Arrow VD1012FBHD Instructions / Assembly
Contents
1. MODELS FB47410 FB5465 FB106 A FB109 AandFB1014 A simple new floor frame system made of heavy duty hot dipped galvanized steel Use as foundation for plywood sand or stone ATTIC KIT WORKBENCH KIT Heavy duty galvanized steel bars that fit all 10 wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113kg evenly distributed Model No Fits AT101 Shipping Weight 10 Long 250 Ib 113kg load Fits all Arrow 10 wide buildings 16 Ibs 7kg Must be drilled for use as workbench in Estator Even weight distribution SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings NS Model 55404 Makes 8 to 12 20 30cm wide shelves in any length Brackets braces hardware included Lumber is not included Model No SS900 A Grey color 3 shelves e Holds up to 85 Ibs 38kg even weight distribution Some drilling required to fit buildings without mid wall bracing THIS PAGE WAS LEFT BLANK INTENTIONALLY THIS PAGE WAS LEFT BLANK INTENTIONALLY Foundation The Foundation For Your Building OPTION 1 ARROW FLOOR FRAME KIT order No FB1014 A or 68387 Arrow has the best base for your building in this simple ki
2. Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles Work Gloves e No 2 Phillips Screwdriver Step Ladder Optional Time Savers Foundation Preparation With Hardened Magnetic Tip Utility Knife Scissors Wrench Nut Driver Hammer and Nails Note A power screwdriver or vari liars Electric Cordless Drill Spade or Shovel able speed drill with Phillips tip at tachment can speed assembly by Carpenter s Level e Square e Hand Saw Power Saw as much as 40 Tape Measure String for squaring frame e Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage eAllow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at e
3. 5288 SIDE C gt FRONT 5288 5288 Corner Post 4 19 Parts Needed For 6 Door Track Assembly 1 Rear Wall Angle Assembly 1 Top Frames Side Wall Angle Assemblies 2 The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup port the roof 1 Fasten the door track assembly holes on top behind the top of the front corner posts using 1 screw in each corner See the figure 2 Fasten the rear wall angle behind the inside top of the rear posts using 2 screws in each post Short Le 3 Fasten the side wall angles be on Top hind the inside top of the side posts using 2 screws in each corner Side wall angles overlap rear wall angle in corners Wall Angles Must Face Inside 10895 Building STEP 1 22 p Long Leg On Top Opening Facing In STEP Short Leg 20 Parts Needed For 6 Splice Post The splice posts support the walls 1 Position splice post at the center of the rear wall and fasten using 4 screws into rear wall angle and 2 screws into rear floor frame Hint Measure or count holes to de termine if post is centered on angle 2 Fasten splice posts to the sides of building in the same manner STEP 5287 Splice Post 3 21 Parts Needed For Door Jamb 7311 Door Jamb 2 The door jambs reinforce the door opening and p
4. 3m ENDVIEW 57 118 1 8 3m 17 N For Front Floor Assembly 1 Paris Needed For e Side Floor Assembly 2 Floor Frame 6 Rear Floor Assembly 1 1 Place the floor trame pieces that you assembled earlier on the foun dation Assemble the four corners of the floor frame using two screws at each corner as shown At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago When Diagonal Measurements nally When the diagonal measure are Equal the Floor Frame ments are equal the floor frame is is Square square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected If you have purchased a Floor Frame Kit you need to install it at this time The floor frame must be squar and level or holes will not align NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds 1 Position corner posts at the cor ners of the floor frame as shown Fasten the corner post to the floor frame with two screws Support the corner posts with stakes until top frames are attached Parts Needed For 6 Corner Posts
