1. Align over studs the measurements between rafters 32 ROOF PANELS PARTS REQUIRED 2 5 7 16 x 48 x 96 1 1 x 122 x 244 cm ali A Roof panels may cause serious injury until securely fastened You must square the roof by attaching one panel first You will use the panels long edge as a lever to bring your roof into square Commonly known as racking V EGIN Attach the 48 x 96 panel with the rough Flush at peak side up painted grid lines side with a 1 8 measurement on the gable trim Fig A and the panel flush at the peak Fig B Two Nails Secure panel with two 2 nails in the corners Flush at peak Move to the opposite end Using the long edge of the panel as a lever move the panel side to side until the top corner is flush to the peak Fig C and there is 1 8 measurement to the gable trim Fig D You may need to move your backwall to get the 1 8 measurement Secure panel with two 2 nails in the corners 33 ROOF PANELS 2 5 cm 1 1 x 16 2 x 244 cm all Keep spacing between the center of the rafters at the lower edge of the panel and secure with one 2 nail into each rafter Fig E Move to the top of the panel and keep spacing between the center of the rafters Secure with one 2 nail into each rafter Fig E Nail the roof panel using 2 nails 6 apart on ed
2. 3 4 1 9 cm Screw x7 PAINT amp CAULK NOT INCLUDED Use acrylic latex caulk that is paintable Caulk at all horizontal and vertical seams between the trim and walls and all around the door trim Use a high quality exterior acrylic latex paint When painting your building there are a few key areas that can be easily overlooked that must be painted Bottom edge of all siding and trim Inside of doors and all 4 edges Note Prime all un primed exterior wood before painting Follow directions provided by manufacturer ROOF FELT NOT INCLUDED Install felt flush to all roof edges overlapping 3 Use minimal amount of roofing nails to hold in place 3 OVERLAP OK to overlap at ridge DRIP EDGE NOT INCLUDED Install over roof felt on gable side and under roof felt on eave side Fig A Do not use nails on side of drip edge that hangs over side of building Only nail top of drip edge as shown Roof Felt Drip Edge Edge flush to trim Snip bottom side of drip edge and bend over to other side of roof Follow directions provided by manufacturer SHINGLES NOT INCLUDED Follow directions provided by manufacturer and these instructions Co A Familiarize yourself with a 3 Tab Shingle Notch Notch SHINGLE NAIL
3. Check these locations for part stamp x 2 1 2 3 8 x 6 3 PARTS LIST INVENTORY YOUR PARTS before you begin We suggest sorting parts by the category they are listed in x5 2 x 8x 17 1 2 5 x 7 6 44 5 2 axax483w 5 x 7 6 x 111 1 6 2 x 3 x 69 5 x 7 6 x 175 3 2x 3x 72 5 x 7 6 x 183 cm 5 xt 2 3 91 5x 7 6 x 231 1 cm x2 2 x9 x 92 12 SX 7 6 x 235 om 1 2 x 3x 96 5x 7 6 x 244 4 ye x2 t2 x 24 3 4 1 x 6 3 x 62 9 cm o 9 x6 6x24 15x61cm Rc 6 KC RAZ 5 x 10x 135 3 cm 4 2 3 41 11 16 5 x 7 6 x 105 9 cm Qx HS 1 3 08 4 2 57 8 2401 amp x5 1x8x5 2 5 x 7 6 x 12 7 cm ONE USED AS A GAUGE BLOCK FOR 3 4 19 mm MEASUREMENT 19 im LEN X 4 GBA_ 1x3x 8 1 4 2 5 x 7 6 x 21 cm RIGHT PAINTED RED 4 3 4 x 6 1 4 11 7 8 1 9 x 15 8 30 LEFT PAINTED GREEN 2 050 2 3x69 6x76x1753 Finger Jointed 8 1 CZB 58 3x 58 1 6 x 7 6 x 140 om WALL PANEL amp DOORS PARTS LIST 4 x1 x1 x1 E x 48 x 72 LEFT DOOR RIGHT DOOR 1 122 183 cm ROOF PANELS p 48 x 96 Oe gru Roof panels 7 16 11 mm thick SOFFIT PANELS FASTENER HARDWARE BAG Shown Actual Size C x28 2 5 0 c
4. 26 BACK WALL INSTALLATION PARTS REQUIRED TEMPORARY x4 xi LHS 2 x6 1x3 x 94 3 4 2 5 x 7 6 x 241 1 3 7 6 cm x24 2 5 cm BEGIN Center back wall assembly on the 96 244 cm floor dimension Use HS as a temporary brace Secure with two 3 screws 3 7 6 cm Screws First nail lower edge of panel to floor frame using 2 nails 6 apart A Angle nail to hit floor frame Fig A Do not nell Screw back wall upright to floor using 2 3 screws Fig B Continue to nail 3 3 nails through each bottom plate into floor FINISH You have finished standing your back wall 3 7 6 cm Screw N nai 2 nails first Angle to nail into floor frame 2 5 cm Nail ar SIDE WALLS INSTALLATION x12 _ xA D PRA 3 7 6 3 7 6 62 ET 8 e V EGIN Stand right sidewall on floor A is important to secure the sidewall in the following order Sottit Panel Center sidewall on floor front to back Rest the top of the sidewall so the soffit panel overlaps the backwall panel 3 8 Fig A 3 8 0 9 cm OVERLAP Fig A Nail the lower sidewall corner to DOOR the backwall trim with one 2 nail Fig B Be sure the measurement
