Home

Arrow BD88 Use and Care Manual

image

Contents

1. eDo not attempt to assemble the building on a windy day because the large panels acting as a sail can be whipped about by the wind making construction difficult and unsafe CARE amp Finish For long lasting finish periodically clean and wax the exterior surface Touch up scratches as soon as you notice them on your unit Immediately clean the area with a wire brush wash it and apply touch up paint per manufacturer s recommendation Roof Keep roof clear of leaves and snow with long handled soft bristled broom Heavy amounts of snow on roof can damage building making it unsafe to enter In snow country Roof Strengthening Kits are available for most Arrow Buildings for added protection against heavy snow accumulation Doors Always keep the door tracks clear of dirt and other debris that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the entire floor area with good ventilation will reduce condensation Other Tips Wash off inked part numbers on coated panels with soap and water Silicone
2. Ridge Cap Right Roof Panel Left Roof Panel Roof Beam Side Wall Angle Side Wall Channel Left Side Roof Trim Ramp Side Floor Frame Wall Panel Vertical Door Brace A 12 Parts List Part Part Quantity Check Number Description in canon Right Door Left Door Wall Panel Door Jamb Rear Wall Channel Rear Floor Frame Door Track Front Floor Frame Front Corner Panel Rear Corner Panel Right Side Roof Trim Ridge Cap Wall Panel Roof Beam Roof Panel 8941 Ramp 1 S 1 Parts Needed For 9379 Front Floor Frame 2 tep 9377 Rear Floor Frame 2 Floor Frame Assemblies Frame E 14 The front floor frame is made up of 3 lt lt pieces The side floor frames and the rear floor frame are made up of 2 pieces The holes in these pieces ES will align when the pieces posi tioned with correct amount of over 9377 lap The illustrations below show the proper overall length for the sides rear and front Proceed as follows 9989 1 Place the front floor frames as Floor STEP shown Center the ramp with drain oF 8941 Frame Assembly holes facing outside on top of the 2 1 95 7 8 2 4m front floor frames Join the frames by 9379 E 9379 Inserting 8 screws HOLES OUTSIDE 2 Overlap the side floor frames and ege 9989 the rear f
3. Tuck Flange Inward to Fit Inside of STEP STEP Roof Trim Cap 2 3 wa 29 e Parts Needed For 10488 Right and Left Doors 2 10498 Horizontal Door Brace 4 Door Assembly 9355 Vertical Door Brace 2 The steps on this page tell how to assemble the right door You will perform exactly the same procedures for the left door Each bolt and screw in the door requires a washer Proceed as follows 1 Attach the handle to the door with 2 bolts and nuts as shown 2 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace in place Fasten to door above and below center connection using 2 screws 3 Put a horizontal door brace onto the top edge and bottom edge and fasten with 7 bolt in the center 4 Attach the lower door guides and bolts as shown 5 Repeat steps 1 through 4 for the left door d o 10488 Right Door 66382 2 10488 Left Door 9355 STEP STEP 2 3 END VIEW SHOWING orizontal Door Brace STEP 4 Parts Needed Right Door Assembly 1 Door Installation amp Adjustment Assembly 1 Horizontal Door Brace Gable Door Track Door Slide 1 From inside the building put the bottom of the right door assembly on your left when you are inside the building behind door jamb into the front frame track Door 2 Position the top of the door so that
4. 825 9900 A Door Track e 7907 Left Gable 2 Gable Assemblies 7916 Roof Beam Bracket 4 Parts Needed For 7906 Right Gable 2 Step 10 The gables go on top of the front and rear walls to support the roof beams NOTE The gables are packed nested together and might be mistaken as one piece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Washer D 7916 Roof Beam Brackets STEP 23 Parts Needed For Left Gable Assembly 2 Right Gable Assembly 2 Step 1 1 Gables Braces 6658 Gable Brace 2 BY 24 1 Lift and fasten a right and left gable under angle at corner to the rear wall angle with screws Hint On the rear gable use a bolt and nut at the overlapping rear wall angle On the front gable leave out 2 screws closest to center gable leg 2 Join the left and right gables together with a gable brace using bolts and nuts in the bottom hole only 3 Repeat Steps 1 amp 2 for the door track on the front of building except for the track supports fasten as shown 6658 Gable Brace 24 Parts Needed For e 6 Main Roof Beam 1 Roof Beams Outer Roof Beam 2 1 Fasten the main roof beam to the gable brace of the front gable STEP 2 Fasten the other end
