Home
ShelterLogic 95340 Instructions / Assembly
Contents
1. A 11114 11051 Use 11131 11051 2 L 3 ASSEMBLE MIDDLE RIBS he eee Assemble middle ribs as shown in Fig 3 Securely fasten all of the joints with the hardware indicated 11112 11112 Fig 3 800057 800057 amp Page 4 05 202153 B2 4 ASSEMBLE WIND BRACES Fig 4 17 EA GENE OIO ss Snow LN ep in Fig 4 Securely fasten the joints with the 11179 11005 hardware indicated 00690 5 CONNECT THE FRONT END RIB TO THE MIDDLE RIBS A With help move the front end rib into the desired staked area B Place the ShelterLock 800372 on the upright as shown in Fig 5 C From the outside of the rib insert the bolt through the upright and then through the ShelterLock D Place the plain end of a Cross Rail 11102 over the bolt and nest it into the ShelterLock Repeat steps A D for the each of the middle ribs E Place the wind brace over the Cross Rail Install the nut onto the bolt and tighten 6 CONNECT THE BACK END RIB The Cross Rails for the last rib will have two plain ends 11104 Take the wind brace and attach it between the end rib and the last middle rib as shown in Fig 6 800454 Page 5 05 202153 B2 7 INSTALL TOP CROSS RAIL A Connect the plain end of the first cross rail 11102 UNDER the front end rib and secure it with bolt 800454 as shown in Fig 7A HAND TIGHTEN this bolt B Connect the middle cross rails 11102 to the first cross rail Lay them OVER the top o
2. S du cliquet dans le trou pratiqu dans le montant recourb Ins rez la courroie dans la bobine du cliquet et tirez sur la courroie Actionnez le cliquet de sorte que la courroie se chevauche elle m me C Glissez y les rails de toile 11105 les fourreaux en tissu chaque pied puis fixez les avec une bride chaque pied R p tez cette tape de l autre c t Appuyez sur les rails de toile pour tendre la toile avant de serrer compl tement les boulons D V rifiez les cliquets et les rails de toile chaque mois pour vous assurer que la toile est bien tendue REMARQUE Le logo ShelterLogic doit tre orient comme le montre l illustration ci dessous CORRECT D J a L ITE RAILS DE TOILE 11105 AVANT Courroie et cliquet retenant la toile Brides de traverse pour nervure centrale Brides de traverse pour nervure d extr mit Page 18 05_202153_B2
3. REPLACEMENT PARTS ASSEMBLY SPECIAL ORDERS Genuine ShelterLogic Corp replacement parts and accessories are available from the factory including anchoring kits for nearly any application replacement covers wall and enclosure kits vent and light kits frame parts zippered doors and other accessories All items are shipped factory direct to your door QUESTIONS CLAIMS SPECIAL ORDERS CALL OUR CUSTOMER SERVICE HOTLINE U S CUSTOMER SERVICE 1 800 524 9970 INTERNATIONAL CUSTOMER SERVICE 001 860 945 6442 CANADA CUSTOMER SERVICE 1 800 559 6175 HOURS OF OPERATION MON FRI 8 30AM 8 00PM EST SAT SUN 8 30AM 5 00PM EST CARE AND CLEANING A tight cover ensures longer life and performance Always maintain a tight cover Loose fabric can accelerate deterioration of cover fabric Immediately remove any accumulated snow or ice from the roof structure with a broom mop or other soft sided instrument Use extreme caution when removing snow from cover always remove from outside the structure DO NOT use hard edged tools or instruments like rakes or shovels to remove snow This could result in punctures to the cover DO NOT use bleach or harsh abrasive products to clean the fabric cover Cover is easily cleaned with mild soap and water WARRANTY This shelter carries a full limited warranty against defects in workmanship ShelterLogic Corp warrants to the Original Purchaser that if properly used and installed the product and all as
