5. Joist Frame and 2 Floor Joists as illustrated above Position Joists equally in Floor Joist Frame Use Small Floor Joist Frame as a template to determine joist position Position Joist so flush with framing 2 When correctly positioned attach each Joist with 4 2 1 2 screws 2 per end You can find the Square Drive Screw Bit in the Hardware Kit Bag Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 4 3 Lay out Floor Joist Frames as illustrated at left There are 3 larger and 3 smaller Frame Sections The Footprint for the floor when attached together will be 136 1 2 deep x 96 wide y 4 Attach each large and small floor joist frame together with 6 2 1 2 screws per section 136 1 2 5 Complete all large and small frame attachments Screw each completed section a a SoMa Rela e 6 When completed your floor footprint should be 136 1 2 deep x 96 wide 7 Attach Floor Runners to completed floor frame There are 2 floor runners per 136 1 2 side and 5 8 Make sure Runners are flush with outside completed runners in total Use 6 2 1 2 screws and front and rear floor framing but not per Runner overhanging Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 5 centered ON Concrete Slab floor frame Foundation 9 Complete all Floor Runners 10 With Floor Runners attached carefully flip l the floor
6. On Time Shipping 3 Motor Freight Delivery 4 Quality of Materials 5 Assembly Manual The materials contained in this Assembly 6 Overall Satisfaction Manual may be downloaded or copied provided that ALL copies retain the Please call write or email us at copyright and any other proprietary notices contained on the materials No material Canadian Address United States Address may be modified edited or taken out of 9393 287th Street P O Box 96 context such that its use creates a false or M aple Ridge British Columbia Sumas W ashington misleading statement or impression as to Canada V2W 11 USA 98295 the positions statements or actions Toll Line 1 888 658 1658 Fax 1 604 462 5333 sales outdoorlivingtoday com Page 31
7. helpers push the Front and Rear Walls at the top from the outside of shed until inside to inside measurement between the Top Plates is 91 Shingles overhang plywood Roof facing down on outside panels Shingles and plywood flush on middle panel 47 Identify Roof Panels There are 2 Outside and 1 Middle Roof Panel per side Starting with outside rear panel lift up and place on rafters Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 20 Roof Plywood flush with rafter end 48 Place Outside Roof Panel so it sits flush on 3rd rafter from the outside doubled up rafter Plywood on roof should be flush with end of rafter at bottom From the outside screw down through bottom and top row of shingles into rafter with 2 2 5 screw iar CE Fp arn F J te TA Hey id ai AF iN ing Gb gig ley S Lo NL PLT ohh Nit SQ fins iat Ba SS ral 49 Locate Middle Roof Panel 50 With Middle Roof Panel aligned as per Step 48 tack panel down to rafters with 2 2 5 screws in the and place on middle rafters bottom row of shingles Shingles overhang plywood on Outside Roof Panel ie i f 51 Lift up position and attach 2nd Outside Roof Panel on Rafters as per Step 48 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 21 Middle lt Outside Palle Yee Panel Outside Panel _ a a a nil 7 a
8. over and place on your foundation Foundations Caution you will need 2 people to assist Note The floor will be flipped over and floor you Be careful when laying floor down not to runners will sit on your foundation It is bend or twist floor When in place level floor important to note that having a level foundation completely is critical Choosing a foundation will vary between regions Typical foundations can be concrete pads or patio stones positioned underneath the floor runners 11 Position Plywood Floor pieces 6 on top of completed floor joists The Plywood is cut slightly smaller than floor framing Keep plywood seams tight plywood pushed together at seam Hint Use a chalk line to mark location of floor joists to determine screw placement 12 with Plywood positioned correctly on floor framing attach with 1 1 4 screws Use screws every 16 a i Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 6 Exploded view of all parts necessary to B i Wal S ecti O nN complete the Wall Section Identify all parts prior to starting Gable Walls 4 na Rear Top f Z p Plates 3 Side Top Plates 4 Angle cut on side 2 per side Solid Wall Panel 7 Window Wall Panel 1 Front Top Plates 3 Narrow Wall Panel 12 wide 2 Sw Door Header Window SS and End Pieces Insert 1 SE 13 Lay out all the w