5. Rear Wall Angle Gable Brace Roof Beam Side Floor Frame Rear Floor Frame Front Floor Frame Siding Stud Side Wall Angle Ramp DESEAS fF ONNAWNNNNH AFNH NH HWDADANAANNN O Asse mbly by Key N 0 VN 9 NA S EN N 3 4 1 NES N n7 Step 1 SV14 The front floor frame is made up of three pieces The side floor frames and the rear floor frame are made up of two pieces The holes in these pieces will align when the pieces are positioned with correct amount of overlap The illustrations below show the proper overall length forthe sides rear and front Proceed as follows 1 Place the front floor frames as shown Center the ramp with drain holes facing outside on top of the two front floor frames Join the frames by inserting eight screws 2 Overlap the side floor frames and the rear floor frames as shown The holes in these pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall length ofthe side and rear floor frames Join the frames by inserting four five bolts into each frame set as shown 3 Double check the length of each and set these pieces aside for later use 14 8934 Ramp 1 9367 Front Floor Frame 2 8936 Rear Floor Frame 2 10392 Side Floor Frame 4 A Parts Needed For 6 Floor Frame Assemblies C M FrontFloor Floor STEP
6. cut the tape this time 3 Install two roof panels 6529 work ing side to side Do not fasten the lower end of the panels to the side wall angles at this time Continue weather stripping the ridge opening NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible 4 Install the first ridge cap 6869 on the completed roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time 5 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts Screws To RoofBeam Fasten At Fasten At Overlap Overlap With Bolt With Bolt Screws To Roof Beam Do not fasten at this time NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up STEP A am ZZ Roof Panel 9 6529 6868 Ridge Cap 1 Parts Needed For 6529 Roof Panel 4 Step 18 Ridge Cap amp Panels 6641 Loft Roof Panel 1 5 31 6640 Right Roof Panel 1 1 Install the second ridge cap 6868 overlapping the first ridge cap while installing two roof panels 6529 Hint The bolts on the ridge cap need to be 1 leftloose to move the ridge cap to the side and overlap the ribs of the next roof panel Continue weather strip ping the ridge Weather 68686 2 Install t
7. exactly the same procedures for the right door Each bolt requires a small washer on the outside of the door Proceed as follows 1 Place foam board under the lip of door 2 Hold the vertical door brace against the long edge of the foam board inside the door and fasten to door using 5 bolts and nuts 3 Put a horizontal door brace onto the top edge and bottom edge cover ing edge of foam board and fasten with 1 bolt in the center 4 Attachthelower door guides and bolts as shown D Push 7 holes through foam board 2 where shown using an awl or nail 6 Fasten center of door and install handle using 7 8 bolts door wash ers hex nuts and acorn nuts 7 Repeat steps 1 through 6 for the right door 67731 Foam Board 2 Parts Needed For e 10493 Right and Left Doors 2 Door Assembly 10501 Horizontal Door Brace 4 8641 Vertical Door Brace 2 10493 Right Door 7 8 Bolt 8641 8641 113 8 Bolt Washer 10501 6 10501 9 B 7 66382 END VIEW SHOWING Horizontal Door Brace S A _ E 66382 Parts Needed For Right Door Assembly 1 Door Installation amp Adjustment 1 Gable Horizontal Door Brace Door Track DoorSlide 1 From inside the building put the bottom ofthe right door assembly on your left when you are inside the building behind door jamb into t
8. periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future r
9. 8 Parts Needed For 6 Righ t Roo f Panel 6640 Right Roof Panel 1 Installing the roof panels is best done with a step ladder Begin Installing roof panels atthe back right corner of the building Each screw and bolt in the roof requires a washer TT ER IE T NOTE p Measure the building diagonally 6529 pep 6529 again and make adjustments to make sure the building is square 6529 6529 and level This will make the roof panels fit better and holes will See ou oe align Don t anchor the floor frame 9324 6529 If a Roof Beef Up Kit was ee purchased assemble prior to Front attaching the roof panels 1 Locate all the roof panels by their numbers and place them on the ground alongside the building in their proper positions 0 o 4 7 79 2 Position the right roof panel at the back right corner and fasten to the gable and roof beams using screws and bolts and nuts as shown Do not fasten the lower end of the panels to ait the side wall angles at this time iH Hint Attach fasteners in order shown on in diagram FRONT 29 6641 Left Roof Panel 1 9 6529 Roof Panel 2 Parts Needed For 6 Ridge Cap amp Panels 6869 Ridge Cap 1 1 Install a left roof panel 6641 atthe left rear corner of the roof 2 Cover the joint at the peak with weather stripping tape Unroll the tape and pressit down overthe open ing at the ridge as you install each roof panel Do not