4. 14 W x 12 H Round Shelter Assembly Manual Please read instructions COMPLETELY before assembly This shelter MUST be securely anchored THIS IS A TEMPORARY STRUCTURE AND NOT RECOMMENDED AS A PERMANENT STRUCTURE Before you start 3 or more individuals recommended for assembly Assembly time is dependent upon the length of your building Allow approximately 15 minutes for every foot in building length 7 Shelter ETELE 150 Callender Road Watertown CT 06795 1 800 559 61 75 www shelterlogic com 12 12 12 Page 1 05 202153 _B2 ATTENTION This shelter product is manufactured with quality materials It is designed to fit the ShelterLogic Corp custom fabric cover included ShelterLogic Corp Shelters offer storage and protection from damage caused by sun light rain tree sap animal bird excrement and light snow Please anchor this ShelterLogic Corp structure properly See manual for more anchoring details Proper anchoring keeping cover tight and free of snow and debris is the responsibility of the consumer Please read and understand the installation detail warnings and cautions prior to beginning installation If you have any questions call the customer service number listed below Please refer to the warranty card inside this package DANGER Prior to installation consult with all local municipal codes regarding installation of temporary shelters Choose the location of your shelter carefully DANGER Keep away from ele
5. A et B Cette distance doit tre gale dans tous les cas Sinon les piquets doivent tre d plac s jusqu ce que la largeur la longueur et les mesures Fia 1 soient correctes g Fig 2 2 ASSEMBLEZ LES NERVURES daissi D EXTREMITE wet boulons n 11131 ee Assemblez les nervures d extr mit comme 5 16 x 2 3 4 po le montre la fig 2 Serrez bien tous les joints avec les fixations illustr es 11182 11182 11114 gt Fig 3 11051 11051 3 ASSEMBLEZ LES NERVURES 7 CENTRALES utilisez 16S a oulons n 11131 Assemblez les nervures centrales comme le 5 16 x 2 3 4 po montre la fig 3 Serrez bien tous les joints avec les fixations illustr es 11112 11112 amp 800057 800057 amp Page 13 05 202153 B2 4 ASSEMBLEZ LES CONTREVENTEMENTS 00648 Fig 4 Assemblez tous les contreventements comme le montre latg 4 Serez hien tous les joints avec les fixations illustr es NENA 00690 10e 5 FIXEZ LA NERVURE AVANT AUX NERVURES CENTRALES A Avec l aide d une autre personne placez la nervure avant l emplacement piquet B Placez la pi ce ShelterLock 800372 sur le montant comme le montre la Fig 5 C partir de l ext rieur de la nervure ins rez le boulon dans le montant puis dans la pi ce ShelterLock D Alignez l extr mit standard d une traverse 11102 avec le boulon et logez la dans la pi ce ShelterLock R p tez ces tapes pour chacune des nervures centrales E Placez le contreventement sur la traver
6. QUESTIONS Assembly Mfg Assembly Mfg Reference Part Reference Part 2 11179 3 800057 4 11131 PLEASE CONTACT CUSTOMER SERVICE 1 800 524 9970 CANADA 1 800 559 6175 11133 7 00648 SN 300454 300372 Shelt io imor erter C2 e ENS 11130 Eee ae EE a Page 3 05 202153 B2 NOTE FRAME EXTENSION KIT 14 x20 x12 is the BASE frame dimension Your model may have more middle ribs than shown in the illustration on pg 3 You will receive one extra rib for every extra 4 ft of building length that you purchase The basic frame assembly will remain the same The cover will be the correct size for the length of the building you purchased 14 ft with 1 PLOTTING THE FRAME Before building your shelter you should choose a flat area on Fi ig 1 your property and plot your shelter A Stake out the area for the shelter in the desired spot The width of the area should be at least equal to the width of the shelter and the length should be equal to the length of the shelter Fig 1 eng B Measure diagonally from corner to corner A amp B These measurements should be the same If they are not equal the stakes need to be adjusted until the width length and inside measurements are correct a 11114 vi Nr Fig 2 2 ASSEMBLE END RIBS Assemble end ribs as shown in Fig 2 Securely Use 11131 fasten all of the joints with the hardware indicated T She x2 3r L QE Bolts 11182 11182
