1. The balance will be delivered by a local lumber supplier When you receive their material check the material delivered against the material list on the back page If you feel you are missing any material listed call the store as soon as possible The foundation size should measure 16 0 wide by 24 0 deep Do Not make the foundation larger The siding should project beyond the foundation for water to expel properly from the walls Check building code in your area for foundation requirements IMPORTANT Unpack the material from our pallet then carefully disassemble the pallet The 2x4s will be used for bracing The OSB panels for roof sheathing The pallet is secured together with square head screws The bit for the screws is packed in the hardware bag The LP siding has a 50 year warranty and is already primed Apply two coats of latex acrylic paint for the finish coat Paint the bottom edge of the siding this is important Maintain 6 to 8 of clearance from the bottom edge of the siding and the ground Don t allow garden mulch to build up and keep shrubs a minimum of 1 away from the building Stacking the boards according to size will make them easier to find when needed Do Not discard any material no matter how small until your building is complete Our component kit does not include the shingles giving you a choice of color and quality The breakdown of the material you need to supply is listed on the back page If you have an
2. Butt the frames together Do Not nail frames together so they can be separated later 5 Square the frames Measure the wall diagonally corner to corner Then measure the opposite corner The measurements will be the same if the wall is square 6 Install the first siding panel flush with the end of the frame Install 2 two more siding panels Do Not nail the LAP edge to the first wall so you can separate the frames and install the walls separately Use 8d galv nails spaced 9 apart Do Not Nail LAP Edge ata Siding ee Siding Extends 3 4 Below Plate Step 2 Assemble Front Door Wall 1 Locate 2 two 2x8 boards that are 10 long Cut the 2x8 boards 3 longer than the rough opening required 2x8 Board 2 Cut 2 two 7 1 2 x 48 long fillers from OSB sheathing that was used to wrap the pallet Install these fillers between the 2x8s Assemble header using 16d sinkers OSB Filler 2x8 Board Cut a treated 2x4 16 to 16 O for the bottom plate From regular 2x4 16 boards cut 1 one to 16 O and 1 one to 15 5 Assemble the front wall panel using the wall plates cut above and pre cut wall studs Install the 2x8 header Note The bottom 2x4 will be removed from the door opening after the walls are set Subtract 1 12 from the rough opening for the door you are installing Cut pre cut studs and install under the door header 7 Install 2x4 blocks to hold the spacing between the door header and the 2x4 to
3. 2 Space Cut and Remove 2x4 Top Plate 4 Cut the 2x4 top plate Cut through the siding to remove the 2x4 The siding does not have to be removed The soffit when installed later will cover the cut marks in the siding 5 Place the beam into the beam pocket Secure in place with 16d sinkers 2x4 Wall Brace Step 9 Install Loft Floor 1 Install 10 long 2x4 tie plates on sidewalls Use 16d sinkers to secure tie plates _ _ _ 2X4 Tie Plate lk ILZ If you are installing the optional stair kit install joist header and floor joist at the front of the building Refer to the stair instructions to install the floor joist at the rear of the building 2 Install the 2x8 boards from Step 8 on the front and back walls flush with the top of the tie plates Secure the 2x8s to the wall plates and wall studs with 16d nails Important Nail 2x8 to each wall stud using 4 four 16d sinker nails in each wall stud 3 Cut and install 2x8 floor joists between the 2x8 joist header and beam You will need to install joist hangers on the opposite side of the beam 4 Install 3 4 flooring Start at the front wall with the Tongue edge flush with the siding Secure flooring with 8d spiral deck nail 5 Tongue and groove flooring does not cover 48 width Install a 1x4 8 white pine board filler after the last row of flooring Cut flush with siding
