Home
Best Barns arlington_1224df Instructions / Assembly
Contents
1. White Pine Corner Trim Hanger Nails White Pine Gable Trim 107 2 1 2 Wood Screws White Pine Fascia 121 1 2 H11z Truss Hangers White Pine Fascia 96 Plyclips for Roof Sheathing NI FI wl HE RL HR IEN ILO TA Truss Gauge Blocks 2x3 10 5 8 1x4 Drive on Metal Plates Truss Jig Blocks 2x4 10 5 16 0z Bottles Wood Glue Soffit Gauge Blocks 7 16 3 x8 18 x 36 Windows w shutters 48 Long Filler Boards 3 8 x 1 1 4 18 x 24 Sunburst Gable Window n N 32 Entry Door w lockset This door will be shipped by local supplier Material Supplied Optional Roof Covering by Local Supplier 15 bdl Roof Shingles 2x4 Pre cut Wall Studs 10 pcs Roof drip Edge 10 2x4 8 Wall amp Tie Plates 2x4 12 Wall amp Tie Plates Exterior Siding 4x8 OSB Sheathing 4x8 OSB Loft Floor 4x8
2. Foundation size is 12 0 x 23 9 Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider i 2 4x8 Flooring Cut 20 twenty 2x4 12 treated boards to 11 8 7 8 These will be the floor joists Place 4x4 12 treated timbers on the ground Cut 2 two 2x4 8 boards into 2 long blocks to secure the 4x4s where they butt together Cut 2 two 2x4 12 to a length of 12 0 They will be used for the joist headers Layout from X IX X X left for 16 on center joist spacing X marks X x X xX where floor joist will be placed 15 1745 16 16 Install the floor joists cut above between the 12 joist headers Secure with 16d galv deck nails Place floor sections over the 4x4s Square floor assembly Measure the floor diagonally corner to corner Then measure the opposite corners These measurements will be the same 1f the floor is square To keep the 2x4 frame from moving toenail frame to the 4x4 runners 4x4 12 Treated Runner 2x4 12 Joist Header Material Description Assembly Instructions for Rear Floor Section 2x4 Blocks 2 pcs 6 Cut 2 two 2x4 12 to a length of 11 9 Layout 9x4 Joist Headers 4 pes for 16 joist spacing see above A Floor lot 20 pes 7 Install floor joists betwee
3. 2 two nails on each end 3 Nail both wall frames together Use 10d sinkers 4 Square wall frame Measure the wall diagonally corner to corner Then measure the opposite corners These measurements will be the same if the wall is square 5 Install the first siding panel with the LAP edge flush with the end of the wall and extending 3 4 below the bottom plate Tip Use a 1x4 trim board as a gauge Nail siding with 8d galv nails spaced 12 apart 6 Install 2 two more siding panels Cut the last panel flush with the end of the frame Siding Extends 3 4 Below Plate Step6 Assemble 140 1 2 Long Back Wall 1 Cut 2 two 2x4 12 to a length of 140 1 2 Wall Plate 140 1 2 Position the boards together x x x and indicate with X marks where ras A X the wall studs will be located e EX Cae 24 a 24 140 1 2 Wall Plate ON 2 Install pre cut wall studs between the top and bottom plates 3 Square wall frame Install the first siding panel with the LAP edge extending 3 1 2 beyond the end of the wall and extending 3 4 below the bottom plate 4 Install 2 two more siding panels Siding Extends 3 4 Below Plate Siding Extends 3 1 2 Beyond 2x4 Frame Step 7 Assemble 137 1 2 Long Back WAI l Cut 2 two 2x4 12 to a length of py 137 1 2 Wall 137 1 2 Position the boards together and indicate with X marks where A A A the wall studs will be located 23 1 4 j _24 24 _ 2 In
