1. These trim boards Ixg Tr measure 4 1 4 wide Im ee Side Wall Back f ush WAII A 87 3 4 Long 1x4 Corner Trim Step 9 Install Front Wall Trim amp Door J amb 1 Install 87 3 4 long 1x4 corner trim boards and 1x4 trim boards to the front wall flush with the top plate on the sidewall 2 Install 48 long x 5 3 8 wide primed siding material on the top of the door opening 3 Install 83 long x 5 3 8 wide primed siding material on the sides of the door opening p C 3 8 Thick Primed Door Jamb Step 10 Install Gables 1 Install a gable on the rear wall The gable siding will extend over the 1x4 trim on the lower wall NOT behind the trim Secure gable to wall by nailing through the gable plate with 10d sinkers Nail siding along the 1x4 trim board with 8d galv nails 2 Repeat to install a gable on the front wall Important Bottom edge of siding extends over 1x4 trim Step 10 Install Gables Continued 2 Install 2x4 6 boards as tie plates on the both sidewalls between the rear and front gables Use 10d sinkers l l Sl T Sidewall 2x4 6 Tie Plate Step 11 Layout Roof Trusses 1 Layout the truss spacing from the rear of the building Measure from the inside of the rear gable when marking the location of the first truss Important When marking the opposite wall place the X mark on the same side of the line so your trusses are parall
2. 4 pes 1x4 Wall Trim 72 Siding Panels 24 x 87 1 4 pes 1x4 Corner Trim 8 7 3 4 Siding Panels Gables 48 x 40 Roof Sheathing 48 x 83 1 2 Siding Panels Gables 48 x 28 Roof Sheathing 37 1 2 x 48 Roof Sheathing 48 x 72 Roof Sheathing 37 1 2 x 72 Roof Sheathing 48 x 48 Material Purchased By Owner 10 bdl Roof Shingles 8 pcs Roof drip edge
3. Turn this truss over and apply wood gussets to the opposite side Repeat 2 through 5 to assemble 6 six more trusses Do Not remove blocks from floor until completing Step 2 12 x24 Gusset Top Gusset gt Top Truss Member 2x4 Block 2x4 90 Collar Tie gt Install collar tie the same 2 ZN iii distance from edge of floor n Me Ai S E a E o a ae a T 2x4 Block Step 2 Assemble Roof Gables 1 Butt 2 two 72 long 2x4s together and secure by nailing a 3 1 2 x 31 3 4 long ply wood gusset across the top where they butt together Use glue and 6d common nails SS ____ 3 4 Plywood Gusset 72 long 2x4 2 Place 2 two truss members in the jig Secure the top together with a barbed metal plate 3 Remove the 2x4 blocks at the corners of the floor and insert the gable plate assembled above into the bird s mouth Make sure the 2x4 gable plate is straight If necessary tack 2x4 blocks to hold plate straight Barbed Metal Plate 2 gt 2x4 Gable Plate 2x4 Block 23 1 2 Gable Stud 4 202 el i a Screw poe plate to truss leg with 2 1 2 screw 4 Remove the two 2x4 blocks that held the collar tie in position 5 Install 2x4x23 1 2 gable studs Nail through the bottom plate with 10d sinkers and secure the top with barbed metal drive on plates 7 Repeat to assemble another gable Remove 2x4 blocks Step 3A Install Siding on Gables 1 Select one
4. of the gable frames Turn the gable over letting the bottom plate overhang the floor so the gable lays flat LAP 2 Install gable siding using 6d galv nails across Edge RY the top of the gable frame Use 8d galv nails along the bottom edge See Note Below LAP Edge SS KN Siding Extends 3 4 Gable trim will cover where Below Bottom Plate the siding butts together Install Siding on Ends 3 Install siding on the other gable frame Step 3B Build 2x4 Assembly 1 Locate 2 two 49 1 2 boards that have shorter 2x4s attached Butt these boards together 2 Apply glue over the exposed area of the longer boards Using 6d common nail a 3 1 2 x 44 OSB filler over the bottom boards Align the boards against the floor or other object to make sure the boards are straight before securing the OSB filler 3 Install a 55 long 2x4 over the OSB filler For added strength apply glue between the 2x4 board and the OSB filler Secure with 8 eight 2 1 2 long deck screws at each end and the center 4 Mark this side B so when installed this side will face the back of the building Another layer of 2x4s will be installed after the 1x6 door jamb is installed 5 Install 8 eight more screws on the opposite side in the 49 1 2 board with center as shown shorter 2x4 attached Step 4 Assemble 12 Back Wall 1 Position 2x4 68 1 2 boards together and indicate with X marks where the wall
