Home

Arrow HM86FBHD Instructions / Assembly

image

Contents

1. Step 1 Bl4otr it The front floor frame is made up of three pieces The rear floor frame is made up of two pieces The holes in these pieces will align when the pieces are positioned with correct amount of overlap The illustrations below show the proper overall length for the front and rear Proceed as follows 1 Place the front floor frames as shown Center the ramp with drain holes facing outside on top of the two front floor frames Join the frames by inserting eight screws 2 Overlap the rear floor frames as shown The holes in these pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper overall length of the rear floor frame Join the frames by inserting five bolts into frame set as shown 3 Double check the length of each and set these pieces aside for later use Parts Needed For Floor Frame Assemblies 8941 Ramp 1 9379 Front Floor Frame 2 9377 Rear Floor Frame 2 Front Floor Frame Assembly 95 7 8 243 5 cm 9379 DRAIN HOLES FACE OUTSIDE Rear Floor Frame 95 7 8 243 5 cm rrr 95 7 8 243 5cem Rear 95 7 8 243 5cm Front p Parts Needed For 6615 Rear Wall Angle 2 Step Frame Assemblies 9924 Rear Wal Channel 2 BlSetr Rear Wali Channel 94 5 8 240 3 cm 9924 The main frame pieces reinforce the walls These pieces will later be in stalle
2. P31 ctr fos Gable 8 Door Track Door Slide Horizontal Door Brace 1 From inside the building put the bottom of the right door assembly on your left when you are inside the building behind door jamb into the front frame track 2 Position the top of the door so that the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Adjustment Holes Allow 4 Doors to Meet Evenly Along Their Length Keep this Owner s Manual and Assembly Instructions for future reference 31 EN86 A NW86 A HM86 A SA86 A VN86 A MN86 A NP86 697 68537 A Anchoring and Floor Frame Anchoring Anchor your building at this time Fioor Frame If you have purchased a Floor Frame Kit you need to install it at this time SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avo
3. TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy duty snap in D a hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings MODELS FB47410 FB5465 FB106 A FB109 A and FB1014 A Asimple new floor frame system made of heavy duty hot dipped galvanized steel Use as base for plywood sand or stone ATTIC KIT WORKBENCH KIT Model No AT101 Heavy duty galvanized steel bars that fit all 10 3 0 m wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113 kg evenly distributed Some drilling required to fit buildings without mid wall bracing SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings Model No SS900 A Model No 88404 Makes 8 to 12 20 3 30 5 cm Grey color e 3 shelves e Holds up to 85 Ibs 38 kg even weight distribution wide shelves in any length Brackets braces hardware included Lumber is not included Some drilling required to fit buildings without mid wall bracing ORDERING ACCESSORIES We recommend that you purchase accessory i
4. 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws 10 B1 ear 65103 8 32 Hex Nut 105 66045 Handle 2 66769 Door Slide 4 6228 Track Support 2 Hardware Remove from bag of screws and save for the last step 65900A 10Bx1 2 13 mm Black Screw 8 Packed with Screws 66646 Washer 279 8 sheets of 40 66382 Lower Door Guide 4 66775 Plug 2 Packed with Screws 11 65923 8 32x3 8 10 mm Bolt 105 65109 8 32 Acorn Nut 6 Packed with Screws 66183 Roof Trim Cap 2 right amp 2 left 67293 Weather Stripping 1 65004 8Ax5 16 8 mm Screw 266 a 67468 Peak Cap 2 Arrow Logo oooo 7916 Roof Beam Bracket 4 Parts List Assembly Part Part Key No Number Description Rear Wall Angle Door Track Splice Horizontal Door Brace Gable Brace Roof Pane Right Gable Left Gable Ridge Cap Right Roof Panel Left Roof Panel Roof Beam Side Wall Angle Side Wall Channel Side Roof Trim Ramp Side Floor Frame Wall Panel Vertical Door Brace Right and Left Doors Wall Panel Door Jamb Rear Wall Channel Rear Floor Frame Door Track Front Floor Frame Front Corner Panel Rear Corner Panel Quantity Check in Carton List NVNUNNNYNNNNNANANNWANN ANMNANMAoD 12
5. inside top of the side panels using screws Side wall angles must overlap rear wall angle in corners 4 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure Door Track Assembly 1 Rear Wail Angle Assembly 1 Paris Needed For 8476 Side Wall Angle 2 Frames Rear Wall Channel Assembly 1 9920 Side Wall Channel 2 Wall Angles Must Fac Inside P Building pa Long Leg on Top Opening Facing in Short Leg on Bottom The wall panels come in two widths Each wall panel has a crimped rib on one side The crimped rib should go under the rib of the panei that follows it 11 1 Locate all of the wall panels and set each one alongside the building 2 Be sure that you have the correct panels in each position Do this by overlapping the panels and deter mining if the holes line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with two screws 5 when you have attached ail wall panels in the correct positions the building will look like this oy Parts Needed For Wall Panels 8995 Wall Panel 4 9363 Wall Panel 2 Panels
