Home
Handy Home Products 18363-8 Instructions / Assembly
Contents
1. Flush E 3 4 19 mm TERIS EE ES 3 4 Primed Side ma 1 7 3 4 Gauge Block i 1 Fig A if 1 1 6 15 3 4 15 i B 19 mm 1 Smaak u le ill 7 Nh Y 5 t 2 Nails enee SQUARE E 8 EDGE 48 19 m 122 33 ick X 0L GABLE 10 x 12 10 x 12 SIDE WALL PANELS PARTS REQUIRED x148 2 5 x4 3 8 x 48 x 72 1 x 122 x 183 cm Place 48 panels frame shown with primed side facing up gt gt NOTE THE SQUARE AND LIP EDGES N A Do not using 2 nails 6 apart on edges and 12 apart inside panel Ihigroove 2 To draw panels tight at seams angle nail 20 Se es SQUARE LIP EDGE EDGE Carefully flip your sidewall over Repeat STEPS 1 8 to assemble your second side wall FINISH You have finished building both of your side walls Go to page 39 34 10 x 16 SIDE WALL FRAMES PARTS REQUIRED x72 76 om x4 7 16 x 2 1 2 x 48
2. Nail left and right wing wall assemblies onto back wall A frame using 2 nails 6 apart FINISH You have finished attaching your wing walls Primed Side UP Flush HINT To draw panels tight at Use a 2x3 seams angle nail for support 22 FRONT WALL FRAME PARTS REQUIRED 1 2 x 3 x 22 1 8 5 x 76 x 56 x2 2x 3x 77 5x 7 6 196 cm x1 2 x 3 x 94 1 2 5 x 7 6 x 240 cm e Lay out two PB one PR and one LT on edge on floor C Nail two PB to PR with two 3 nails at each end Ensure LT is centered with PR and nail in place with two 3 nails FINISH p You have finished building your Front Wall Frame LT 6 4 cm 2 1 2 NTA 6 4 cm 120 cm 2 1 2 47 1 4 PB 191 X OL 37979 0 18 01 dH VO 94 1 2 240 7 22 1 8 LT 56 cm a HINT PR de 73 41 178 EY 23 GABLE 10 x 12 GABLE 10 x 8 GABLE 10 x 16 FRONT WALL PANELS PARTS REQUIRED x22 SS x1 3 4 GAUGE BLOCK T e Place LEFT panel on front frame as shown with primed side up Use a 3 4 gauge block on edges of panel Be sure to maintain 1 measurement between bottom edge of frame and bottom edge of panel Fig A Nail panel to frame with 2 nails 6 apart LN Do not nail in groove For squarene
3. Nail along the panel edge into the trim using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig D Fig D Nail down the bottom plate using two 3 nails between the wall studs Screw through the backwall trim into the top plate Fig E and angled to hit floor frame at Fig E 3 JOE END bottom Fig F using 3 screws a 3 7 6 cm Repeat process to secure the left sidewall E Screw Ap Pall 3 7 6 cm 3 7 6 cm Screw Nail Fig F 40 FRONT WALL INSTALLATION x8 00000001 3 76 76 cm x36 2 5 cm e e VEGIN Stand frontwall on floor It is important to secure the frontwall in the following order Soffit Center frontwall on floor side to side The sidewall soffit will overlap the Panel frontwall 3 8 Fig A Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig B Nail the lower sidewall corner to the frontwall trim with one 2 nail Fig O Be sure the measurement between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper corner Fig D Nail along the panel edge into the trim using 2 nails spaced 6 apart lt gt Secure the frontwall frame using two 3 screws Fig E
4. 3 4 yle 19 mm i lt Fig B Y Mh 2 Nails SQUARE EDGE 8 il C EC 3 4 19 mm Y E INE 48 122 cm 37 191 X 01 31979 GABLE 10 x 16 10 16 SIDE WALL PANELS PARTS REQUIRED 238 2 5 6 3 8 x 48 72 1 x 122 x 183 cm Place 48 panels on frame as shown with primed side facing up NOTE THE SQUARE AND LIP EDGES A Do not nail Nail using 2 nails 6 apart on edges and 12 apart inside panel in groove draw panels tight at seams angle nail SQUARE LIP SQUARE LIP SQUARE EDGE EDGE EDGE EDGE EDGE o ao e Carefully flip your sidewall over Repeat STEPS 1 8 to assemble your second side wall FINISH You have finished building both of your side walls Go to page 39 38 BACK WALL INSTALLATION PARTS REQUIRED TEMPORARY x1 x24 3 7 6 cm 2 x 3 x 69 5 x 76 x 175 3 gt 5 om Y BEGIN Center back wall assembly on the 120 805 cm floor dimension E gt Use OO as a temporary brace Secure with two 3 screws NOTE 10 x8 Gable Shown 308 cm 3 7 6 cm 2 420 Screws First nail lower edge of panel to floor frame using 2 nails 6 apart An
5. FOR 10 x 12 SKIP TO PAGE 31 2 FOR 10 x 16 SKIP PAGE 35 BEGIN Orient parts on edge on floor Measure and mark from end of boards Use two 3 nails at each mark IMPORTANT You will build two walls the same 3 7 6 cm Nails 46 1 4 117 5 22 1 4 57 22 1 4 57 Center on marks OV x3 1 1 2 3 8 Er lt 24 3 4 __ 24 3 4 63 cm 63 cm 49 1 2 j 125 7 cm 27 8 01 1 GABLE 10 x 8 10 x 8 SIDE WALL FRAME SOFFIT 1 1 4 3 2 cm T 3 8 x 5 x 98 1 4 0 9 x 12 7 236 9 cm D Place panel onto 2 x 3 with primed side against 2 x 3 Fig A N Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panel flush to 2 x 3 Fig A and with 3 8 offset at ends Fig using eleven 1 1 4 screws Approximate screw spacing 236 9 cm 28 10 x 8 SIDE WALL PANELS PARTS REQUIRED x58 SSS TA 3 4 T GAUGE BLOCK i 3 8 x 48 x 72 1 x 122 x 183 cm Ensure your wall frame is square by installing one panel and squaring frame Place the 48 x 72 panel onto wall frame with primed side up as shown Note the lip and square edges Use the gauge block to mark the 3 4 measurement on the wall stud Locate the pan
6. Screw through the backwall trim into the top plate Fig F and angled to hit floor frame at bottom Fig G using 3 screws 3 7 6 cm Screw Repeat process to secure the right side of the frontwall BEN 41 2 5 cm Nail x 3 7 6 ick 0 18 01 dH VO 191 X 01 31979 GABLE 10 x 12 GABLE 10 x 8 GABLE 10 x 16 GABLE TRIM PARTS REQUIRED x24 x4 2x 3 x 54 5 16 5 x 76 x 138 cm C 1 1 4 8 cm N e Position one CD flush to front panel edge and center on right edge of 27 TTE groove Fig A Attach trim with eight 1 1 4 screws from inside Install Tree two screws at seam Fig B Vere Position second CD flush to panel edge and flush to CD already attached Fig A Attach trim with eight 1 1 4 screws from inside Install two screws at seam Fig B Repeat steps 1 2 to attach the back trim FINISH You have attached your upper trim Continue to attaching your endcaps Flush Flush to top of panel OUI Lo NOTE 10 x8 Gable Shown 42 TRIM ENDCAPS PARTS REQUIRED 4 32 1 1 4 3 2 3 4 x 3 1 2
