Home
Arrow VD86 Instructions / Assembly
Contents
1. Note Platform Slab will extend 9 16 1 4 cm beyond floor frame on all four sides Seal this 9 16 1 4 cm of wood with a roofing cement not included or bevel this 9 16 1 4 cm of OPTION 3 Concrete Slab concrete when pouring for good water drainage Allow 6 7 hours for construction The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the concrete cures Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Base 1 Dig a square 6 15 2 cm deep into the ground remove grass TS 2 Fill up to 4 10 2 cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 97 4 Construct a wood frame using four planks of 1 4 19 mm x 89 mm FRONT 245 9 lumber DOOR cm 5 Pour in concrete to fill in the hole and the frame giving a total of 4 10 2 cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time 9 Anchoring 10 ctr Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommende
2. 1 Following dimensions measuring from the ends of angles place a stud between each corner and splice post at the rear of building and 2 studs between corner posts at the sides Position stud inside top angle and fasten with a screw at the lower hole 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building FASTEN STUD AT LOWERHOLE DO NOT FASTEN TAB 5 LARGE HOLE 21 Step 9 W22 ctr Each screw in the wall requires a washer CORRECT INCORRECT 1 Slide side siding into channels of corner posts flat edge upward bottom edge down resting on floor frame Always follow this pattern Fasten bottom edge and tab of stud to floor frame using screws Fasten center to stud with screws Do not fasten flat edge yet 2 Install side siding as before Note how the slot in bottom edge must overlap flat edge of last siding Fasten both siding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts using screws 5 Repeat steps 1 through 4 for oppo site side of building NOTE Be careful to install the correct panel in each position as shown The floor frame must be square and level or holes will not align Parts Needed For Side Siding 8719 Side Siding 6
3. Arrow has the best base for your building in this simple kit It keeps stored items above the ground This kit should be used with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own base be sure to select the appropriate materials These are the recommended materials for your base 2 x 4 s 38 mm x 89 mm Pressure Treated Lumber 5 8 15 5 mm 4x8 1220 mm x 2440 mm Plywood exterior grade NOTE Pressure Treated Lumber must not be used where it will make contact with your storage building The properties of Pressure Treated Lumber will cause accelerated corrosion If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided 10 amp 4 penny Galvanized Nails 6 Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails 9 Measure 16 24 40 6 cm 61 0 cm sections to construct FRONT 24 Lo inside frame see diagram DOOR Secure plywood to frame using 4 penny galvanized nails
4. Bottom Edge FASTEN TAB OF STUD Flat Quum DES Edge Be certain all Siding overlaps are fastened with a single screw 10 Parts Needed For 65345 Rear Siding 6 Rear Front Siding 9746 Front Siding 6 Fasten Top Center of Last Siding to Stud 1 Slide rear siding into channel of corner and splice posts fastening to rear frame as shown in previous step 2 Install rear siding to complete each section of rear wall Fasten top center of last siding to rear angle 3 Slide front siding into channels of corner post and door jamb This siding is fastened from the inside using screws into post and jamb Fasten Rear Siding to Corner amp Splice Posts From Inside 4 Install front siding to complete both front sections n STEP STEP 3 4 IE Front Panels Fasten at Corners amp Door Jambs from the Inside 23 7906 Right Gable 2 S te 11 Parts Needed i pide Gable Assemblies 7916 Roof Beam Bracket 4 W24 ctr The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face