5. 2 CUSTOMER SERVICE Call 1 888 827 9056 email customerserviceGbackyardproductsllc com TOOLS Required Optional Phillips ili i Tool Belt Screwdriver Knie Pouch Q Shingle Blades Q Drill Driver 3 8 Drill Bit Tin Snips 2 Philips Drive Bit E Gauk Gun for drip edge D Chalk Line Hammer famn Ll Paint Tools d Level Gun QPendl Safety Glasses gun nails Tape Measure L Ladder Gloves 22 H Square Safety Always use approved safety glasses during assembly HELPFUL REMINDER SYMBOLS Look for these symbols for helpful reminders throughout this manual e e 7 7 Assistance Required two or more people 27 Mark part with pencil Ensure squareness Beginning of steps for assembly installation Important required step or operation You have finished the assembly or installation a Helpful assembly hint Level ORIENT LUMBER AND TRIM FOR BEST APPEARANCE Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible Please remember that these blemishes in no way negatively affect the strength or integrity of our product See Fig A B C CONCRETE FOUND
6. PS 19 FRONT WALL PANELS PARTS REQUIRED x22 H Bom x1 3 4 GAUGE BLOCK Pre Assembled LEFT WeEGIN 9 Place LEFT panel on front frame as shown with primed side up Use 3 4 gauge block on edge of panel A ED Nail panel to frame with 2 nails 6 apart pono For squareness maintain 3 4 measurements along panel edge 20 FRONT WALL PANELS PARTS REQUIRED x10 5 cm pe Pre Assembled RIGHT Place RIGHT panel on front frame primed side up N F a 710 Pa gt INS Nail panel to frame with 2 nails 6 apart Q9 A 7 Do not in groove gt 41 To draw panels tight at seams angle nail Primed Side UP N For squareness maintain 96 244 cm measurement 21 FRONT WALL BOTTOM PLATES PARTS REQUIRED k 2 5 cm x2 2 x 3 x 17 1 2 5 x 7 6 x 44 5 cm V EGIN GD Position BV on edge flush with outside edge and 1 from bottom edge of LEFT wall panel Fig A Nail Bv to wall panel using 3 2 Nails Repeat step 1 2 for RIGHT wall panel Fig B FINISH You have finished building your front wall Flush 22 SIDE WALL FRAMES PARTS REQUIRED x6 x4 3 7 6 cm 7 16 x 2 1 2 x 24 3 4 1 1 x 6 4 x 62 9 cm _ 5 2 x 3 x 69 5 x 7 6 x 175 cm x2 2x 3 x 92 1 2 5 x 7 6 x 235 BEGIN Orient par
7. 6 x 44 5 cm VEGIN Position BV on edge flush with outside edge and 1 from bottom edge of LEFT wall panel Fig A Nail BV to wall panel using 3 2 Nails EP Repeat step 1 2 for RIGHT wall panel Fig B FINISH You have finished building your back wall 17 FRONT WALL PANELS PARTS REQUIRED x16 Dt 1 1 4 3 cm x1 x1 2 2x 3 x 72 5 x 7 6 x 183 cm BEGIN Place OY on floor A Place the left front wall panel primed side down onto OY Fig A and flush to panel edges as shown CED Secure flush to edges using eight 1 1 4 screws 10 apart Repeat Steps 1 2 to assemble the right front wall panel Locate OY flush to these edges 10 25 4 cm sal ae 2 z e EM Use 2x3 for temporary support Fig A Primed Side Down 18 FRONT WALL FRAME PARTS REQUIRED x2 3 7 6 x1 2x 8x 17 1 2 5 x 7 6 x 44 5 cm x2 2 x 3 x 91 5 x 7 6 x 231 cm V amp EGIN GD Lay out PS and BV on edge on floor Nail PS to BV with two 3 nails Ensure BV is centered with PS and nail in place with two 3 nails FINISH You have finished building your Front Wall Frame BV P Q a done n 4 6 4 2 1 2 45 1 2 6 4 115 6 ie 45 1 2 45 1 2 115 6 cm 115 6 cm 17 1 2 44 5 cm