7. FINISH p You have attached your rafters Go to page 47 Fig B Screw into top late 2 5 cm Screw GABLE 10 x 8 ELSE NOTE Measurements from inside of panels 22 1 4 22 1 4 24 24 gt 56 5 61 61 56 5 Align over studs A Maintain the measurements between rafters 44 RAFTER INSTALL 10 x 12 PARTS REQUIRED x20 TOTTI 8 76 1 0 A 5 T pre assembled 2 5 cm al x5 s VEGIN GS Locate rafters directly over studs and flush to overhang in wall frame 2 Fig A Check that you have the measurements shown Screw through soffit panel into rafters using 2 screw Fig ED Attach with two 3 screws at each end Fig B Re tighten 2 screws if neccessary 1 4 Repeat steps to attach 5 rafters INISH You have attached your rafters Go to page 48 Screw into top NOTE Measurements from inside of panels 24 24 24 24 gt 22 1 4 _ 61 cm 61 56 5 61 22 1 4 56 5 Align over studs Maintain the measurements between rafters 45 0 31999 GABLE 10 x 16 RAFTER INSTALL 10 x 16 PARTS REQUIRED x28 x VEGIN
8. 1 1 2 PB Eg 3 8 cm Use NH as a guide to locate PR Do not nail 17 191 X OL 37979 0 31999 18 01 dH V9 BACK WALL FRAME PARTS REQUIRED GABLE 10 x 16 GABLE 10 x 12 GABLE 10 x 8 2x 3 x 46 1 4 5 x 7 6 x 1175 cm Orient parts on edge on floor as shown Use two 3 screws at middle connection You have finished building your back wall frame 48 3 4 124 cm 48 3 4 124 cm 1 1 2 3 8 cm 46 1 4 117 5 2 3 7 6 Screws 18 x2 BACK WALL PANELS PARTS REQUIRED x29 H 2 5 cm x1 6 _ GAUGE S T BEGIN Place LEFT panel on back frame as shown with primed side facing up Use a 3 4 gauge block at edges of panel Be sure to maintain 1 measurement between bottom edge of frame and bottom edge of panel Fig A B using 2 nails 6 apart on edges and 12 apart inside panel 4 not in groove For squareness maintain 3 4 measurement along panel edges 3 4 1 9 cm pe Primed side UP 191 X OL 37979 ick 0 371999 18 01 dq 18V BACK WALL PANELS PARTS REQUIRED x29 2 5 cm x1 5784 3 4 GAUGE BLOCK CH Place RIGHT panel on back frame as shown with primed side facing up Use 3 4 gauge block at
9. 10 x 16 SIDE WALL PANELS PARTS REQUIRED x58 SSS T x2 3 3 8 48 72 GAUGE BLOCK o 1 x 122 x 183 cm Ensure your wall frame is square by installing one panel and squaring frame 12 jc Place the 48 x 72 panel onto wall frame with primed side up as shown 4 92 Note the lip and square edges A Use the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A p gt Move to the opposite end Using the long edge of the panel as lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails amp Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel N Do not nail in groove For squareness maintain 3 4 and flush under soffit panel 2 N pean Flush 3 4 19 mm 6 15 3 4 Gauge Block SAE 2 Nails Flush 1 N There will be an overhang at top 12 80 cm LIP EDGE T LJ EX seres ie mm ER m TIF EL men 1 3 4 G 19 mm Primed Side if di i Fig 1 MI i if 7 1 i f
10. 2 x8x 69 5 x 76 x 175 3 cm CD Attach temporary support OO as a ledger board flush under wall panels for doors rest on using three 3 screws Fig 9 Flush against wall panels E OO Center doors on right edge of groove as shown Fig B 1 m N Check ledger board is still flush under panels c Screw hinge boards into wall supports and floor using four 3 screws as shown Make sure screws go into framing and floor Fig C D Remove temporary supports and check doors open properly FINISH Center 3 8 measurement on You have finished installing your doors _ right edge of groove _ 4 m AP Cre al 3 8 1 cm 4 Fig C 3 7 6 cm Screws into the wall Angle 3 7 6 support and frame a I Fig D 57 0 31999 18 01 dq 18V 191 X 01 31979 GABLE 10 x 12 GABLE 10 x 8 GABLE 10 x 16 DOOR PARTS REQUIRED x8 x1 5 8 x 3 x 72 1 6 x 7 6 183 cm x11 3 4 19 mm a a Bagged separately Fd 64 Metal Threshold special coating GIN SS Secure hinge boards from inside using 3 4 screws as shown Fig L s x58 2 5 cm 3 4 19 mm Re
11. Call Us First DO NOT RETURN TO STORE For immediate help with assembly or product information call our toll free number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 7 00 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST This page intentionally left blank rrr 12770 06 16 2011 GABLE ASSEMBLY MANUAL 10 x 8 305 x 244 BUILDING SIZE ACTUAL FLOOR SIZE BASE MODEL 10 8 305 x 244 cm 10 x 7 8 5 8 305 x 235 3 cm ADD ONE 10 x 4 10 x 12 305 x 365 8 cm 10 x 11 8 5 8 305 x 357 2 cm ADD TWO 10 x 4 10 x 16 305 x 487 7 cm 10 x 15 8 5 8 305 x 479 cm KEEP THIS MANUAL FOR FUTURE REFERENCE A IMPORTANT READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY BEFORE YOU BEGIN BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and
12. If tab is not displayed skip to next page including 10 x 16 tab AN IF ALL TABS ARE DISPLAYED FOLLOW ALL INSTRUCTIONS AN REGARDLESS OF MODEL SIZE N NOTE GABLE 10 x 8 image shown standard on pages applicable to all sizes OPTIONAL WOOD FRAME FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame Our recommended leveling method is shown below Leveling materials are not included in this kit PREFERRED METHOD 4x4 TREATED RUNNERS Typical for 10 x 8 Kit Runners are generally 12 30 5 cm from ends of floor frame and under seams Measurements to centers of 4x4 s 3 Screws angled into 4x4 e 2 at each point frame and 4x4 touch FRAME NOT INCLUDED Fasteners for Frame to 4 x 4 3 Screws shown as one option MATERIAL REQUIRED Minimum 3 screws exterior grade 7 6 cm 10 8 2 4 x 4 x 10 10 x 10 305 cm Treated Lumber x24 X3 4 x4 x 12 10 x 10 x 365 8 cm Treated Lumber 48 4 4 16 10 10 x 487 7 cm Treated Lumber OO Use only wood treated for ground contact and fasteners approved for use with treated wood 3 76 3 76 Always support frame seams Maximum between leveling Shingle 4x4 Runner material locations Level Shingle n Do T 16 im 2 Block Gravel 4 Block 2x4 Treated Lumber 8 Block LEVELING MET
13. Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E NOTE Measurements from inside of panel Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Fig F Flush at peak Attach 47 7 8 x 48 roof panel flush to the peak Fig G and with a 1 8 0 3 cm measurement at the gable trim Fig H Attach lower 19 x 48 roof panel flush to the top panel and with a 1 8 0 3 cm measurement at the gable trim Fig 1 Attach next lower 19 x96 roof panel flush to top panel Nail the roof panels using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side Go to page 56 0 GABLE 10 x 16 ROOF PANELS 10 x 16 2 5 cm x2 7 16 x 48 x 96 1 1 x 122 x 244 cm LGAN 3 4 T GAUGE BLOCK Roof panels may cause serious injury until securely fastened a _ You must square the roof by attaching one panel first You will use the panels long 1 FI LUI mf edge lever to bring your roof into square Commonly known racking p BEGIN Flush at peak Attach the 48 x 96 panel with
14. between the trim and walls and all around the door trim e Use a high quality exterior acrylic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Note Prime all un primed exterior wood before painting Follow directions provided by manufacturer ROOF FELT NOT INCLUDED e Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place 3 OVERLAP OK to overlap at ridge DRIP EDGE NOT INCLUDED Install drip edge over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top of drip edge as shown Roof Felt Drip Edge Edge flush to trim Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer NOTE 10 x8 Model Shown SHINGLES NOT INCLUDED Follow directions provided by manufacturer and these instructions A DNT Familiarize yourself with a 3 Tab Shingle Notch Notch SHINGLE NAIL PATTERN Full Rain Slot NAILS A NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS Install first starter row upside down and color with a 1
15. overhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BACK OF SHED FRONT OF SHED e 2 TA 2 7 EA 2 7 4 AN TABS UP 1 2 5 cm overhang flush with drip edge Shingle overlaps 1 2 5 cm overhang roof decking past roof deck 62 SHINGLES continued Beginning at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge Roof Deck FRONT OF SHEP 2 5 SHED tren with starter a Install second row of shingles flush at top of first 5 rain slots Ensure 1 overhang or flush to drip edge at front stagger each row FRONT OF BACK OF SHED SHED Flush with rain slots Flush with rain slots Continue installing rows of shingles by staggering at front FRONT OF SHED Notch 63 SHINGLES continued Continue installing rows of shingles to the peak At the peak make sure there is a maximum of 5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak with a utility knife 5 12 7 cm MAX 7 4 lt Cut Off of rain slot If more than 5 to
16. 1 1 x 6 4 x 122 cm 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm xi4 0V x2 2x 3 x 69 5 x 76 x 175 2x 3 x 48 5 x 76 x 122 cm x2 CPM 2 x 3 x 92 5 8 5 x 76 x 235 8 Orient parts on edge on floor Measure and mark from end of boards IMPORTANT You will build two walls the same Use two 3 nails at each mark 188 1 2 478 8 cm 166 422 3 142 1 4 861 3 118 1 4 300 5 cm E 1 4 gt gt gt gt gt gt 178 4 46 1 4 117 22 1 4 4 24 22 2214 57 4 61 pM 61 61 jm 61 m 61 cm 57 cm on 3 7 6 Nails NK 3 7 6 cm Nail 24 3 4 63 122 122 cm 63 cm 48 3 4 48 48 3 4 123 8 cm 122 123 8 145 1 2 369 6 35 191 X OF 18 GABLE 10 x 16 10 x 16 SIDE WALL FRAME SOFFIT PARTS REQUIRED xu 1 1 4 3 2 cm x4 3 8 x 5 x 48 0 9 x 12 7 x 122 cm x2 3 8 x 5 x 93 1 4 0 9 x 12 7 x 236 9 cm Place panels onto 2 3 with primed side against 2 3 as shown Fig N Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C using nineteen 1 1 4 screws Fig C Use two screws at seam Fig B 36
17. 384 8 cm 10 x 8 Building Requires x2 2x4x10 6x10x305cm x2 2x4x8 6x 10x244 cm x1 caulk Building Size Actual Floor Size A B 10 x 12 305 365 8 10 x 11 8 5 8 305 357 2 120 305 133 5 8 339 4 cm 140 5 8 357 2 184 7 8 469 5 101 x 12 Building Requires 2 2 4 10 5 x 10 x 305 cm X2 2 4 12 5 10 x 365 8 x1 Cauk Building Size Actual Floor Size A B C D 10 x 16 Building Requires 2 2x4xto 6x10x305cm x2 2 4 12 6x 10 x 365 8 cm x2 2x4x8 6x 10 x 244 A Allow new concrete slabs to cure for at least seven 7 days A treated 2 x 4 5 x 10 cm sill plate is required when installing your shed on concrete Purchase full length treated lumber or butt shorter pieces end to end and seal seams with caulk e Use a high quality exterior grade caulk beneath all sill plates e Fasten 2 x 4 5 x 10 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements WOOD FLOOR FRAME Not Included If you choose to build a wooden floor system you will need treated 2 x 4 boards cut to size and nails Floor panel sizes and quantities are shown below Floor Frame MUST be treated lumber Materials shown are raw sizes and will need to be cut to size 2x4x 96 5 5 10 244 2 x
18. 5 1 9 x 9 x 12 7 cm 4 __ GBZ x4 3 4 3 1 2 x 8 1 2 1 9 x 9 x 21 6 a C RIGHT PAINTED RED 3 4 x 6 1 4 x 11 7 8 1 9 x 15 8 x 30 cm LEFT PAINTED GREEN VEGIN Glue 5 and 8 1 2 boards onto endcaps and fasten with 1 1 4 screws as shown 4 Saat Repeat steps to build two more endcaps Locate endcaps flush with upper trim and corner trim and attach each endcap 26 i The 47732 7 from inside of shed using four 1 1 4 screws as shown Fig FINISH You have attached your endcaps Right RED x2 4 1 1 4 3 2 cm Screws NOTE 10 x8 Gable Shown Glue 8 1 2 Board Left GREEN GBZ x2 8 1 2 Board 43 ick 0 31999 18 01 1 191 X 01 31979 RAFTER INSTALL 10 8 PARTS REQUIRED x12 D VR AAA DADA DA DADA 3 76 cm x6 A pre assembled 2 5 3 E us FOR 10 x 12 SKIP TO PAGE 45 FOR 10 x 16 SKIP TO PAGE 46 4 Locate rafters directly over studs and flush to overhang in wall frame Fig A Check that you have the measurements shown Screw through soffit panel into rafters using one 2 screw Fig A e VEGIN Attach with two 3 screws at each end Fig B Re tighten 2 screws if neccessary Repeat steps to attach 3 rafters
19. PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts Nominal Board Size Actual Size x 3 1 2 3 8 8 9 x 3 1 2 1 9 x 8 9 cm RS 3 1 2 2 1 2 3 8 6 3 x 2 1 2 3 8 6 3 Check these locations for part stamp 10 4 GABLE 10 X 4 EXTENDER PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in 2 5 16 122 cm 2 x 8x 69 5 x 16 x 175 3 1 2 7exe 2 x 48 1 1 6 8 x 122 om 4 7 ___ 6x24 15x 61 em x4 2 x 4 x 65 7 8 5 x 10 x 167 WALL _ x2 1x8 x 48 2 5 x 76 x 122 cm 2 3 8 48 72 1 122 x 183 7 16 19 x 48 1 1 x 48 x 122 L_ x2 2 7 16 47 7 8 48 1 1 121 6 122 ROOF PANELS WALL PANELS TRIM RAFTERS Roof panels are 7 16 11 mm thick 5 ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS e This shed kit does not include a wood floor frame It does not include any floor panels See page 8 for the additional floor panel sizes and quantities required This shed does not include any leveling materials See the FLOOR LEVELING section on page 10 for recommended methods and suggested materials to pr
20. frame contacts the 4x4 runners Fig B Go to page 14 Runners are generally 12 30 5 cm from ends of floor frame and under seams e 2 at each point frame and 4x4 touch 3 1 567 7 Measurements to centers of 4x4 s 30 5 cm 13 3 Screws angled into 4x4 191 X OF 31979 N IMPORTANT NOTE GABLE 10 x 8 shown standard throughout manual Check the floor frame is level after installing floor panels Re level if needed lt p xw floor should used as a stable work surface for wall construction HINT Organize your assembly procedure during the build process to avoid over handling of the walls BACKWALL SIDEWALL SIDEWALL FRONTWALL RAFTER ASSEMBLY JIG PARTS REQUIRED x8 humm 1 1 4 3 2 2 3 4 x 3 x 5 1 9 x 76 x 12 7 x2 3 4 x 8 x 8 1 2 1 9 x 76 x 21 6 cm gt g BEGIN Build a Jig to ensure all Rafters are assembled the same e nm Mark a straight line on the Floor from corner to corner Fig A or on sill plates to fit measurements Fig B C Screw blocks in place to measurement shown Make sure blocks square and at 125 317 5 FINISH You have finished building a Rafter Jig 2 1 1 4 3 2 cm Screws per block 317 5 cm NOTE 10 x8 Gable Floor Shown Square 125 317 5
21. materials to level your shed are listed on page 10 CHECK ALL PARTS Inventory all parts listed on pages 3 5 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 6 for required and optional materials and quantities 2 CUSTOMER SERVICE Call 1 888 827 9056 email customerserviceGbackyardproductsllc com TOOLS Required Optional Q Phillips ili E o y L1 Tool Belt Sealy hate Nail Pouch Q Shingle Blades Drill Driver 3 8 Drill Bit OTin Snips ec 2 Philips Drive Bit Caulk Gun X for drip edge Chalk Line Hammer d Level Q Nail Gun Pencil Safety Glasses Se gun nails O Tape Measure s Ladder oves 22 Square Safety Always use approved safety glasses during assembly HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual Assistance Required two more people 27 Mark part with pencil Ensure squareness Beginning of steps for assembly or installation Important required step operation You have finished the assembly or installation gt A Helpful assembly hint Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is grade
22. o CD pre assembled x1 4 Ditta prm T ul i eee 9 ST 3 7 6 Locate rafters directly over studs and flush to overhang in wall frame MP Fig A Check that you have the measurements shown Screw through soffit panel into rafters using one 2 screw Fig A 96 Attach with two 3 screws at each end Fig Re tighten 2 screws if neccessary 1 M Repeat steps to attach 5 rafters INISH p You have attached your rafters Go to page 49 Screw into top NOTE Measurements from inside of panels 22 1 4 24 24 24 24 24 24 gt j 22 1 4 _ 56 5 cm 61 cm 61 cm 61 61 61 61 56 5 Align over studs Maintain the measurements between rafters 46 TRIM 10 x 8 PARTS REQUIRED x20 x2 1 x 3 x 94 3 4 2 5 x 76 x 240 6 cm BEGIN 8 FOR 10 12 SKIP 48 FOR 10 x 16 SKIP TO PAGE 49 Attach fascia trim flush to bottom of soffit Fig A and endcaps at ends of rafters Fig B using 2 5 cm nails as shown Repeat steps to attach fascia trim on both sides FINISH p You have attached your fascia trim Go to page 50 47 18 01 1 GABLE 10
23. of roof X Trim cap off flush to shingles Cut at top of rain slot Install flush to shingles QD Flush to shingles FINISH You have finished your ridge cap 66 WARRANTY ae Storage Solutions LLC warrants the following Limited Conditional Every product is warranted from defects in workmanship and manufacturing for one year All hardware and metal components are warranted for two years Trim is warranted for 10 years Waferboard siding and sheathing is warranted for two years SmartSide siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings Timber series buildings siding and trim are warranted for 10 years Solar Shed windows are warranted for 1 year Cedar lumber is warranted for 15 years Cedar doors and Cedar Garden Center are warranted for 10 years 0 Metal roof is warranted for 25 years Warranty 2 60 0 Backyard Storage Solutions LLC will repair replace pay for the affected part In no event shall Backyard Storage Solutions LLC pay the cost of labor or installation or any other costs related thereto All warranties are from date of purchase If a cash refund is paid on affected part it will be prorated from the date of purchase CONDITIONS The warranty is effective only when 1 The unit has been erected in accordance with the assembly instructions 2 The unit has been