7. angement et de la protection contre les dommages caus s par le soleil la pluie l g re la s ve les excr ments d animaux ou d oiseaux et la neige l g re Veuillez ancrer ad quatement cette structure ShelterLogic Corp Consultez le guide pour conna tre les d tails sur l ancrage Il incombe l utilisateur d assurer un ancrage ad quat et de garder la toile bien tendue et exempte de neige ou de d bris Veuillez lire et vous assurer de bien comprendre les d tails de l installation les avertissements et les mises en garde avant d entreprendre l installation Pour toute question t l phonez au service la client le au num ro ci dessous Veuillez aussi consulter la fiche de garantie se trouvant dans l emballage DANGER Avant d entreprendre l installation v rifiez tous les r glements municipaux concernant les abris temporaires Choisissez soigneusement l emplacement de l abri DANGER Tenez vous loign des fils lectriques Evitez les lignes lectriques les branches d arbres et les autres types de structures Avant de creuser v rifiez la pr sence de tuyaux ou de fils enfouis N installez PAS cet abri proximit d un toit ou de toute autre structure pouvant laisser tomber de la neige de la glace ou des d bris Ne suspendez AUCUN objet au toit ou aux c bles de soutien AVERTISSEMENT Risque d incendie Ne fumez PAS et n utilisez AUCUN dispositif produisant des flammes p ex un barbecue un foyer une friteu
8. ctrical wires Check for overhead utility lines tree branches or other structures Check for underground pipes or wires before you dig DO NOT install near roof lines or other structures that could shed snow ice or excessive run off onto your shelter DO NOT hang objects from the roof or support cables WARNING Risk of fire DO NOT smoke or use open flame devices including grills fire pits deep fryers smokers or lanterns in or around the shelter DO NOT store flammable liquids gasoline kerosene propane etc in Rac or around your shelter Do not expose top or sides of the shelter to open fire or other flame source CAUTION Use CAUTION when erecting the frame Use safety goggles during installation Secure and bolt together overhead poles during assembly Beware of pole ends PROPER ANCHORING AND INSTALLATION OF FRAME PROPER ANCHORING OF THE FRAME IS THE RESPONSIBILITY OF THE CONSUMER ShelterLogic Corp is not responsible for damage to the unit or the contents from acts of nature Any shelter that is not anchored securely has the potential to fly away causing damage and is not covered under the warranty Periodically check the anchors to ensure stability of shelter ShelterLogic Corp cannot be responsible for any shelter that blows away NOTE Your shelter s cover can be quickly removed and stored prior to severe weather conditions If strong winds or severe weather is forecast in your area we recommend removal of cover
9. e c t avec les fourreaux pour tuyaux vers le bas et les courroies avant et arri re vers les coins de l abri Centrez la toile entre avant et l arri re de l armature fig 11A B Repliez le c t le plus proche de l armature de sorte que le fourreau pour tuyau soit accessible Ins rez un tuyau de toile la premi re nervure centrale partir de l avant et la premi re nervure centrale partir de l arri re de sorte que les deux extr mit s du tuyau soient ins r es dans le fourreau et que le centre du tuyau soit expos Pour un abri allong il pourrait s av rer n cessaire d utiliser des tuyaux additionnels au centre fig 11B C Fixez une corde chaque tuyau expos puis lancez l autre extr mit de chaque corde par dessus l armature fig 11C D Allez de l autre c t de l armature et placez la toile sur l armature en tirant sur les cordes Cette op ration peut n cessiter deux personnes ou plus fig 11D REMARQUE ASSUREZ VOUS QUE LA TOILE EST PLACEE CORRECTEMENT SUR L ARMATURE Le logo ShelterLogic doit tre align avec les coins avant gauche et arri re droit pr s du rail sup rieur Si le logo n est pas bien visible la toile n est pas plac e correctement sur l armature Page 17 05 202153_B2 12 INSTALLEZ LA TOILE ET LES RAILS DE TOILE A Assurez vous de bien centrer la toile sur l armature La toile doit d passer galement aux quatre coins B Ins rez le crochet en