5. LEFT BLANK INTENTIONALLY Foundation The Foundation For Your Building OPTION 1 ARROW FLOOR FRAME Order No 109 68385 A Arrow has the best base for your building in this simple foundation kit It keeps stored items above the ground This kit should be used with one of the following A To support a plywood deck B To be filled with sand We recommend the combined use of 1 an ARROW FLOOR FRAME KIT and 2 an ARROW ANCHORING KIT as an effective method of securing the building to the ground Allow 1 2 hours for construction OPTION 2 Wood Platform If you decide to build your own foundation be sure to select the appropriate materials These are the recommended materials for your foundation 2 x 4 s 5cm x 10cm Pressure Treated Lumber 5 8 1 5cm 4 x 8 122cm x 244cm Plywood exterior grade 10 amp 4 penny Galvanized Nails Concrete Blocks optional The platform should be level and flat free of bumps ridges etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the foundation follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction Note Platform Slab will extend 9 16 1 4cm beyond floor frame on all four sides
6. 2 4m 9924 Side Wall Channels 89 7 8 2 3m Rear Wall Angle 94 5 8 2 4m 6615 Side Wall Angles Rear Wall Channel 94 5 8 2 4m Side Wall Channels 89 7 8 2 3m sa Rear Wall Angle 94 5 8 2 4m Side Wall Angles 89 7 8 2 3m Step 3 BY16 The roof beams join the 2 gables and support the roof panels The roof as sembly is made up of 4 pieces over lapped back to back at the center Hint These pieces are force fitted so you may have to press hard to join them together 1 Place the end of one roof beam inside a second roof beam so thatthe 6 holes 4 holes if 2 beam in each piece align Make 2 sets of 4 roof beams and 4 sets of 2 roof beams by repeating this procedure Do not insert bolts yet 2 Take 2 of the pressed together 4 roof beams and join them as shown toform the main roofbeam assembly Hold the assembly together and fas ten with 14 bolts and nuts Make 1 assembly 3 Make 2 of the press together 2 roof beams and join them as shown to form the roof beam assembly Hold the assembly together andfasten with 12 bolts and nuts Make 2 assem blies 4 Set these pieces aside for later assembly 16 Roof Beam Assemblies Parts Needed For 10470 Roof Beam 4 10471 Roof Beam 8 2 3m 2 3m Make two sets 4 or d Make four sets 2 2 Roof Beam Assembly at Outer Side of Roof Assembled End View 91 7 8 STEP 4 Roof Beam As
7. 4 0 63cm dia Contains 4 Anchors with Cable Clamps and holes provided in the frames for proper anchoring installation instruction OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit Model No AK100 or 68383 Anchoring into Concrete Recommended for use with the concrete foundation 1 For poured concrete slab or footing or patio blocks Contains Corner gussets perimeter clips hardware Use 1 4 x 2 Lag Screws 1 4 masonary drill bit and installation instruction 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 Lag Screws 65103 8 32 Hex Nut 175 66045 Handle 2 66769 Door Slide 4 6228 Track Support 2 Hardware Remove from bag of screws and save for the last step 65900A 10Bx1 2 Black Screw 8 Packed with Screws 66646 Washer 360 9 sheets of 40 Ju 66382 Lower Door Guide 4 7916 Roof Beam Bracket 4 T 65923 8 32x3 8 Bolt 175 65109 8 32 Acorn Nut 6 Packed with Screws W 66183 Roof Trim Cap 2 right amp 2 left 67293 Weather Stripping 1 T 65004 8Ax5 16 Screw 311 67468 Peak Cap 2 Arrow Logo 66029 Plug 2 Packed with Screws Parts List Part Part Quantity Check Number Description in Hear Wall Angle Door Track Splice Horizontal Door Brace Gable Brace Panel Right Gable Left Gable
8. Seal this 9 16 of wood with a roofing cement not included or bevel this 9 16 of OPTION 3 Concrete Slab concrete when pouring for good water drainage The slab should be at least 3 to 4 8 10cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s 2 5cm x 10cm will be removed once the concrete cures Concrete 6 Sheet of 6 mil plastic We recommend for a proper strength concrete to use mix of 1 part cement 6 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a Foundation 1 Dig a square 6 15cm deep into the ground remove grass 2 Fill up to 4 10cm in the square with gravel and tamp firm 3 Cover gravel with a sheet of 6 mil plastic 4 Construct a wood frame using four planks of 1x4 2 5cm x 10cm lumber 5 Pour in concrete to fill in the hole and the frame giving a total of 4 8 10cm thick concrete Be sure surface is level Note Finished Slab dimensions with lumber removed Allow 3 5 hours for construction and a week for concrete curing time 8 10 Anchoring Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected Below are recommended ways of anchoring Arrow Anchoring Kit Model or 60298 Anchoring into Wood Post Recommended for use with any suggested base Use 1 4 Wood Screws There are 1