24. outside edge of panel Nail using 2 nails 6 apart edges and 12 apart inside panel Sh Do not nail Cu Proceed to building your wing wall panels draw panels tight at seams angle nail GABLE 10 x 8 lt gt gt Ss 90 5 LEE Gauge Block Et gt 297 For squareness maintain 3 4 and 97 1 2 measurements GABLE 10 x 16 20 WING WALL PANELS PARTS REQUIRED x32 Mume 1 1 4 3 cm x4 2x3 x 72 5 x 76 x 183 cm You will assemble TWO RIGHT and TWO LEFT wing walls E gt Place OY on floor Place a wing wall panel primed side down onto OY 9 Fig A and flush to panel edges as shown m Secure flush to edges using eight 1 1 4 screws 10 apart i o You have finished building two sets of wing wall assemblies Set ONE LEFT and al ONE RIGHT aside Continue building your back wall Fig A Locate OY flush to these edges OY fn 10 25 4 cm A Approximately 32 Primed Side 2 4 2 Down 2 rm cc E A 6 35 cm x2 AR Ep S E E d RE m 5 Use 2x3 s for support 3 gt tee ES Flush 21 GABLE 10 x 12 GABLE 10 x 8 GABLE 10 x 16 BACK WALL PANELS PARTS REQUIRED x24 GM 2 5 cm Pre assembled xi LEFT T x1 Pre assembled RIGHT amp Place wing wall assemblies onto frame with bottom of panels flush
25. properly shingled and painted or stained and reasonably and regularly maintained thereafter 3 The failure occurs when the unit is owned by the original purchaser 4 Backyard Storage Solutions LLC has received the warranty registration card within thirty 30 days of purchase and notification of the failure in writing within the warranty period specified above 5 Backyard Storage Solutions LLC has had reasonable opportunity during the sixty 60 days following receipt of notification to inspect and verify the failure prior to commencement of any repair work REQUIREMENTS Storage Buildings amp Playhouses To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit shingle the roof and paint or solid colored stain the siding using 10096 acrylic latex exterior product with a minimum of two 2 coats within thirty 30 days of assembly caulk above all doors and all horizontal and vertical trim boards paint and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas amp Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex e
26. rain slot you must install another row of shingles Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge C Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line FINISH You have finished shingling your roof Proceed to capping the ridge 64 SHINGLES RIDGE COS You will finish off the top of the roof with a ridge cap made from shingles SA VGEGIN Cut shingles into THREE pieces Hint Use cut off pieces first 2 2 5 cm 5 cm ered 2 2 2 5 cm 5 om 5 K 5 lt 02 Ys Score shingle then snap off angled cut 1 1 Sey M Weather Seal Top of slot Note You will need about 20 22 cut pieces 10 x 8 model You will need about 30 32 cut pieces for 10 12 model You will need about 40 42 cut pieces for 10 x 16 model 20 to 22 30 to 32 40 to 42 Pieces Pieces Pieces Install first ridge flush to shingles at front as shown 227 7 LL Flush FRONT OF SHED amp Install second ridge cap 5 back as shown 1 Nail per side through weather seal Flush FRONT OF SHED 65 SHINGLES RIDGE continued AY Continue installing ridge cap to back
27. seams angle nail Flush I t 2 LIP SQUARE EDGE EDGE Carefully flip your sidewall over Repeat STEPS 1 8 to assemble your second side wall FINISH You have finished building both of your side walls Go to page 39 30 10 x 12 SIDE WALL FRAMES PARTS REQUIRED x52 SSS 76 om x2 2 2 x 3 x 48 5 x 7 6 x 122 cm 7 16 x 2 1 2 x 48 1 1 x 6 4 x 122 cm x10 x4 T 2 x 3 x 69 5x 76 x 175 cm 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 Orient parts on edge on floor Measure and mark from end of boards Use two 3 nails at each mark IMPORTANT You will build two walls the same 140 1 2 J 356 9 cm 118 1 4 300 5 94 1 4 d 239 4 cm 70 1 4 i 178 4 cm 46 1 4 gt 117 5 22 1 4 24 24 24 24 22 1 4 57 61 61 61 61 I 57 C Q5 3 7 6 cm Nails on marks OV x5 3 7 6 cm Nail 24 3 4 __ 48 ___ 24 3 4 63 cm 122 cm 63 cm 48 3 4 48 3 4 123 8 cm 123 8 31 0 GABLE 10 x 12 10 x 12 SIDE WALL FRAME SOFFIT PARTS REQUIRED 2 3 8 x 5 x 48 0 9 12 7 122 cm 1 1 4 3 2 cm
28. the roof by attaching one panel first You will use the panel s lon edge as a lever to bring your roof into square Commonly known as racking GABLE 10 x 8 Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is a 1 8 0 3 cm measurement to the gable trim Fig D You may need to move your backwall to get the 1 8 measurement Secure panel with two 2 nails in the corners 50 g BEGIN C Attach the 48 x 96 panel with the rough Two Nails side up painted grid lines side with a 1 8 measurement on the rafter Fig A and the 78 r panel flush at the peak Fig B y LC B Flush at peak Flush at peak ROOF PANELS 10 x 8 PARTS REQUIRED 2 5 cm 7 16 x 19 x 96 x2 1 1 x48 x 244 cm T ali Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Fig F 18 X OF dq 1H V9 Attach the lower roof panels flush to the upper panels and with a 1 8 0 3 cm measurement at the g
29. weatherstrips 2 i OFFSET CM gt lt Center OO in door opening 2 5 cm screw Fig A ih 5 cm x14 28 Approximately 59 0 18 01 dq 1H VO 191 X 01 31979 DOOR HARDWARE PARTS REQUIRED en B 3 8 D 3 4 1 9 cm 3 4 1 9 cm i EE O d WeEGIN GD Mount barrel bolt flush at top of OO on left door using 3 4 screws as shown Fig A e With door closed mark hole location for bolt to extend into HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into Install hasp on right door and latch on left door Bottom edge of hasp is amp 35 1 2 90 cm up from bottom edge of door trim Measure and mark locations v and install with 3 4 screws as shown Fig B Drill 3 8 hole FINISH in line with bolt w p You have finished mounting your door hardware t 5 Flush on A a x a HINT With door closed extend bolt a and tap with hammer to leave a mark in S wood for drilling 3 4 1 9 cm Screw x7 60 PAINT amp CAULK NOT INCLUDED e Use acrylic latex caulk that is paintable Caulk at all horizontal and vertical seams