9. solid wall into place on plywood floor Butt both vertical wall studs Optional Caulking of side and rear walls seams will help prevent together and attach with Imoisture from entering 3 2 1 2 SCrews screw at your shed Caulking the bottom middle and top J not included in kit Do Not Attach Walls To of stud to secure properly Floor Until Step 26 18 With the corner wall attachment complete position rear wall so bottom 2x3 wall framing is sitting flush with floor framing Wall siding should overhang floor by approximately 1 2 When positioned correctly add a second rear wall panel and attach both rear wall panel studs together as per Step 17 a 2x3 wall framing flush with floor framing l SU i SS Ill Be sure that TNN rear wall panels i 4S fit between the Ry D side wall panels en Lb sandwiched Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 9 19 Locate Window Insert and Window Trim Package Before installing run a bead of caulking around window opening perimeter Position window in cavity and secure with 8 1 1 4 screws Position Window Trim around window doing a dry run first and attach with 4 1 1 4 finishing nails per piece Trim Sizes 1x 24 1 16 angle cut top 3 x 23 straight cut Sides amp Bottom 20 Next complete all side wall panel attachments Typically Window Wall Panel is
10. 8x12 SpaceMaker Garden Shed r L res Assembly Manual y on Bia E Revision 18 April 30 2012 os i i v p F r 7 F Thank you for purchasing our 8x12 SpaceMaker Garden Shed Please take the time to identify all the i parts prior to assembly B l j i i i ed Safety Points and Other Considerations Our products are built for use based on S proper installation and normal residential use on level ground Please I follow the instruction manual when SS n building your Shed and retain the sE manual for future maintenance k purposes Some of the safety and usage measures you may wish to consider include snow load ratings vary by geographical location If heavy or wet snowfall occurs it is advisable to sweep the snow off the roof s if the product is elevated any structural and building code requirements are solely the customer s responsibility and should be abided by in high or gusty wind conditions it is advisable to keep the structure securely grounded have a regular maintenance plan to ensure screws doors windows and parts are tight Customer agrees to hold Outdoor Living Today Partnership and any Authorized Dealers free of any liability for improper installation maintenance and repair In the event of a missing or broken piece simply call the Outdoor Living Today Customer Support Line 1 888 658 1658 within 30 days of the delivery of your purchase It is our com
11. a eS Tr 3 pieces of Bottom Skirting for sides 2 pieces for front and rear ee SSS s ne x OS a N Bu aa 1 2 overhang Gap in corner 60 Position Rear Wide Corner Trim 4 1 2 x 4 1 2 x 82 over filler trim Prior to attaching do adry run with Narrow Corner Trim First butt Narrow Trim up tight underneath the Soffit Position Wide Trim evenly with Narrow Trim at bottom Attach with 8 1 1 2 finishing nails per piece Wide trim will overhang sidewall by 1 2 to cap Narrow Trim Toll Free 1 888 658 1658 www outdoorlivingtoday com Page 24 sales outdoorlivingtoday com 61 Attach Narrow Corner Trims to each side corner 4 1 2 x 2 1 2 x 79 long Use 8 1 1 2 finishing nails per piece Align Trim so tight underneath Soffit and flush with Wide Corner Trim Narrow Wall Trim Rear Wall Trim L i S 62 Attach Narrow Wall Trim 4 1 2 x 2 1 2 x 79 where wall panels come together and leave a seam Position trim equally on each wall and use 8 1 1 2 finishing nails per piece Align as per Corner Trim Attach Rear Wall Trim 77 1 2 long as above Angled Facia Square Cut Facia positioned between Angled Facia 63 Position Front and Rear Facia angle cut on ends and Side Facia Square cut ends in corner Line Fascia up so square cut Facia is positioned between angled cut facia Attach angled facia to plywood end with 8 1 1 2