9. caulking may be used for watertight seals throughout the building Do not store swimming pool chemicals in your building Combustibles and corrosives must be stored in air tight approved containers Keep this Owner s Manual and Assembly Instructions for future reference ACCESSORIES ROOF STRENGTHENING heavy snow load KITS Extra roof beams and gable braces designed for added protection against 1 heavy snow accumulation Increases the strength of your roof by 50 ANCHOR KITS Model No AK4 Anchor Kit contains heavy duty steel augers 60 18m of steel cable and 4 cable clamps No digging or concrete pouring just insert cable under roof over roof beams into augers and twist augers into the ground For buildings larger than 10 9 use 2 kits Model No AK100 New concrete anchor system permits anchoring any size Arrow building directly to a concrete slab Each kit contains heavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included Model No AK600 Earth Anchor Kit anchors any size Arrow building to the ground Each kit contains heavy duty hot dipped galvanized steel corner gussets and 4 earth anchors TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 65cm steel channels plus five heavy duty s
10. completed roof section using bolts and nuts Fasten roof panel overlaps not used for ridge cap Cover the head of bolt with the 2 5 piece of weather stripping tape Do notfasten the ends of the ridge cap at this time 2 Install the second ridge cap over lapping the first ridge cap while in stalling the remaining narrow roof panels Continue weather stripping the ridge 3 Fasten the lower end of the panels to the side wall angles using screws and washers Use bolts and nuts through wall angle overlaps at the bottom of the panel Cut Weather Stripping and Fold Under 28 8840 Ridge Cap 1 Parts Needed For 9978 Roof Panel 2 Ridge Caps amp Panels 8486 Ridge Cap 1 8836 Right Side Roof Trim 2 1 6 Parts Needed For 8485 Left Side Roof Trim 2 1 Attach the right and left side roof trim to the lower end of the roof pan els on each side of the building using screws at each panel overlap NOTE A single screw fastens both trim pieces at the overlap 2 Using your thumb and index fin ger overbend the bottom flange of the roof panel rib at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 4 Fasten the roof panel ribs peak Caps and ridge caps together using bolts and nuts Peak Cap STEP Roof Trim Cap 72 EA r
11. free of moisture oils dirt or grime and then apply an even film of high quality touch up paint 709981207
12. of the main roof beam to the gable brace of the 2 Roof Beam Assembly rear gable 3 Fasten the 2 roof beam assem blies to the outer roof beam brackets in the same manner 2 a ip Main Roof Beam Assembly 25 Parts Needed For Step 13 Right Roof Panel 8466 Right Roof Panel 1 STEP Installing the roof panels is best done 1 with a step ladder Begin installing roof panels at the back right corner of nd ERS pur 05 20200 the building Each screw and bolt in the roof requires a washer 9978 9978 NOTE Measure the building diagonally again and make adjustments to make sure the building is square This will make the roof panels fit better and holes will align 7875 7 7875 9978 10 9978 ee ee P Roof Beef Up Kit was FRONT purchased assemble prior to STEP attaching the roof panels 2 8466 Right Roof Panel 7 Y 6 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 1 mtm IDA 2 Position the right roof panel atthe back right corner and fasten to the gable with 5 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the side wall angle at this time ch Hint Attach fasteners in order shown in diagram 26 Step 14 BY27 1 Install a left roof panel at the left rear and right front corner of the roof Inst