8. PATTERN Full Rain Slot NAILS A NEVER DRIVE FASTENERS INTO OR ABOVE SEALING STRIPS VEGIN a Install first starter row upside down and color up with a 1 overhang at back and bottom of roof panel Use 4 nails per shingle Starter row must be straight and level all the way across with lower edge of roof deck NOTE If you have installed drip edge install shingles flush to drip edge BACK OF SHED FRONT OF SHED 2 TA e i 27 a 2 7 4 Nails Noms 1 2 5 cm overhang or flush with drip edge Shingle overlaps L 1 2 5 cm overhang roof decking past roof deck 42 SHINGLES continued Beginning at front of shed install first row of shingles with notch at 1 past roof edge or flush with drip edge Roof Deck FRONT OF BACK OF SHED 2 5 cm Notch Flush with starter row or J ZEE E e Exp Drip Edge Al 2 2222 Notch Install second row of shingles flush at top of first row s rain slots Ensure 1 overhang or flush to drip edge at front stagger each row FRONT OF BACK OF SHED Flush with rain slots Flush with rain slots Continue installing rows of shingles by staggering at front FRONT OF SHED E Notch 43 SHINGLES continued Continue installing rows of shingles to the peak At the peak make sure there
9. screws through outside trim into OO Fig On right door center OO vertically in door opening Fig A OO will offset the right door 1 IN from the door trim Fig C CD Secure OO using seven 3 screws through outside trim into OO Fig C FINISH oe You have finished installing your door weatherstrips 1 OFFSET 2 5cm gt lt Center OO in door opening 2 5 cm Screw Screws 5 cm x14 11 28 cm Approximatel 39 DOOR HARDWARE m PARTS REQUIRED 3 8 9 mm Drill Bit e FINISH 3 4 1 9 cm 3 4 1 9 cm Li Mount barrel bolt flush top of OO on left door using 3 4 screws as shown Fig LA 7 2 With door closed mark hole location for bolt to extend into HINT Extend bolt to leave a mark in wood Tap bolt with hammer Drill 3 8 hole deep enough for bolt to slide into Install hasp on right door and latch on left door Bottom edge of hasp is 35 1 2 90 cm up from bottom edge of door trim Measure and mark locations and install with 3 4 screws as shown Fig B in line with bolt You have finished mounting your door hardware Flush on OO OO HINT With door closed extend bolt and tap with hammer to leave a mark in wood for drilling
10. 16772 Call Us First DO NOT RETURN TO STORE For immediate help with assembly or product information call our toll free number 1 888 827 9056 or email customerservice backyardproductslic com Our staff is ready to provide assistance April through October M F 8 00 AM to 4 30 PM EST Saturday 8 30 AM to 4 30 PM EST November through March M F 8 00 AM to 5 00 PM EST This page intentionally left blank 16772 N 1 21 2013 ASSEMBLY MANUAL GABLE 8 x 8 244 x 244 cm ACTUAL FLOOR SIZE IS 96 x 92 5 8 244 x 235 cm KEEP THIS MANUAL FOR FUTURE REFERENCE A IMPORTANT READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY BEFORE YOU BEGIN e BUILDING RESTRICTIONS AND APPROVALS Be sure to check with local building department and homeowners association for specific restrictions and or requirements before building ENGINEERED DRAWINGS Contact our Customer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to level your shed are listed on pages 7 CHECK ALL PARTS Inventory all parts listed on pages 5 6 Contact our Customer Service Team if any parts are missing or damaged ADDITIONAL MATERIALS You will need additional materials to complete your shed See page 4 for required and optional materials and quantities
11. 3 3 4 5x 7 6 111 1 cm Orient parts on edge on floor as shown Use two 3 screws at middle connection FINISH You have finished building your back wall frame 48 122 cm NJ 43 3 4 111cm 2 3 7 6 cm Screws 14 BACK WALL PANELS PARTS REQUIRED x16 2 5 x1 x1 Je A 3 7 6 cm 1 6 3 4 Pre Assembled LEFT BLOCK 9 ic VEGIN D Place LEFT panel back frame as shown with primed side facing up C Use a 3 4 gauge block at edge of panel Nail using 2 nails 6 apart on edges and 12 apart inside SS CN in groove Use 1 3 screw at end _ 1 3 Screw For squareness maintain Flush V e 3 4 measurement along i panel edges N 3 4 6 Primed side UP 1 9 cm BACK WALL PANELS PARTS REQUIRED x16 2 5 cm x 1 X 1 5 RE ULL 3 7 6 cm Pre Assembled RIGHT p lt gt Place RIGHT panel back frame as shown with primed side facing up 4C js mE d Nail using 2 nails 6 apart on edges and 12 apart inside panel n Do not nail ED Use 1 3 screw at end ngroove lt 7 bU To draw panels tight at 6 seams angle nail 15 2 16 BACK WALL BOTTOM PLATES PARTS REQUIRED x6 ss 2 5 cm x2 2x3 x 17 1 2 5 x 7