4. side of the building Step 16 Set Trusses 1x3 Board l Install 2x6 trusses over the X marks on the truss plate Toenail the truss to plate flush with the outside edge of the 2x6 truss plate Use 7d sinker Remove and use lower 2x4 wall bracing to brace the trusses 2x4 Bracing COLL LS l o Secure trusses to 2x6 truss plates with 2x6 AKAA CA AN metal hangers Nail metal hanger to truss plate and trusses with hanger nails 2x4 Metal Hanger Step 17 Install Roof Sheathing Install 7 16 OSB roof sheathing according to the layout below Install roof sheathing flush with the 2x4 on the rear gable Install the lower sheathing first Use a straight edge to align the top of the sheathing with the top of the truss See Detail B If you are installing ridge vent cut the roof sheathing at the top of the building to be 1 below the peak of the truss This will allow air circulation through the ridge vent Install sheathing using 7d sinkers Space nails 12 apart Install a plyclip between each truss on the top row of sheathing Cut Top Row to Fit ee 48 Long S 96 Long 96 Long Ve Long SES 48 x 72 48 x 96 48 x 96 48 x 27 Install This Row of Roof Sheathing First X 48 x 48 x 48 x 96 48 x 96 48 x 51 37 3 8 x 72 37 3 8 x 96 37 3 8 x 96 37 3 8 x 27 X Cut Sheathing From Pallet Building Tip Ridge vent provides ideal ventilation preventing heat or moisture from damaging your b
5. the wall studs with 16d galv deck nails Use 16d sinkers to nail the top plate Install a beam support built in Step 3 at the left end 5 Install the first 4x8 siding panel with the LAP edge extending 3 1 2 past the right end of the wall frame The siding will extend 3 4 below the bottom plate Siding Extends 3 1 2 J Past Frame Siding Extends 3 4 Below Plate 6 Install 2 two full width siding panels Step5 Assemble Left Sidewalls 1 Cut 2 two 2x4 12 to a length of 140 1 2 Position the boards together and indicate with X marks where the wall studs will be located 140 1 2 Wall Plate Top Wall Plate X X X Treated Bottom Wall Plate X X X 11 3 4 Le 16 r lt ___16 l 2 Install 92 5 8 wall studs between the top and bottom plates qm q 92 5 8 Precut IS mali aG Treated Bottom Plate 11 3 4 Space 3 Position this frame next to the panel with the beam support Do Not nail frames together Square the wall frame Install a siding panel Do Not nail the LAP edge to the 140 1 2 wall so you can separate the frames and install the walls separately 4 Install 2 two more siding panels Cut the last panel to extend 3 1 2 beyond wall frame Note Position the panel so the 11 3 4 stud space in at this end Do Not Nail LAP Edge Beam Support SN 140 1 2 Sidewall Step6 Assemble Right Sidewalls 1 Repeat 4 and 5 to assemble the wall frames for the right sidewal
6. 16 Back Wall 2x8 Joist Header 2x8 Floor Joist Step 10 Install Front amp Back Wall Trim 1 Cut 1x4 10 trim boards to length for the front corners Install trim flush with the bottom edge of the siding and the top of the loft floor Install the boards flush with the siding on the sidewalls Use 8d galv nails to install all trim boards 2 Cut and install 1x4 8 trim boards between the corner trim Important Install the trim board flush with the floor Loft Floor 3 Repeat procedure to install trim at the rear of building 1x4 8 Trim Sidewall 1x4 Corner Trim _ Step 11 Assemble Rear Roof Gable gt Assemble Roof Gable on Loft Floor 1 The rear panels are numbered 6 through 10 Locate panels numbered 6 and 7 Lay these Panel 7 panels siding down on the front loft floor Nail the panels together with 10d sinkers _ 2 The 2x4 wall studs in the bottom wall frame are screwed to Move Wall Stud the outside 2x4s If you are installing a window or loft door remove the screws and move the 2x4s to create the opening width needed The maximum opening width is 44 3 4 If no opening is necessary center the wall studs in the opening 7 3 Locate a 47 3 4 wide wall frame and an upper gable frame The frames are numbered 8A and 8B Nail these frames together using 10d sinkers Move Wall Stud Step 11 Assemble Rear Roof Gable Continued 4 Position gable walls numbers 6 and 7 on the floor with