10. Frame Assembly 119 3 8 3 0m 9367 aes S OUTSIDE ege 10392 1 c Side Floor Frame 141 5 8 3 6m 10392 SE GEL Ex 18 Rear Floor Frame 119 3 8 3 0m 8936 141 5 8 Sides 3 6m 3 6m 3 0m Front amp Rear 119 3 8 3 0m Parts Needed For 6 10396 Rear Wall Angle 2 10395 Side Wall Angle 4 Frame Assemblies The main frame pieces reinforce the walls This piece will later be installed at the top edge of the side walls and the rear wall Proceed as follows 1 Overlapthe rear wall angle pieces as shown in the figure and fasten them together with one bolt in the single large hole 2 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with two bolts thru the sec ond set of large holes from each end 4 1 2 11 4cm 3 Setthe assemblies aside You will use them later Rear Wall Angle 118 1 8 3m 3 3 4 9 5cm Side Wall Angles 140 3 8 3 6m 15 Parts Needed For Step 3 Roof Beam Assemblies SS SV16 The roof beams join the two gables and supportthe roof panels The main roof beam is made up of four pieces overlapped back to back at the cen ter The left and right roof beam as semblies are made up of two pieces Hint These pieces are force fitted so you may have to press hard to join them together 1 Place one end of roof beam inside an
11. Owner s Manual amp Assembly Instructions SY01 Model VD1012 D1 697 68619 A1 22 ARROW World s Leading Maker of Storage Buildings CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ 714541207 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 10 12 121 x 143 1 4 115 734 123 1 4 145 3 4 82 1 8 118 1 4 140 1 2 80 7 8 55 1 2 69 1 4 3 0m 3 6m 307cm 364cm 10 7m 20 8m 313cm 370cm 209cm 300cm 357cm 205cm 141cm 176cm BEFORE YOU Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for correct results Foundation and Anchoring Your
12. eeded For 6000 Right Gable 2 Step 13 Sane The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together must be on top 5971 T Roof Beam Brackets Sri i E 26 Parts Needed For 6 6 Left Gable Assemblies 2 Step 1 4 6 Right Gable Assemblies 2 Gables Braces 6 6635 Gable Brace 2 27 1 Litt and fasten right and left gable under angle at corner to the rear wall angle with screws 2 Join the left and right gables together with a gable brace using a bolt in the bottom hole only 3 Repeat Steps 1 amp 2 for the door track on the front of building except for the track supports fasten as shown 27 Parts Needed For Main Roof Beam Assembly 1 Roof Beams Single Roof Beam Assemblies 2 1 Spreadthetwohalves ofthe double STEP roof beam and fasten to the gable 3 brace of the front gable 2 Fasten the other end of the double roof beam to the gable brace of the rear gable Roof Beam Single 3 Fasten the single roof beams small holes on top as shown using bolts and nuts Spread Two Halves Of Roof Beams 2
13. eference ACCESSORIES ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18m of steel cable and 4 cable clamps No digging or concrete ARROW pouring just insert cable under roof i over roof beams into augers and twist augers into the ground For buildings larger than 10 x9 use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel corner gussets and 4 earth anchors TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty snap in 6 XL RE aris hangers and a small tool holder for d screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings FLOOR FRAME KITS
14. el No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete foundation 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws SY11 O 65103 8 32 Hex Nut 149 66045 Handle 2 66769 Door Slide 4 6228 Track Support 2 Hardware Remove from bag of screws and save for the last step T 65900A 10Bx1 2 Black Screw 8 65923 Packed with Screws 8 32x3 8 Bolt 135 66646 65109 Washer 280 8 32 Acorn Nut 14 8 sheets of 40 Packed with Screws W 66183 66382 Roof Trim Cap Lower Door Guide 4 2 right amp 2 left 65020 67545 Door Washer 14 Weather Stripping 1 Packed with Screws 65004 8Ax5 16 Screw 404 5971 Roof Beam Bracket 4 67468 Peak 2 Arrow Logo 65958 8 32x7 8 Bolt 14 Packed with Screws 11 Parts List Key No Number Description In Carton List 1 Front Wall Channel 2 Splice Post Corner Post RightGable LeftGable Side Siding Roof Panel Right Roof Panel Left Roof Panel Door Jamb Horizontal Door Brace Vertical Door Brace Rear Siding Front Siding Right Door Left Door Foam Board Door Track Splice Side Roof Trim Side Roof Trim Ridge Cap Ridge Cap Door Track
