Home
Arke K33027 Installation Guide
Contents
1. 155cm 54 155cm N 59cm 11114 145 90cm 211 59cm 171114 N 94cm 3 1 KARINA 140cm 4 7 FIG 5 KARINA FIG 6 KARINA vov 488 898 999 498 alt N 01 10 LOW zog 918 Q 1 Z N LL N 7Z N SOV 988 erg 688 HE 804 604 L N 09 OL N 03 Al KARINA English PRODUCT DETAILS DATOS DE IDENTIFICACI N GB product details trade name KARINA type flight with alternate treads and rotation without interruption used materials STRUCTURE description composed by metallic elements 1 assembled between themselves by bolts materials Fe 370 finishing epoxy powder coated in furnace TREADS description treads 2 shaped in wood assembled to the structure by bolts materials beech finishing water base colour polyurethane undercoat polyurethane finishing RAILING description composed by vertical balusters 3 in metal fixed to the treads 2 materials balusters Fe 370 fixings 4 nylon finishing balusters epoxy powder coated in furnace CLEANING clean with a soft wet cloth without any product containing solvents or abrasive materi
2. by drilling with D 8 mm 516 tip Use the parts B11 B12 B83 and BO2 fig 1 24 Insert the baluster C12 and tighten the part BO2 fig 1 KARINA Espanol Antes de empezar el ensamblado de la escalera desembalar todas las piezas de la escalera Colocarlas de manera que pueda verificarse las cantidades TAB 1 A C digo Cantidad Os aconsejamos que ve is previamente el DVD que encontrar is con el material sumistrado Para el mercado estadounidense para cualquier inconveniente llamar al n mero de asistencia al cliente 1 888 STAIRKT Ensamblaje 1 Medir con cuidado la altura de pavimento a pavimento 2 Calcular el valor de la tabica 1 restar 22 cm 8 58 al valor de la altura de pavimento a pavimento 2 dividir el resultado por l numero de contrahuellas menos una Ejemplo para una altura de pavimento a pavimento 268 cm y una escalera de 12 contrahuellas 268 22 12 1 22 36 83 8 58 12 1 8 4 3 Hallar la posici n donde fijar el soporte N19 fig 1 teniendo en cuenta dos puntos 1 la contrahuella anteriormente calculada que incluye tambi n el espesor del pelda o L19 o L20 fig 2 2 colocar el soporte N19 teniendo en cuenta el tipo de hueco fig 3 Taladrar con broca de 14 mm 946 Ensamblar sobre el pavimento con desarrollo rectilineo los soportes N19 N18 N17 y N16 teniendo en cuenta la altura anteriormente calculada Utilizar los elementos C15 B71 y
3. las distintas partes sigan bien apretados el mantenimiento extraordinario deber llevarlo a cabo personal cualificado ponerse en contacto con el fabricante PRECAUCIONES DE USO evitar usos impropios y no conformes con el producto eventuales manipulaciones o instalaciones que no cumplan con las instrucciones del fabricante pueden menoscabar las cualidades certificadas en las pruebas de conformidad a las que previamente fue sometido el producto KARINA arke Fontanot For further information pertaining to these assembly instructions additional parts or general questions regarding products or assembly please call fax or email us at ARKE by Fontanot Albini amp Fontanot SpA 75 Jackson Street Suite 303 Newnan GA 30263 Toll Free 888 782 4758 Phone 770 683 7200 Fax 770 683 7209 Email info arkestairs com
4. los elementos C39 y apretar definitivamente fig 1 23 Volver montar el primer pelda o 119 L20 y fijar al pavimento el elemento FO1 a la altura del primer barrote taladrando con una broca Y 8 mm 546 Utilizando los elementos B11 B12 B83 y BO2 fig 2 24 Introducir el barrote C12 y apretar el elemento BO2 fig 1 KARINA BO2 B11 B12 71 75 B83 B86 c12 C13 C14 C15 C28 C39 C40 FOL F23 L19 L20 N16 N17 N18 N19 N26 TAB 1 KARINA Omm 0 m KARINA FIG 1 KARINA FIG 7 ae een FIG 2 FIG 4 119 120 1 1 N19 FIG 3 ALTEZZA NUMERO ALZATE NUMERO VALORE GRADINO DI PARTENZA GRADINO DI PARTENZA GRADINI ALZATA DALL ALTO DAL BASSO HEIGHT NUMBER OF RISERS NUMBER MEASURE 1st TREAD ON TOP 1st TREAD ON BOTTOM ALTURA N MERO OF TREADS OF RISERS coNTRAHUELLAS PRIMERO PELDANO PRIMERO PELDANO NUMERO VALOR EN ALTO ABAJO PELDANOS CONTRAHUELLAS H_cm cm 209 258 5 43 16 19 23 5 f 6 101 4 8 5 3 4 7 31 64 91 4 228 282 KIT 12 11 12 Sue 753 4 9 3 7 31 64 9 1 4 SE 247 305 5 19 23 5 r EEE T 13 12 811 4 0 1 4 7 31 64 9 1 4 A EE 266 329 14 13 19 23 5 8 8 3 4 10 9 1 2 7 31 64 9 1 4 o j 59cm 1 118 94cm 31 11111