4. Cut 1x6 8 board flush with the 2x4 on the front gable Straight Edge 1x6 Fascia Board Piso Step 23 Install Roof Sheathing on Back l Install 4x8 roof sheathing starting at the lower left back corner The bottom edge of the sheathing should extend past the end of the trusses and rest on the 1x6 fascia Make sure the trusses and gables are plumb and the roof sheathing meets the center of the trusses Install roof sheathing per layout below The top row of sheathing is supplied in our component kit There will be a gap at the top to allow ventilation if ridge vent is applied Insert 2 two ply clips into the roof sheathing between each truss at the top row see drawing on next page Secure sheathing with 7d sinkers nails Space nails 12 apart 72 48 48 48 72 48 x 48 48 x 96 48 x 96 Nes x 48 48 x 96 48 x 96 48 x 96 Supplied in our component kit Q p Optional ridge vent provides Kir ideal ventilation Space Step 24 Install Roof Sheathing on Front 1 Install 4x8 roof sheathing per layout below 2 Install 1x6 trim on the end gables flush with the top of the 2x4s Use 8d galv nails spaced 12 48 x 48 1x6 Gable Trim 48 x 96 End Wall You can cut the dormer openings as you install the roof sheathing See Step 2 in the Dormer Assembly Book packed in the dormer kit for the opening sizes Ro
5. SEEE SHANA SRA NACA RS NAEGRRERASNA CURA RRR RR CRS INCRE GNI Best Barns USA Assembly Book Revised July 1 2014 Or Building Si the Arlington R a he A Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2013 eY EESAN BaRa RCE EEK EA URRU EALER RRE SeA KEERA KELB AA Spb DDD DDD DDD DDD DD DDD DDD DD DDD DD DDD DDDDDDDDDD DDD DD DDDDD DDD DD DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DONS IMPORTANT INFORMATION ABOUT YOUR SHED KIT This manual will show the assembly for the Arlington building kit See back page for the breakdown of this material If you received duplicate books use the one with the latest revision date The foundation is 12 0 x 23 9 Do Not make the foundation larger Read the instructions before starting the assembly of the building If you have any questions about assembling the kit call 800 245 1577 Business hours 8 00 5 00 ET Monday thru Friday After business hours call 724 866 HELP 4357 or email to help barnkits com The siding roof sheathing long framing material and optional floor if ordered will be delivered by a local supplier The breakdown of this material is listed on the back page Check to see if you received the correct amount of material before th
6. built door header between the center wall studs Cut pre cut studs and install under door header lt on both sides gt Center These Studs in Opening 27 3 4 To Stud 34 1 2 door opening 27 3 4 To Stud 3 Cut 2 two pre cut 2x4 studs and install under the door header Step 12 Fasten Left End Wall and Center Frame 1 Select the wall frame with siding assembled in Step 10 Butt the wall frame against the 8 center wall frame DO NOT nail these frames together so they can be separated later Step 12 Fasten Left End Wall and Center Frame continued 2 Square the wall frame Install a full width siding panel but do not nail along the long edge that overlaps the left wall panel You can nail this edge after the wall panels are installed This will enable you to separate the wall panels making them easier to handle Cut the siding out of the door opening flush with the side frame and top header 3 Install another siding panel Cut out the door opening Do Not Nail This Edge Siding Extends 3 4 Below Bottom Plate Step 13 Apply Siding to Right Front Wall 1 Select the wall frame assembled in Step 10 Butt the wall frame against the 8 center wall with the smaller 18 1 4 stud space placed on the end DO NOT nail these frames together so they can be separated later 2 Square the wall frame Install a full width siding panel but do not nail along the long edge that overlaps the 8 wall panel You can nai