5. with a roof beam and fasten together using ten screws 2 Set this piece aside for later use Assembled 8476 Side Wall Angle 8474 Roof Beam Main Roof Beam Step 4 B17 ctr 4 The door track assembly supports the sliding doors and reinforces the front wall Itis made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track assembly as shown in the end view 4 Set this piece aside for later use PRU 66769 END VIEW Parts Needed For 6 6617 Door Track Splice 1 Door Track Assembly 9378 Door Track 2 NOTE Door Track Splice painted part 900 N 2 200 66769 Zh 9378 lt lt Long Leg 7 STEP 1 2 94 5 8 240 3 cm STEP STEP 3 4 17 8946 Side Floor Frame 2 St 5 Parts Needed For e Front Floor Assembly 1 P Floor Frame Rear Floor Assembly 1 B18 ctr 1 Assemble the four corners of the floor frame using two screws at each corner as shown At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the di
6. a sail can be whipped about by the wind making construction difficult and unsafe CARE amp Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone caulking may be used for watertight seals throughout the building Do not store swimming pool che
7. edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 705340111
8. roof center Cover the head of bolt with the 2 5 1 cm piece of weather stripping tape NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up Parts Needed For 8467 Left Roof Panel 2 7875 Roof Panel 4 8466 Right Roof Panel 1 STEP 2 Roof Assembly PUER 8467 Left Roof Panel T 1 Weather Stripping wes Tape Rol 8466 Right gt C ax Roof Panel Pa 7875 Roof Panel STEP 3 Screws To Roof Beam Fasten At Fasten At Overlap with Overlap with Bolt Bolt Screws To Roof Beam Do not fasten Cut Weather Stripping and Fold Under FRONT St 16 Parts Needed For 8461 Ridge Cap 1 Cp Ridge C ap Roof Trim 8482 Side Roof Trim 2 W29 ctr 1 Install the ridge cap on the com pleted roof section using bolts Do not fasten the ends of the ridge cap until instructed to do so 2 Fastenthe lower end of the panels to the side wall angles using screws and washers 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap 4 Using your thumb and index fin ger overbend the bottom flange of the side roof trim atthe corner inward enough so
9. the right and left roof trim caps fit onto right and left corners 5 Fasten the roof trim caps to the side trim using a screw 6 Fasten the roof panel rib peak cap and ridge cap together using bolts and nuts Fasten the remaining peak cap in the same manner Tuck Flange Inward to Fit Inside of Roof Trim Cap 10486 Right and Left Doors 2 Door Assembly 10503 Horizontal Door Brace 4 W30 ctr 08641 Vertical Door Brace 2 Parts Needed For Step 17 The steps this tell how 10486 Right Door assemble the left door You will per z roe form exactly the same procedures for the right door Each bolt requires a small washer on the outside of the door Proceed as follows SS 1 Place foam board under the lip of SS door 2 Hold the vertical door brace against the long edge of the foam board inside the door and fasten to door using 5 bolts and nuts 3 Puta horizontal door brace onto 3 3 the top edge and bottom edge cover 8641 10mm ing edge of foam board and fasten Bolt with 1 bolt in the center 2 Attach the lower door guides and ax d bolts as shown 5 6 oor Washer CAE M 6382 5 Push 5 holes through foam board 10503 9 where shown using or nail 3 10503 8 66382 6 Fasten center of door and install END VIEW handle using 7 8 22 mm bolts door SHOWING washe
10. Allow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside eBefore you begin the first steps in assembling your parts a base should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing fety edge safety edge eKeep children and pets away from worksite to avoid distractions and any accidents which may occur eNever concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools eDo not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 or assist arrowsheds com eDo not attempt to assemble the building on a windy day because the large panels acting as
11. Owner s Manual amp Assembly Instructions wol Model VD86 L 697 68616 L ARROW World s Leading Maker of Storage Buildings Missing Parts Questions on Assembly Call 1 800 851 1085 or assist arrowsheds com Do not return to dealer they are not equipped to handle your requests 705340111 CAUTION SOME PARTS HAVE SHARP EDGES CARE Storage Area 43Sq Ft 271 Cu Ft MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES 4 0 m 7 7 m TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Exterior Dimensions Interior Dimensions Door Approx Base Roof Edge to Roof Edge Wall to Wall Opening Size Size Width Depth Height Width Depth Height Width Height 8x6 97 1 2 x 68 3 4 99 3 4 71 1 4 79 1 8 94 3 4 66 77 7 8 43 1 2 69 1 4 24 1 7 247 7 cmx 1746 253 4 cm 1810 201 0 240 7 cm 167 6 197 8 110 5 175 9 BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this manual and contain all appropriate information for your b
