Best Barns millcreek_1216 Instructions / Assembly
Contents
1. White Pine Trim 34 4 gt 4 17 4 12 4 10 4 1x4 Comer Trim 2 1x4 Door Trim 2 E 3 Pre built Components 2x6 Framing 18 Pre built Truss Halves 2 Door Header 6 3 1 2 x 65 1 4 Pre built Soffit Boards Beam Material 72 2 21 x 35 1 2 Loft Door Frames A A IN IA 6 Beam Material 2 36 x 76 Pre built Barn Doors 4 4 s 4 3 3 _ Miscellaneous Lumber_ Door Hasp 10 2 13 14 4 Door Hinges 6 _ 5 Door Hinges 2 7 16 Loft Floor Fillers 3 1 2 x 56 Lower Wall Siding Gable Siding amp Soffit 12 48 x 84 a asrx sor 2 24 x 39 3 4 48 x 48 2 734 x36 4 7 1 2 x 48 22 1 2 x 72 oo Prt x 24 13 x72 Roof Covering 12 bundle shingles 8 pcs roof edge optional felt paper 1 roll NTO NTN RTO
2. measure from here gt When measurements are given for a board DO length or width it is from the longest side To O L i sft _ Hammer amp Hand Saw _ Power Drill screwdriver _ Framing Square amp Level _ Measuring Tape _ Power Circular Saw 2 8 Step Ladders Always wear safety glasses when cutting or nailing Constructing Details for Deluxe Floor System Deluxe floors include 4x4 runners standard floors do not Foundation size is 12 0 x 16 0 Check local building codes in your area the construction may have to change For a concrete slab install sill sealer as a moisture barrier between the concrete and the wall plates Foam sill sealer can be purchased at home centers in rolls 3 1 2 or wider 1 Cut 2 two 2x4 joist headers to 16 0 Layout for 16 on center joist spacing X marks where floor joist will be placed X IX X X ext Joist Header SS OOOO a O O O 15 1 4 j 16 16 lt lt 2 Cut 2x4 12 floor joist to 11 9 Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 12 0 building width 2x4 Joist Header 2x4 Floor Joist spaced 16 o c It is important that the floor be level and square Square the floor as follows before nailing the flooring measure the floor diagonally corner to corner Then measure the opposite corners These measurements will be
3. Cut the siding length to 34 3 4 Mark the siding cut from the right siding panel with the letter R Install 2 two 61 and 2 two 43 1 2 long 2x3s on the front gable flush with the top of the gable frame Install the top 2x3s with the blue ends together Use 10d sinkers Blue ends 43 1 2 Long 2x3 SS Recut to y 20 3 4 Right door has Lap edge Recut the siding panel marked R Measure from LAP edge and cut the width to 20 3 4 Install Siding Install Siding Flush Flush r R Right Door when closed gt Install panels on door frames with the cut edges flush with bottom and side of frames The frames will extend 3 4 above the siding at the top Screw through the back of siding with 1 wood screws Back Side of Siding Top of Door Frame Topor Sank oor Frame Tongue Edge extends past frame to creates a door stop when right door is closed LAP Edge Step6 Assemble Sidewalls 1 Position 2 two 2x4 72 boards together and indicate with X marks where the wall studs will be located 72 Wall Plate X X X 2321 4 24 2 Install 4 four 80 1 4 long wall studs between the wall plates User 2 two 10d sinkers at each end of stud 80 1 4 7 Wall Stud 72 Wall Plate 3 Repeat process to assemble 3 three more 72 wall frames 4 Install 3 three 2x4 80 1 4 wall studs between 2 two 48 long 2x4s boards Install the stud in the center
4. Plate 80 1 4 Wall WY 3 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square 4 Install the 1st siding panel with the LAP edge extending 3 1 2 past the wall frame The bottom will extend 3 4 below the bottom plate Tip Use 3 4 trim board as a gauge 5 Install the other siding panels Cut the last panel to extend 3 1 2 beyond the wall frame Siding Extends Past 2x4 Stud Step 8A Assemble Door Header Assemble door header using 2 two 75 long 2x6 boards and a 75 OSB filler panel Apply wood glue between OSB and boards Nail header together with 10d sinkers Use 12 twelve nails on each side 75 Long 2x6 OSB Filler Step 8B Assemble Bottom Wall Plate offset doors IEY If you want the barn doors in the center of the front wall go to Step 8C 1 Butt 2 two 68 1 2 boards together to make bottom wall plate Secure bottom plate with a a 2x4 6 board used as door spacer installed 56 1 2 from the end of the 2x4 wall plate Secure with 4 four 2 1 2 wood screws 2 Mark locations for the wall studs with X marks 19 3 4 Bottom Wall Plate Assembly Step 8C Assemble Bottom Wall Plate doors centered Butt 2 two 68 1 2 boards together Center a 2x4 6 board used as door spacer on top and screw the boards together using 4 four 2 1 2 wood screws Mark stud spacing as shown below 2x4 6 Board Door Spacer 32 1 2 lt __