12. ack screws secure hinges to Door Trim Hint Do not attach all the 2 screws until both doors are positioned correctly into place Use Screw Driver to tighten screws completely Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 28 73 Position Left Side Door as per Step 72 and secure with 2 Black Screws When satisfied with door positioning complete all 2 screws Note Do not over tighten hinge screws when using screw gun Tighten 3 4 of the way and use a Screw Driver to finish so as not to strip screws 14 Attach Horizontal and Vertical Door Stops to door header and jambs Start with horizontal Stop first and then complete both vertical stops Position so door gap is covered Use 4 2 screws per piece to secure 75 Close both doors and align so doors are straight Attach Door Threshold 2 1 2 wide x 62 1 2 long with 4 2 screws centering between doorway Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 29 a Inside Edge of e Door Frame K p j Ss 17 The Interior Cane Bolt will be attached to Vertical Door Flange To position Cane Bolt correctly attach to flange first close doors and mark hole to house Cane Bolt Rod Open doors and drill hole where previously marked with 1 2 bit Use hardware provided in each kit to complete installation of all hardware VA 78 Attach Doo
13. all panels and become familiar with their location On a Standard Kit there is 1 Window Wall Panel 7 Solid Wall Panels and 2 Narrow Wall Panels for the front Make sure to position panels right side up so water is directed away from and not into shed Look at window wall panel to compare and determine proper wall position Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 7 14 Starting with Solid Wall Panels carefully lay panel face down Position and attach Wall Plate to bottom of wall studs of each wall panel with 3 2 1 2 screws Position so plates are flush with framing 15 Starting at Rear Corner position a Solid Wall Panel on top of plywood floor The Wall Panel bottom framing will sit flush with floor framing Wall siding will overhang the floor by 1 2 Important Make sure all walls are aligned in their upright position If not water may leak into your shed Unsure if panel is facing up or down Check and compare siding on window wall panel to match alignment Side Panel 16 The side wall panels will sit flush with floor framing at corners and the rear panels will be sandwiched between them Note Siding will overhang the floor by approx 1 2 Outside 2x3 framing of wall panel is flush with outside of floor framing when properly aligned Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 8 if 17 Position rear
14. d below When positioned correctly attach Ridge Board to remaining rafters with 2 2 screws ratfter end Board to inside 38 Attach end of a 68 1 4 long Soffit Board flush to ends of outside rafters with 2 1 1 4 screws per rafter end Drill pilot hole in Soffit ends to prevent splitting Complete both outside rafter Soffit connections first Measure and position interior Rafters as illustrated above When positioned correctly attach Soffits to remaining rafters with 2 1 1 4 screws rafter Flip completed rafter section over Complete 2nd Rafter section now as per Steps 35 37 with the following exception When attaching Ridge Board to Rafter ends make sure Metal Ridge Board Connector is positioned so offset to first Rafter Section See Step 43 for illustration Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 17 39 Starting with one side lift completed rafter section up make sure Soffit is facing down pi Soffit ATA N Rafter should rest on gable framing a gable a Wd 41 When Rafter Section is correctly positioned outside rafters will sit equally on gable framing and Soffit will sit approximately 1 8 away from wall panels Soffit should sit _ approx 1 8 away __ trom wall panel Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 18 42 Place 2nd completed Offsett