30. x2 3 8 x 5 x 93 1 4 0 9 x 12 7 x 236 9 Place panels onto 2 x 3 with primed side against 2 x 3 as shown Fig A N Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panels flush to 2 x 3 Fig A and with 3 8 offset at ends Fig B C using 16 1 1 4 screws Fig C 3 8 Approximate screw spacing 93 14 9 1 2 236 9 32 10 x 12 SIDE WALL PANELS PARTS REQUIRED x58 SSS Rory 3 4 T GAUGE BLOCK i 3 8 x 48 x 72 1 x 122 x 183 cm 9 Ensure your wall frame is square by installing one panel and squaring frame L Place the 48 x 72 panel onto wall frame with primed side up as shown Note the lip and square edges Use the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails the panel using 2 nails 6 apart on edges and 12 apart inside panel Do not in groove For squareness maintain 3 4 and flush under soffit panel Flush N 2 Nails There will be an overhang at top
31. 4 x 120 x2 5 x 10 x 305 cm 48 x 96 N 1x3 122 x 244 cm b GABLE 10 x 8 x1Ib j 3 76 x1 2 5 0 Building Size Actual Floor Size A B C 10 x 8 305 x 244 cm 10 x 7 8 5 8 305 x 235 3 120 305 89 5 8 227 6 cm 92 5 8 235 3 cm 2 x 4x 144 x2 5 10 x 365 8cm 1x7 2 x 4 x 120 5 x 10 x 305 cm 48 x 96 x4 122 x 244 cm GABLE 10 x 12 xd tb 8 76 0 x1 Ib AO 2 5 0 cm BY Building Size Actual Floor Size A B 2 x 4 x 192 x2 5 x 10 x 4877 cm 2 x 4 x 120 1x9 5 x 10 x 305 cm 48 96 N pm 0 x1 lb Sub E 1 2 Ibs gt 2 5 0 cm Building Size Actual Floor Size A B C INSTRUCTION MANUAL LAYOUT NTABS ARE DISPLAYED AT THE OUTSIDE EGDE OF INSTRUCTION PAGES TO IDENTIFY MODEL SIZE Use tabs to make sure you are following the correct instructions GABLE 10 x8 Look for this tab throughout instructions GABLE 10 x 8 18 01 d 18V If tab is not displayed skip to next page including 10 x 8 tab GABLE 10 x 12 La If tab is not displayed skip to next page including 10 x 12 tab Look for this tab throughout instructions 21 0 371979 2 GABLE 10 x 16 L FEE Look for this tab throughout instructions 12 22 54 191 01 31979 GABLE 10 x 16
32. HODS e Level under 4x4 runners only Locate leveling material 12 from ends of runners and no more than 48 apart Asphalt shingles should be used between 4x4 runners and blocks or treated lumber Never use shingles in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING MATERIALS Gravel Solid Masonry Blocks in 1 2 4 or 8 thickness 2x4 Treated Lumber Asphalt Shingles Gravel Leveling higher than 16 not recommended 10 LEVELING amp SQUARING A 10 8 FLOOR FRAME Not Included FOR 10 x 12 SKIP TO PAGE 12 FOR 10 x 16 SKIP TO PAGE 13 Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed LEVEL AND SQUARE FLOOR FRAME BEGIN GD See page 10 for the preferred floor leveling method Use level and check the frame is level before applying floor panels Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 151 1 2 385 cm When the frame is level and square secure one side of frame to 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fasten
33. able trim Fig G Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side FINISH You have attached your roof panels Go to page 56 51 ROOF PANELS 10 12 PARTS REQUIRED x4 2 7 16 48 96 2 5 1 1 x 122 x 244 cm 3 4 GAUGE BLOCK Roof panels may cause serious injury until securely fastened 2 9 TT You must square the roof by attaching one panel first You will use the panels long edge as a lever to bring your roof into square Commonly known as racking mun VEGIN Attach the 48 x 96 panel with the rough side Flush at peak up painted grid lines side with a 3 4 1 9 cm measurement on the rafter Fig A and the panel flush at the peak Fig B Two Nails Secure panel with two 2 nails in the corners GABLE 10 x 12 Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is a 1 8 0 3 cm measurement to the gable trim Fig D You may need to move your backwall to get the 1 8 measurement Secure panel with two 2 nails in the corners 52 ROOF PANELS 10 x 12 PARTS REQUIRED x152 2 5 2 47 7 8 48 121 6 122 T 7 16 x 19 x 96 2 000000 _
34. cm GAA GBZ GBZ Chalk Line Flush Flush 15 0 18 01 1 191 X 01 31979 v v v PARTS REQUIRED DN 8x 24 5x61 xe 60 2 x 4 x 65 7 8 5 x 10 x 167 dh a E FOR 10 x 8 ASSEMBLE 3 RAFTERS TOTAL FOR 10 x 12 ASSEMBLE 5 RAFTERS TOTAL VEGIN FOR 10 x 16 ASSEMBLE 7 RAFTERS TOTAL Place two rafter halves CV on floor jig AS Apply glue on gusset and place on rafters Nail gusset onto rafter using 2 nails staggered as shown QD Flip over rafter assembly and glue and nail gusset to back side Repeat steps 1 4 to build two more assemblies for 10 x 8 Gable four more assemblies for 10 x 12 Gable or six more assemblies for 10 x 16 Gable INISH Unscrew jig and save blocks Set aside rafters and proceed to building your back wall p 1 4 6 mm Contact at peak GABLE 10 x 16 GABLE 10 x 12 GABLE 10 x 8 125 317 5 cm NOTE 10 x8 Model Shown 16 BACK WALL FRAME x1 2x3 x 46 1 4 5 x 76 x 117 5 x2 2x3x 77 bx 76 x 196 cm x1 2 x 3 x 94 1 2 5 x 76 x 240 cm PARTS REQUIRED x6 SS BEGIN Orient parts on edge on floor as shown Nail using two 3 nails at each connection 3 7 6 cm Nails 46 1 4 117 5 cm 117 5 cm
35. d for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts Nominal Board Size Actual Size x 3 1 2 3 8 8 9 x 3 1 2 1 9 x 8 9 cm Check these locations for part stamp RS 3 1 2 x 2 1 2 3 8 6 3 x 2 1 2 3 8 6 3 10 8 GABLE 10 X 8 PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in x1 x2 6 2 x4 6 6 4 2 5 4 4 2 1 DOOR TRIM RAFTERS WALL 2 x 3 x 22 1 8 5 x 7 6 x 56 cm NH 2x3x46 4 6x 78 1175 2 x 8x 69 76 x 175 3 cm 2 x 8x 72 5 x 76 183 2 6x 76x 196 2 x3 x 92 5 8 5x 16 x 235 3 cm 2x8 x 94 1 2 5 x76 x 240 7 h6x2 12 x 24 3 4 1 1 x 6 3 x 62 9 c 6 x 24 15 x 61 cm 2x4 x 85 718 10 x 167 2x8 x54 5 16 5x 76 x 198 H8 7 76 x 2404 1x3
36. el flush under the soffit panel Secure panel with two 2 nails in the corners Fig A Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with two 2 nails GD Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel Do not nail For squareness maintain 3 4 and flush under soffit panel Flush There will be overhang at top Flush 3 19 mm i 1 gt Primed Side i 19 mm UP i 9 ip 3 4 Gauge Block Fig 1 allt I hi il Y im 6 15 e 3 4 I 19 mm 1 1 n m i 12 30 cm 1 Fig B Wh Y 2 Nails 1 LIP map EDGE SQUARE ace ee EDGE 3 4 19 mm gt o9 3 18 01 dq IH VO 10 8 SIDE WALL PANELS PARTS REQUIRED x2 3 8 x 48 x 72 1 x 122 x 183 cm Place 48 panel frame as shown with primed side facing up NOTE THE SQUARE AND LIP EDGES A Do not nail in groove Nail using 2 nails 6 apart on edges and 12 apart inside panel 202 To draw panels tight at