7. e driver leaves and note any shortage The 12 material was shipped in 5 five cardboard packages The shorter lumber is shipped on a small pallet Stacking the boards according to size will make them easier to find when needed Do Not discard any material no matter how small until your building is complete Paint the bottom edges of the siding around the perimeter of the building Keep dirt grass mulch snow and similar substances away from the lower part of the siding The siding manufacturers generally recommend 8 or more of clear space Before you begin construction study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners Exterior Siding The siding is made in 4x8 sheets with grooves LAP Edge cut into the face the long edge is beveled so that the siding overlays where they butt To identify which edge we want you to use we will refer to the edge as either the LAP Edge or the Tongue Edge Nail siding with 8d galv nails spaced 12 apart Tongue Edge Tool List _ Hammer amp Phillips Screwdriver Power Drill Screwdriver _ Framing Square amp Level _ Measuring Tape _ Hand or Circular Saw 2 8 Step Ladders amp Ladder Jacks Always wear safety glasses when cutting or nailing Constructing Details for 12 x24 Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not
8. e gusset on the line When marking the wall plates place the x on the correct side of the lines to keep the trusses parallel 24 gt 24 gt 22 3 8 Step 18 Set Rear Gable 1 Install gable on the back wall Secure bottom of gable by nailing gable blocks to wall plate 2 Nail the bottom edge of the siding into the 1x4 trim Use 8d galv nails Important Bottom edge of gable siding extends over 1x4 trim Step 19 Set Trusses 1 Install 4 four trusses with the wood gusset on the line and the truss bottom over the X marks 2 Secure trusses with the metal hangers and 1 1 2 long hanger nails p IMPORTANT 4 Secure the trusses to the sidewall that has the wall bracing first Make sure the opposite sidewall is straight before securing trusses The building width should be 12 O measuring outside of 2x4 tie plate to outside of 2x4 tie plate Step 20 Install Loft Flooring 1 Install 2 two 4x8 sheets of loft flooring on trusses Notch floor around studs in the rear gable Make sure the walls are straight before nailing flooring Nail floor to bottom 2x4 of gable and trusses with 7d coated nails Lil AN lt 2 If necessary cut flooring to the center of the 2x4 3 Install the remaining trusses and the front gable panel 4 Install 4x8 sheets of loft flooring on trusses at the front and center of the building Step 21 I nstall Sidewall T
9. h the end of the end wall panel 3 Cuta6 long 2x4 in half and install 3 long 2x4s on the 12 end wall as shown below Cut and install a 6 long 2x4 between the 3 long 2x4s Repeat on the opposite end wall 2x4 8 Tie Plates Cut 2x4 6 to Fit ee inl aT ML 2x4 3 Tie Plate 2x4 12 Tie Plate Step 16 Install Corner Trim IMPORTANT Lower Trim Must Be Installed Before Installing Roof Gables Tack 1 1 2 x 48 filler strips on top of the siding on the back wall Install 2 two 72 3 8 long 1x4 white pine trim boards flush with the siding on the sidewalls and flush with the top of the 2x4 tie plate Use 8d galv nails to install all trim m Filler Tie Plate 1x4 Trim Boards ________ 3 Install 95 long 1x4 white pine trim boards as corner trim to the rear walls Install trim flush with the Side siding on the sidewalls Back Wall 4 Repeat to install trim boards to the Wall front wall panel ew 1x4 Corner Trim e Step 17 Layout Roof Trusses 1x4 Trim O O Back of Building 1 Draw a line where the trusses will D be positioned Mark an X to the A side of this line 2 From the first line draw more lines 24 apart and put an X to the side of these lines This will place the trusses 24 on center Measure from outside of 1x4 Trim 3 When installing trusses position the wood gusset on the line Important When installing trusses gt lt place th