15. each Kit 2 Pentagon Facia Plate 4 Facia Trim Detail Plates 1 pc Spare Wall Siding 2 pcs Spare Shingles use to shim door etc Note We recommend you drill a 1 8 pilot hole for each screw to avoid splitting wood The hole depth should be equal to 3 4 the length of screw Toll Free 1 888 658 1658 www outdoorlivingtoday com Page 2 sales outdoorlivingtoday com 8x12 SPACEMAKER HARDWARE PACKAGE Hardware Kit Provided Note screws and nails shown actual size Silver 3 4 paso Black S erin ie 11 4 am l J 1 T h 11 2 O P p Finishing lack 11 4 Ann 7 Square Drive Bit Tee Hinge x6 Door Barrel Bolt Ridge Board Cane Bolt Handle x 2 Connector x 2 Simpson Strong Tie Roof x 8 T l Screw Gun Drill Tape Measure Wood Clamp Utility Knife ara nE Te ki N ina Ladder 1 8 amp 1 2 Drill Bits Safety Glasses Work Gloves Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 3 E Exploded view of all parts necessary to A Floor Sectio a complete Floor Section Identify all parts m prior to starting Note Floor Footprint is 96 wide x 136 1 2 deep Plywood Floor Plywood Floor Small 3 Large 3 Floor Joist Frames Small 3 Concrete Pad optional foundation method Floor Joist Frames B Floor Runners 10 Large 3 Flush with framing 1 Lay out Large Floor
16. ecessary to Misc Section complete the Miscellaneous Section Identify all parts prior to starting Door Hardware r aoe ee Pull Handles and Ridge Cap Barrel Bolt Facia Trim Detail Plate 4 Front and Rear Facia 4 Pentagon Facia Piece Horizontal WW Gable Trim 4 Filler Di Trim 4 ay Cre T Right Doors Flower 2 Box E l f j J f J X a j r Pi 7 1 eS i BAN ee i Narrow Trims 9 A Door Trim 2 Bottom Skirting Sides 6 Bottom Skirting Tee Hinges 6 Wide Trim 4 Front amp Rear 4 Note missing from exploded drawing Interior Door Stops and Interior Cane Bolt Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 23 58 Attach Bottom Skirting around the base of the shed Skirting will hide floor framing The front amp rear skirting pieces will meet together in the center Gaps on outside will be covered by Wide Trim pieces later Start with side skirting and attach with 4 1 1 2 finishing nails per piece Attach additional 1 1 4 screws on bottom edge of wall siding into bottom wall plate to further secure bottom siding to framing Drill pilot holes in siding to prevent splitting 59 Attach Corner Trim Filler Strips 4 1 2 x 2 1 2 x 75 to front and rear walls In each corner Hammer with 8 1 1 2 finishing nails i Pill itis i i ce Se Se E i
17. ing Metal eK M Ridge Board aN e Connectors a Rafter Gable Notch 43 At the peak align Ridge Boards so they are flush together and secure them with 12 1 1 4 screws Important if there is a gap between Ridge Boards try pushing side walls closer together from outside Walls should be 91 apart at top from inside of wall plate to wall plate To completely secure Ridge Boards place 4 1 1 4 screws into any of the remaining Metal Ridge Board Connector holes Complete both sides 44 With both Rafter Ridge Boards connected Completely secure Gable framing to both outside rafters with 8 2 screws per gable side Important If Gable framing does not line up with Rafters remove temporary 2 screws from gable framing Re align gable and secure with 8 2 screws total Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 19 45 Roof Gussets are positioned on middle rafters Prior to attaching make sure Side Walls are properly aligned Have two helpers push the front and rear walls at the top from the outside of shed until inside to inside measurement between Side Wall Plates is 91 When correct slide gusset up use level to square gusset and attach to rafters with 4 2 screws Complete remaining Gussets 46 Secure Rafters to Top Wall Framing with one 3 screw per rafter Screw through Wall Frame at an angle Have two