12. Packed with Screws Parts List Part Part Quantity Number Description in Carton List Hamp Front Floor Frame Hear Floor Frame Hight Rear Wall Angle Door rack Door Track Splice Left Rear Wall Angle Left Gable Right Gable Side Floor Frame Corner Post side Wall Angle Splice Post Door Jamb Siding Stud Side Siding Gable Brace Rear Siding Front Siding Roof Beam Roof Angle Right Roof Panel Roof Panel Left Roof Panel Ridge Cap Side Roof Trim Right Door Left Door Horizontal Door Brace Foam Board Vertical Door Brace By rA ye 2 qua 7 07 EA ANN Assembly by Key KS es 8941 Ramp 1 Ste 1 ee eal 9379 Front Floor Frame 2 p Floor Frame Assemblies 9377 Rear Floor Frame 2 14 ctr The front floor frame is made up of three pieces The rear floor frame is made up of two pieces The holes in these pieces will align when the pieces are positioned with correct amount of overlap The illustrations below show the proper overall length for the front and rear Proceed as follows 7 Front Floor TE eR 8941 99 Frame Assembly 1 gt gt 95 7 8 243 5 1 Place the front floor frames as shown Center the ramp with drain SS holes facing outside on top of
13. agonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the When Diagonal Measurements floor frames to your base at this are Equal the Floor Frame time You will anchor the building is Square E STEP after it is erected The floor frame must be square and level or holes will not align Step 6 W19 ctr 22 NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup port the roof 1 Position corner posts at the cor ner of the floor frame as shown Fas ten the corner post to the floor frame with two screws Support the corner posts with stakes or other devices until door jambs are attached 2 Fasten the door track assembly holes on top behind the top of the front corner posts using 1 screw in each corner See the figure 3 Fasten the rear wall angle as sembly behind the top of the rear posts using 2 screws in each post 4 Fasten the side wall angles be hind the top of the side posts using 2 screws in each corner Side wall angles overlap rear wall angle in cor ners The floor frame must be square and level or hole
14. crete slab Full assembly instructions and a 1 4 masonary drill bit are included Some drilling required to fit buildings without mid wall bracing Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty Heavy duty galvanized steel shelf units help organize storage hot dipped galvanized steel fu space They easily mount on the wall or sit on the floor Fits all corner gussets and 4 earth anchors Arrow buildings TOOL HANGING RACK Model No TH100 pa The perfect tool organizer Twin 25 1 2 64 8 steel channels WHY plus five heavy duty snap in Wie 22 hangers and a small tool holder for SHELF UNITS screwdrivers pliers etc Holders Model No 55404 Model No SS900 A slide along channel for fully Makes 8 1012 20 3 30 5 cm Grey color adjustable spacing Great for wide shelves in any length 3 shelves garage basement or the back Brackets braces Holds up to 85 lbs 38 kg hardware included even weight distribution of any door Fits all Arrow storage buildings Lumber is not included Some drilling required to fit buildings without mid wall bracing ________ 5 WAS LEFT BLANK INTENTIONALLY ________ 5 WAS LEFT BLANK INTENTIONALLY Base BO9 ctr The Base For Your Building OPTION 1 ARROW FLOOR FRAME order No 106 68381
15. d ways of anchoring Arrow Anchoring Kit Model No AK4 or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 6 mm Wood Screws There are 1 4 6 mm Contains 4 Anchors with Cable Clamps and dia holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND 7777 Arrow Anchoring Kit Model AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete base 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 6 mm x 51 mm Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws 10 Hardware Remove from bag of screws and save for the last step 65900A 10Bx1 2 13 mm 65923 65004 65103 Black Screw 8 8 32x3 8 10 mm 8Ax5 16 8mm 8 32 Hex Nut 109 Packed with Screws Bolt 99 Screw 276 66646 65109 66045 Washer 186 8 32 Acorn Nut 12 67293 Handle 2 5 sheets of 40 Packed with Screws Weather Stripping 1 Ju W 66183 66769 66382 Roof Trim Cap 67468 Peak Cap 2 Door Slide 4 Lower Door Guide 4 2 right amp 2 left Arrow Logo 0 0 0 ai 65958 lt HE 10 Track Support 2 4 0 oor Washer pport 2 Roof Beam Bracket 4 Packed with Screws 11