5. studs will be located Mark the ends that will butt together with the letters A and B 68 1 2 Wall Plate 68 1 2 Wall Plate lt 19 3 4 24 gt P 2o ly 24 gt Da WS 2x4 7 Wall Studs SQ 2 Install 7 wall studs between the top and bottom plates Assemble wall frames with 10d sinkers two 2 nails at each stud end Nail both wall frames together 3 Square wall frame Measure diagonally corner to corner The measurements will be the same when the wall is square Install the first siding panel with the LAP edge extending 3 1 2 past the wall frame The bottom will extend 3 4 below the bottom plate Use 8d galv nails spaced 12 apart 5 Install the other siding panels Cut the last panel to extend 3 1 2 beyond the wall frame IS The siding will be 1 2 below the top of the wall frame on all walls __ N Edge Siding Extends 3 1 2 Past 2x4 Stud Step 5 Assemble 12 Long Sidewalls 1 Position 2x4 72 boards together and indicate with X marks where the wall studs will be located 72 Wall Plate 72 Wall Plate 23 1 4 24 23 1 4 24 gt 72 Wall Plate gottom pe 2x4 7 Wall Studs 2 Install 7 wall studs between the top and bottom plates Nail both wall frames together I gt If you are installing the optional walk in door see the instructions at the back of the book 3 Square wall frame Install the first siding panel with the LAP edge flush with the end of the
6. SNEEKER EEEE E EEEE EEE EEEEEE EEEE KEKEE EEEE EEEE EEEE KE EEE EEE EEEE EEE EEEIEE KEE EE EEEE EEE EEEE Best Barns USA l Assembly Book A Revised July 21 2014 G the Sierra 12 x 16 Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 724 646 3775 This manual is copyrighted Under the copyright laws this manual may not be copied in whole or in part without consent from Reynolds Building Systems Inc Copyright 2011 ZO DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DDD DDN WMA ddddddd ddd dq EEEE EEEE EE EEE da dq EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EE EEE EEEE EEE EEE EE EEE EE EEE ZED DDD DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD DUN S IMPORTANT INFORMATION ABOUT YOUR SHED KIT Thank you for purchasing our Sierra kit These instructions will construct a 12 x16 building If you received two books use the one with the latest revision date If you have any questions about assembling the kit call 800 245 1577 If you are calling after normal business hours call 724 866 HELP 4357 or email to help barnkits com Before you begin construction be sure to study this assembly manual Also obtain a building permit and check all pertinent building code regulations The material that is included in o
7. e door header Install door header over header supports 80 1 2 Header Supports 37 1 2 Long 2x4 door opening 34 1 2 OSB Filler Material Packaged In Lumber Kit Collar Ties 2x4 90 1 1b box Sinkers Truss Rafters 2x4 86 1 4 1 Ib box Sd Galv Wall Studs 2x4 84 1 Ib box 7d Sinkers Double Studs 2x4 84 1 lb box 6d Galv Wall Plates 2x4 T2 1 lb box 6d Common Wall Plates 2x4 68 1 2 1 Ib box 1 1 2 Hanger Nails 2x4 2x4 Door Jamb Door Assembly 51 1 2 55 Ca Ca 1x4 2x4 Metal Plates Metal Truss Hangers Wall Plates 2x4 48 Wood Screws Wall Plates 2x4 Bottle Glue Gable Studs 2x4 23 1 2 1x6 Gable Trim 87 Pre built Door Assembly 49 1 2 1x6 Fascia Trim 84 SidingOver Door 3 8 3 1 2 x 48 1x4 Door Trim sides 84 Primed Soffit Boards 3 8 5 x 48 1x4 Door Trim top 51 1 4 Primed Soffit Boards 3 8 5 x 24 7 16 Filler Board 3 1 2 x 44 Primed Soffit Boards 3 8 8 1 2 x 48 7 16 Filler Board 3 1 2 x 48 Primed Door Jamb 3 8 5 3 8 x 48 7 16 Truss Gussets 8 x 20 Primed Door Jamb 3 8 5 3 8 x 83 7 16 Truss Gussets 12 x 24 Plywood Gusset 3 4 x 3 1 2 x 32 7 16 OSB 37 1 2 x 83 1 2 Material Packaged In Siding amp Roof Sheathing Kit Siding Panels 48 x 87 1 4