5. rotation of 18 fig 3 15 To rotate the supports of 13 or 18 you have to proceed as follows a Set out with a pencil at the connection point of two supports two vertical lines at a distance of 9 mm 2364 to rotate 13 configuration or fig 5 or 13 mm 3364 to rotate 18 configuration D fig 6 b Loosen the parts C15 one support by one starting from the top and rotate until one of the lines matches the one of the top according to the direction of rotation c Tighten the parts C15 completely fig 1 Assembly of the Railing 16 Assemble the parts C28 by using the parts C13 BO2 and insert them into the balusters C12 fig 1 17 Insert the balusters C12 into the parts F23 blocking them by the part BO2 18 The first balusters C12 of the long side of every tread L19 120 have to be cut 19 Tighten the part C28 completely by using the part BO2 fig 1 For a correct assembly twist the key at about 90 from the contact point KARINA Final Assembly 20 Control the vertical line of the whole stair and if necessary correct it by moving the support N16 fig 1 21 Disassemble the first tread 119 or 120 and drill the floor with a D 14 mm 3564 tip in relation to the present holes on the support N16 fig 1 22 Insert the parts C39 and tighten completely fig 1 23 Reassemble the first tread 119 or 120 and fix on the floor in relation to the first baluster C12 the part FO1
6. B75 fig 1 Apretar suficientemente teniendo en cuenta que los soportes N19 N18 N17 y N16 deben de girar para las configuraciones D 6 Levantar y colocar la estructura con el soporte 19 en contacto con el forjado fig 4 el caso que el hueco sea estrecho aconsejamos girar alg n soporte 7 Fijar definitivamente el soporte N19 utilizando el elemento C39 fig 1 8 Repartir sobre el pavimento seguidos un pelda o izquierdo 119 un pelda o derecho 120 y seguir as Determinar en este punto cual va a ser el primer pelda o de arriba fig 3 9 Recortar la plantilla fig 7 p gina central 10 Decidir donde colocar la barandilla interior o exterior fig 3 y taladrar los pelda os L19 L20 con una broca de 6 5 mm v4 UTILIZANDO LA PLANTILLA SOLAMENTE PARA LOS TRAMOS RECTOS Para determinar el punto de fijaci n en el lado corto y el lado largo de los pelda os en curva L19 L20 respetar una distancia igual a la de los barrotes C12 montados sobre el lado recto fig 3 11 Ensamblar y fijar los elementos F23 utilizando los elementos C14 B83 B86 C13 BO2 fig 1 12 Fijar el elemento N26 en los pelda os L19 y L20 utilizando el tornillo C40 13 Fijar definitivamente los pelda os L19 y L20 partiendo desde abajo N16 hasta el soporte N19 utilizando los elementos 40 fig 1 14 1 La configuraci n A rectil nea no necesita ninguna modificaci n fig 3 2 Las configuraciones B o C n
7. KARINA English ASSEMBLY INSTRUCTION Espanol INSTRUCCIONES PARA EL ENSAMBLAJE 09 10 13 19 mm HK in 3 5 6 10 mm KR in 20007000 8x120 14 150 DANA DAS in D 65 mm English Before starting the assembly process unpack all components of the staircase Lay them out on a large surface and check the quantity of all the pieces by consulting the table TAB 1 A Code Quantity Inside the staircase box you will also find a DVD which we suggest watching before proceeding to assemble For customers in the USA there is a customer assistance number 1 888 STAIRKT which you can telephone in case of problems Assembly 1 Carefully measure the floor to floor height 2 Calculate the rise 1 subtract 22 cm 8 58 from the floor to floor height you measured 2 divide this value by the rises number minus one Example for the measured floor to floor height of 268 cm and a staircase with 12 rises 268 22 12 1 22 36 8 3 v2 8 58 12 1 8 34 3 Determine the position of the support N19 fig 1 keeping in mind two points 1 the rise calculated previously also contains the tread depth L19 or L20 fig 2 2 position the support N19 keeping in mind the opening feature fig 3 Drill with the drill bit D 14 mm 946 Assemble on the floor in a straight line the supports N19 N18 N17 and N16 keeping in m