6. the side trim using a screw 4 Fasten the roof panel ribs peak caps and ridge cap together using bolts and nuts oF V a i ai Peak Cap Parts Needed For Roof Trim 8482 Side Roof Trim 2 Tuck Flange J inward to Fit Inside of Roof Trim Cap Step 17 hit 0 mm 0 12 6 The steps on this page tell how to assemble the right door You will perform exactly the same procedures for the left door Each bolt and screw in the door requires a washer Proceed as follows 10498 1 Attach the handle to the door with 2 bolts and nuts as shown 66382 2 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Puta horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the center 4 Attach the lower door guides and bolts as shown 5 Repeat steps 1 through 4 for the left door Parts Needed For 10488 Right and Left Doors 2 10498 Horizontal Door Brace 4 Door Assembly 9355 Vertical Door Brace 2 a 4 A gt 66382 o GP Right Door S o Left Door Q 66382 G SSS 0498 er al END VIEW SHOWING Parts Needed For Right Door Assembly 1 Step 18 Door Installation amp Adjustment Left Door Assembly 1
7. Left Gable Assembly 2 Right Gable Assembly 2 Gables Braces 6658 Gable Brace 2 1 Lift and fasten a right and left gable under angle at corner to the rear wall angle with screws Hint On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using bolts and nuts in the bottom two holes only 3 Repeat Steps 1 amp 2 for the door track on the front of building except for the track supports fasten as shown 6658 Gable Brace 24 S 1 2 Parts Needed For Main Roof Beam 1 tep Roof Beams 8474 Roof Beam 2 B25 cr 1 Fasten the main roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3 Fasten the remaining roof beams small holes on top as shown using bolts and nuts Step 13 B26 ctr p 0 2 Installing the roof panels is best done with a step ladder Begin installing roof panels at the back right corner of the building Each screw and bolt in the roof requires a washer NOTE Measure the building diagonally again and make adjustments to make sure the building is square and level This will make the roof panels fit better and holes will align Don t anchor the floor frame NOTE If a Roof Beef Up Kit was pur
8. Owner s Manual amp Assembly Instructions BOL Model No ENS86 A O HM86 AL MNS6 A L NP86 O NWw86 A SA86 A VN86 A 697 68537 A ARROW World s Leading Maker of Storage Buildings Seen AVI Y AeA A468 ee MAEM Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle your requests 709320611 CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES Storage Area 43Sq Ft 230 Cu Ft x TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ 4 0 m 6 5 m 3 SAFETY INFORMATION PROVIDED IN THIS MANUAL Keema BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Exterior Dimensions Interior Dimensions Door Approx Base Roof Edge to Roof Edge Wall to Wall Opening Size Size Width Depth Height Width Depth Height Width Height 8x6 97 1 2 x 68 3 4 99 3 4 711 4 67 7 8 94 3 4 66 66 5 8 43 1 2 58 2 4mx1 7m 247 7 cmx 174 6cm 253 4cm 18 0cm 172 4 cm 240 7 cm 167 6cm 169 2cm 110 5cm 147 3 cm BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual important information and helpful tips will make your construction easier and more enjoyable As
9. and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage Allow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside Before you begin the first steps in assembling your parts a base should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing safety edge sharp edge EE safety edge Keep children and pets away from worksite to avoid distractions and any accidents which may occur eNever concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Practice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by l
10. chased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2 Position the rightroof panel atthe back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the side wall angle at this time Hint Attach fasteners in order shown in diagram HOL 6 Parts Needed For 8466 Right Roof Pane 1 Right Roof Panel eer a eS 1 oes gt ia gt k T eal aaae a aa FRONT 8466 Right Roof Panel i Step 14 B27 ctr 1 Install a left roof panel at the left rear and right front corner of the roof Install a right roof panel at the left front corner of the roof 2 Cut2short2 5 1 cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time 3 Install 4 roof panels in the se quence and positions shown on pre vious page Do not fasten the lower end of the panels to the side wall angles at this time Continue weather stripping the ridge opening Fasten roof panel overlaps not used for ridge cap roof center Cover the head of bolt with the 2 5 1 cm piece of weather stripping tape NOTE Nar