18. mitment to you to courier replacement parts free of charge within 10 business days of this notification Replacement parts will not be provided free of charge after the 30 day grace period Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 1 Thank you for purchasing our 8x12 SpaceMaker Garden Shed Please take the time to identify all the parts prior to assembly Parts List A Floor Section 3 45 1 2 x 75 Floor Joist Frames 6 1 1 2 x 3 1 2 x 72 Center Floor Joists Unattached 3 45 1 2 x 21 Floor Joist Frames 3 45 1 2 x 75 Plywood Floor Large 3 45 1 2 x 21 Plywood Floor Small 10 1 1 2 x 3 1 2 x 68 Floor Runners B Wall Section 7 45 1 2 x 75 Solid Wall Panels 7 1 1 2 x 2 1 2 x 45 1 2 Bottom Wall Plates 1 45 1 2 x 75 Window Wall Panel 2 12 x 73 Narrow Wall Panels Door Jambs amp Header 2 1 1 2 x 3 x 73 Vertical Door Jamb 1 2 x 3 x 78 Door Header 2 2 x 3 x6 1 2 Door Header End Plates 1 Left Side Door 1 Right Side Door 2 2 1 2 x 1 2 x 72 Interior Vertical Door Stops 1 2 1 2 x 1 2 x 68 Interior Top Horizontal Door Stop 1 2 1 2 x 3 4 x 62 1 2 Door Threshold 1 1 2 x 2 1 2 x 71 Interior Door Flange Top Wall Plates 6 3 4 x 2 1 2 x 32 Front amp Rear Top Plates 2 pieces Angle c
19. ndercourse Ridge Cap on roof peak overhanging shingles by approximately 1 Attach with 2 1 1 4 Shingle Nails 9 from end Place 2nd Ridge Cap 1 back from 1st cap Attach with 2 1 1 4 Shingle Nails 9 from end RG TREA TTET ON POAN pl AN nt ah on 70 Place 3rd Ridge Cap 8 back from 2nd enough to cover shingle nails Attach 3rd Ridge Cap down as per Step 69 Continue to position and attach Ridge Caps until half roof is complete From opposite side position and attach Ridge Caps as described above Score cut 1 Ridge Cap to 12 or to fit in the center of roof Attach center cap with 4 1 1 4 Shingle Nails Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 27 Note illustration of Hinge may not be accurate The of screw holes in the hinge may vary from three to four depending on model Attach Black Tee Hinges with 3 4 amp 2 Black 2 Screws hardware provided 11 Attach Door Hinges to both Left and Right Side Double Doors Position Hinges equally on door trim as shown above and attach with Black 3 4 and 2 screws 3 8 gap on side 1 2 gap i at bottom 2 Black Screws Bottom of Door 12 Next position and secure the Double Doors Starting with Right Side Door position so there is a 1 2 gap on bottom and approximately 3 8 on the side Use a spare Shingle to shim door in place at the bottom Using 2 bl
20. ng your shed Caulking not included in kit Angle screws into perimeter Floor Joists Confirm 67 Wide Door Opening at Bottom 26 Position Front Top Plates on top of wall studs so they are flush on the inside with Door Header There are 3 pieces of Front Top Plates 2 end plates angle cut on 1 end and 1 middle plate straight cut on both ends Together the plates should be centered evenly on the wall left to right Attach by screwing down into Door Header with 4 2 screws Top Plates should be flush with inside of wall framing Angle cut on ends iW IN li f Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 12 2 Next attach the 4 Side Top Plates 2 per side The side top plates are angle cut down the length Once again position top plate on wall plate so it is flush with inside of wall plate Side plate should also be flush with Front Top Plate Secure with 4 2 screws per piece Rear Top Plates Plate flush to inside ee of wall framing ee i 28 Position the Rear Top Plates on rear wall top framing to complete Use 4 2 screws per piece Male Female i Wall Lapp Sidin Notched at top gm i i E e E EE Flashing 29 Locate Gable 1 2 Walls for both sides of the shed Align framing and wall siding lapp together Screw center wall framing of each piece together with 3 2 1 2 screws