10. e end rib B Disconnect top rail the horizontal pipes that run from front to back along the top from the end rib Pull the webbing the black strap below the cross rail Reattach the top cross rail to the end rib Repeat Step B for side rails the horizontal pipes that run from front to back along the sides of the unit near the bend in the frame where the legs meet the roof C At the bottom where the webbing exits the pocket on each side of end panel pull webbing to remove the slack Be careful not to pull the webbing through the other side of the webbing pocket D Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of the ratchet and pull tight Wind the ratchet so that the webbing overlaps itself Position the end panel so that it is centered on the building before fully tightening the end panel E Tighten ratchets alternating from one side to the other until the end panel is centered and tight Text Keep Zippers closed when tightening end panels WRAP END PANEL EDGES OVER AND AROUND PIPE TOWARDS INSIDE OF FRAME DO NOT INSERT ANY PIPES ee ES NTO THESE POCKETS TOP CROSS RAIL WRAP END PANEL EDGES TO INSIDE OF FRAME SIDE CROSS RAILS ZIPPERS WEBBING INSIDE VIEW OF END RIB SIDE VIEW OF END RIB Insert Webbing into Ratchet Page 7 05_202153_B2 11 INSTALLING THE COVER ON THE FRAME A Lay the cover on the ground next to the frame with
11. et so that the webbing overlaps itself C Slide cover rails 11105 through fabric pockets at each leg and reattach with clamps to each leg Repeat this on other side Push down on cover rails to tighten cover before tightening bolts completely D Check and tighten Ratchets and Cover Rails monthly to ensure the cover is tight NOTE The ShelterLogic logo should be oriented as shown below CORRECT Fig 12 wy aw mn an nu mn Se COVER RAILS 11105 REAR Webbing and Ratchets Securing Cover Middle Rib Cover Rail Clamps End Rib Cover Rail Clamps Page 9 05 202153 B2 Abri toit rond 4 3 m larg xX 3 7 m haut Guide d assemblage Veuillez lire TOUTES les instructions avant d entreprendre l assemblage Cet abri DOIT tre bien ancr CECI EST UNE STRUCTURE TEMPORAIRE IL N EST PAS RECOMMANDE D EN FAIRE UNE STRUCTURE PERMANENTE Avant de commencer Il faut 2 personnes ou plus pour le montage qui prend environ 3 heures Le temps de montage d pend de la longueur de votre b timent Veuillez pr voir environ 15 minutes pour chaque pied de longueur du batiment 7 Shelter ETELE 150 Callender Road Watertown CT 06795 1 800 559 61 75 www shelterlogic com 12 12 12 Page 10 05_202153_B2 ATTENTION Cet abri est fabriqu avec des mat riaux de qualit Il est con u en fonction de la toile adapt e ShelterLogic Corp fournie Les abris ShelterLogic Corp offrent de l espace de r
12. f the middle ribs and connect using round head bolt 11133 Fig 7B C The last cross rail 11104 connects UNDER the end rib with bolt 800454 Fig 7A HAND TIGHTEN this bolt Top Cross Rail UNDER End Rib Fig 7A Top Cross Rail OVER Middle Ribs 11133 8 SQUARING UP THE FRAME A Be sure that frame in its final location which needs to be as flat and level as possible B Measure across opposite corners These distances must be equal to within 1 inch C Check that the front and rear of the frame measures 14 feet in width 9 INSTALL AUGER ANCHORS A Anchors must be placed inside shelter at the corner legs Insert a inch pipe or steel rod through the eyelet Fig 9 of the auger and turn the anchor clockwise until the eyelet is sticking out of the ground 1 to 2 inches allowing Middle Rib room to be anchored to the legs B Thread cable provided through the eyelet of the Anchor as indicated in figure 9 Secure the cable with the clamps provided If the ground is too hard dig a hole with a shovel or post hole tool Optional Fill with cement If you are anchoring in gravel clay or asphalt ShelterLogic recommends the Easy Hook Drive Anchors Use one at each leg for a stronger more secure installation Page 6 05 202153 B2 10 DOOR AND SOLID END PANEL INSTALLATION A Hold end panel at the top center with white inner surface facing inside of the shelter Wrap the edges of the fabric panel around th