5. beyond the 2x4 wall frame Square Edges Butt Together Header 3 4 Below 12 Siding Panel Siding Extends 3 1 2 Past 2x4 Frame Optional windows can be installed now or later Step 9B Assemble Front Wall doors centered Gather the material listed below to assemble the door wall 2 Install 4 four 80 1 4 wall studs over the X marks 3 Install the wall studs with the door jacks on each side of the door spacer 1 lt 68 1 2 Top Plate 2x6 Door Header 4 Install door header on the door jacks Material List 68 1 2 Wall Plates 8Q 1 4 Wall Studs Wall Studs with Door Jacks Attached 80 1 4 Wall Studs w door jacks attached Door Header from Step 8A Bottom Plate from Step 8C 2x4 6 Door Space lt Check measurements They should be the same or the door opening will not be square 2x4 Bottom Plate w Door Spacer 5 Locate a 12 siding panel that has a LAP edge Position the cut edge flush with the left side of the door opening Do not nail the LAP edge until the other siding is applied 6 Cuta full width siding panel in half lengthways Select the siding with the tongue edge and install this siding panel at the left end of the wall frame 7 Install 2 two 7 3 4 pre cut siding panels over the door opening flush with the top plate 8 Install a 12 34 siding panel with the cut edge flush with the side of the door opening Install the last
6. contents Step 22 Install Front Gable Overhang Ends With Blue Mark 61 long 2x3 L DAS 4p 1 With a helper holding 2 two install 61 and 2 two L 43 1 2 long 2x3s against the roof sheathing screw the gt sheathing to the 2x3s with 1 1 2 long screws Important the roof sheathing should extend 3 4 beyond the 2x3s to receive the 1x4 gable trim installed later 2 Install 2 two 4 1 2 long 2x3s at the bottom between the 43 1 2 2x3s 43 1 2 long 2x3 Siding Extends 3 4 EE ST 3 t 4 1 2 long 2x3 Block 3 Install 2 two 1x4 64 gable trim with the ends marked with a blue line together at the ridge 4 Install 2 two 43 1 2 long 1x4 trim boards on the sides 5 Install 7 1 2 wide soffit panels under the overhang Use 6d galv nails 6 Install 35 3 4 long 1x3 trim boards flush with each side of the loft door opening Install a 50 long trim board across the top If door opening is cut out the siding will extend 3 4 below the top trim board 7 Install loft doors using 4 hinges and 1 1 4 long hinge screws Install barrel bolt to the back of the right door to prevent door from opening Step 23 Install Doors 1 Lay the left door with the trim facing up The siding on the left door extends past the door trim See detail below 2 Install 5 hinges to the left side of the door frame To position the hinge properly hold the rectangular plate against the
7. flush with outside edge of wall plate Install a 72 long 2X4 tie plate Cut another 72 tie plate to finish Use 10d nails 2 Repeat to install tie plates on the opposite side Rear Gable 48 Tie Plate 72 Tie Plate 3 Layout the truss spacing Measure from the inside face of the 2x4 gable plate to mark the location of the first truss The last truss space will be more than 24 Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parallel when they are installed Rear Gable N Measure from Face MS eS of Gable Plate P lt J a 18 3 4 oa oN Step 19 Install Trusses amp Soffit Boards 1 Place trusses over the X marks and secure trusses to 2x4 tie plate using 2x4 hangers and 1 1 2 hanger nails 2 Locate 65 1 4 long soffit boards that have a beveled edge Install one of these boards flush with the top of the siding and butting against the rear gable trim Secure soffit boards to the top wall plate with 3 long screws Install the last soffit board to fit behind 2x3 boards on the front gable Metal Truss Hanger Soffit Board Flush With Siding Step 20 Install Roof Sheathing Straight Edge 1 Install a 42 x 72 OSB roof panel flush with the face of the rear gable trim Use a straight edge to align the top of the sheathing with the top of the truss Continue adding sheathing foll
