Home
Ariel EZWT-2651 Air L Installation Guide
Contents
1. Ariel Walk In Bathtubs Installation Guide PD PD Pd Pd Ped df df ed d et ee Table of Contents GENERAL INFORMATION Page 1 SAFETY INSTRUCTION ccccecceccnvecncevedeestencencsacses Page 1 ROUGH DRAWING DIACoRAMS cece cece ccc ees Page 2 GETTING STARTED DOG Page 3 INSTALLATION wesc wcscieciackacad cin tendaatateans dads vactienoaancen Page 4 5 OPERATION GUIDE wdic sicasSase sad cedeecidetecdeaal ecuds M e Ee Page 5 WARRANTY EE Page 6 PPP Eeer Page 7 12 Ariel Walkin Bathtub Installation Guide Page 1 GENERAL INFORMATION SAVE THIS MANUAL RETAIN FOR CONSUMER USE Read these instructions completely before installing the product If you have any questions call 800 304 3598 You must follow all instruction in this manual Failure to do so will result in your assumption of liability that may occur Failure to comply with all instructions can result in product and personal injury RESPONSIBILITY OF THE INTALLER The installer must inspect and water test the product prior to installation to ensure the unit is free of defect or damage In the event of a problem the unit must not be installed If the crate or product has been damaged please call immediately 800 304 3598 This product is designed to be installed by a licensed tradesperson licensed plumbers and electricians should be employed to insure proper installation Installers assume all liability for the correct installation procedures Only accessories authorized by the
2. 50Hz Rated power input 15W Protection class l Tested EN 55014 1 A2 2002 according to EN 55014 2 A1 2001 EN 61000 3 2 2000 EN 61000 3 3 A1 2001 This EC Attestation of Conformity is issued according to the Directive 89 336 EEC relating to electromagnetic compatibility on a voluntary basis It confirms that the listed equipment complies with the principal protection requirements of the EMC directive and applies only to the sample and its technical documentation submitted to T V Product Service GmbH for testing and certification See also notes overleaf Test report no 48888505801 E Date 2005 10 25 Za oi After preparation of the necessary technical documentation as well as the conformity declaration the required CE marking can be affixed on the product Other relevant directives have to be observed Page 1 of 1 T V Product Service GmbH T V SUD Gruppe Zertifizierstelle Ridlerstrasse 65 80339 M nchen Germany Page 8 Ariel Walkin Bathtub Installation Guide St GA ma ken E LU Oo i i Ke ma LO St x Ki a H Wl am al ZERTIFIKAT e CERTIFICATE EC Attestation of Conformity Product Service No N8 06 06 48732 011 Holder of Certificate Changzhou Sanding Electro motors amp Appliances Co Ltd Industrial Park Luoyang Town 213104 Changzhou Jiangsu PEOPLE S REPUBLIC OF CHINA Product Whirlpool baths Heater Model s SDP
3. Ariel Walk in bathtub shall not be liable for the expense of removing defective products installing replacement products or the expense of adjoining components such as tile marble wall panels ceilings etc No liability shall exit for incidental or consequential damages caused in whole or part by any defect in Ariel Walk in Bathtub products No warranty expressed or implied including any warranty of merchantability or fitness for a particular purpose shall apply after the warranty period described above This warranty does not cover defects or damage caused by the common carrier or installer from without limitation any of the following careless handling lifting whirlpools by the piping modification of the product for any reason improper installation including installation not in accordance with instructions provided with the unit Page 7 Ariel Walkin Bathtub Installation Guide et LA TE ce HA A Les lt x OG fe ce Lid et x Ss a Ss HA 2 Ho H o GEI 5 ZERTIFIKAT CERTIFICATE B Product Service EC Attestation of Conformity No E8 05 10 48732 006 Holder of Certificate Changzhou Sanding Electro motors amp Appliances Co Ltd Industrial Park Luoyang Town 213104 Changzhou Jiangsu PEOPLE S REPUBLIC OF CHINA Name of Object Household equipment Controller Model s DXD A Description of Rated voltage 220 240V AC Object Rated frequency
4. 1500 SDP 3000 Parameters Rated voltage 220 240V Rated frequency 50Hz Rated power input 1700W SDP 1500 3400W SDP 3000 Degree of protection IP 00 Remark This heater is intended to be incorporated in a whirlpool bath to warm the water Protection against access to live parts amp protection against moisture has to be maintained by the built in appliances Model differences SDP 1500 basic model equipped with only one heating element SDP 3000 similar with basic model equipped with two heating elements connected in parallel Tested EN 60335 2 60 A1 2005 according to This EC Attestation of Conformity is issued on a voluntary basis according to the Low Voltage Directive 73 23 EEC relating to electrical equipment designed for use within certain voltage limits It confirms that the listed equipment complies with the principal protection requirements of the directive It refers only to the particular sample submitted for testing and certification See also notes overleaf Test report no 484000600903 Date 2006 06 13 After preparation of the necessary technical documentation as well as the conformity declaration the required CE marking can be affixed on the product Other relevant directives have to be observed Page 1 of 1 T V SUD Product Service GmbH Zertifizierstelle Ridlerstrasse 65 80339 M nchen Germany Page 9 Ariel Walkin Bathtub Installation Guide 98 Hengshan Rea