13. ivent tre plac s l int rieur dans les coins de l abri Ins rez un tuyau ou une tige d acier de 3 4 po dans l illet de la tari re et vissez l ancrage dans le sol Fig 9 jusqu ce que l illet d passe du sol de 1 ou 2 pouces afin de pouvoir fixer l ancrage au pied B Faites passer le c ble fourni dans l illet de l ancrage comme le montre l illustration Fixez le c ble avec les brides fournies Si le sol est trop dur creusez un trou l aide d une pelle ou d une b che tari re Option Remplissez le trou de ciment Pour un ancrage dans le gravier l argile ou l asphalte ShelterLogic recommande d utiliser les ancrages Easy Hook soit un pour chaque pied de l armature afin d obtenir une installation plus r sistante et s curitaire Page 15 05 202153 B2 10 INSTALLATION DES PANNEAUX DE PORTE ET DE BOUT A Tenez le panneau en haut et au centre avec la partie blanche vers l int rieur de l abri Entourer le bord de la toile autour de l ossature et passez les tubes au travers de la fente d j coup e dans la toile B D brancher rail du haut les tuyaux horizontaux qui vont de l avant vers l arri re le long du haut de la nervure fin Tirez sur la sangle la sangle noire ci dessous la traverse Remettez le rail traverse sup rieure de la nervure fin R p tez l tape B pour longerons les tuyaux horizontaux qui vont de l avant vers l arri re le long des c t s de l appareil pr s de
14. la courbure dans le charpente o les jambes r pondent le toit C En bas la ou la sangle sort de la poche de chaque cot du panneau tirez sur la sangle pour tendre le panneau Faite bien attention de ne pas trop tirez sur la sangle pour vitez qu elle disparaisse de l autre cot du panneau D Ins rez le crochet en S dans le trou du coin courb de la jambe Ins rez la sangle dans le cliquet et tirez fort Remontez le cliquet jusqu ce que la sangle s enroule autour d elle m me Positionnez le panneau de mani re ce qu il soit bien centr sur l abri E Serrez les cliquets en alternant d un cot l autre jusqu ce que le panneau soit bien tendu AU Tel Les glissi res doivent tre ferm s pour l installation ENVELOPPER BORDS DU PANNEAU DE FIN SUR ET AUTOUR DE TUYAUX VERS L INTERIEUR DU CHARPENTE NE PAS METTRE DE TUBES UE DANS CES POCHES Z TUBE DE POINTE JN ENROULEZ LES DU TOIT BOUTS DU PANNEAU L INT RIEUR DE LA CHARPENTE RAIL LAT RAUX COURRIE a VUE INT RIEURE DE NERVURE D EXTR MIT COT DE NERVURE D EXTR MIT Courroie et cliquets courroie dans le cliquet retenant le panneau d extr mit Page 16 05 202153 B2 11 INSTALLEZ LA TOILE SUR L ARMATURE PANNEAUX D EXTREMITE NON ILLUSTRES A Etalez la toile sur le sol c t de l armature en pla ant l int rieur de la toil
15. n des toiles de rechange des ensembles de parois des n cessaires d a ration ou d clairage des pi ces d armature des portes glissi re etc Tous ces articles sont exp di s directement chez vous partir de lusine QUESTIONS R CLAMATIONS OU COMMANDES SP CIALES LIGNE D AIDE DU SERVICE LA CLIENTELE TATS UNIS 1 800 524 9970 SERVICE LA CLIENT LE INTERNATIONAL 001 860 945 6442 CANADA 1 800 559 6175 HEURES D OUVERTURE DU LUNDI AU VENDREDI DE 8 H 30 20 H HE SAMEDI ET DIMANCHE DE 8 H 30 17 H HE ENTRETIEN ET NETTOYAGE Une toile bien tendue assure une longue dur e utile Gardez toujours la toile bien tendue Une toile desserr e acc l re la d t rioration du tissu Enlevez sans attendre toute accumulation de d bris sur le toit l aide d un balai d une vadrouille ou d un autre outil souple Soyez tr s prudent au moment d enlever la neige de la toile Enlevez la toujours partir de l ext rieur de la structure N utilisez PAS d outils rigides comme des rateaux ou des pelles pour enlever la neige car ils risqueraient de perforer la toile N utilisez PAS de javellisants ou d abrasifs pour nettoyer la toile Utilisez tout simplement de l eau savonneuse pour nettoyer la toile GARANTIE Cet abri offre une garantie limit e contre les d fauts de fabrication ShelterLogic Corp garantit l acheteur initial que s il est install et utilis ad quatement cet article et toutes se