8. frame Use 1 3 4 black screws 3 Install hinges to the right side of the other door 4 Install 1x4x76 3 4 trim boards along each side of the door opening Tack these boards with a couple nails you may want to move the trim later when you install the doors 5 Install a 1x4x81 3 4 board that has angle cuts on both ends over the door opening fT N Before you fasten the hinges to the door trim temporarily prop the doors in the opening Tip set the door stop on a piece of siding to help hold the door in place a Leave a space between the doors and the side trim to allow room for the doors to expand when they absorb moisture If your door opening is out of square the space around the doors will not be even You can reposition the side trim to make allowances for this The side trim does not have to be flush with the frame of the door opening You can move the trim in or out to make the door spacing equal Front of Left Door Secure hinges to trim with 1 3 4 screws Siding Extends Past Trim Back of Left Door 6 Install a barrel bolt on the lower back of T the door to secure this door in place when closed Drill a hole for the round shaft to drop into lt a ee 8 Install another bolt at the top of the door Install door latch Siding Shim Millccreek 12 x 16 Barn kit Packing List 7 Feb 2014 Qty Description Size Qty Description Size aed Framing
9. of the wall frame 80 1 4 Wall Stud gt 2x4 4 Bottom Plate 5 Repeat to assemble another 4 wall section Step6 Assemble Sidewalls Continued 6 Position a 48 wide wall frame between 2 two 72 wall frames as shown below Nail frames together with 10d sinkers 7 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square 72 Wall Frame 48 Wall Frame 72 Wall Frame EY Cut the siding flush with the bottom plate if installing the building on a cement slab 8 Install the first siding panel with the LAP edge flush the end of the wall and extending 3 4 below the bottom plate 9 Install 2 two more siding panels You can install the last siding panel now or after the walls are erected so the panel will be easier to handle Siding Extends 3 4 Below Plate 10 Repeat to assemble the another sidewall Step 7 Assemble Back Wall 1 Position 4 four 2x4x68 1 2 boards together and indicate with X marks where the wall studs will be located Mark the ends that will butt together with the letters A and B Install 8 eight 80 1 4 long wall studs between the wall plates over the X marks and where the plates meet Use 2 two 10d sinkers at each end of stud Nail wall sections together using 10d sinkers 2 68 1 2 Wall Plate 68 1 2 Wall Plate X X X A B X X X __19 3 4 P 24 23 1 4 24 lt P 68 1 2 Wall
10. siding panel It will extend 3 1 2 beyond the 2x4 wall frame LAP Edge re Edges LAP Edge Butt A Tongue Edge SIX Cut Edge d 12 3 4 ed a al ea ha 12 Siding Panel Siding Panel Step 10 Set Walls 1 Set the back wall panel between the sidewalls Secure wall panels together at the corners Use 4 four 10d coated nails per corner Nail wall panels to the floor Nail through the bottom plate Space 10d sinkers 24 apart 2 Install the front wall frame between the sidewalls 3 Install the last siding panel on the sidewalls Nail along the siding edge where the sidewall siding panels overlap 4 Disassemble the other shipping pallet and use the 2x4s to brace the wall to hold them straight Front Wall Frame T Nail Alon TE 2x4 Wall Siding Edge tics a Brace a 2x4 Bottom Plates 5 Cut and remove the bottom 2x4 in the door opening Step 11 Layout Loft Joist Spacing on 2x6 Beam Layout both beams for the spacing of the loft floor joists SS The X marks where the floor joist will be placed a ee eee Step 12 Install 2x6 Loft Beams 1 Disassemble the pallet the siding and roof sheathing was shipped on Cut the 4 2x4 boards to a length of 76 1 4 2 Install the front 2x6 beam to the side of the double studs facing the front of the buildi