7. SS EERE RARR ER RERE RR EKR ER ERER RR EREEREER ERER ERRER ERE REER ERE RER EER EERE ER ERER EERE EE REER AAA AUAUAURUNLAZ 7 J Sentry Assembly Book Buildings Revised February 6 2015 j a OMe _ f da x 1S ee Pad 1 g Or I uf i see ot Bs AS 7N ea aS 5 we ee TS ee te rf let 3 eis aie 5 A ian eae ah aa salle 16 x24 Build the Richmond x ites Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc aoe a SAP DD DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DODDI YDDDDDDDDDDDDDDD DDE EESEL Kakka eeuu KLERKE R CAS IS CROCK RAR CR OR CCEA RR ORR KK AR ORR AR ORO RS RAR CR OCR AALS CRORE CRSA CROSSES n OO E o Ww 4 54 2 54 Ww 54 Ww S v 54 gt A Ww z Cd m 4 IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our Richmond shed kit The material supplied is listed on the back page If you have received duplicate books use the one with the latest revision date The material may be delivered in two shipments Our shipment will contain the roof gables and truss components The nails are packed in the first layer of gable panels It is not necessary to unpack the rest of the material until you have built the lower walls and 2nd floor loft
8. e 10d sinkers 5 You can set this gable now Refer to Step 14 6 Repeat to assemble the front gable panels When complete move the gable frame to the back area of the loft to create room to assemble the roof trusses Step 13 Assemble Trusses 1 Lay 2x6 truss parts inside the 2x4 blocks One end of the 81 3 4 long 2x6 boards have a blue mark Place these ends together at the ridge Add a 2x4 block at the bottom of the truss leg to keep this 2x6 from moving 2 Install a 2x4 block at the ridge and at the knee area of the truss The 2x4 blocks at the knee have a blue mark on the end Install this end towards the ridge Hold blocks in place with 7d sinkers until the gussets are installed 3 Secure the 2x6 boards together using pre cut wood gussets Apply wood glue between the gussets and 2x6s Secure gussets with 3 three rows of 6d common nails spaced 6 apart 4 Turn truss over and apply gussets to the other side 5 Assemble the remaining trusses 2x4 Block Wood Gussets L Wood Gussets 2x4 Block 71 3 8 Truss o 2x4 Block w Member Blue Mark on End Step 14 Set Gables and 2x6 Truss Plate L Install front and rear gables The gable siding will extend over the 1x4 trim on the lower wall panel The bottom gable plate should overhang the loft floor the same distance on both ends Nail gable plate to floor with 16d coated nails Use a 2x4 to brace gables to floor Nail bottom edg
9. e of siding to 1x4 trim with 6d galv nails T 5 Teg eb TS Front Wall Siding Install 2x6 plates 92 from the center of the building When installed properly the 2x6 will project 1 1 2 past the 2x4 tie plate See detail below Nail to floor with 16d nails Layout 2x6 plate for trusses Important Start the truss layout 19 1 2 from the back of the gable plate Then space trusses 24 Install 2x6 plate on the opposite side 2x6 Truss Plate _ 2x6 Truss Plate floor t 2x4 Tie Plate N 1 1 2 Step 15 Install Soffit Overhang on Sidewalls 1 Extend the lines on the face of the 2x6 to the edge of the 2x6 2 Install 1x3 8 boards on the sidewall Use a 2x6 soffit block as a gauge to install the 1x3 at the correct height Nail the 1x3 boards to each wall stud with one 10d nail When installed the soffit blocks must be set directly below the trusses Screw A Soffit Block with siding attached to Overhang Nail 1x3 Board to Wall Studs 2x6 Truss Plate 2x6 Truss Plate Position the 2x6 soffit blocks between the 1x3 board 2 1 2 Screw and the 2x6 truss plate Secure the top of the soffit Bee l blocks in place by screwing through the 2x6 truss g EXD ay plate into the soffit block Secure the bottom by toe nailing through the bottom of the 2x6 soffit block into the 1x3 board Use 7d coated nails Install the soffit overhang on the opposite