15. flat edge of last siding Fas ten both siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts and splice post using screws 5 Repeat steps 1 through 4 opposite side of building NOTE Be careful to install the correct panel in each position as shown The floor frame must be square and level or holes will not align 24 Parts Needed For 6287 Side Siding 12 Side Siding THIS SCREW MUST FASTEN TAB OF STUD Flat Edge Be certain all siding overlaps are fastened with a single screw Parts Needed For 8736 Side Siding 6 Rear Front Siding 8737 Front Siding 6 1 Slide rear siding into channel of corner and splice posts fastening to rear frame as shown in previous Step 11 Fasten Top Center of Last Siding to Stud 2 Install rear siding to complete each section of rear wall Fasten top center of last siding to rear angle Fasten Rear Siding to Corner amp Splice Posts From Inside 3 Slide front siding into channels of corner post and door jamb This sid ing is fastened from the inside using screws into post and jamb M 4 install front siding to complete both front sections Front Panels Fasten at Corners amp Door Jambs STEP from the Inside 25 6001 Left Gable 2 Gable Assemblies 6 5971 Roof Beam Bracket 4 Parts N
16. he front frame track i 2 Position the top of the door so that the holes in the door line up with the holes in the door slides Front Floor Frame Assembly 3 Fasten the door to the door slides using two 10Bx1 2 screws per door slide Door Slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 10Bx1 2 Screw 4 Repeat steps 1 through 3 for the left door Adjustment Holes Allow Doors to Meet Evenly J Along TheirLength STEP Left Door 34 Keep this Owner s Manual and Assembly Instructions for future reference VD1012 D1 697 68619 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain mois
17. he third ridge cap 6869 overlapping the second ridge cap while installing the remaining two roof panels 6529 Hint The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof panel Continue weather strippingthe ridge Roof Panel Install the left 6641 and right roof panel 6640 as you unroll the weather Stripping tape and press it down Fasten the lower end of the panels to the side wall angles using screws and washers 4 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts Peak Cap Ele p Cut Weather Stripping and Fold Under NY N 31 Ste 19 e Pars rore 6 6015 Side Roof Trim 4 Roof Trim 6 6014 Side Roof Trim 2 SW32 1 Attachthe siderooftrim pieces to the lower end of the roof panels on each side ofthe building using screws at each panel overlap NOTE A single screw fastens both trim pieces at the overlap 2 Using your thumb and index fin ger overbend the bottom flange of the side rooftrim atthe cornerinward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw Roof Trim 6014 STEP 1 Inward to Fit Inside of Roof Trim Cap 7 STEP Tuck Flange 2 32 Step 20 SY33 The steps on this page tell how to assemble the left door You will per form
18. level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s 2 5cm x 10cm will be removed once the concrete cures Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 6 3 parts pea sized gravel 6 2 1 2 parts clean sand Prepare the Site Construct a Foundation 1 Dig a square 6 15cm deep into the ground remove grass 2 Fill up to 4 10cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 2 5cm x 10cm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 8 10cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time B Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 Wood Screws There 1 4 0 63 dia Contains 4 Anchors with Cable Clamps and holes provided in the frames for proper anchoring installation instruction C OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Mod
19. ntrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a foundation should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing safety edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur Never concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe 5 CARE amp MAINTENANCE Finish For long lasting finish
20. other roof beam so that the s 142 3 8 3 6m six holes in each piece align Make four sets of roof beams by repeating this procedure Do not insert bolts yet e 2 Take two of the pressed together roof beams and join them as shown to form the main roof beam assembly Hold the assembly together and fas ten with 14 bolts Build only one Doubled Beam Assembly Build one Doubled Main Roof 3 Fasten the other two pressed Bean Assembly for Peskin Roof together roof beams with eight bolts to make the left and right roof beam assemblies 4 Set these pieces aside for later assembly 142 3 8 3 6m 142 3 8 3 6m Build two Single Beam Assemblies 16 Parts Needed For 6403 Door Track Splice 1 Door Track Assembly 9366 Door Track 2 NOTE Door Track Splice painted part The door track assembly supports the sliding doors and reinforces the front wall Itis made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 66769 2 Insert four screws from the under side only Long Leg Hint The holes in the top side of the doortrack assembly are forfastening the gable to the top of the front wall in a later step 118 1 6 3m 3 Position door slides onto the legs from the end of door track assembly as shown in the end view STEP STEP 4 4 Set this piece aside for later use 118 1 8
21. rovide an attractive trim 1 Fasten the top of the door jambs to the door track with 2 screws Do the same for the bottom into frame Notched edge faces toward center of building NOTCHEDEDGE MUST FACE CENTER OF BUILDING Washer Parts Needed For 9344 Siding Stud 10 Studs Front Channel 9365 Front Wall Channel 2 The studs provide a surface for at taching the siding panels 1 Following dimensions measuring from the ends of angles place 2 studs between each corner and splice post on the sides and 1 on the rear of building Position stud inside top angle and fasten with a screw at the lower hole 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building 3 Fasten front wall channel into position behind corner post and door jamb Fasten using three screws Me 210m 56cm 479 24 15 16 FASTEN STUD AT LOWER HOLE AT THIS TIME 4 222 DO NOT FASTEN TAB LARGEHOLE 23 Step 11 SX24 Each screw in the wall requires a washer 1 Slide side siding into channels of corner and splice posts flat edge upward bottom edge down resting on floor frame Always follow this pattern Fasten bottom edge and tab of stud to floor frame using screws Fasten center to stud with screws Do not fasten top edge yet 2 Install side siding as before Note how the slot in bottom edge must overlap
22. storage building must be anchored to prevent wind damage A foundation is also necessary as a base in order to construct a square and level building Anchoring and foundation materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building eAll part numbers can be found on the parts All of these numbers before the must agree with the numbers on the parts list The parts list is located on page 12 elf you find that a part is missing include the model number of your building and contact Arrow Group Industries Inc Customer Service Department Route 50 East Breese Illinois 62230 1 800 851 1085 Separate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later eFamiliarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD
23. t It keeps stored items above the ground This kit should be used with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own foundation be sure to select the appropriate materials These are the recommended materials for your foundation 2 x 4 s bcm x 10cm Pressure Treated Lumber 6 5 8 1 5cm 4 x 8 122cm x 244cm Plywood exterior grade 10 amp 4 penny Galvanized Nails 6 Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the foundation follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction Note Platform Slab will extend 9 16 1 4cm beyond floor frame on all four sides Seal this 9 16 of wood with roofing cement not included or bevel this 9 16 of OPTION 3 Concrete Slab concrete when pouring for good water drainage The slab should be at least 3 to 4 8 10cm thick It must be
24. ture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 714541207