11. the same if the floor is square Material Description 12 x 16 shed 2x4 Joist Headers 2pcs 16 2x4 Floor Joist 13 pes 12 4x4 Treated Runners 8 pcs 8 Flooring 5 8 or 3 4 6 pcs 4x8 Screw Floor Nails 2lb d Nail 2x4 joist headers and Galv Box Nails 21b 16d Floor joist to 4x4 Step 1 Assemble Loft Beams 1 Locate 2 two 36 long 2x6 boards with a notch on one end and a 2x6 board without a notch Position these 2x6 boards on a flat surface as shown below 2 Apply a coat of glue to the top surface using wood glue supplied in kit 3 Locate 2 two 72 long 2x6 boards with a notch on one end Install these 2x6 boards over the bottom boards 72 Long 2x6 w Notch 72 Long 2x6 w Notch 36 Long 2x6 w Notch 72 Long 2x6 without notch 36 Long 2x6 w Notch 4 To provide additional strength install 2 1 2 wood screws spaced 16 apart as shown below 16 16 16 Q Q Q Q 2x6 Beam 5 Repeat steps to assemble another 2x6 beam Step 2 Assemble Gable Plates 1 Butt 2 two 72 long 2x4s together and secure them by nailing a 3 1 2 x 42 3 4 long plywood gusset across the top where they butt together Use glue and 6d common nails Install the gusset with the center line lined up where the 2x4 meet gt 3 4 Plywood Gusset 72 long 2x4 2 Repeat to assemble another Gable Plate Step 3 Assemble Trusses lt gt Building Tip To aid in the assembly o
12. WANAAA AAAI AAA AAAI AA AAA Add ddd ddd ddd ddd ddd ddd dad dqdddaqddqdddaqddadddadddaddddddaddddddddddddddddddg Best Barns USA Assembly Book Revised February 7 2014 A FET Tiik F Fii ee po Sy the Millcreek R 12 x 16 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 4 SAPD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDN WANA AAA AMAA EEE EERE EEEE EEE EERE EEE EEEE EEEE ddddddd ddd EEE EEEE EEEE EEE EEEE EEE EEEE EERE EEEE EEEE EEE EERE EEEE EEE EEEE EEEE ERE EERE EERE ZDDDDDDDDDDDDDDDDDDDDDDDDDD DDD DDD DDDDDDDDDDDDDDDDDD DDD DDD DDD DDD DDD DDD DDD DDD DDD DPD D DDD DDD DDD DDDDDDDDDDDDDDDDDDDDDDPDDDDDDDDD DDN i IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our shed kit These instructions will construct a 12 x16 building If you received two books use the one with the latest revision date Read the instructions before starting the assembly of the building If you have any questions about assembling the kit call 800 245 1577 Business hours 8 00 5 00 ET Monday thru Friday After business hours call 724 866 HELP 4357 or email to help barnkits com The material that is included in our kit is liste
13. ___ _ 1 _ _y 2x4 68 1 2 Boards Step 9A Assemble Front Wall offset doors 1 Gather the material listed below to assemble the door wall 2 Install 4 four 80 1 4 wall studs over the X marks 3 Install the wall studs with the door jacks on each side 68 1 2 Top Wall Plates eT of the door spacer 4 Install door header on the 2x6 Door Header door jacks Material List 68 1 2 Wall Plates 80 1 4 Wall Studs Wall Studs with Door Jacks Attached gt 80 1 4 Wall Studs w door jacks attached Door Header from Step 8A Bottom Plate from Step 8B i 2x4 6 Door S Check measurements They should be the same or the door opening will not be square L To install doors offset to the left flip wall before applying the siding 5 Install a 12 and a full width siding panel on the left corner right corner if installing door on left side The cut edge on the 12 siding should be flush with the left side of the door opening and extend 3 1 2 past the frame Do not nail the LAP edge until the other siding is applied Position the full width siding panel and nail along the LAP edge of the 12 wide panel 6 Install 2 two 7 3 4 high pre cut siding panels over the door opening The siding will extend 3 4 below the door header 12 3 4 7 Install a 12 3 4 wide siding panel on the end Siding Panel of the wall frame The siding will extend 3 1 2