10. idge 2x4 92 5 8 Pre cut Wall Studs 12 x 24 Truss Gussets knee 2x6 I Framing Lumber Vpr Primed Soffit Panels 2x8 10 Door headers 3 3 8 x 10 Primed Soffit Panels 2X8 12 Floor Joist Ibs 16d Galv Deck Nails 2x8 16 Joist Header lbs 16d Sinkers 11 7 8 x 16 LVL Beams Ibs 8d Galv siding amp trim nails 1x3 8 White Pine Trim lbs 8d Galv sprial loft flooring nails 1x4 8 White Pine Trim Ibs 7d Sinkers roof sheathing 1x4 10 White Pine Trim Ibs 6d Common for wood gussets Material Shipped by Best Barns lbs 1 1 2 Joist Hanger Nails Roof Gable Panels w siding applied pes 2x6 Joist Hangers loft joist 7 16 Roof Sheathing 48 x 90 pes 2x6 Truss Hangers trusses 2x4 82 1 4 Gable Overhang 32 oz Bottles Wood Glue 2x4 84 1 2 Gable Overhang Plyclips for roof sheathing 7 16 2x6 81 3 4 Truss Components Wood Screws 2 1 2 2x6 71 3 8 Truss Components 5 8 x 3 1 4 x 16 Beam Pocket Fillers Install felt paper and metal roof edging perimeter of the roof area Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Material Needed 25 bdl roof shingles 12 pcs roof edge and 2 rolls felt paper
11. l 2 Positions the wall frame with the beam support on the left Position the other wall frame as shown below This step is important so the siding is applied to the correct side of the wall frames 3 Apply siding to the wall frames following the previous procedure 11 3 4 Stud Space Frame with Beam Support Beam Support Step 7 Set Wall Panels 1 Set the left sidewall panels and the 96 long back wall panel Secure the corner together with 16d sinkers 4 four nail per corner 2 Set the other back wall panel and the right sidewall panel Brace sidewalls using 90 long 2x4s pallet material Cut a 2x4 16 to a length of 15 5 and install across the top of the back wall The 2x4 will set in 3 1 2 from each end of the back wall 15 IR 5 Long Tie plate Wall Panel with Beam Support mw we A e 5 Install the remaining wall panels Step 8 Install 2nd Floor Loft Beam 1 Cut 2 two 1 3 4 x 11 7 8 LVL micro lam beams to a length of 16 0 Glue and nail them together with 16d sinkers 2 Cut 2 two 2x8 16 boards to 15 5 Position a 2x8 against the 16 beam as shown below 3 Position 2x8 blocks leftover from door header at the top of the 2x8 and beam Important The hangers should line up across from each other Install metal joist hangers on both 2x8 s and beam Install hanger with hanger nails 2x8x15 5 2x8 Blocks Metal Hanger 16 0 Beam 2x4 Blocks C 3 1
12. p plate 2x4 15 5 Tie Plate pa 1 2 space 3 1 2 ae ae a a I 2x8 2x8 Door Heder Header a ive 2X4 16 Precut 2x4 Studs lt 2x4 Header Support Studs cut to length lt 6 _ 16 Lale area en 2x4 16 Treated 16 16 16 Bottom Plate 15 1 4 15 1 4 St ee Step 2 Assemble Front Door Wall Continued 8 Square Wall Frame Install a 4x8 panel with the LAP edge flush with the left wall stud 9 Install more 4x8 siding panels 10 Cut siding from door opening Siding Flush w Opening Siding Extends 3 4 Below Plate Step 3 Build Beam Supports 1 Cut 2 two pre cut wall studs to a length of 83 3 4 83 3 8 if using western wall studs Nail one of the 2x4s to a pre cut wall stud Use 10d sinkers 2 Nail 3 three 3 1 4 x 16 long OSB fillers to the 83 3 4 long 2x4 as shown Use 6d common nails 3 Install the other 83 3 4 82 3 8 long 2x4 over the fillers 4 Repeat to assemble another beam support 83 3 4 long 2x4 3 3 8 When using 5 8 OSB Filler western wall studs Pre cut 2x4 Step 4 Build Left 12 Sidewalls with Beam Support 1 Cut a 2x4 12 treated board to a length of 140 1 2 2 Cut a 2x4 12 board to a length of 137 This will be the top plate D ea PNK Beam Support 16 pene 16 aes 11 3 4 3 Install 92 5 8 wall studs between the top and bottom plates Install the first stud 11 3 4 from the right end Nail the treated bottom plate to