12. 3 5 16 338 6 cm 133 5 16 338 6 cm P Fig A First secure at ends with one fastener IMPORTANT Check the floor frame is level after installing floor panels Re level if needed lt gt Se p Ww The floor should be used as a stable work surface for wall construction HINT Organize your assembly procedure during the build process to avoid over handling of the walls BACKWALL SIDEWALL FRONTWALL RAFTER ASSEMBLY JIG PARTS REQUIRED x8 hum 1 1 4 3 2 cm x2 3 4 x 3 x 5 1 9 x 7 6 x 12 7 x2 3 4 x x 8 1 4 1 9 x 7 6 x 21 cm VEGIN Build a Jig to ensure all Rafters are assembled the same Mark a straight line on the Floor from corner to corner Screw blocks in place to measurement shown 5 N Make sure blocks are square and at 101 256 5 cm F INISH You have finished building a Rafter Jig 2 1 1 4 3 2 cm Screws per block Square A Chalk Line 256 5 cm B Flush Flush 10 RAFTERS PARTS REQUIRED x72 2 5 6 24 15 61 cm a x6 2 4 x 53 1 4 5 x 10 x 135 3 6 VEGIN Place two rafter halves RAZ on floor jig You will assemble 3 rafters Apply glue on gusset and place on rafters Nail gusset onto rafter using 2 nails staggered as shown Flip over rafter as
13. ATION If you choose to install your kit on a concrete slab refer to the diagram below Treated Sill Plate Caulk between sill plate and concrete Aa Building Size Actual Floor Size A B 8 x 8 244 x 244 cm 8 x 7 8 5 8 244 x 235 3 cm 96 244 cm 85 5 8 217 5 cm 92 5 8 235 3 cm Requires X4 2 4 8 5 10 244 A MUST treated lumber x1 Cauk C Allow new concrete slabs to cure for at least seven 7 days A treated 2 x 4 5 x 10 cm sill plate is required when installing your shed on concrete Hint Use treated lumber in your kit or purchase full length treated lumber Use a high quality exterior grade caulk beneath all sill plates Fasten 2 x 4 5 x 10 cm sill plates to slab using approved concrete anchors fasteners not included Check local code for concrete foundation requirements WOOD FLOOR FRAME NOT INCLUDED Building Size Actual Floor Size A B C 8 x 8 244 x 244 cm 8 x 7 8 5 8 244 x 235 3 cm 96 244 cm 89 5 8 227 6 92 5 8 235 3 Required Floor materials on following page ADDITIONAL MATERIALS FLOOR MATERIALS 24 WOOD FLOOR OPTION SHOWN x7 Cut 5 to 2 x 4 x 89 1 2 5 x 10 x 227 cm 2x 4x 8 5x 10x 244 cm 48 x 92 5 8 Treated Lumber x2 122 x 235 3 cm Floor panels are the FLOOR LEVELING section on page 7 for recommended 5 8 16
14. N RED OFFSET 3 8 Make sure spacer 1 jenen 1 is attached gt lt 3 8 1 111 crews cn ne oe ess NE A N Tighten screws securely 2 1 1 4 3 cm screws NOTE Screw hole will be 1 used later 3 4 1 pry dif 3 4 Bottom edges flush 1 9 cm DOORS 5 Q U R E D 7 009 3 7 6 1 2 x 3 x 69 5 x 7 6 x 175 3 E Attach temporary support OO as a ledger board flush under wall panels for doors to rest on using three 3 screws Fig A Flush A against wall panels OO Center doors on right edge of groove as shown Fig m A Check ledger board is still flush under panels Screw hinge boards into wall supports and floor using four 3 screws as shown A Make sure screws go into framing and floor Fig C D Remove temporary supports and check doors open properly FINISH Center 3 8 You have finished installing your doors A measurement on right edge of groove a 4 E ns J a 19 7 E 411 8 1 11341 p 3 7 6 cm 5 into the wall Angle 3 5 floor H X 4 N Fig D 37 DOOR PART
15. S REQUIRED 2 5 cm 3 4 19 mm xi 28 5 8 x 3 x 55 1 6 x 7 6 x 140 cm x8 Pass 3 4 19 mm 234 La Bagged separately 48 122 cm Metal Threshold special coating GIN Secure hinge boards from inside using 3 4 screws as shown Fig Reinforce the door trim using 3 4 screws through door panel into trim Fig A Locate screws as shown in Fig B Use two screws at seams 237 Center trim ZB over doors and secure using eight 2 finish nails into framing as shown Center metal threshold between doors and secure using 8 3 4 special coating screws into floor as shown Fig C FINISH You have finished securing your door and trim 2 Nails x8 I Center Nail into framing Hinge ZB AS 7 Board a A Fig A A Install 3 4 screws Door 4 from inside X6 Trim pm come 14 35 5 cm f Approximately eee CENTER e CENTER 8 Special coating screws DOOR WEATHERSTRIP PARTS REQUIRED x14 2 5 cm x2 in 2x3x69 5 x 7 6x 175 cm 8 VEGIN AA e With left door closed center a weatherstrip OO vertically on the left door in 4 the door opening Fig A will offset the left door 1 OUT past the door trim 1 Fig B Secure using seven 3