10. l on the left side of the wall panel Before you install the siding cut and remove the siding that extends into the door opening Install a siding panel leftover from Step 3 above the door opening Install another 4x8 siding panel on the right side of the wall panel Cut and remove the siding that extends into the door opening Cut Siding Flush With Door Opening Step 10 Assemble Front End Walls 1 Cut 2 two 2x4 8 boards to a length of 91 Position the boards together and indicate with X marks where the wall studs will be located 91 Wall Plates 2 Mark this end with the letter A gt LX_A X X A fN TN EN 3 Install wall studs between the top e 18 174 24 54 and bottom plates Use 2 two 10d sinkers at each end of the stud 91 Wall Plate 4 Measuring from the tongue edge cut a siding panel to a width of 46 1 2 Install this panel with the cut edge extending 3 1 2 past the left end of the wall frame The siding should extend 3 4 below the wall plate 5 Install a full width siding panel 6 Locate where you want the window and cut the opening 7 Build another 91 wall frame Do Not apply the siding on this wall frame LAP a SEZ i N N Tongue Edge Xe SS 36 Cut ice _ Siding Extends 3 1 2 Siding aa Past wall Frame Step 11 Assemble Center Front Wall 1 Install 6 six pre cut wall studs indicated in gray between 8 long 2x4s 2 Install a pre
11. l this edge after the wall panels are installed 3 Cuta siding panel to a width of 46 1 2 cutting off the tongue edge Install the siding panel will extend 3 1 2 past the end of the wall frame Do Not Nail This Edge 18 1 4 Stud Space 8 Center Wall Panel Step 14 Set Wall Panels 1 Set the end wall panel without the door opening between the 91 long front wall panel Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail through the bottom plate Space 10d sinkers 24 apart 2 Nail along the siding edge where the sidewall panels overlap 3 Use pre cut wall studs to hold the front wall straight r 91 Long 91 Long Wall Panel 96 Long Wall Panel Wall Panel O OO O eet gt z pp Step 14 Set Wall Panels Continued 1 Set the back wall panels between the end wall Brace where necessary 2 Nail along the siding edge where the sidewall panels overlap This 137 1 2 Long Wall Panel il 140 1 2 Lon lias Nail Alon Siding Edge 2x4 Wall Brace 3 Cut and remove the bottom 2x4 in both door openings Step 15 Install 2x4 Tie Plates 1 Install a 2x4 12 board on the front wall at the left corner of the building as shown below Cut and install another 12 long 2x4 flush with the right corner Use 10d sinkers 2 Install 3 three 2x4 8 boards across the top of the back wall Cut the last 2x4 flush wit
12. n the joist headers Square 4x4 Treated Runners 8 pcs the floor section Install this section with the 16 Flooring 5 8 or 3 4 9 pes spacing against the section assembled above Screw Floor Nails 4 b 8 Install 4x8 flooring over the 2x4s Use 8d galv Galv Box Nails 51b 16d spiral nails Step 1 Assemble Roof Trusses l 2 gt Locate a 2x4 12 board with angle cuts on both ends to be used for the truss bottom Position 105 3 4 long pre cut 2x4 rafters on the 12 board Temporarily tack 2x4 blocks packed in kit around the truss members This will insure H fe that the trusses are built exactly the same AA Position a 2x4 17 1 2 block at the ridge Position a 16 3 4 long 2x4 gable stud L at each end of the truss V Va 2x4 12 0 a angled ends Pa Important To insure the proper overhang insert a 11 1 4 long 2x3 gauge block GB on each end Butt the 2x4 truss bottom against the block Mark this end of the trusses with an X mark When you install the trusses later install all the trusses with this end on a the same side of the building A Wood Gussets Install wood gussets to secure truss parts in place Apply wood glue be tween gussets and 2x4s Secure top gussets with 12 twelve 6d common nails Secure the lower gussets with 16 sixteen 6d common nails Turn truss over and apply wood gussets to the opposite side of the trusses Repeat process to assemble 10