13. the siding facing up 5 Install the center wall frame against the panels Cut a 4x8 siding panel to the shape of the center gable and apply to center wall frame 6 Fasten 2x4 packing blocks to the loft floor on the outside of the gable frames Tack nail blocks or use 2 1 2 screws Siding Extends gt Below Bottom Plate 2x4 Block 7 Locate gable panels numbered 9 and 10 Remove the Front Wall siding from these panels The siding panels are tacked to the walls with a few nails 8 Install the gable frames numbered 9 and 10 to the center wall panel Reapply the siding 9 Fasten more 2x4 packing blocks to the outside of the gable frames Reapply Siding Step 12 Install 2x4 Gable Overhangs 1 Nail the siding where the siding panels overlap Use 8d galv nails 2 Move the gable panel to the back loft area Install 82 1 4 long 2x4s at the top of the gable The 2x4s have a blue mark on one end Install this end at the peak Install the 2x4s so they extend 1 2 above the gable frame to receive the roof sheathing Use 10d sinkers Nail another layer of 2x4s over the first layer to create a 3 deep gable overhang 2x4x82 1 4 2nd Layer End With Blue Mark l a m A s lt lt N Se os Ve 4 Locate 4 four 2x4s that are 84 1 2 long and have an angle block attached to one end Install these 2x4s along the sides of the gable frame extending 1 2 beyond the gable frame Us
14. uilding or its contents Pie Shingles SSN Space Ridge vent provides me ideal ventilation DETAIL B Step 18 Install 1x6 Eave Soffit 1 Install 1x6 white pine boards under the 2x6 eave overhang You can install soffit vents for added ventilation 2 Cut and Install 1x4 corner trim under 1x6 soffit board Cut to length 3 Cut 3 wide primed siding panels to length and install under the gable overhang 4 Cut 3 3 8 wide x 10 long primed siding panels to length and install under the gable overhang n Ie 1x6 Soffit Board Step 19 Install Gable Trim 1 Install 82 1 4 long 1x6 white pine trim boards at the top of the gable overhangs Install the end with the blue marking at the ridge Install 1x6 flush with the top of the 2x4s Use 8d galv nails 2 Install 86 long 1x6 white pine trim boards at the sides of the gable overhangs 1x6 Gable Trim lt Packing List Richmond 16 Wide x 24 Barn Kit Material Shipped by Others Material Shipped by Best Barns 3 8 LP Exterior Siding 2x6 10 Soffit Blocks 7 16 OSB Sheathing 2x6 10 Soffit Blocks w siding 3 4 OSB Loft Flooring 1x6 84 1 8 Gable Trim 8 Treated Boards 1x6 73 1 2 Gable Trim Treated Boards 1x6 ey Beveled Soffit Boards Treated Boards 1x6 59 Beveled Soffit Boards Framing Lumber 1x6 24 Beveled Soffit Boards Framing Lumber 2x4 23 1 4 Truss Ridge Blocks Framing Lumber 2x4 2 Truss Knee Blocks 10 x 24 Truss Gussets r
15. y questions about assembling the kit call 800 245 1577 If you are calling after normal business hours call 724 866 HELP 4357 or email to help barnkits com Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations Thank you for your purchase Bill amp Linda Rinella owners i measure 3 from here When measurements are given for board length NV it is from the longest side of the board T O ol _ Hammer amp Phillips Screwdriver J Power Screwdriver Drill i List _ Framing Square amp Level _ Measuring Tape l __ Circular Saw _ 2 12 Step Ladders Always wear safety glasses when cutting or nailing Step 1 Assemble Rear Wall 1 Note When building the lower walls use treated 2x4s for the bottom wall plate Cut 2 two 2x4 8 boards one will be treated to a length of 8 0 Position the boards together and indicate with X marks where the wall studs will be located 8 O Plates Top Wall Plate Treated Bottom Plate Stud Spacing gt 3474 __lo __ 16 NOTE In western States all wall studs are 92 1 4 in length 92 5 8 Precut Wall Studs Treated Bottom Plate 2 Install 92 5 8 wall studs between the top and bottom plates Nail the treated bottom plate to the wall studs with 16d galv deck nails Use 16d sinkers to nail the top plate Repeat to build another 8 long wall frame

Download Pdf Manuals

image

Related Search

Related Contents

Hitachi 50PD9800TA User's Manual  Mise en page 1  MONTE-CARLO IMPORTANTS BIJOUX ET MONTRES DE  König CSGCIPH5BL mobile phone case  USER MANUAL LCT-500  Manual: 4200 LaserSource - Laser 2000 Medienserver  1. Información de seguridad 2. Descripción general 3  MS型側圧式液面計 取付・取扱説明書  

Copyright © All rights reserved.
Failed to retrieve file