11. d in the center and at the top edge of the rear wall Proceed as follows 1 Overlap the rear wall channel pieces as shown in the figure and fasten the two pieces together with one bolt in the center hole three holes will align Rear Wall Angle 2 Overlap the rear wall angle pieces 94 5 8 240 3 cm as shown in the figure and fasten them together with one bolt in the center hole 6615 3 Double check the length of each and set these pieces aside for later use Rear Wall Channel 94 5 8 240 3 cm Rear Wall Angle 94 5 8 240 3 cm 15 Step 3 BiG ctr tee 10 The roof beams join the two gables and support the roof panels The main roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back with a roof beam and fasten together using ten screws 2 Set this piece aside for later use Assembled 8474 Roof Beam Parts Needed For Roof Beam Assembly 16 8476 Side Wall Angle 8474 Roof Beam 1 8476 Side Wal Angle 1 Main Roof Beam Step 4 BI ctr i We 4 The door track assembly supports the sliding doors and reinforces the front wall It is made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the door track assembly are for fasten i
12. eps show how to join related parts to make larger sub assemblies which will be used later Familiarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles e Work Gloves e No 2 Phillips Screwdriver e Step Ladder Optional Time Savers Base Preparation With Hardened Magnetic Tip e Utility Knife Scissors Wrench Nut Driver Hammer and Nails Note A poner aan PH or varis e Pliers e Electric Cordless Drill Spade or Shovel able peed oll wih Pompe te ak Carpenter s Level Square e Hand Saw Power Saw tachment can speed assembly by 2 as much as 40 Tape Measure String for squaring frame e Lumber and or Concrete Selecting
13. id nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 709320611
14. ight winds Call 1 800 851 1085 or assist arrowsheds com Do not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe Aae CARE amp MAINTENANCE Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snowon roof can damage building making it unsafe to enter In snowcountry Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Contact Arrow as outlined on the Ordering Accessories page to place an order Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation w
15. ill reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18 m of steel cable and 4 cable clamps No digging or concrete pouring just insert cable under roof over roof beams into augers and twist augers into the ground For buildings larger than 10 x9 3 0 m x 2 6 m use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel eet corner gussets and 4 earth anchors
16. ng the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track assembly as shown in the end view 4 Set this piece aside for later use E A e ch 66769 END view Y Parts Needed For 6617 Door Track Splice 1 Door Track Assembly WBE EBOOK Track 2 NOTE Door Track Splice painted part i Short Leg on Bottom 94 5 8 240 3 cm 94 5 8 17 eP ed F Front Floor Assembly 1 arts Needed For 8946 Side Floor Frame 2 Floor Frame Rear Floor Assembly 1 STEP 8946 1 Assemble the four corners of the floor frame using two screws at each corner as shown At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the When Diagonal Measurements floor frames to your base at this are Equal the Floor Frame time You will anchor the building is Square after it is erected The floor frame must be square and level or holes will not align 18 Parts Needed For 9380 Front Corner Panel 2 Step 6 Corners 9384 Rear Corner Panel 2 B19 ctr Narrow Side The remainder of the building assembly tequires many hours and more than one person Do not continue be
17. o use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Base 1 Dig a square 6 15 2 cm deep into the ground remove grass D 2 Fill up to 4 10 2 cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 19 mm x 89 mm 8 gt FRONT 247 2 lumber DOOR Cm 5 Pour in concrete to fill in the hole and the frame giving a total of 4 10 2 cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time 9 Anchoring Al0 ctr Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 6 mm Wood Screws There are 1 4 6 mm Contains 4 Anchors with Cable Clamps and dia holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete base 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 6mm x 51 mm Lag Screws
18. rest on frame as shown Crimped Rib Underneath Detail Showing Center of Panel Screwed to Wall Channel ote Bolt and nut does not go thru wall channel at overlap Use bolts and nuts thru wall angle overlap at the top of panel at rear cA ney il a 21 Parts Needed For 9900 Door Jamb 2 Door Jamb o 8 G 2 3 bolts TOP VIEW Hex Nut Acorn Nut The door jambs reinforce the door opening and provide an attractive trim Follow these steps for both door jambs 1 Fasten a door jamb to the front panel with three bolts nuts and acorn nuts as shown Push a plug into hole at center of jamb closest to door opening 2 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame Repeat steps 1 through 2 for the opposite door jamb Parts Needed For Step 10 Gable Assemblies pw 8 The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable 7916 Roof Beam Brackets 7906 Right Gable 2 7907 Left Gable 2 7916 Roof Beam Bracket 4 Parts Needed For