13. of sheathing is packed in the component kit Step 25 Install Front Gable Trim and Door Trim 1 Install 1x6 trim boards over the 2x4 boards flush with the top of the 2x4s 1x6 Gable Trim if wr ee eee eee enn nee D gt 3 7 8 Wide Jamb Material 1x4 Door Trim IEY Complete the steps below if you are installing wood pocket doors 1 Install 3 7 8 x 72 white pine wide jamb material on the top of the door opening Install 3 7 8 x 79 1 4 white pine wide jamb material on the sides of the door opening Install 80 3 4 long 1x4 trim boards on each side of the door opening Install an 82 long 1x4 trim board this board has angle cuts on both ends across the top of the door opening e ae Step 26 I nstall Roof Dormers and Pocket Doors 1 Install the roof dormers Refer to the instruction manual packed with the dormer kit 2 Install the pocket door per the instruction manual packed with the door kit Note The instructions shows the door track being fastened to a door header For this model you will be installing the tract to the 2x4 studs in the door header Install Roofing Not Supplied in Kit 1 Install metal roof edging along the end walls and the front edge of the roof sheathing Metal Roof Edge Roof Sheathing 2x4 Overhang 2 Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or new
14. rim amp Soffit It will be easier to install the soffit panel if the corner and sidewall trim are installed first This enables the soffit panels to rest on the trim where it meets the building See lower detail 1 Install a 96 3 4 long 1x4 trim board flush with the corner trim on the back of the building This trim board 7Z has blue paint on one end Locate a 7 16 x 3 x 8 gauge block packed in the hardware bag Place this gauge block under the truss overhang and butt the corner trim against it 2 Install 4 long 1x4 trim along the top f of the sidewall Use the gauge block to set where the trim will be installed A lt 3 Install 1x4 12 trim along the top of the side wall and cut another 4 long board to finish 96 3 4 Long Corner Trim 7 16 Gauge Block 4 Install 10 5 8 soffit panels under the truss overhangs Use 5d galv nails Install the soffit with the beveled edge toward the ends of the trusses Cut a 4 long panel to the center of A aal Bevel Edge 5 Install 2 two 6 long soffit panels 6 Install 4 long soffit panels to finish Vi Step 22 Install 1x6 Fascia on Sidewalls l Install a 121 1 2 long 1x6 trim board at the rear of the building flush with the face of the 2x4 Install the 1x6 board so the face of the board is aligned with the top of the trusses Use a straight edge as shown below Use 8d galv nails Install a 1x6 8 board
15. sstands Material Packaged In Dormer Component Kit 2x6 Bottom Plates 55 3 4 1 lb box 8d Galv Box 2x4 Ridge Boards 56 1 2 1 lb box 6d Galv Box 2x4 Bottom Plates 33 1 2 1 2 White Screws for Windows 2x3 Sidewall Overhang 45 1 4 2 1 2 Wood Screws 2x3 Gable Overhang 22 3 4 3 1 2 Wood Screws 1x4 Sidewall Fascia 45 1 4 2 Bit for Wood Screws 1x4 Gable Trim 23 3 4 5 x7 Step Flashing 1x3 Side Corner Trim 37 7 x41 Front Dormer Flashing 1x3 Front Corner Trim 34 1 4 ea 18 x 23 Windows 7 16 Roof Sheathing 20 1 2 x 58 3 4 ea 18 Sunburst Windows 3 8 Sidewall Siding 4 x 47 angled ea Pre built Angle Sidewall Panels 3 8 Front Siding 33 1 2 x 49 ea Pre built Frontwall Panels 4 2 2 4 4 4 4 4 4 4 4 2 Material Packaged In Component Kit Material Packaged In Component Kit Truss Bottom 144 7 16 Truss Rafters 105 3 4 7 16 Wall Plates T2 7 16 Gable Studs 50 7 16 Gable Studs 38 3 4 3 8 Gable amp Truss Studs 16 3 4 3 8 Pre built Door Header 37 1 2 Truss Blocks 17 1 2 lbs 10d White Pine Trim 72 3 8 Ibs 8d White Pine Wall Trim 48 Ibs 7d White Pine Wall Trim 144 Ibs 6d White Pine Corner Trim 95 Ibs 6d 96 3 4 Ibs 1 1 2 24 x 11 Truss Gussets 24 x 24 Truss Gussets 9 3 4 x 72 Sheathing 9 3 4 x 48 Sheathing Soffit Boards 4 x 10 5 8 Soffit Boards 6 x 10 5 8 Sinkers Galv Nails Sinkers Galv Nails Common