16. s pi ces sont exempts de d faut de fabrication pendant une p riode de 1 AN POUR LA TOILE LES PANNEAUX D EXTREMITE ET L ARMATURE La p riode de garantie est calcul e partir de la date d exp dition par ShelterLogic Corp pour les achats faits directement l usine ou de la date d achat chez un revendeur autoris veuillez conserver votre re u d achat Si cet article ou une de ses pi ces est jug d fectueux ou qu il est manquant au moment de la r ception ShelterLogic Corp r parera ou remplacera sa discr tion toute pi ce d fectueuse sans frais pour l acheteur initial Toute pi ce remplac e ou r par e demeure couverte durant le reste de la p riode de garantie limit e initiale Tous les frais d exp dition sont la charge du client Les pi ces et les composants de rechange sont exp di s contre remboursement Veuillez conserver le mat riel d emballage initial pour l envoi de retour Pour les achats faits chez un marchand local toute r clamation doit tre accompagn e d une copie du re u initial Apr s lachat veuillez remplir et exp dier la fiche de garantie pour inscrire l article Veuillez consulter la fiche de garantie pour obtenir de plus amples renseignements Brevets Am ricains et brevets en instance 6 871 614 6 994 099 7 296 584 D 430 306 D 415 571 D 414 564 D 409 310 D 415 572 090111 Page 11 05 202153_B2 Abri toit rond 4 3 m larg x 3 7 m haut Assemblage de l armat
17. se Serrez l crou sur le boulon cs 6 FIXEZ LA NERVURE ARRI RE Les traverses de la derni re nervure comportent deux extr mit s standard 11104 Fixez le contreventement entre la nervure d extr mit et la derni re nervure centrale comme le montre la Fig 6 800454 Page 14 05 202153_B2 7 INSTALLEZ LA TRAVERSE SUP RIEURE A Reliez la premi re traverse 11102 la nervure avant et fixez la avec un boulon 800454 comme le montre la Fig 7A Serrez ce boulon LA MAIN B Reliez les traverses centrales 11102 a la premi re traverse Placez les sur les nervures centrales et fixez les avec un boulon a t te ronde 11133 comme le montre la Fig 7B C Installez la traverse 11104 pour compl ter l assemblage de la traverse sup rieure Fixez la la nervure d extr mit avec un boulon 00648 comme le montre la Fig 7A Serrez ce boulon LA MAIN 11102 Fixation de la traverse sup rieure la nervure d extr mit Traverse sup rieure SUR les nervures centrales Fig 7A 11133 8 METTEZ L ARMATURE EN EQUERRE A Placez l armature son emplacement d finitif dont la surface doit tre aussi plane que possible B Mesurez la distance qui s pare les coins oppos s X et Y Cette distance doit tre la m me a 1 pouce pres C Assurez vous que les sections avant et arri re de armature mesurent 4 3 m de largeur 9 INSTALLEZ LES ANCRAGES A TARIERE A Les ancrages do
18. se un fumoir ou une lanterne proximit de l abri Ne rangez PAS des pad liquides inflammables essence k ros ne propane etc proximit de l abri N exposez pas le dessus ou les parois de l abri au feu ou toute source d incendie ATTENTION Soyez PRUDENT au moment de monter l armature Portez des lunettes de s curit durant l installation Boulonnez les mats sup rieurs durant l assemblage Prenez garde aux extr mit s des mats ANCRAGE ET INSTALLATION DE L ARMATURE IL INCOMBE L UTILISATEUR D ASSURER L ANCRAGE AD QUAT DE L ARMATURE ShelterLogic Corp n assume aucune responsabilit pour les dommages caus s l abri ou son contenu par les catastrophes naturelles Tout abri n tant pas ancr solidement risque de s envoler et de causer des dommages ce qui n est pas couvert par la garantie V rifiez p riodiquement les ancrages pour assurer la stabilit de l abri ShelterLogic Corp ne peut tre tenue responsable d un abri qui s envole REMARQUE La toile de l abri peut tre retir e rapidement pour tre entrepos e en pr vision de mauvais temps Si des vents forts ou du mauvais temps sont pr vus pour votre r gion nous vous recommandons d enlever la toile de l abri PI CES DE RECHANGE ET COMMANDES SP CIALES Des pi ces de rechange et des accessoires d origine ShelterLogic Corp sont disponibles l usine notamment des n cessaires d ancrage pour presque toute utilisatio