13. the holes in the door line up with the holes in the door slides 3 Fasten the door to the door slides using two 10Bx1 2 screws per door slide NOTE The holes the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Adjustment Holes Allow 4 Doors to Meet Evenly Along Their Length STEP 4 Keep this Owner s Manual and Assembly Instructions for future reference 31 MOSS NWSSP A 88 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture Problem areas include screw holes unfinished edges or where scrapes and nicks occur in the protective coating through normal assembly handling and use Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible rust as soon as possible Make sure the surface is
14. used later eFamiliarize yourself with the hardware and fasteners for easier use during construction These are packaged within the carton Note that extra fasteners have been supplied for your convenience PLAN AHEAD Watch the Weather Be sure the day you select to install your building is dry and calm Do not attempt to assemble your building on a windy day Be careful on wet or muddy ground leamwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a complete list of the materials you will need Required Required e Eye Goggles Work Gloves No 2 Phillips Screwdriver Step Ladder Optional Time Savers Foundation Preparation With Hardened Magnetic Utility Knife Scissors Wrench Nut Driver Hammer and Nails Note A power screwdriver or vari Pliers e Electric Cordless Drill Spade or Shovel able speed drill with Phillips tip at eS re e Hand S tachment can speed assembly by e Carpenter s Level qua e bod as much as 40 Tape Measure e String for squaring frame Lumber and or Concrete Selecting and Preparing Your Site Before assem
15. Owner s Manual amp Assembly Instructions BYOI Model No BD88 MOSS WMSS LI 9 e a a a ep eta 9 d V 9 u a amp p s a a e tu PU P 4 2 a S amp 5 8 ET TT TR P EN cdm n n a e el Ld gt 7 a t x ut VES x A i 2 7 M v PITT nlt A World s Leading Maker of Storage Buildings CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ 709981207 SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES BUILDING DIMENSIONS Size rounded off to the nearest foot WHEN HANDLING METAL PARTS Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 8x8 97 1 2 x 92 3 4 59 314 99 3 4 95 1 4 67 7 8 94 3 4 90 66 5 8 43 1 2 58 2 4m x 2 3m 248cm 236cm 5 55m 8 9m 253cm 242cm 172cm 241cm 229cm 169cm 110cm 147cm BEFORE YOU BEGIN Owner s Manual Before beginning construction check local building codes regarding footings location and other requirements Study and understand this owner s manual Important information and helpful tips will make your construction easier and more enjoyable Assembly Instructions Instructions are supplied in this ma
16. all a right roof panel at the left front corner of the roof 2 Cut 4 short 2 5cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time 3 Install 2 narrow and 2 wide roof panels in the sequence and posi tions shown on previous page Do not fasten the lower end of the panels to the side wall angles at this time Continue weather stripping the ridge opening NOTE Narrow roof panel crimped rib is overlapped by wide rib of adjacent panel where possible NOTE If roof beam holes do not line up with the roof panel holes shift the building from left to right If this does not help your building may not be level Shim the corners until holes line up 8466 Right Roof Panel 1 Parts Needed For 6 8467 Left Roof Panel 2 7875 Roof Panel 2 Roof Assembly 9978 Roof Panel 2 STEP 8467 Left Roof Panel STEP 2 9978 Roof Panel 1 Weather Stripping 7875 Roof Panel Tape Roll 9978 Roof Panel 8466 Right Roof N m eee 7875 Roof Panel Screws To Hoof Beam 2 Bolts at middle of building Fasten At Overlap with Bolt Fasten At Overlap with Bolt Screws To Hoof Beam 2 Bolts at middle of building Do not fasten at this time 27 Step 15 BY28 1 Install the first ridge cap on the
17. bly you will want to decide on a location for your building The best location is a level area with good drainage eAllow enough working space for ease of moving parts into position during assembly Be sure there will be enough space at entrance for doors to open fully and enough space around the building to be able to fasten the panel screws from the outside eBefore you begin the first steps in assembling your parts a foundation should be constructed and an anchoring system should be ready to use SAFETY FIRST Safety precautions are important to follow throughout the construction of your building eCare must be taken when handling various pieces of your building since some contain sharp edges Please wear work gloves eye protection and long sleeves when assembling or performing any maintenance on your build ing fety edge safety edge eKeep children and pets away from worksite to avoid distractions and any accidents which may eNever concentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it ePractice caution with the tools being used in the assembly of this building Be familiar with the operation of all power tools eDo not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085