16. stall pre cut wall studs between the top and bottom plates 3 Butt the above wall frame against a wall panel from Step 6 4 Square wall frame and install a siding panel DO NOT nail the long edge that overlaps the siding on the adjoining panel so they can be separated Install another siding panel Cut the last siding panel to a width of 45 The last panel will extend 3 1 2 past the wall frame 5 Separate wall panels Do Not Nail Edge N pu N ESE 137 1 2 Wall Frame 140 1 2 Wall Parel Step 8 Assemble Door Header 1 Cut 2 two 2x4 8 boards to a length of 75 2 Cut 6 six 2x4 11 blocks from another 8 long 2x4 3 Assemble the door header using 2x4 75 Board 10d sinkers Step 9 Assemble 12 End Wall with door opening l Gather the material listed below to assemble the door wall yoo 2x4 6 Pre cut Wall Studs 2x4 6 Boards 2x4 6 NS Door Header from Step 8 nail 2x4 Block cg a A E Door Header Install 6 six pre cut wall studs between the 2x4 6 boards Cut pre cut studs and install where shown Temporarily under door header secure the bottom 2x4 6 boards T a together with a 2x4 block lt on both sides Install Stud in Center sea ock with 3 Install the door header at the wood screws top of the door opening 2x4 6 Cut and install 2 two pre 2o cut wall studs under door header 33 to Stud 72 Finished Door Opening 33 to Stud Install a 4x8 siding pane
17. ten more trusses Do Not remove the 2x4 blocks around the perimeter of the truss until the gables are assembled in the next step Step 2 Assemble Roof Gables 1 Select another 12 long 2x4 with angle cuts on both ends Install pre cut rafters and bottom gussets as in previous step Install the bottom gussets on one side only 2 Install 38 3 4 and 50 long 2x4 gable studs Secure gable studs with 1 x 4 metal drive on plates 3 Install the upper wood gusset on one side 2x2 Board If installing the optional gable window install gs a 2x2 board packed with window between 3 ey ay e PE 1g Sanaa gt Aae the 53 long gable studs Cut to fit 1x4 Drive on Plate Nag 50 Gable Stud IL NNS SST N SS SIS Gi 38 3 4 Gable Stud CSS ae 1x4 Drive on Plate 4 Loo 4 Repeat steps to assemble another roof gable 5 Lay gable on flat surface with gussets facing down 6 Remove 2x4 blocks used to hold truss parts in place Secure 3 three blocks evenly spaced to the bottom 2x4 using 2 1 2 long wood screws SS z Ce Cy T 2x4 Block S Gusset Facing Down Step 3 Install Siding on Gables 1 Cuta4x8 siding panel in half creating 2 two 48 siding panels Install one of the pieces with the LAP edge flush with the end of the bottom 2x4 board and extending 3 4 below the bottom 2x4 Cut siding flush with the top of the gable frame Secure with 6d galv nails 2 Cuta 4x8 siding panel to a leng
18. th of 66 1 2 Save the cutoff Install the siding in the center Cut siding flush with the top of the gable frame 3 Install the remaining 48 siding panel on the end of the gable IS Cut the window opening if you are installing the optional gable window Use the cardboard template for the sunburst top Cut a 18 1 8 x 22 3 4 opening for the lower window 48 Long Siding Panel Cut Siding Flush with Frame LAP Edge flush Siding to extend 3 4 below 2x4 Bottom 2x4 4 Cut siding and install on the ends of the gable The siding should extend 1 2 below the 2x4 to receive the soffit when installed later 5 Repeat to install siding on the rear gable Step 4 Install Gable Overhang 1 Install 2 two 105 3 4 long 2x4 rafters on the front gable Install 2x4s extending 3 1 2 above the top of the gable frame to receive the roof sheathing when applied in a later step 2 Repeat to install 2x4s on the rear gable Step 5 Assemble 12 End Wall without door opening 1 Position 4 four 2x4 72 boards together and indicate with X marks where the wall studs will be located 72 Top Wall Plate 72 Bottom Wall Plate X X xX Kc CKO X 23 1 4 P 24 gt 23 1 4 24 2x4 72 Wall Plate Pre cut Wall Studs 42 Bottom plate Install pre cut wall studs between the top amp bottom plates Pre cut wall studs will be 92 5 8 or 92 1 4 in length Nail studs to wall plates with 10d sinkers
Download Pdf Manuals
Related Search
Related Contents
V7 Slide-In USB 2.0 Flash Drive 16GB black NEX-979R LDE60001 - 東芝産業機器システム株式会社 MANUAL-DE-INSTRUCAO-GICR-grade-intermediaria Prise de notes de la conférence de Michel Fayol du 20 septembre Copyright © All rights reserved.
Failed to retrieve file