21. positioned in middle of side Attach wall studs together as per Step 17 Wall panel will sit flush with floor framing at front of shed Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 10 22 Complete both Narrow Wall attachments making sure 2x3 wall framing is flush with floor framing and siding of wall is overhanging the floor by approximately 1 2 2 l d Dado cut facing to the Sits flush with inside top and outwards of wall framing 23 There are 2 6 1 2 Door Header End Plates Align dado cut on top facing outward and flush to inside of wall framing Attach each with 2 2 1 2 screws as illustrated above Make sure joints are tight Push walls in if required i ple i 24 Position Door Header 78 long with dado cut facing outwards between End Plates Push walls together so joints are tight together Secure Header to Narrow Wall framing with 2 2 1 2 screws per side Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 11 25 When all walls are attached together check alignment with the floor Bottom wall framing should sit flush with outside of floor framing Confirm 67 wide door opening at bottom When positioned correctly fasten bottom wall plates to floor using 4 2 1 2 screws per wall panel Optional Caulking seams will help prevent moisture from enteri
22. r Handles and Black Barre Bolt 79 Assemble Flower Box Kit with Assembly as illustrated above with 3 4 Black Screws Note Instructions found in each Kit Position how female part of Barrel Bolt is positioned completed Flower Box below bottom of window higher than male Do a dry run first to position trim and secure with 2 2 screws per box Barrel Bolt correctly Important Drill pilot holes Screw from inside of box into the center wall with 1 8 drill bit prior to securing with screws to stud Attach second screw 2 underneath first prevent wood splitting screw and once again into the wall stud Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 30 F Outdoor Living Today OS I e e CE Note Our Sheds are shipped as an unfinished products If exposed to the elements the western red cedar lumber will weather to a silvery gray color If you prefer to keep the cedar lumber looking closer to the original color we suggest that you treat the wood with a good oil base wood stain You may also wish to paint your new shed rather than stain it In both cases we recommend that you consult with a paint and stain dealer in your area for their recommendations We hope your experience assembling your shed has been both positive and rewarding We value your feedback and would like to hear back from you on how well we are doing in the following areas 1 Customer Service 2
23. ut on end 1 piece straight cut both ends 4 3 4 x 2 1 2 x 65 3 4 Side Top Plates Angle cut on edge 65 3 4 I Gable Walls 4 Gable Half Walls Triangular Shaped C Rafter Section 18 1 1 2 x 3 1 2 x 56 1 2 Roof Rafters 2 3 4 x 4 1 2 x 84 Roof Ridge Boards 2 3 4 x 4 1 2 x 52 1 2 Roof Ridge Boards 2 1 16 x 3 x 7 Metal Ridge Board Connectors 4 1 2 x 4 1 2 x 68 1 4 Soffits D Roof Section 4 Outside Rear Roof Panels Shingles overhanging roof battens on 1 end 2 Middle Roof Panel Shingles flush with roof battens 3 3 4 x 3 1 2 x 72 Roof Gussets angle cut on ends E Miscellaneous Section Bottom Skirting 10 1 2 x4 1 2 x 45 1 4 Side Bottom Skirting Corner amp Sidewall Trim 1 2 x 2 1 2 x 79 Narrow Trims 1 2 x 2 1 2 x 77 1 2 Doorway Rear Wall Trims 4 1 2 x 2 1 2 x 75 Filler Trim 4 1 2 x 41 2 x82 Wide Corner Trim 4 1 2 x 4 1 2 x 44 1 2 Horizontal Gable Trim Facia Trim 4 3 4 x 3 1 2 x 58 long Front and Rear Facia Angle cut on ends 2 right 2 left 4 3 4 x 3 1 2 x 71 3 4 long Side Facia Filler Shingles 5 1 2 wide Ridge Caps 22 Cedar Roof Ridge Caps Misc Pieces 1 Window Insert 1 Window Trim Pkg 1 24 1 16 angle cut 3 23 straight cut 1 Flower Box Kits Assembly Manual amp Hardware found in
Download Pdf Manuals
Related Search
Related Contents
Philips Hair clipper QC5050 ダウンロード(1.1MB) EM 28 - EM 28/B - ZM Vakuum GmbH PostalOne! Mail.dat Client Batch Processing Smeg VSTQ20 sink Plastiment 600 - Sika Mexicana Cody Universel 1/1 1/2 1/3 Advantech UNO-2182 User Manual Copyright © All rights reserved.
Failed to retrieve file