14. ble Toenail the bottom to the plywood gusset with 10d sinkers Secure the top with a barbed metal plate 4 Butt 2 two 40 3 4 long 2x4s against the wood gusset Secure the bottom to the 2x4 plate by nailing through the plate with 2 two 10d sinkers Secure the top with barbed plates 5 Install 2 two 30 3 4 long 2x4s the same way 6 Nail truss leg to 12 Gable Plate with 10d sinkers Wood Gusset y 42 3 4 Long 2x4 40 3 4 Long 2x4 32 Long 2x3 Block 7 Repeat steps to assemble the front roof gable Read note below ger Ifyou want the loft doors to open repeat steps 1 6 substituting number 3 with directions below a 3 Install a 42 3 4 long 2x4 board in the opening and secure with 1 x4 metal barbed plates Install this board 32 from EES J the wood gusset Step 5A Apply Siding to Rear Roof Gable l Z Remove 2x4 blocks and turn gable frame over Flush with op sa Install pre cut siding on rear gable Bottom of siding extends 3 4 below Gable Plate Use 6d galv nails spaced 12 apart The rear gable trim is installed in Step 17 however you can install the trim now Siding Extends 3 4 Below Plate Step 5B Side Front Roof Gables l 2 Install siding on front gable You can attach the loft door frames to the gable to create a decorative look or if you want the loft doors to open cut the siding from the opening Cut the siding flush with the sides of the opening
15. d on the back page The optional floor package if purchased will be supplied by a local lumber supplier Our kit does not include the shingles the quantity needed is listed on the back page The siding is primed You will need to apply a finish coat using latex acrylic paint Some of the framing lumber was used in the shipping pallet Unpack the material from the pallets then unscrew the bottom runners from the 2x4s The bit for the screws is packed in the hardware bag This material is used for wall bracing and loft beam support boards Most buildings are installed on a wood floor and the siding was designed to extend over the wood flooring If the foundation is a concrete floor cut the siding flush with the bottom of the wall plate to prevent the concrete from contacting the siding Stacking the boards according to size will make them easier to find when needed Some boards have colored ends All the wall studs have black ends stack these boards together Do Not discard any material until your building is complete Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners LAP Edge To identify which edge we want you to use we will refer to the edge as either the LAP Edge or the Tongue Edge Nail siding with 8d galv nails spaced 12 apart Tongue Edge lt
16. f the trusses temporarily screw 2x4 blocks to the floor There are short 2x4s that may have an angle on one end supplied in kit This will insure that all the trusses are assembled the same 1 Position a Gable Plate from Step 2 on the floor with the narrow edge side down Use 2x4 blocks to hold the 2x4 plate straight 2 Position 2 two truss halves 2x4s connected with a metal plate with the short legs against the 2x4 Gable Plate Assembly DO NOT attach the Gable Plate Assembly to the truss It is temporarily used to help hold the 2x4 truss parts in place it will be used in a later step 3 Secure 2x4 blocks around the perimeter of truss to hold truss parts in place 32 Top Gusset CS _ Truss Half Metal Plate ae 32 Long 2x3 Block N 2x4 Block A A Gable Plate n Gable Plate Assembly 2x4 Block Do Not Fasten Truss Legs to the 12 Board e 4 Nail the 2x3 32 board where the trusses meet at the top Secure with a 32 wood gusset Apply wood glue between the gusset and 2x4s Nail gusset using 20 twenty 6d common nails 5 Turn the truss over and install a gusset to the other side of the truss 6 Repeat to assemble 6 six more trusses Step 4 Assemble Roof Gables 1 Position 2 two truss halves together and secure the top with a 1 x4 barbed metal plate 2 Nail a 32 long 2x3 board to the truss at the ridge with 10d sinkers 3 Cut a 42 3 4 long 2x4 to length and install in the center of the ga