8. el when they are installed 2 Using 1 1 2 hanger nails install metal hangers to the 2x4 tie plate The opening should line up with the X mark the bottom of the opening flush with the 2x4 tie plate See Detail D Detail D 2x4 Tie Plate N lt a Measure From Backside of 2x4 Step 12 Set Roof Trusses Set roof trusses Secure trusses to metal hangers with 1 1 2 hanger nails Rear Gable Step 13 Install Eave Soffit amp Corner Trim 1 Locate a 5 wide x 24 siding panel that has a tongue edge Install this panel under the truss overhang at the rear of the building Install the siding soffit panel with the beveled edge flush with the end of the trusses and the cut edge against the gable siding Use 6d galv nails 2 Install 4 four more full length siding panel under the trusses Cut the last panel to fit 3 Install soffit panels on the opposite side Start with a 24 long panel that has a LAP edge Sof fit 4 Cut 87 3 4 long 1x4 trim boards Beveled Edge to length and install at the corners Step 14 Install 1x6 Fascia amp Roof Sheathing l Starting at the rear of the building cut 1x6 7 white pine fascia boards to 6 and install on each side flush with the face of the siding on the back gable Install the fascia so the bottom edge of the roof sheathing will rest on ic SECU Use a straight edge to align the 1x6 boards with the t
9. evel _ Measuring Tape amp Chalkline _ Circular Saw and or Hand Saw _ 2 8 Step Ladders Always wear Safety glasses when cutting or nailing Optional Wood Floor System Shown below is a typical wood floor Depending on your area the construction may have to be changed to meet local codes The foundation size should be 12 0 x 16 0 1 Cut 2 two treated 2x4 8 boards in half 2 Butt 4x4 8 treated runners together Use one of the 4 long 2x4s to secure them together Note Use 16d galv nails to secure all treated framing together 3 Repeat to join the other 4x4 runners 4 Long 2x4 4x4 Treated Runners Cut 2 two 2x4 16 joist headers to 16 0 5 Layout for 12 on center joist spacing X marks where floor joist will be placed 2x4 16 0 X X IX X Detail 1 Joist Header X X X 1 1 4 1 12 6 Cut all the 2x4 12 boards to 11 9 These boards will be the floor joist Treated lumber may be thicker than 1 1 2 Take this into account when cutting the length of floor joists Shorten joist measurements if necessary to obtain 12 O building width 7 Install floor joist boards between the joist headers Use 16d galv nails Install this section over 4x4s 2x4 16 Joist Header 2x4 11 9 Floor Joist 4x4 Runners Optional Wood Floor System 8 Itis important that the floor be level and square Square the floor as follows before nailing the flooring measure the floor diagonally corne
10. op of the trusses Install fascia with 8d galv nails 1x6 6 Fascia Board Cut another 1x6 7 board to 6 and install in the center of the building Install roof sheathing per layout below Make sure the trusses are plumb and the roof sheathing meets the center of the truss Use 7d sinkers spaced 12 apart The top row of roof sheathing will be about 1 below the ridge to allow for ventilation Important Make sure the front gable is plumb and the roof sheathing extends 8 1 2 past the siding along the face of the gable 48 Long Panel 72 Long Panel 83 1 2 Long Panel Remove From Pallet 48 x 48 48 x 83 1 2 Sheathing Will Extend 8 1 2 Beyond Gable Step 15 Install Front Soffit 1 Install 86 1 4 long 2x4s under the roof sheathing against the front gable 2 Install 86 long 2x4s under the front edge of the roof sheathing Hold the 2x4s against the roof sheathing and screw through the sheathing into the 2x4 boards Use 1 5 8 long screws Install 8 1 2 wide siding under the gable overhang as the soffit Use 6d galv nails 4 Install 2 two 87 long 1x6 trim boards over the 2x4 boards flush with the top of the roof sheathing Use 8d galv nails 5 Cut 1x6 7 long 1x6 fascia boards flush with the 2x4 boards at the front of the building 6 Install 1x6 trim on the back gable 7 7 m 1x6 Gable Trim Nan I nstall Optional Door Sill If you ordered the o