37. er at ends of each runner making sure the frame remains square Fig A FINISH Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners Fig B Go to page 14 3 Screw angled into 4x4 2 at each point frame and 4x4 touch Runners are generally 12 30 5 cm from ends of floor frame and under seams Second secure at ends with one fastener ex 151 1 2 385 cm SSS SS 151 1 2 385 First secure at ends with one fastener 11 18 01 dq 18V GABLE 10 x 12 LEVELING amp SQUARING A 10 12 FLOOR FRAME Not Included LEVEL AND SQUARE FLOOR FRAME A Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed VEGIN See page 10 for the preferred floor leveling method C Use level and check the frame is level before applying floor panels E Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 184 7 8 469 5 cm c When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame
38. gle to hit floor frame Fig A Do not nail in groove ED Screw back wall uprights to floor using two 3 screws Fig B FINISH You have finished standing your back wall N nai 2 nails first NOTE 10 x8 Gable Shown OO 6 15 cm gt I 3 ws cm 3 7 6 Va Screw 2 3 7 6 5 Screw Nail 39 Angle to nail into floor frame 2 5 cm Nail 3 7 6 cm Screw x8 k 0 31999 18 01 d 18V 191 X 01 31979 GABLE 10 x 12 GABLE 10 x 8 GABLE 10 x 16 SIDE WALLS INSTALLATION G 8 8 2 3 76 x12 A Additional fasteners needed for 10 x 12 kit or 10 x 16 kit Same instructions apply 7177 2 VEGIN e a a Stand right sidewall on floor It is important to secure the sidewall in the following order QD Center sidewall on floor front to back Rest the top of the sidewall so the soffi t panel overlaps the backwall panel 3 8 Fig A DOOR Nail the lower sidewall corner to the backwall trim with one 2 nail Fig B Be sure the measurement between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper corner Fig C Measurement
39. inforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams Center trim ZJ over doors and secure using eight 2 finish nails into framing as shown Center metal threshold between doors and secure using eleven 3 4 special coating screws into floor as shown Fig C FINISH You have finished securing your door and trim gy 2 Nails x8 Door Cent Panel Nail into framing 11 Hinge lt 7 Board Fig A Door Install 3 4 screws 40 from inside x6 Trim bi CENTER lt 14 35 5 cm NN Approximately 11 Special coating screws 58 DOOR WEATHERSTRIP PARTS REQUIRED x14 x2 CN 2x3x69 5 x 76 x 175 cm YBEGIN C With left door closed center a weatherstrip OO vertically on the left door in the door opening Fig A OO will offset the left door 1 OUT past the door trim 1 Fig B Secure using seven 3 screws through outside trim into Fig ED On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C Secure OO using seven 3 screws through outside trim into OO Fig C You have finished installing your door
40. isted on the yellow warranty card enclosed in the product package Mail the above information to Backyard Storage Solutions LLC Attn Customer Service 1000 Ternes Monroe MI 48162 WARRANTY TERMS MAY VARY OUTSIDE THE U S A IMPORTANT This is your warranty certificate Please complete and mail your warranty card to properly validate your warranty 67
41. operly level your floor as this will vary depending on your specific site COMPLETING YOUR SHED You will need these additional materials 10x8 10x12 10x16 ALL SIZES C 3 SHINGLES Bundles B g C PAINT FOR 1 Quart Use 100 acrylic latex exterior paint PAINT FOR SIDING Gallons _ 2 WOOD GLUE Exterior Rated 2 Tubes 1 GALVANIZED ROOFING NAILS Ibs Use acrylic latex exterior caulk that is paintable For shingles OPTIONAL MATERIALS 10x8 10x12 10x16 59799 DRIP EDGE Feet so 60 15 ROOFING FELT Sq ft to 96 144 192 1 GALVANIZED ROOFING NAILS Ibs For roofing felt REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT NOTES CONCRETE FOUNDATION If you choose to install your kit on a concrete slab refer to the diagram below Attach the sill plates on the foundaton as shown and continue on to page 9 Treated Sill Plate Caulk between sill plate and concrete lt 5555 4 1 0 207700 A Sill plates MUST be treated lumber Building Size Actual Floor Size 10 x 8 305 x 244 cm 10 x 7 8 5 8 305 x 235 3 cm 120 305 cm 85 5 8 217 4 cm 92 5 8 235 3 cm 151 1 2
42. remains square Fig A FINISH Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners Fig B Go to page 14 Runners are generally 12 30 5 cm from ends of floor frame and under seams 3 Screws angled into 4x4 2 at each point frame and 4x4 touch Measurements to lt i 122 cm centers of 4x4 s Fia A PUR 122 Centered 2 ls 42 Centered 30 5 12 LEVELING amp SQUARING 10 16 FLOOR FRAME Not Included Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed LEVEL AND SQUARE FLOOR FRAME A GD N See page 10 for the preferred floor leveling method CED Use level and check the frame is level before applying floor panels Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 223 1 2 567 7 When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A FINISH Once the floor frame is level and square fasten the frame at each point the
43. rim Fig J Nail the roof panels using 2 nails 6 19 apart on edges and 12 apart inside 48 cm panel C lt Repeat process to attach roof Z7 panels on the opposite side 191 X 01 31979 DOORS PARTS REQUIRED ac 00 x2 iu x1 2 x 3 x 69 5 x 7 6 x 175 3 1 1 4 3 cm x4 Y 3 7 6 cm HINT Look for 3 8 SPACER D attached to doors x1 x1 B 1 x 3 x 5 2 5 x 7 6 x 12 7 Left Door Right Door Me GABLE 10 x 16 GABLE 10 x 12 GABLE 10 x 8 Orient parts as shown on flat surface A 378 offset is to top Look for red 2 785 right and green left on hinge board Attach temporary support OO using 3 screws with 3 4 1 9 from right edges Fig A and at ends Tighten securely Attach temporary support GAA at bottom with 1 1 4 screws Fig A Tighten securely GREEN RED OFFSET 3 8 Make sure spacer r 1 is attached dom Ai cm 4 3 7 6 cm Screws a PN A Tighten screws securely EE GAA NOTE Screw hole will be used later 19 12 30 5 lt Bottom edges flush 1 cm Fig A DOORS R T 5 R Q U R E D 7 3 76 x1