19. row roof panel crimped rib is overlapped by wide rib of adjacent panel where possible NOTE if roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up Parts Needed For Roof Assembly 8466 Right Roof Panel Fasten At Overlap with Bolt Screws To Roof Beam Cut Weather Stripping and Fold Under 27 STEP 8467 Left Roof Panel X Screws To Roof Beam V Do not fasten at this time 8467 Left Roof Panel 2 7875 Roof Panel 4 8466 Right Roof Panel 1 Fasten At Overlap with Bolt Weather Stripping Tape Roll 7875 Roof Panel STEP Parts Needed For 8461 Ridge Cap 1 Step 15 Ridge Cap B28 ctr fe i 0 a 20 4 1 Install the ridge cap on the com pleted roof section using bolts and nuts Do not fasten the ends of the ridge cap at this time TEP 2 Fasten the lower end of the panels 8461 to the side wali angles using screws and washers 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 2 Using your thumb and index fin ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to
20. sembly Instructions Instructions are supplied in this manual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for successful results Flooring and Anchoring Your storage building must be anchored to prevent wind damage A base is necessary to construct a square and level building Anchoring and base materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available at your local dealer Arrow s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building eAll part numbers can be found on the parts All of these numbers before the must agree with the numbers on the Parts List page eif you find that a part is missing include the model number of your building and contact Arrow Shed LLC Customer Service Department 1101 North 4th Street Breese Illinois 62230 1 800 851 1085 or assist arrowsheds com Separate contents of the carton by the part number while reviewing parts list The first few st
21. ted Lumber 5 8 15 5 mm 4 x 8 1220 mm x 2440 mm Plywood exterior grade NOTE Pressure Treated Lumber must not be used where it will make contact with your storage building The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided 10 amp 4 penny Galvanized Nails Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Note Platform Slab will extend 9 16 1 4 cm beyond floor Allow 6 7 hours for construction frame on all four sides Seal this 9 16 1 4 cm of wood with a roofing cement not included or bevel this 9 16 1 4 cm of OPTION 3 Concrete Slab concrete when pouring for good water drainage The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete t
22. tems from your local storage building dealer whenever possible however because the full line of accessories is not always available from all dealers Arrow is offering them to you on a direct basis There are two ways to order Arrow Storage Building Accessories Option 1 Option 2 Accessories can be purchased Order accessories by telephone through using your MasterCard or Visa credit card arrowsheds com Call toll free 1 800 851 1085 Customer Service Allow 2 weeks for delivery SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re delivery charge assessed by the carrier Base BO9 ctr The Base For Your Building OPTION 1 ARROW FLOOR FRAME KIT Order No FB106 A or 68381 A Arrow has the best base for your building in this simple kit It keeps stored items above the ground This kit should be used with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own base be sure to select the appropriate materials These are the recommended materials for your base 2 x 4 s 38 mm x 89 mm Pressure Trea
23. yond this 4 point if you do not have enough time to complete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall SIDE requires a washer STEP TOP VIEW CORRECT INCORRECT 9380 1 Position the rear corner panels at FRONT the rear corners as shown The wid est part of each rear corner panel must be placed along the rear of the building Attach the corner panels to the floor frame with four screws 2 Position a front corner panel at the corner of the floor frame as shown The widest part of each front corner panel must be placed along the front of the building A small gap will exist between frontcorner panel and ramp Fasten the corner panel to the floor frame with three screws NOTE Be careful to install the correct G Panels rest on fo panel in each position as shown frame as shown 3 Double check the part numbers of Washer the wall panels before proceeding The floor frame must be square and level or holes wili not align 19 Step 7 B20 ctr The main frame pieces give rigidity to the side walls and provide a sur face for attaching the gables which support the roof 1 Fasten the rear wall angle as sembly across the inside top of the rear wall using screws 2 Fasten the rear wall channel assembly across the middle of the rear wall using screws 3 Fasten the side wallangles across the

Download Pdf Manuals

image

Related Search

Related Contents

RCA RACE1201 Use and Care Manual  Refrigerant Leak Detector  trasmettitore digitale rs-232/rs-485 optoisolata optoinsulated  Ramsey Winch Company OWNER`S MANUAL Front Mount Electric  CTC series of dry-block - Cameron Instruments Inc.  La Saga Des Jeux Vidéo - Racine  GRT-101/401 User`s Manual - PLANET Technology Corporation.  5. W. A. T. LOCK - R  OPS User Manual - Cayman Islands Planning Department  Manuale Utente  

Copyright © All rights reserved.
Failed to retrieve file