18. e as show Washer Door Track Assembly 1 Parts Needed For Rear Wall Angle Assembly 1 Side Wall Angle Assemblies 2 Frames Rear Wall Channel Assembly 1 Side Wall Channel Assemblies 2 The main frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup ete D port the roof Inside Building 7 1 Fasten the rear wall angle as sembly across the inside top of the rear wall using screws 2 Fasten the rear wall channel as sembly across the middle of the rear wall using screws 9 STEP STEP 12 3 Fasten the side wall angle as semblies across the inside top of the side panels using screws Side wall angles must overlap rear wall angle in corners 4 Fasten the side wall channel assemblies across the middle of the side panels using screws Fasten overlaps in rear corners with screws Long Leg Opening Facing in 5 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure Short Leg on Bottom 20 Parts Needed For 8995 Wall Panel 2 9363 Wall Panel 2 9364 Wall Panel 4 Wall Panels The wall panels come in two widths Each wall panel has a crimped rib on one side The crimped rib should go under the rib of the panel that follows it 1 Locate all of the wall panels and set each one alongside the building 2 Be sure that you
19. have the correct panels in each position Do this by overlapping the panels and deter mining if the holes line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs using a bolt and nut with 2 screws 5 When you have attached all wall panels in the correct positions the building will look like this 9364 Panels rest on frame as shown Crimped Rib Underneath Al Detail Showing Center of Panel Screwed to Wall Channel Bolt and nut does not go thru wall channel at overlap ps Use bolts and nuts thru wall angle overlaps at the top of panel at sides and rear STEP 5 21 Parts Needed For 9900 Door Jamb 2 Door Jamb The door jambs reinforce the door Opening and provide an attractive trim Follow these steps for both door jambs 1 Fasten a door jamb to the front panel with three bolts nuts andacorn nuts as shown Push a plug into hole at center of jamb closest to door opening 2 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame Repeat steps 1 through 2 for the opposite door jamb N INSIDE OF N BUILDING TOP VIEW 3 bolts Door Track Acorn Nut amp D pa m lt Cross Section Plug OS Top View e e
20. is erected NOTE If you have purchased a Floor Frame Kit you need to install it at this time The floor frame must be square and level or holes will not align Parts Needed For 9380 Front Wall Panel 2 Corners 9384 Rear Corner Panel 2 NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 1 Position the rear corner panels at the rear corners as shown The wid est part of each rear corner panel must be placed along the rear of the building Attach the corner panels to the floor frame with 4 screws 2 Position a front corner panel at the corner of the floor frame as sown The widest part of each front corner panel must be placed along the front of the building A small gap will exist between frontcorner panel and ramp Fasten the corner panel to the floor frame with 3 screws NOTE Be careful to install the correct panel in each position as shown STEP 0384 3 9384 TOP VIEW 9384 9380 3 Double check part numbers of the wall panels before proceeding T am 4 9380 The floor frame must be square c y and level or holes will not align gt p H SS Panels rest on Led 4 V fram