5. 909331 001 APPLIANCES CO LTD LUOYANG INDUSTRIAL PARK CHANGZHOU JIANGSU 213104 CHINA Applicant SAME AS MANUFACTURER 909331 001 Recognized Company SAME AS MANUFACTURER 909331 001 This Procedure authorizes the above Manufacturer to use the marking specified by Underwriters Laboratories Inc only on products covered by this Procedure in accordance with the applicable Follow Up Service Agreement The prescribed Mark or Marking shall be used only at the above manufacturing location on such products which comply with this Procedure and any other applicable requirements The Procedure contains information for the use of the above named Manufacturer and representatives of Underwriters Laboratories Inc and is not to be used for any other purpose It is lent to the Manufacturer with the understanding that it is not to be copied either wholly or in part and that it will be returned to Underwriters Laboratories Inc upon request This PROCEDURE and any subsequent revisions is the property of UNDERWRITERS LABORATORIES INC and is not transferable UNDERWRITERS LABORATORIES INC l Ah A W Schaefer Vice President and General Manager US and Canadian Operations A not for profit organization dedicated to public safety and cammitted to anality cor
6. FCI fails to operate in this manner there is a ground current flowing indicating the possibility of an electrical shock Do not use this unit Disconnect the unit and have the problem corrected before using 7 Traction enhanced textured tub button must remain clean to minimize slippage 8 Risk of electrical shock all pumps and heaters must be connected to a ground fault circuit interrupter GFCI protected outlets 9 Avoid use of alcohol drugs or medication while using your tub 10 Consult your physician before using the whirlpool air system if you are pregnant and or have heart conditions 11 All units must be water tested before installation Ariel Walkin Bathtub Installation Guide Page 2 Drawings for the tubs Ariel 265138 660mm W x 1300mm L x 960mm H Note Refer to above measurements for actual demensions Diagram below is generic measurments Ariel 305439 760mm W x 1370mm L x 990mm H Note Refer to above measurements for actual demensions Diagram below is generic measurments THE SIDE THE TOP Ariel Walkin Bathtub Installation Guide Page 3 GETTING STARTED 1 UNPACKING THE UNIT 1 Inspect the carton if carton damage is noted take a picture if possible notify the deliverer write DAMAGED on the Proof of Delivery P O D and call 800 304 3598 2 NEVER LIFT THE TUB BY THE PLUMBING Doing so can result in leaks for which the installer is responsible 3 Immediately inspect the unit
7. d Suzhou New District Suzhou 215009 China Tel 0512 6808 6400 Fax 0512 6808 4099 ww UL CO mm NOTICE OF AUTHORIZATION TO APPLY THE UL MARK UL CCIC Company Limited 2007 04 06 Changzhou Sanding Electro Motors amp Appliances Co Ltd Luoyang Industrial Park Changzhou Jiangsu 213104 China Fax number 865198522389 E mail 0519 8522369 Reference File E239204 Project 06CA52478 P O Number QIN XIAO YONG Mr Product USR CNR MOTOR model DXD 20 DXD 30 DXD 40 DXD 315 DXD 320 DXD 330 DXD 340 DXD 310 and DXD 312 Dear MR Qin Yiao Yong Any information and documentation involving UL Mark services are provided on behalf of Underwriters Laboratories Inc UL or any authorized licensee of UL Us investigation of your product has been completed under the above project number and the subject product was determined to comply with the applicable requirements This letter temporarily supplements the UL Follow Up Services Procedure and serves as authorization to apply the UL Recognized Marking and or Recognized Component Mark only at the factory under UL e Follow Up Service Program to the subject product which is constructed as described below Similar to the subject model which was submitted to UL for this investigation The UL Records covering the product will be in the Follow Up Services Procedure File E239204 Volume 1 This authorization applies only to the address on this letter This authorization is effective from th