8. als MAINTENANCE about 12 months after the installation date check the tightening of bolts on the various components special maintenance must be done by skilled staff please contact the provider USE PRECAUTION avoid any improper use that is not in accordance with the product possible violations or installations which don t with the providers instructions can invalidate the agreed product conformities KARINA E datos de identificaci n del producto denominaci n comercial KARINA tipo escalera abierta con pelda os de paso alternado y rotaci n de las rampas con pendiente materiales empleados ESTRUCTURA descripci n compuesta por elementos 1 met licos ensamblados unos con otros mediante pernos materiales Fe 370 acabado barnizado en horno con polvos epox dicos PELDA OS descripci n pelda os 2 de madera perfilados y ensamblados a la estructura mediante pernos materiales haya acabado barniz al agua imprimaci n poliuret nica acabado poliuret nico BARANDILLA descripci n compuesta por barrotes 3 verticales de metal fijados a los pelda os 2 materiales barrotes Fe 370 fijaciones 4 nylon acabado barrotes barnizado en horno con polvos epox dicos LIMPIEZA limpiar con un trapo suave humedecido con agua y sin ning n producto que contenga disolventes o materiales abrasivos MANTENIMIENTO transcurridos unos 12 meses desde la fecha de instalaci n comprobar que los tornillos que fijan
9. ecesitan una rotaci n de 13 fig 3 3 La configuraci n D necesita una rotaci n de 18 fig 3 15 Para girar los soportes de 13 o 18 proceder como se indica a Realizar un trazo con un l piz en el punto de uni n de dos soportes dos l neas verticales con una distancia de 9 mm 2364 para girar 13 configuraci n fig 5 13 mm 3364 para girar 18 configuraci n D fig 6 b Aflojar los elementos C15 un soporte a las ves empezando desde arriba y girar hasta hacer coincidir una l nea con la otra c Apretar los elementos C15 definitivamente fig 1 an Montaje de la barandilla 16 Ensamblar los elementos C28 utilizando los elementos C13 BO2 e introducirlos en los barrotes 12 fig 1 17 Introducir los barrotes C12 los elementos F23 bloque ndolos con el elemento BO2 18 Los primeros barrotes C12 del lado largo de cada pelda o L19 120 deben cortarse en altura 19 Apretar definitivamente el elemento C28 utilizando el elemento BO2 fig 1 Para una correcta KARINA instalaci n girar la llave de 90 aproximadamente desde el punto de contacto Montaje final 20 Verificar la verticalidad de toda la escalera y si fuera necesario corregirla desplazando el soporte N16 fig 1 21 Desmontar el primer pelda o 119 120 y taladrar el pavimento con una broca de 14 mm 3564 en la situaci n de los orificios presentes en el soporte N16 fig 1 22 Introducir
10. ind the calculated rise Use the parts C15 B71 and B75 fig 1 Tighten sufficiently keeping in mind that the supports N19 N18 N17 and N16 still have to rotate for the configurations B C D 6 Lift and position the structure with the support N19 which has to touch the floor fig 4 If the stair place is too tight it is suggested to rotate some supports 7 Tighten the support N19 completely by using the part C39 fig 1 8 Place on the floor in sequence one left tread L19 one right tread L20 and so on Now determine which will be the first tread from the top fig 3 9 Cut along the shape fig 7 center page 10 Decide where to assemble the railing inside or outside fig 3 and pierce the treads L19 L20 with the drill bit D 6 5 mm USING THE TEMPLATE ONLY FOR THE STRAIGHT SIDES To find the fixing point on the short side of the winding treads L19 L20 maintain the same distance as the one between the balusters C12 to assemble on the long side of the tread fig 3 11 Assemble and tighten the parts F23 by using the parts C14 B83 B86 C13 BO2 fig 1 12 Fasten element N26 to the treads L19 and L20 using the screw C40 13 Finally attach the treads L19 L20 starting from the bottom N16 up to the support N19 using the elements 40 fig 1 14 1 The configuration A straight doesn t need any further changes fig 3 2 The configurations B or C need a rotation of 13 fig 3 3 The configuration D needs a
Download Pdf Manuals
Related Search
Related Contents
INSPECTION TOOL Mode d`emploi calorMATIC 370 Type d`appareils VRT 370 DVX-1616A enum_instruct_ht1971 TP301DTM – Device Type Manager Manuale d`istruzioni 取扱説明書 ~はカタログ-取扱説明書をお Impostazioni di copia Copyright © All rights reserved.
Failed to retrieve file