16. as needed thereafter to maintain your warranty Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement The minimum ground clearance for siding must be one half inch 92 inch from concrete slab or two and one half inches 2 2 from the ground when building is erected or constructed on a treated wood floor kit Water from sprinklers must be kept off unit In no event will Backyard Storage Solutions LLC be responsible for any indirect incidental consequential or special damages nor for failure s that are caused by events acts or omissions beyond our control including but not limited to misuse or improper assembly improper maintenance which eventually leads to rot or decay and acts of God Backyard Storage Solutions LLC will not be held responsible for any labor costs incurred to construct your unit This warranty gives you certain specific rights that vary from state to state CLAIM PROCEDURE To make a claim under this warranty you can either call 1 888 827 9056 or prepare a letter Please have ready the information below when you call or include the information when writing 1 The model and size of the product 2 A list of the part s for which the claim is made 3 Proof of purchase of the Backyard Storage Solutions LLC item as shown on the original invoice 4 Run code as listed on the yellow warranty card enclosed in the product package Mail the above inform
17. ation to Backyard Storage Solutions LLC Attn Customer Service 1000 Ternes Monroe 48162 WARRANTY TERMS MAY VARY OUTSIDE THE U S A IMPORTANT This is your warranty certificate Please complete and mail your warranty card to properly validate your warranty 47
18. between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the upper corner Fig C Measurement Nail along the panel edge into the trim using 2 nails spaced 6 apart Nail along bottom of panel using 2 nails 6 apart Angle nail to hit floor frame Fig D GD Nail down the bottom plate using two 3 nails 9 D between the wall studs Screw through the backwall trim into the top plate using one 3 screw Fig E Screw through the backwall trim using one 3 screw Angle screw to hit floor frame Fig F 3 7 6 cm Screw C Repeat process to secure the left sidewall 3 7 6 cm crew Fig F 28 FRONT WALL INSTALLATION x4 A x34 3 7 6 2 5 7 6 gg e e BEGIN Stand frontwall on floor It is important to secure the frontwall in the following order Soffit Panel QD Center frontwall on floor side to side The sidewall soffit will overlap the frontwall 3 8 Fig A Nail the frontwall flush to the floor using 2 nails 6 apart Angle nails to hit floor frame Fig B Nail the lower sidewall corner to the frontwall trim with one 2 nail Fig C sure the measurement between the panel edge and the trim is the same along the entire length Then secure with one 2 nail in the uppe
19. ges and 12 apart inside panel Fig F ED Attach the lower roof panels flush to the upper panels and with a 1 8 measurement at the gable trim Fig G Nail the roof panel using 2 nails 6 apart on edges and 12 apart inside panel Repeat process to attach roof panels on the opposite side 2 TRIM PARTS REQUIRED x20 l x2 1 x 3 x 94 3 4 2 5 x 7 6 240 6 cm VEGIN Cu Attach fascia trim flush under roof panel and endcaps Fig A B using 2 2 5 cm nails as shown Finish attaching fascia at end of rafters Fig B using 2 2 5 cm nails as shown ED Repeat steps to attach fascia trim on both sides FINISH You have attached your fascia trim 35 DOORS PARTS REQUIRED x2 sene 2 x 3 x 69 5 x 7 6 175 3 cm x4 oo 3 7 6 cm HINT Look for 3 8 SPACER attached to doors x1 x1 x1 CA 9 Left Door Right Door 1 8 5 25 Te T V amp EGIN Orient parts as shown on flat surface AA 3 8 offset is to top Look for red right and green left on hinge board Attach temporary support OO using 3 screws with 3 4 1 9 cm gap from right edges Fig A and at ends Tighten securely Attach temporary support GAA at bottom with 1 1 4 screws Fig A Tighten securely GREE