19. sociated parts are free from manufacturer s defects for a period of 1 YEAR FOR COVER FABRIC END PANELS AND FRAMEWORK Warranty period is determined by date of shipment from ShelterLogic Corp for factory direct purchases or date of purchase from an authorized reseller please save a copy of your purchase receipt If this product or any associated parts are found to be defective or missing at the time of receipt ShelterLogic Corp will repair or replace at it s option the defective parts at no charge to the original purchaser Replacement parts or repaired parts shall be covered for the remainder of the Original Limited Warranty Period All shipping costs will be the responsibility of the customer Parts and replacements will be sent C O D You must save the original packaging materials for shipment back If you purchased from a local dealer all claims must have a copy of original receipt After purchase please fill out and return warranty card for product registration Please see warranty card for more details Covered by U S Patents and patents pending 6 871 614 6 994 099 7 296 584 D 430 306 D 415 571 D 414 564 D 409 310 D 415 572 090111 Page 2 05 202153 B2 14 W x 12 H Peak Style Frame Assembly Please read and understand instructions completely before assembly Lay out frame parts as shown Top Rail Middle Ribs End Rib End Rib Ig Y Wind Brace Wind Brace ATTENTION FOR MISSING OR REPLACEMENT PARTS OR
20. the inside of the cover the side with the pipe pockets facing down and the webbing on the front and rear of the corner of the building Position the cover so that it is centered to the frame front to back Fig 11A B Fold over the side closest to the frame so the pipe pocket is now accessible Insert a cover pipe at the first middle rib from the front and the first middle rib from the rear so that it is inserted in the pipe pocket on both ends of the pipe but the center of the pipe is exposed For long buildings it may be necessary to use additional pipes in the middle Fig 11B C Tie the rope on each of the exposed pipes and throw the other end of the rope over the frame Fig 11C D Move to the other side of the frame and pull the cover over the frame with the rope This may require two or more people Fig 11D NOTE CHECK THAT YOUR COVER IS CORRECTLY PLACED ON THE FRAME The ShelterLogic logo should line up on the left front and right rear corners near the top rail If the logo is not legible the cover has not been put on the frame correctly Page 8 END PANELS NOT SHOWN FOR CLARITY 05_ 202153 B2 12 INSTALLING COVER AND COVER RAILS A Make sure cover is centered on frame There should be an equal amount of overhang at all four corners B Insert the S Hook on ratchet into hole on the leg bend Insert the webbing into the spindle of the ratchet and pull tight Wind the ratch
21. ure Veuillez lire et vous assurer de bien comprendre TOUTES les instructions avant d entreprendre l assemblage talez les pi ces de l armature comme le montre l illustration Tube sup rieur Nervures Nervure centrales oN d extr mit Nervure d extr mit Rails de Contreventement toile lat raux Contreventement ATTENTION EN CAS DE PI CE MANQUANTE ET POUR TOUTE PI CE DE RECHANGE OU TOUTE QUESTION VEUILLEZ COMMUNIQUER AVEC N N de N d assemblage pi ce d assemblage pi ce LE SERVICE LA CLIENT LE 1 800 524 9970 CANADA 1 800 559 6175 Ce Lino s oo 9 Lino Shelt E E erter Page 12 05_202153_B2 REMARQUE N CESSAIRE DE RALLONGE D ARMATURE L armature de base mesure 4 3 x 6 x 3 7 m Votre abri peut comporter davantage de nervures centrales que l illustration de la page 12 Vous recevez une nervure additionnelle pour chaque section suppl mentaire de 1 2 m L assemblage de l armature de base reste le m me La taille de la toile correspondra la longueur de l abri 1 TRACEZ L EMPLACEMENT LARGEUR gt Avant d assembler l abri vous devez choisir une surface rr 9H plane et y tracer son emplacement A Piquetez l emplacement de l abri l endroit choisi La largeur de l emplacement doit tre au moins gale la largeur de l abri et sa rales longueur celle de l abri fig 1 B Mesurez la distance en diagonale entre les coins
Download Pdf Manuals
Related Search
Related Contents
DYMO Omega embosser Biostar N68S motherboard watercooled service manual Apache Maven Doxia - The Apache Software Foundation! MA200 Manual 9-2153-5.indd Onkyo CR-N7 User's Manual Premier Mounts Hidden T-bar Frame Adapter (PP-FCTA) mettle skybox & skybox studio Sennheiser HD 408 Copyright © All rights reserved.
Failed to retrieve file