11. ptional floor install the galvanized door sill Secure sill with pan head screws i Soffit Panels Galv Door Sill Step 16 Install 2x4 Around Door J amb 1 Install a 2x4 7 on the inside of the door opening to support the door track Use 2x4 wall bracing material 2 Install 51 1 2 long 2x4s across the top of the door jamb iz 51 1 2 Long 2x4 Prime Door Jamb o 2x4 7 VIEW FROM INSIDE Step 17 Install Roofing Not Supplied in Kit 1 Install metal roof edging perimeter of the roof area If you are not installing shingles at this time you can purchase Paper felt paper to protect the roof sheathing Install the felt paper before you install the metal roof edge 1x6 Fascia 2 Install shingles according to the instructions on the wrapper If you need more detailed instructions on installing shingles there are good publications at book stores or newsstands Building Tip Install a ridge vent in lieu of shingle caps Ridge vent provides ideal ventilation preventing heat or moisture from damaging your building or its contents ey a Shingles Optional ridge vent provides ideal ventilation Space Optional DoorOpening Frame Door Opening 1 Cut 2 two 80 1 2 long header supports form 2x4 7 boards 2 Cut 2 two 37 1 2 boards from a 2x4 7 2x4 Header 3 Cut a 3 1 2 x 37 1 2 filler from a 48 long OSB board included in the kit Assemble th
12. r to corner Then measure the opposite corners These measurements will be the same if the floor is square The diagonal measurement should be 20 0 Nail several floor joist to the 4x4 runners to hold the floor frame in place 9 Install floor using 8d spiral nails ta Material Description 12 x 16 shed 2x4 Treated 2pcs 8 2x4 Treated 17 pes 12 2x4 Treated 2 pes 16 4x4 Treated Runners 8 pes 8 Flooring 3 4 6 pcs 4x8 Screw Floor Nails 3 lb 8d Galv Box Nails 51b 16d Step 1 Assemble Trusses IS Building Tip To aid in the assembly of the trusses temporarily screw 2x4 blocks to l 5 6 the floor There are short 2x4s that may have an angle on one end supplied in kit This will insure that all the trusses are assembled the same Screw 2 two 2x4 blocks to the 12 wide end of the floor at the corner see below Place two truss legs together Position the notch in the 2x4s called a bird s mouth into the 2x4 blocks Important You must have 12 0 between the bird s mouth Affix more 2x4 blocks above the truss legs to hold the truss members in place Secure the tops together with a wood gusset Apply wood glue between the 2x4 boards and the gusset Nail the gusset to the 2x4s with 6d common nails Use 14 nails per gusset Install a 2x4 90 collar tie between the 2x4 boards Hold in place with 2x4 blocks Install 12 x24 gussets to the ends of the collar tie Glue and nail using 14 nails per gusset