20. is a maximum of 5 or less to the rain slot as shown below If shingles overlap at ridge cut to peak with a utility knife _ 12 7 MAX Lx Cw Cut Off Top of rain slot A If more than 5 to rain slot you must install another row of shingles Repeat steps 1 5 to shingle the opposite side of your roof Trim shingles at ridge Cu Once both sides are shingled you need to trim ends Strike a chalk line 1 from edge Using your shingle hooked blade carefully cut shingles along chalk line FINISH You have finished shingling your roof Proceed to capping the ridge 44 SHINGLES RIDGE You will finish off the top of the roof with a ridge cap made from shingles s V amp EGIN Cut shingles into THREE pieces Hint Use cut off pieces first 2 2 5 cm 5 cm exp Pa 2 5 2 2 A Score shingle then snap off angled cut 1 1 ay M Weather Seal Aw Top of slot 20 to 22 Note You will need about 20 22 cut pieces Pieces Install first ridge cap flush to shingles at front as shown Le ME i Flush FRONT OF SHED C Install second ridge cap 5 back as shown 1 Nail per side through weather seal Flush FRONT OF SHED 45 SHINGLES RIDGE CAP continued Continue installing ridge cap to back of roof Trim cap off flush
21. m x50 78 22 2 5 0 em x106 0 Deme 1 1 4 3 2 x58 3 4 19 DOOR HARDWARE Not Actual Size x1 C x1 48 122 Metal Threshold x4 iw 3 4 19mm x7 3 4 19 0 x8 3 4 19 Bagged seperately special coating NOTES FLOOR LEVELING OPTIONS There are multiple ways to level your floor frame Our recommended leveling method is shown below Leveling materials are not included in this kit PREFERRED METHOD 4x4 TREATED RUNNERS 2x4 s not included 96 a 4x4 Runners not included Measurements to centers of 4x4 s 3 Screw angled into 4x4 2 at each point frame and 4x4 touch MATERIAL REQUIRED X2 4 x 4 x 8 10 x 10 x 244 cm Treated Lumber Fasteners for Frame to 4 x 4 3 Screws shown as one option Minimum 20 3 screws exterior grade A Use only wood treated for ground contact and fasteners approved for use with treated wood A Always support frame seams Maximum between leveling Shingle 4x4 Runner material locations Level 48 ay 1 Gravel Block p Gravel 4 Block N LEVELING METHODS 2x4 Treated Lumber 8 Block Level under 4x4 runners only Locate leveling material 12 from ends of runners and no more than 48 apart Asphalt shingles should be used between 4x4 runners and blocks
22. mm thick methods and suggested materials to properly level your floor as this will vary depending on your specific site N If you reqiure a stronger floor you will need to purchase additional 2 x4 x8 material COMPLETING YOUR SHED You will need these additional materials 3 TAB SHINGLES 4 Bundles 1 GALVANIZED ROOFING 6 2 Lbs For shingles PAINT FOR SIDING 2 Gallons PAINTFORTRIM 1 Quart Use 100 acrylic latex exterior paint 2 coats recommended Use 100 acrylic latex exterior paint CAULK Ge 2 Tubes Use acrylic latex exterior caulk that is paintable WOOD GLUE Exterior Rated NAIL BOXES Not included L x2 Boxes 3 7 6 L x3 Boxes 2 5 0 Shown Actual Size OPTIONAL MATERIALS DRIP EDGE 34 Feet 15 ROOFING FELT To cover 73 Sq Ft of roof area 1 GALVANIZED ROOFING NAILS 1 4 Lb For roofing felt REFER TO THE BACK OF THIS MANUAL AND THE MANUFACTURER S INSTRUCTIONS FOR INSTALLATION OF SHINGLES DRIP EDGE AND FELT NOTES PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts Nominal Board Size Actual Size x 3 1 2 3 8 x 8 9 cm D x 3 1 2 1 9 x 8 9 cm RS 2 1 2 3 8 6 3
23. ntil you have a 3 4 measurement on the wall stud Secure corner with two 2 nails Fig B Nail the panel using 2 nails 6 apart on edges and 12 apart inside panel A Do not nail in groove For squareness maintain 3 4 and flush under soffit panel 15 25 Flush overhang at top T 3 4 gt 19 d TEES 3 4 Primed Side 1 if 1 3 4 Gauge Block Fig A Nul Ji I TN m 6 15 1 1 19 1 mn 1 Fig 2 Nails 1 LIP 1 CE SQUARE 4414 EDGE 48 19 ni gt 122 cm SIDE WALL PANELS PARTS REQUIRED x58 _ 2 5 cm 1 x 122 x 183 cm x2 3 8 x 48 x 72 m Place 48 panel on frame as shown with primed side facing up NOTE THE SQUARE AND LIP EDGES in groove Nail using 2 nails 6 apart on edges and 12 apart inside panel an wr To draw panels tight at seams angle nail Flush d 48 122 cm LIP SQUARE EDGE EDGE Carefully flip your sidewall over Repeat STEPS 1 8 to assemble your second side wall FINISH You have finished building both of your side walls