8. e date of this Notice and only for products at the indicated manufacturing locations Records in the Follow Up Services Procedure covering the product are now being prepared and will be sent to the indicated manufacturing locations in the near future Please note that Follow Up Services Procedures are sent to the manufacturers only unless the Applicant specifically requests this document Products that bear the UL Mark shall be identical to those that were evaluated by UL and found to comply with UL s requirements If changes in construction are discovered appropriate action will be taken for products not in conformance with UL s requirements and continued use of the UL Mark may be withdrawn Sincerely Reviewed by Witman Li Arthur Meng Witman Li Arthur Meng Engineer Section Manager Department 3015CGUB Tel 8602083486999 66191 Fax 86 20 8348 6777 66191 E mail witman li cn ul com Department 3015CSUZ E mail Arthur meng cn ul com An independent organization working for a safer world with integrity precision and knowledge Page 10 Ariel Walkin Bathtub Installation Guide 333 Pfingsten Road Northbrook Illinois 60062 2096 United States Country Code 1 847 272 8800 FAX No 847 272 8129 http www ul com Underwriters Laboratories Inc o File E239204 Vol dh Issued 2004 01 14 FOLLOW UP SERVICE PROCEDURE TYPE R COMPONENT MOTORS PRGY2 PRGY8 Manufacturer CHANGZHOU SANDING ELECTRO MOTORS amp
9. edicated service for each feature unless otherwise stated on the actual product Each electrical service must be a dedicated 20 amp 110 125 volts alternating current service that is GFCI protected 1 Hydro Jet Massage Systems require one 15 amp 110 volt service that is GFCI protected 2 Hydro Air Massage Systems require one 15 amp 110 volt service that is GFCI protected 3 Dual Massage Systems require two dedicated electrical circuits 20 amps 110 volt GFCI for the pump and blower IN LINE HEATER WILL ALWAYS REQUIRE ITS OWN DEDICATED 20 AMP 110 VOLT GFCI PROTECTED CIRCUIT ELECTRICAL INSTALLATION All electrical connections must be carried out by a certified electrician in accordance with the local electrical requirements and codes INSTALLATION PROCEDURES WARNING When installing jet massage baths air massage baths or dual massage baths basic precautions should be followed including the following Danger Risk of electrical shock Connect only to a separate circuit protected by a ground fault circuit interrupter GFCI Installation must provide access for servicing pump motor all Tubs come with an access panel for the pump motor and faucet 1 Install tub waste according to instructions provided with fitting 2 Install faucet If spout and supply lines are to be installed on deck of tub mark the locations and drill pilot holes from the side of product Using proper size hole saw drill spout hand shower and supply lines from side of the pr
10. for damage even if there is no carton damage Once the unit is accepted surface damages will be assumed to be installation related if not reported within 72 hours of delivery Installers are responsible for damage that occurs once the unit is placed in its niche Inspect the plumbing for any loose fittings 5 Remove all packaging material except for the protective plastic This has been placed on the tub at the factory to eliminate abrasions from handling This should only be removed at final clean up GETTING STARTED 2 TESTING YOUR SAFETY TUB BEFORE INSTALLATION 1 All Tubs 100 water tested at the factory and certified to be free of leaks Transportation and mishandling may cause leaks It is necessary to test the bath while there is access to all sides of the bath 2 This unit should be both static and operationally tested with water It is best to test the unit outside by filling with a garden hose A Place the tub on a completely flat surface in an area where it may be drained after testing B Seal the drain can be sealed with tape for test and fill the tub three inches above the jets or to a normal level if it s a soaking tub C Allow the water to stand in tub for 10 minutes and then inspect all plumbing and seals for leaks D Insure all jets are open and working every hydro jet is adjustable for both flow rate and direction of flow depending on the jet the water flow is adjusted by either turning the outside ring or the nozzle cloc
11. heat pump contains safety devices which only allow it to turn on when a water pressure is present from the running water pump and b the water temperature is below 104 degrees Fahrenheit D The heat pump is designed to add heat to a body of flowing water and is only designed to keep warm water warmer longer Warning A Make sure the power wires are complying to the installation diagram before turn the electrical system on B Do not turn on the Air pump Water pump and Heater without water C Make sure the power supply has adequate load capacity and a ground wire D Turn off power when working with any wiring connections RUN CONDITON A Power AC110V 50 60 Hz B Water pump AC110V 6 0 7 0 Amps C Air pump AC110V 4 0 5 0 Amps D Heater AC110V 12 14 Amps 1500w Page 6 Ariel Walkin Bathtub Installation Guide WARRANTY Limited Warranty Coverage All items manufactured by Ariel Walk in Bathtub are warranted in accordance with the following warranty This warranty is extended to the first purchaser does not extend to products previously used as display models or products that have been modified or repaired by anyone else but Ariel Walk in Bathtub unless approved by Ariel Ariel walk in bathtub comes with a 3 year warranty on walk in bathtub and components only Warranty Limitations In the event of a defect in the material or workmanship of a product defective product s will be repaired or replaced by Ariel Walk in bathtub