16. e are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground Teamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a complete list of the materials you will need Required Required Eye Goggles Work Gloves e No 2 Phillips Screwdriver Step Ladder Optional Time Savers Base Preparation With Hardened Magnetic Utility Knife Scissors e Wrench Nut Driver e Hammer and Nails Note power screwdriver or vari Pliers Electric Cordless Drill e Spade or Shovel able speed drill with Phillips tip at i eS e Hand S S tachment can speed assembly by Carpenter s Level quare ANSAN AYN as much as 40 Tape Measure String for squaring frame Lumber and or Concrete Selecting and Preparing Your Site Before assembly you will want to decide on a location for your building The best location is a level area with good drainage e
17. lding is square and level This will make the roof panels fit better and holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2 Position the right roof panel at the back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the side wall angle at this time Hint Attach fasteners in order shown in diagram Parts Needed For Righ t Roo f Panel 8466 Right Roof Panel 1 7875 7875 ES FRONT STEP 6 8466 Right Roof Panel 27 Step 15 W28 ctr 1 Install a left roof panel at the left rear and right front corner of the roof Install a right roof panel at the left front corner of the roof 2 Cut2 short2 5 1 strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time 3 Install 4 roof panels in the se quence and positions shown on pre vious page Do not fasten the lower end of the panels to the side wall angles at this time Continue weather stripping the ridge opening Fasten roof panel overlaps not used for ridge cap
18. micals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18 m of steel cable and 4 cable clamps No digging or concrete pouring just insert cable under roof over roof beams into augers and twist augers into the ground For buildings ATTIC KIT WORKBENCH KIT larger than 10 x9 3 0 m x 2 6 m use 2 kits d MODELS FB47410 FB5465 FB106 A FB109 A FB1014 A A simple new floor frame system made of heavy duty hot dipped galvanized steel Use as base for plywood sand or stone Model No 101 Model No AK100 Heavy duty galvanized steel bars that New concrete anchor system permits fit all 10 3 0 m wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113 kg evenly distributed anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a con
19. rs hex nuts and acorn nuts Horizontal Door Brace 7 Repeat steps 1 through 6 for the right door Parts Needed For Right Door Assembly 1 Step 18 Door Installation amp Adjustment LeftDoor Assembly 1 ctr Horizontal Door Brace Gable m Door Track 8 Door Slide H 1 From inside the building put the bottom of the right door assembly on your left when you are inside the building behind door jamb into the frontframe track 2 Position the top of the door so that the holes in the door line up with the holes in the door slides Front Floor Frame Assembly 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide Door Slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 10 1 2 Screw yf 13mmy Yi STEP 3 4 Repeat steps 1 through 3 for the left door Adjustment Holes Allow Doors to Meet Evenly Along Their Length STEP 4 Keep this Owner s Manual and Assembly Instructions for future reference 31 697 65616 Anchoring and Floor Frame Anchoring Anchor your building at this time Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished
20. s will not align 5288 Corner Post 4 Parts Needed For e Door Track Assembly 1 Rear Wall Angle Assembly 1 Posts Top Frames 6 9342 Side Wall Angle 2 5288 SIDE TOP VIEW STEP 1 5288 FRONT Short Leg on Top STEP Wall Angles 4 Must Face STEP 9342 Inside Building 3 Right Rear Wall Angle Assembly Long Leg On Top Opening Facing In STEP Short Leg on Bottom 19 Step 7 W20 ctr The door jambs reinforce the door opening and provide an attractive trim Ihe splice post supports the rear wall 1 Position splice post at the center of the rear wall and fasten using 4 bolts and nuts into rear wall angle and 2 screws into rear floor frame Hint Measure or count holes to determine if post is centered on rear 2 Fasten the top ofthe door jambs to the doortrack with two screws Do the same for the bottom into frame There must be a 7 8 2 2 cm gap between end of ramp and edge of door jamb Notched edge faces to ward center of building Fasten middle hole on inside edge of door jamb with a bolt inside building and a hex nut with an acorn nut outside as shown Hex Nut Acorn Nut MUST FACE CENTER Parts Needed For 6 5287 Splice Post 1 Splice Post Door Jamb 7311 Door Jamb 2 Od NOTCHED EDGE Studs Step Q Parts Needed For 9344 Siding Stud 6 W21 ctr The studs provide a surface for at taching the siding panels
21. the two front floor frames Join the frames by DRAIN HOLES FACE OUTSIDE inserting eight screws 2 Overlap the rear floor frames as shown The holes in these pieces STEP will align when the pieces are posi tioned with correct amount of over lap See the illustrations below for 79 T the proper overall length of the rear 95 7 8 243 5 floor frame Join the frames by insert ing five bolts into frame set as shown 3 Double check the length of each and set these pieces aside for later use 95 7 8 243 5 Rear 95 7 8 243 5 Front Step 2 W15 ctr The main frame pieces reinforce the walls This piece will later be installed at the top edge of the rear wall Pro ceed as follows 1 Overlap the right and left rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole 2 Set the assembly aside You will use it later 9337 Left Parts Needed For 9336 Right Rear Wall Angle 1 Frame Ass embly 9337 Left Rear Wall Angle 1 9336 Right Rear Wall Angle 94 5 8 240 3 cm 15 S tep 3 Parts Needed For 6 8474 Roof Beam 1 Roof Beam Assembly 8476 Side Wall Angle 1 B16 ctr roof beams join the two gables and supportthe roof panels The main roof beam is made up of two pieces fastened together 1 Place the side wall angle back to back
22. toward center of gable Washe lt Roof Beam Brackets STEP Step 12 W25 ctr 1 Lift and fasten a right and left gable under angle at corner to the rear wall angle with screws Hint On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using a bolt in the bottom two holes only 3 Repeat Steps 1 amp 2 for the door track on the front of building except for the track supports fasten as shown Parts Needed For Gables Braces STEP Track Supports 6228 25 Left Gable Assemblies 2 Right Gable Assemblies 2 6658 Gable Brace 2 6658 Gable Brace St 1 3 Parts Needed For Roof Beams 8474 Roof Beam 2 W26 ctr 1 Fasten the main roof beam to the gable brace of the front gable 2 Fasten the other end of the main roof beam to the gable brace of the rear gable 3 Fasten the remaining roof beams small holes on top as shown using 2 bolts Main Roof Beam 26 Step 14 W27 ctr Installing the roof panels is best done with a step ladder Begin installing roof panels at the back right corner of the building Each screw and bolt in the roof requires a washer NOTE Measure the building diagonally again and make adjustments to make sure the bui
23. uilding model Review all instructions before you begin and during assembly follow the step sequence carefully for successful results Flooring and Anchoring Your storage building must be anchored to prevent wind damage A base is necessary to construct a square and level building Anchoring and base materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building eAll part numbers can be found on the parts All of these numbers before the must agree with the numbers on the Parts List page e f you find that a part is missing include the model number of your building and contact Arrow Shed LLC Customer Service Department 1101 North 4th Street Breese Illinois 62230 1 800 851 1085 or assist arrowsheds com eSeparate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be used later eFamiliarize yourself with the hardware and fasteners for easier use during construction Thes
Download Pdf Manuals
Related Search
Related Contents
Descarregar Snapper S21, SP21, SPV21, SPV21S, SPV21E Lawn Mower User Manual VLS Instruction Plan 4-8 LE DOSSIER COMMUNAL SYNTHETIQUE (DCS) TYPE ASUS R72501GD5 User's Manual Philips FWD182 DVD Mini Hi-Fi System Artsound AS150 HGB loudspeaker Copyright © All rights reserved.
Failed to retrieve file