21. loor frames as shown The holes in these pieces will align when p SG AOTP TANE ANGA the pieces are positioned with cor rect amount of overlap See the illus e trations below for the proper overall length of the side and rear floor frames Join the frames by inserting 4 5 bolts into each frame set as shown 3 Double check the length of each and set these pieces aside for later use 791 1 8 2 3m 91 1 8 2 3m 14 Parts Needed For Frame Assemblies 6615 Rear Wall Angle 2 9924 Rear Wall Channel 2 9990 Side Wall Channel 4 9991 Side Wall Angle 4 The main frame pieces reinforce the walls These pieces will later be in Stalled in the center and at the top edge of the side walls and the rear wall Proceed as follows 1 Overlap the rear wall channel pieces as shown in the figure and fasten the 2 pieces together with 7 bolt in the center hole 3 holes will align 2 Make 2 side wall channels by overlapping the side wall channel pieces as shown Fasten each set together with 7 bolt the center hole of each set 3 Overlap the rear wall angle pieces as shown in the figure and fasten them together with 7 bolt in the center hole 4 Make 2 side wall angles by over lapping the side wall angle pieces as shown Fasten each set together with 1 bolt in the center hole 5 Set the assemblies aside You will use them later Rear Wall Channel 94 5 8
22. nap in aes hangers and a small tool holder for d screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow storage buildings MODELS FB47410 FB5465 FB106 A FB109 Aand FB1014 A Asimple newfloorframe system made of heavy duty hot dipped galvanized steel Use as foundation for plywood sand or stone ATTIC KIT WORKBENCH KIT Heavy duty galvanized steel bars that fit all 10 wide Arrow buildings They install quickly and easily to help organize space and create more useable space as an attic or workbench Will hold up to 250 Ibs 113kg evenly distributed Model No Fits AT101 10 Long 250 Ib 113kg load Fits all Arrow 10 wide buildings Shipping Weight 16 Ibs 7kg Must be drilled for use as workbench in Estator Even weight distribution SHELF UNITS Heavy duty galvanized steel shelf units help organize storage space They easily mount on the wall or sit on the floor Fits all Arrow buildings Model No SS404 Makes 8 to 12 20 30cm wide shelves in any length Brackets braces hardware included Lumber is not included Model No SS900 A Grey color 3 shelves e Holds up to 85 Ibs 38kg even weight distribution Some drilling required to fit buildings without mid wall bracing po THIS PAGE WAS LEFT BLANK INTENTIONALLY po THIS PAGE WAS
23. nual and contain all appropriate information for your building model Review all instructions before you begin and during assembly follow the step sequence carefully for correct results Foundation and Anchoring Your storage building must be anchored to prevent wind damage A foundation is also necessary as a base in order to construct a square and level building Anchoring and foundation materials are not included with your building We recommend the combined use of an Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method of securing your building to the ground Available by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building eAll numbers can be found on the parts All of these numbers before the must agree with the numbers on the parts list The parts list is located on page 12 elf you find that a part is missing include the model number of your building and contact Arrow Group Industries Inc Customer Service Department Route 50 East Breese Illinois 62230 1 800 851 1085 eSeparate contents of the carton by the part number while reviewing parts list The first few steps show how to join related parts to make larger sub assemblies which will be
24. sembly at Peak 2 3m 2 Parts Needed For 6617 Door Track Splice 1 Step 4 Door Track Assembly 9378 Door Track 2 NOTE Door Track Splice painted part The door track assembly supports the sliding doors and reinforces the front wall Itis made up of three pieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under 7 Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 94 5 8 2 40m 3 Position door slides onto the legs from the end of door track STEP STEP assembly as shown in the end view 3 4 4 Set this piece aside for later use gt 0 66769 END VIEW Front Floor Assembly 1 Paris Needed For Side Floor Assembly 2 Floor Frame Rear Floor Assembly 1 RIGHT F REAR 1 Assemble the four corners of the floor frame using two screws at each corner as shown Atthe front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square When Diagonal Measurements are Equal the Floor Frame is Square NOTE If using a wood platform concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it

Download Pdf Manuals

image

Related Search

Related Contents

取扱説明書 - デロンギ・ジャパン  Woodstock W1693 User's Manual  View the manual  641621p_manual  User Guide 9.0 vol. 2_Advanced Features.book - Support  ZCX03T_FN-136_CL CA15-3.indd  

Copyright © All rights reserved.
Failed to retrieve file