24. or treated lumber Never use shingles in direct contact with ground For best results and aiding in water drainage use gravel under each concrete block LEVELING MATERIALS Gravel Solid Masonry Blocks in 1 2 4 8 thickness 2x4 Treated Lumber Asphalt Shingles N Leveling higher than 16 not recommended CONCRETE e If you are building your shed on a concrete foundation see the following page 7 Before attaching floor decking it is important to level and square the floor frame A level and square floor frame is required to correctly construct your shed e N LEVEL AND SQUARE FLOOR FRAME N VEGIN GD See page 7 for the preferred floor leveling method CED Use level and check the frame is level before applying floor panels Check for frame squareness by measuring diagonally across corners If the measurements are the same the frame is square The diagonal measurement will be approximately 133 5 16 338 6 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at ends of each runner making sure the frame remains square Fig A FINISH Once the floor frame is level and square fasten the frame at each point the frame contacts the 4x4 runners Second secure at ends with one fastener Ce A 13
25. r 3 The failure occurs when the unit is owned by the original purchaser 4 Backyard Storage Solutions LLC has received the warranty registration card within thirty 30 days of purchase and notification of the failure in writing within the warranty period specified above 5 Backyard Storage Solutions LLC has had reasonable opportunity during the sixty 60 days following receipt of notification to inspect and verify the failure prior to commencement of any repair work REQUIREMENTS Storage Buildings amp Playhouses To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit shingle the roof and paint or solid colored stain the siding using 100 acrylic latex exterior product with a minimum of two 2 coats within thirty 30 days of assembly caulk above all doors and all horizontal and vertical trim boards paint and seal all exposed edges sides and faces of SmartSide and waferboard siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas amp Timber Buildings To validate your warranty it is necessary to properly maintain your Backyard Storage Solutions LLC unit This includes treating all of the exposed cedar and pine surfaces on your gazebo or timber building with an exterior grade wood preservative an exterior oil based semi transparent stain an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly and
26. r corner Fig D Nail along the panel edge into the trim using 2 nails spaced 6 apart 2 5 cm Nail ED Secure the frontwall into the top plate using one 3 screw Fig E Secure the frontwall through the trim using one 3 screw Angle screw to hit floor frame Fig F Fig E Continue to 3 3 nails though bottom plate 7 6 cm into floor crew Repeat process to secure the right side of the frontwall FINISH You have finished installing your front wall 3 7 6 cm Screw Fig F 29 GABLE TRIM PARTS REQUIRED x20 x4 PAX 2x 3x 41 11 16 5 x 7 6 x 105 9 cm CN VEGIN e A AN Position one PAX flush to front panel edge and center on right edge of gt 27 1 1 4 3 groove Fig A Attach trim with eight 1 1 4 screws from inside Position second PAX flush to panel edge and flush to PAX already attached Fig A Attach trim with eight 1 1 4 screws from inside Repeat steps 1 2 to attach the back trim Flush FINISH You have attached your upper trim sq PAX Center on right edge of groove Flush to top of panel TRIM ENDCAPS PARTS REQUIRED x32 1 1 4 3 2 cm x4 3 4
27. sembly and glue and nail gusset to back side Repeat steps 1 4 to build two more assemblies FINISH p Unscrew jig and save blocks Set aside rafters and proceed to building your back wall 1 4 0 6 cm Gap Contact at peak 101 256 5 cm Use Jig to assemble Rafters 11 BACK WALL PANELS PARTS REQUIRED x16 _ 1 1 4 3 x1 9 1 C 48 2 OY 2 x 3 x 72 5x 7 6 x 183 BEGIN Place OY on floor A Place the left back wall panel primed side down onto OY Fig A and flush to panel edges as shown Secure flush to edges using eight 1 1 4 screws 10 apart Repeat Steps 1 2 to assemble the right back wall panel lt FINISH SN OY You have finished building your back wall panels IX gt Q A Primed Side 7 7 Down Locate OY flush Fig A to these edges 10 25 4 cm Use 2x3 for temporary support 12 BACK WALL FRAME PARTS REQUIRED x1 2 x 3 x 43 3 4 5 x 7 6 x 111 x1 2 x 3 x 96 5 x 7 6 x 244 cm V GEGIN TA orient parts edge on floor as shown f P d 21 using two 3 nails at each connection E L BF 3 7 6 cm Nails o be 14 2 3 8 13 BACK WALL FRAME PARTS REQUIRED x2 CA 2x3 x 4