44. ss maintain 3 4 3 4 GAUGE Fig A BLOCK measurements along panel edges 1 Ber SE 5 2 cm gt S lt 3 4 GAUGE lt gt BLOCK 97 1 2 247 7 cm OS Q FRONT WALL PANELS PARTS REQUIRED 22 _ SS 3 4 GAUGE BLOCK x1 Place RIGHT panel on front frame primed side Use 3 4 gauge block on edges of panel panel to frame with 2 nails 6 apart Do not nail in groove To draw panels tight at Ta A ee seams angle nail Primed Side UP 247 7 cm 191 0 37979 ick 0 31999 18 01 1 gt N For squareness maintain 3 4 and 97 1 2 measurements 25 FRONT WALL PANELS PARTS REQUIRED x24 2 5 Pre assembled x1 Pre assembled RIGHT Place wing wall panels onto frame with bottom of panels flush Nail left and right wing wall assemblies A using 2 nails 6 apart in groove FINISH You have finished attaching your wing walls Primed Side UP To draw panels tight Flush Use a 2x3 at seams angle nail for support GABLE 10 x 16 GABLE 10 x 12 GABLE 10 x 8 26 10 8 SIDE WALL FRAMES PARTS REQUIRED x28 F 76 cm x4 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm x6 OV 2 x 3 x 69 5 x 7 6 x 175 cm x2 2 x 3 x 92 5 8 5 x 7 6 x 235 3 cm
45. the rough side up painted grid lines side with a 3 4 1 9 cm measurement on the rafter Fig A and the panel flush at the peak Fig B Secure panel with two 2 nails in the corners Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is a 3 4 1 9 cm measurement on the rafter Fig D You may need to move your rafter to get the 3 4 measurement Secure panel with two 2 nails in the corners ROOF PANELS 10 x 16 x4 47 7 8 x 48 121 6 x 122 cm T 7 16 x 19 x 96 2 000000 lt gt Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E PARTS REQUIRED 2 5 Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Fig F Flush at peak Attach 47 7 8 x 48 roof none panels flush to the peak Fig G and with a 1 8 0 3 cm measurement at the gable trim Fig 1 AA 122 cm 2 CD Attach the lower 19 x96 roof panel flush to top panel Attach the lower 19 x48 roof panels flush to the top panels and with a 1 8 0 3 cm measurement at the gable t
46. x 12 TRIM 10 x 12 PARTS REQUIRED x33 x2 1 x 3 x 94 3 4 2 5 x 76 x 240 6 cm x2 1x 3 x 48 2 5 x 7 6 x 122 cm 18 VEGIN Attach fascia trim flush to bottom of soffit Fig A and endcaps Fig B using 2 5 cm nails as shown Nail trim to end of rafters and toe nail trim together Fig C using 1 2 5 cm nail as shown C Repeat steps to attach fascia trim on both sides FINISH p You have attached your fascia trim Go to page 52 Flush TRIM 10 16 PARTS REQUIRED x46 x2 1 x 3 x 94 3 4 2 5 x 76 x 240 6 cm x4 1x 3x 48 2 5 x 7 6 x 122 cm 8 V GEGIN Attach fascia trim flush to bottom of soffit Fig A and endcaps Fig B using 2 5 cm nails as shown Nail trim to end of rafters and toe nail trim together Fig C using 1 2 5 cm nail as shown e Repeat steps to attach fascia trim on both sides FINISH You have attached your fascia trim Go to page 54 49 191 X 01 d318V9 ROOF PANELS 10 x 8 PARTS REQUIRED 7 16 x 48 x 96 x2 1 1 x 122 x 244 cm AN FOR 10 x 12 SKIP PAGE 52 FOR 10 x 16 SKIP TO PAGE 54 Roof panels may cause serious injury until securely fastened 1 You must square
47. x 5 2 5 x 76 x 12 7 cm ONE USED AS A GAUGE BLOCK FOR 3 4 19 mm MEASUREMENT x 3 4 682 x3x8 1 2 2 5 x 76x 21 6 19 mm RIGHT PAINTED RED 3 4 x 6 1 4 x 11 7 8 1 9 x 15 8 x 30 cm LEFT PAINTED GREEN 2 8x 69 6x 26 1752 em Finger Jointed ZJ 5 8 x 3 x 72 1 6 x 76 x 183 WALL PANEL 8 DOORS PARTS LIST D x1 x1 im im x4 x2 x1 x1 x1 2 3 8 x 48 x 72 LEFT DOOR RIGHT DOOR 1 x 122 x 183 cm ROOF PANELS 48 x 96 19 x 96 Roof panels are 7 16 11 mm thick SOFFIT PANELS NAIL BOXES Shown Actual Size C x1 Boxes 3 76 x3 Boxes M y 5 0 cm FASTENER HARDWARE BAG Shown Actual Size C x28 lt gt 5 0 45 9 cm x22 2 6 0 x118 1 1 4 8 2 x71 3 4 19 mm ____________ 0 HARDWARE Not Actual Size _______ x1 x1 x1 64 Metal Threshold x4 3 4 x7 3 4 19 x11 3 4 19 mm Bagged seperately special coating 4
48. xterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and as needed thereafter to maintain your warranty Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement The minimum ground clearance for siding must be one half inch 1 2 inch from concrete slab or two and one half inches 2 1 2 from the ground when building is erected or constructed on a treated wood floor kit Water from sprinklers must be kept off unit In no event will Backyard Storage Solutions LLC be responsible for any indirect incidental consequential or special damages nor for failure s that are caused by events acts or omissions beyond our control including but not limited to misuse or improper assembly improper maintenance which eventually leads to rot or decay and acts of God Backyard Storage Solutions LLC will not be held responsible for any labor costs incurred to construct your unit This warranty gives you certain specific rights that vary from state to state CLAIM PROCEDURE To make a claim under this warranty you can either call 1 888 827 9056 or prepare a letter Please have ready the information below when you call or include the information when writing The model and size of the product 2 A list of the part s for which the claim is made 3 Proof of purchase of the Backyard Storage Solutions LLC item as shown on the original invoice 4 Run code as l
Download Pdf Manuals
Related Search
Related Contents
manual del propietario Maytag MMW7730DS Warranty Information 取扱説明書/保証書 え TEFAL BL3001AC Instruction Manual Harbor Freight Tools 6 Amp 3 in. x 21 in. Professional Belt Sander Product manual Untitled - Datavideo Shure Headphones E3g User's Manual The Rainbow Vol. 12 No. 01 - August 1992 - TRS Copyright © All rights reserved.
Failed to retrieve file