17. ng Place the notch under the top plate and support the beam with one of the 76 1 4 long 2x4s Further secure the beam with a 3 wood screw through the top of the wall plate 3 Install the rear beam in the same number Install the front 2x6 beam to the side of the double studs facing N the back of the building Ban Important When installed properly the X marks will be facing the front wall on the front beam and the back wall on the back beam Beams will be 51 apart 76 1 4 2x4 Board Double Stud lt 2x6 Beam Step 13 Install Loft Floor Joists 1 Install 2 two 68 1 2 long 2x4s on the back wall to support the floor joist Install the 2x4s 3 1 2 below the top of the wall plate Secure to d EP NS L wall studs with 10d sinkers 68 1 2 Long 2x4 2 Install 64 long 2x4 floor joist Secure 2x4 Hanger one end to the loft beam using 2x4 hangers over X marks Use 1 1 2 hanger nails Cover X Marks on gt Toenail other end on top of the 68 1 2 2x6 Beams gt M long 2x4s installed on the wall 3 Repeat steps for the front loft area Step 14 Install Loft Flooring 1 Install 7 16 OSB loft flooring on back loft floor joists Loft flooring is flush with outside of top wall plate Use 7d sinkers spaced 12 apart See layout pattern below 3 1 2 x 51 Filler 2 Repeat step 1 to install loft flooring at the fr
18. ont of the building 3 Cut 3 1 2 x 56 lomg floor fillers to fit between the loft flooring Step 16 Install Wall Trim 1 Install 2 two 84 1 2 long 1x4 corner trim on the back wall flush with the siding on the sidewall Use amp d galv nails 2 Install 2 two 1x4 72 trim boards across the top of the back wall Cut to fit Install the 1x4 boards flush with the top of the loft flooring See diagram below 3 Repeat steps 1 2 for front wall trim Loft Floor 1x4 Trim T Jee Sidewall 1x4 84 1 2 Corner Trim BA 1x4 72 Top Trim Cut to Fit Back and Front Walls Step 17 Set Rear and Front Gables 1 Install the rear gable on the rear wall The siding on the gable must extend over gt the 1x4 trim board not behind it See detail D below Nail bottom gable to loft flooring Use 10d nails WARNING The gable ends are heavy and awkward You ll need helpers to lift and set gables in place 2 Install 2 two 61 long 1x4 gable trim flush with the top edge of the gable Install the ends with blue marks together Install trim with 8d galv nails 3 Install 2 two 42 1 2 long 1x4 gable trim __ flush with the side edge of the gable 4 Install the front gable Do Not apply trim DETAIL D a be Te 1x4 Trim Bottom Edge of shite Siding Overlaps Top Wall Trim Step 18 Install 2x4 Truss Plates 1 Install a 48 long 2x4 tie plate against the rear gable and
19. owing the layout on the next page Use 7d sinkers spaced 12 apart 2 Repeat step for opposite side gt To prevent the nails from protruding thought the bottom of the soffit board do not nail at an angle when nailing roof sheathing to the soffit boards Step 20 Install Roof Sheathing Continued 3 Install roof sheathing on the upper roof trusses below Insert 2 two plyclips onto roof sheathing between every truss on the top row The top row of roof sheathing will be about 1 below the ridge to allow for ventilation Use 7d sinkers spaced 12 apart 4 Repeat for the opposite side 5 Install 80 long 1x4 trim boards on the corners of the sidewalls Le 48 x 48 42 x 72 80 long 1x4 Step 21 Install Roofing Not Supplied in Kit Install metal roof edging perimeter of the roof area If you are not installing shingles at this time you can lt T purchase felt paper to protect the sheathing Install SSS the felt paper before you install the metal roof edge Space Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Optional ridge vent provides ideal ventilation Building Tip Install ridge vent in lieu of shingles caps Ridge vent provides ideal ventilation preventing heat and moisture from damaging your building or its