12. kwise and counter clockwise GETTING STARTED 3 NOTE Ifthe pumps do not operate A Check the breaker to insure power is on and the cable connecting the controls to the pump is attached B Ifan optional heater is present check the indicator light on the heater to insure that power is present Do not run any pumps or heaters unless the tub is filled with water to proper usage level 4 inches 10cm above the highest jet fixture Damage due to dry running pumps running pumps without proper water level height is not covered under any stated warranty Failure to perform these tests before installation will make the installer liable for future repair costs Ariel Walkin Bathtub Installation Guide Page 4 INSTALLATION INSTALLATION PREPERATION 1 Check the floor area where the tub is to be installed A Clean the area of any debris or trash B Use a5 or 6 foot level and determine if the floor is level If the floor is not level adjust all 4 leveling feet to perfectly level the tub Note it is important that ALL leveling feet are completely touching the floor and level for the door system to work properly Leveling Feet 2 Check to insure the drain rough has been placed at the proper location See spec sheets attached for you unit 3 Insure that the proper electrical service has been installed at the pump location See electrical requirements below ELECTRICAL REQUIREMENTS Equipment utilized on these baths requires individual d
13. manufacturer should be used with this product SAFETY INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS 1 When using this product basic precautions should always be followed Read and follow all instructions pertaining to risk of fire electric shock or injury to persons 2 Use this unit only for its intended purposes or as described in this manual Use only attachments recommended by the manufacturer 3 Risk of hyperthermia and possible drowning Water temperature in excess of 100 F 38 C may be injurious to your health Check and adjust temperature before use READ AND FOLLOW ALL INSTRUCTIONS 1 Danger To reduce the risk of injury do not permit children or persons with infirmities to use this product unless they are closely supervised at all times To avoid injury exercise caution when entering or exiting the tub Never drop or insert any objects into any openings Risk of electrical shock connect only to a separate circuit protected by a ground fault circuit interrupter GFCI Sr e ai Warning Risk of electric shock do not permit electric appliances such as a hair dryer lamp telephone radio or television within 5 feet 1 5M of this hydro massage bathtub 6 This unit must be connected to a circuit interrupter GFCI Such a circuit is provided by the installer and should be tested on a routine basis To test the GFCI push the test button the GFCI should interrupt power Push the RESET button power should be restored If the G
14. oduct 3 Standard installation After framing is complete set product in place to check fit and make certain that the tub can be properly leveled Caution if walk in bathtub is not resting on ALL leveling feet water will not drain properly and may cause the door to leak Warning Never allow the weight of the tub to be supported by wood support stringers and do not use tile flange on the 60x32 to screw or nail in place as this will result in product failure and void the warranty Ariel Walkin Bathtub Installation Guide Page 5 4 Verify the product is completely level by checking tub surface and ensure ALL leveling feet are touching the ground 5 Electrical connection is made by simply plugging pump cord shipped with cord and plug into specified dedicated 120V 20A GFCI outlet After plumbing and electrical connections have been made the tub should be cleaned of dirt and debris 7 Installation is not complete until the bath has been tested in place Al D fl o Motor Pump Access Panels Optional Extension End Panel Kit OPERATION GUIDE OPERATION GUIDE A When the bathtub is full of water Turn on the water pump and or the air pump by pressing the pneumatic button s on the sidewall of the bathtub B The working condition of the water pump air pump and heat pump is contingent on the presence of adequate power supply secure connections of the pneumatic tubes and components and adequate water level C The
Download Pdf Manuals
Related Search
Related Contents
【つかみ機】岩用首振りグラスパー RL/120L-400L Manual de utilização do Livromédia IGLOO FR326M-BLACK Use and Care Manual - Cloudmarkt.de notice console cs 7000 isobus seed monitor cs 7000 Installation Instruction Copyright © All rights reserved.
Failed to retrieve file