28. to shingles d 4 72 GO Install flush to shingles Flush to shingles FINISH You have finished your ridge cap 46 WARRANTY pee Storage Solutions LLC warrants the following Limited Conditional Every product is warranted from defects in workmanship and manufacturing for one year All hardware and metal components are warranted for two years Trim is warranted for 10 years Waferboard siding and sheathing is warranted for two years SmartSide siding is warranted for 10 years on all Marco series buildings and 15 years on all Premier Series buildings Timber series buildings siding and trim are warranted for 10 years Solar Shed windows are warranted for 1 year Cedar lumber is warranted for 15 years Cedar doors and Cedar Garden Center are warranted for 10 years 0 Metal roof is warranted for 25 years Warranty ONS Backyard Storage Solutions LLC will repair replace or pay for the affected part In no event shall Backyard Storage Solutions LLC pay the cost of labor or installation or any other costs related thereto All warranties are from date of purchase If a cash refund is paid on an affected part it will be prorated from the date of purchase CONDITIONS The warranty is effective only when 1 The unit has been erected in accordance with the assembly instructions 2 The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafte
29. ts on edge on floor Measure and mark from end of boards IMPORTANT You will build two walls the same Use two 3 nails at each mark 3 7 6 cm Nails 46 1 4 117 5 cm 22 en 57 cm 22 1 4 1 1 2 57 cm Center on marks OV x3 1 1127 3 8 HINT m 8 MN 63 cm 49 1 2 125 7 cm 23 SIDE WALL FRAME SOFFIT PARTS REQUIRED 325 1 1 4 3 2 cm x2 3 8 x 5 x 93 1 4 0 9 x 12 7 x 236 9 cm Place panel onto 2 x 3 with primed side against 2 x 3 Fig A AN Keep panel flush along entire edge of 2 x 3 top plate Fig A Attach soffit panel flush to 2 x 3 Fig and with 3 8 offset at ends Fig using fourteen 1 1 4 screws 93 1 4 236 9 cm A PRIMED SIDE n Flush AN Fig A 24 SIDE WALL PANELS PARTS REQUIRED x2 3 4 3 8 x 48 x 72 GAUGE BLOCK 1 x 122 x 183 cm AN Ensure your wall frame is square by installing one panel and squaring frame Place the 48 x 72 panel onto wall frame with primed side up as shown NOTE THE LIP AND SQUARE EDGES Use the gauge block to mark the 3 4 measurement on the wall stud Locate the panel flush under the soffit panel Secure panel with two 2 nails in the corners Fig A Move to the opposite end Using the long edge of the panel as a lever move the panel side to side u
30. x 3 x 5 1 9 x 7 6 x 12 7 4 GBA oS 3 4 x 3 x 8 1 4 1 9 x 7 6 x 21 cm d x4 RIGHT PAINTED RED 3 4 x 6 1 4 x 11 7 8 1 9 x 15 8 x 30 cm LEFT PAINTED GREEN VEGIN SG a amp Glue 5 and 8 1 4 boards onto endcaps and fasten with 1 1 4 screws as shown ZZ Ce Repeat steps to build two more endcaps Locate endcaps flush with upper trim and corner trim and attach each endcap from inside of shed using four 1 1 4 screws as shown Fig FINISH You have finished attaching your endcaps GBA GBA x2 Right RED 8 1 2 Board x2 4 1 1 4 3 2 cm Scr Fig A 31 RAFTERS P A RT S R E Q U D x1 2 J tttm ttt RR 3 7 6 cm X 6 SNL n 2 T al x3 48 pe Locate rafters directly over studs and flush to overhang in wall frame Fig A L SIZ _ Check that you have the measurements shown Screw through soffit panel into 2 VEGIN rafters using one 2 screw Fig A CE Attach with two 3 screws at each end Fig B Re tighten 2 screws if neccessary M Repeat steps to attach three rafters Screw into top plate 2 5 cm Screw NOTE Measurements from inside of panels 22 1 4 24 24 te 56 5 cm 61 cm 61 cm 22 1 4 gt 56 5

Download Pdf Manuals

image

Related Search

Related Contents

Sony Xperia M4 Aqua 8GB 4G Black  GoVideo DVD/VCR Combo DVD VCR Combo User Manual  Smeg FA560X User's Manual    Polaris 600 IQ Shift Offroad Vehicle User Manual  GPX ISP591B docking speaker  descargar pdf  HY313X EVA Test Tool User Manual      

Copyright © All rights reserved.
Failed to retrieve file