13. ur kit is listed on the back page The optional floor package if ordered will be supplied by a local lumber supplier The door opening is for a 8 wide x 7 high garage door You will need to order your garage door with an 9 low headroom kit The foundation size should measure 12 0 wide by 16 0 Do Not make the foundation larger than the building size The siding should project beyond the foundation for water to expel properly from the sidewalls IMPORTANT Unpack the material from the pallet then unscrew the 2x4s from the pallet The bit for the screws is packed in the hardware bag Remove the OSB panel it will be used for roof sheathing The 2x4s will be used for wall bracing and interior door jamb material When building the trusses our instructions suggest using the floor as a work area If your foundation is a concrete slab it will not be possible to use this method Build the 12 long back wall to use as a platform The LP siding has a 50 year warranty and is already primed Apply two coats of latex acrylic paint for the finish coat Paint the bottom edge of the siding this is very important Maintain 6 to 8 of clearance from the bottom edge of the siding and the ground Don t allow garden mulch to build up and keep shrubs a minimum of 1 away from the building Thank you for your purchase Bill amp Linda Rinella owners Tool List _ Hammer amp Phillips Screwdriver J Power Drill Screwdriver _ Framing Square amp L
14. wall and extending 3 4 below the bottom plate 4 Install 2 two more siding panels Siding 1 2 Below LAP Top P p Plate SS TN 5 Repeat to assemble the another sidewall Step 6 Assemble Sidewalls for 16 Building Length 1 Install 3 three 7 wall studs between 2 two 48 long 2x4s boards Install the middle stud in the center of the wall frame 2x4 4 Bottom Plate 2 Repeat to assemble another 4 wall section 3 Select one of the 12 sidewalls assembled in Step 5 Butt the 48 wall frame against the wall with siding DO NOT nail these frames together so they can be separated later 4 Install a full width siding panel but do not nail along the long edge that overlaps the 12 wall frame You can nail this edge after the wall panels are installed This will enable you to separate the wall panels making them easier to handle Bo Not Nail Along This Edge ae 4 Wall Panel 12 Wall Panel from Step 5 5 Repeat to apply siding to the other 4 wall frame Step 7 Assemble Door Walls 1 Locate a 7 wall stud with a 83 1 2 long 2x4 attached 2 Assemble a wall frame using a 7 wall stud the double stud and 2 two 19 long 2x4 wall plates Use 10d sinkers 2x4 7 Wall Studs 19 Bottom Wall Plat ee 83 1 2 Long 2x4 3 Repeat to assemble another wall frame Mark Left Frontwall 4 Locate a 24 wide siding panel that has a LAP edge Position this panel with the LAP edge flush
15. with the 2x4 header support and extending 3 4 below the bottom plate Cut Edge Extends3 1 2 Beyond Frame LAP Edge Siding Extends 3 4 Below Plate 83 1 2 Long 2x4 Mark Right Frontwall SO 5 Install the remaining siding with the tongue edge flush with the edge of the 83 1 2 long2x4 Cut Edge Extends3 1 2 Wo Beyond Frame 83 1 2 Long 2x4 Bottom Plate Step 8 Set Walls amp Install Rear Trim l 12 Set wall panels Secure at corners with 10d sinkers 4 nails per corner Secure to floor with 10 sinkers Disassemble shipping pallet and use the 2x4s to brace the front wall and the sidewalls Install the pre built 2x4 assembly from Step 3B between the front wall panels Install assembly on the front wall panels with the side marked with the letter B facing the back of the building Install 2 two 3 1 2 x 48 siding panels over the built up assembly Note The trim boards will hide where the siding panels meet the fit does not have to be exact 2x Wall Brace Pre built 2x4 Assembly Sidewall Nail Siding Panels Where They Overlap 3 1 2 x 48 Siding Panels Install 87 3 4 long 1x4 corner trim boards to the rear wall Install trim flush with the 2x4 top plate and flush with the siding on the sidewalls Use 8d galv nails spaced 12 apart Cut 2 two 1x4 6 trim Flush Across board to fit between the Top Plate corner trim boards

Download Pdf Manuals

image

Related Search

Related Contents

SE128K - Kastor Gaas  StoreBound DFSB001RD Use and Care Manual  Training in Integrated Pest Management Number 3 (French)  スポーツカウント  エピソード Type S  修理お取扱いについてのお知らせ  ユーザーズ マニュアル - Rockwell Automation  

Copyright © All rights reserved.
Failed to retrieve file